Drawings_set_4_of_6.pdf

PDF 11 MB Posted

Attached to
Addition/Alteration to Commissary, NAS Pensacola, FL Federal contract opportunity
Solicitation number
HDEC03-18-R-0007
Issued by
Defense Commissary Agency

About this file

Attachment 06 Drawing Set 4 of 6

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SSS

S

S

S

S

S

S

S

S

S

S

S

S S

VV

V

S

S

V

S

S

S

V V V

S

S

S

S

S

S S S

V

.5 1

P

N

M

E

C

B

1412107.975.342

C.8

H

LOCKER ROOM - MEN

EMP. TLT - MEN

EMP. TLT - WOMEN

LOCKER ROOM- WOMEN

QAE OFFICE

JANITOR

20A

VESTIBULE

21A

MOBILE REGISTER

STORAGE

CONTRACT STOCKER

STORAGE

COMM. ROOM

31A

TRAINING ROOM

MHE CHARGING

ADMINISTRATIVE AREA

STORE DIRECTOR OFFICE

ASST. STORE DIRECTOR

OFFICE

STORE ADMINISTRATOR

OFFICE

18A

ADMIN. CORRIDOR

VENDOR

ELEC

31J

PATRON ASSISTED

RESTROOM

BREAKROOM

16A

WOMEN RESTROOM

JANITOR

20D

MEN RESTROOM

ENTRY

1A

MASS DISPLAY

CARRYOUT RETURN VEST.

3B

EXIT VEST.

2B

POS

WIC

POS

WIC

POS

WIC

POS

WIC

POS

WIC

M

M

D D D

M

KS

W

FOR COPY

TYP

W 3

POS W

W

.5 1

P

N

M

E

C

B

1412107.975.342

A

H

C.8

POS

WIC

M M

NEW POS /

DATA

CABINETS

NEW

TELEPHONE

CABINET

24" CABLE TRAY

M

M

DA

DA

E-501

V

V

V

V

V

V V V8

TYP

TYP

E-501

TYP

TYP

POS

WP

WITH KEY LOCK

AP

AP

ADMIN. STORAGE

STAIRWAY

22A

VENDOR

TYP

PROFESSIONAL

REGISTERED

ARKANSAS

S T

A T E O F

ENGINEER

No. 7509

W I L

L I A M A . F U L

L E R

PROFESSIONAL

REGISTERED

ARKANSAS

S T

A T E O F

ENGINEER

No. 7509

W I L

L I A M A . F U L

L E R

PROFESSIONAL

REGISTERED

ARKANSAS

S T

A T E O F

ENGINEER

No. 7509

W I L

L I A M A . F U L

L E R

101 south spring street little rock, ar 72201

501.372.2900 cromwell.com

SEQUENCE

NO.

SHEET NO.

OF

DATE:SOL. NO.

PROJECT NO.

DRAWING NUMBER

SUBMITTED BY:

ENGINEER:

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

TO THE BEST OF OUR KNOWLEDGE,

INFORMATION AND BELIEF, BASED

ON AND LIMITED TO OUR NORMAL

FUNCTIONS PERFORMED UNDER OUR

CONTRACT WITH THE GOVERNMENT,

IT IS OUR PROFESSIONAL OPINION

THAT THIS PROJECT IS DESIGNED

IN ACCORDANCE WITH APPLICABLE

DOD REGULATIONS.

ALLAN FULLER

DEFENSE COMMISSARY AGENCY

LACKLAND AFB, TEXAS

FORT LEE, VIRGINIA

DIRECTORATE OF ENGINEERING

30-MAY-2018

EA16MI05

NAVAL AIR STATION

PENSACOLA, FLORIDA

PENSACOLA COMMISSARY FACILITY

ADDITION /ALTERATION

A/E: 2016-001

RTA SOLICITATION ISSUE

SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION

1 5-30-2018 RTA SOLICITATION ISSUE

ET101

WAF

JRD

PSM

FIRST FLOOR SYSTEMS PLAN - AREA A

05/30/18

1/8" = 1'-0"

1 FIRST FLOOR SYSTEMS PLAN - AREA A

KEYED NOTES (SOME NOTES MAY NOT BE USED):

PROVIDE DATA / COMM OUTLETS FOR PHONES AND REGISTERS.

NEW DATA / COMM JACK LOCATION.

KNOWN TELEPHONE / INTERCOM LOCATIONS NEEDING CONVERSION TO CAT 6 (SEE GENERAL NOTE 1).

USE CONTRACTOR-PROVIDED POWER POLES TO PROVIDE DATA DROPS.

NEW POS DROPS ARE ROUTED VIA NEW CABLEWAY TO POS EQUIPMENT ROOM (31A). COORDINATE WITH

STORE OPERATIONS.

CABLE AND JACKS SHALL BE TESTED AND DOCUMENTED PER TIA / EIA STANDARDS.

EXISTING TO REMAIN.

ADD NEW SPEAKERS. CONNECT TO EXISTING PA SYSTEM.

PROVIDE NEW DATA / COMM DROPS TO REGISTERS. ROUTE TO NEW COMM ROOM 31A.

SPEAKERS OVER CHECKOUT AND SALES FLOOR ARE EXISTING UNLESS OTHERWISE NOTED. (SEE

GENERAL NOTE 2)

NEW PA/PAGING/MUSIC CABINET. PROVIDE ALL NEW EQUIPMENT AND CONNECT TO VOIP TELEPHONE

SYSTEM FOR PAGING. RE-CONNECT ALL EXISTING AND NEW SPEAKERS. SEE E-501 DETAIL 5.

PROVIDE NEW MAGNETIC SWITCHES, KEYPADS, DURESS BUTTONS AND OTHER SECURITY DEVICES FOR NEW AREAS AS NOTED. VERIFY COMPATIBILITY WITH EXISTING SECURITY SYSTEM AND PROVIDE WIRING

AND INTERFACE TO EXISTING SYSTEM. COORDINATE WITH STORE OPERATIONS.

GENERAL NOTES:

1. THE TELEPHONE SYSTEM SWITCHING HAS BEEN UPGRADED TO VOIP. REPLACE ORIGINAL CAT 3 TELEPHONE CABLE WITH CAT 6 CABLE AND WITH NEW RJ-45 JACKS AT EACH AND EVERY TELEPHONE / INTERCOM OUTLET. USE EXISTING CONDUITS, CABLE HOOKS, AND WIRE WAY AS NEEDED AND PROVIDE NEW WHERE NECESSARY. TERMINATE CABLES AT NEAREST PHONE CONNECTION POINT (MAIN CABINET OR SUB HUB CABINET) AND PROVIDE PUNCH DOWN BLOCKS AND CROSS CONNECT JUMPERS TO ALLOW PROPER OPERATION OF BOTH PHONE AND INTERCOM SERVICE. CAREFULLY COORDINATE WORK WITH STORE OPERATIONS AND WITH DECA HQ IT SERVICES (RICKY ROSSER 804 734-8000 EXT 48467) TO MAINTAIN TELEPHONE SERVICE TO COMMISSARY WITH MINIMAL DISRUPTION DURING SWITCH OVER TO NEW CABLES.

CONTRACTOR TO PROVIDE DETAILED SWITCH OVER STAGING PLAN FOR APPROVAL BY DECA, AND STORE MANAGEMENT.

ADDITIONAL CONTRACT MODS FOR OUTAGES AND/OR OTHER UNANTICIPATED CIRCUMSTANCES WILL NOT BE ALLOWED.

2. REMOVE AND CAREFULLY STORE ALL SPEAKERS, STROBES, AND PRICING DATA TRANSMITTERS FROM CEILING OVER SALES AND CHECKOUT AREAS. REINSTALL EQUIPMENT AFTER NEW CEILING AND GRID ARE INSTALLED.

3. CABLE AND JACKS SHALL BE TESTED AND DOCUMENTED PER TIA / EIA STANDARDS.

4. LABELS SHALL BE PRE-PRINTED OR COMPUTER-TYPED.

5. THE EXISTING CCTV SYSTEM (APPROXIMATELY 52 CAMERAS) SHALL REMAIN FULLY OPERATIONAL. COORDINATE ANY

CAMERA RELOCATIONS WITH STORE OPERATIONS.

SCALE : 1/8" = 1'-0"

0 4 8 16

NORTH

KEY PLAN

D C

A B

3 7-24-2018 REVISIONS TO BID DOCUMENTS

HDEC03-18-R-0007

AMENDMENT 0006

ATTACHMENT 06

S S

S S

S S

S S S S

SSSS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S S

S S

S S

S S

S

S

S

S

S

.5 1

3 5 9 13 W.5

W

V.5

V

U

T

S

R

P

RECEIVING AISLE

MEDICAL FOOD INSPEC.

OFFICE

CONTRACT STOCKER

STORAGE

PRODUCE CHILLED

STORAGE NON-GAS

43A

PRODUCE AMBIENT

STORAGE

44B

PRODUCE PROCESSING

44A

PRODUCE MANAGER

VESTIBULE

21B

JANITOR

20B

DAMAGED MERCHANDISE

GROCERY MGR OFFICE

MEAT PROCESSING

MEAT WRAPPING

BULK MEAT STORAGE

PRODUCE CHILLED

STORAGE GAS

43B

W

W

W

.5 1

3 5 9 13

X

W.5

W

V.5

V

U

T

S

R

P

4 4

4 4

4 4

4 4 4 4

RING FOR

PRODUCE

DELIVERY

TYP

A

A

AP

A A

AP

AP

AP

A

A

AP

4 4

M M

PROFESSIONAL

REGISTERED

ARKANSAS

S T

A T E O F

ENGINEER

No. 7509

W I L

L I A M A . F U L

L E R

PROFESSIONAL

REGISTERED

ARKANSAS

S T

A T E O F

ENGINEER

No. 7509

W I L

L I A M A . F U L

L E R

PROFESSIONAL

REGISTERED

ARKANSAS

S T

A T E O F

ENGINEER

No. 7509

W I L

L I A M A . F U L

L E R

101 south spring street little rock, ar 72201

501.372.2900 cromwell.com

SEQUENCE

NO.

SHEET NO.

OF

DATE:SOL. NO.

PROJECT NO.

DRAWING NUMBER

SUBMITTED BY:

ENGINEER:

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

TO THE BEST OF OUR KNOWLEDGE,

INFORMATION AND BELIEF, BASED

ON AND LIMITED TO OUR NORMAL

FUNCTIONS PERFORMED UNDER OUR

CONTRACT WITH THE GOVERNMENT,

IT IS OUR PROFESSIONAL OPINION

THAT THIS PROJECT IS DESIGNED

IN ACCORDANCE WITH APPLICABLE

DOD REGULATIONS.

ALLAN FULLER

DEFENSE COMMISSARY AGENCY

LACKLAND AFB, TEXAS

FORT LEE, VIRGINIA

DIRECTORATE OF ENGINEERING

30-MAY-2018

EA16MI05

NAVAL AIR STATION

PENSACOLA, FLORIDA

PENSACOLA COMMISSARY FACILITY

ADDITION /ALTERATION

A/E: 2016-001

RTA SOLICITATION ISSUE

SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION

1 5-30-2018 RTA SOLICITATION ISSUE

ET104

WAF

JRD

PSM

FIRST FLOOR SYSTEMS PLAN - AREA D

05/30/18

1/8" = 1'-0"

1 FIRST FLOOR SYSTEMS PLAN - AREA D

SCALE : 1/8" = 1'-0"

0 4 8 16

NORTH

KEY PLAN

D C

A B

KEYED NOTES (SOME NOTES MAY NOT USED):

KNOWN TELEPHONE / INTERCOM OUTLETS NEEDING CONVERSION TO CAT 6 (SEE GENERAL NOTE 1).

RELOCATE OLD "RING FOR SERVICE" BUTTON TO THIS POINT. COORDINATE WITH STORE MANAGER.

PROVIDE NEW WP SPEAKERS AND CONNECT TO EXISTING SYSTEM.

PROVIDE NEW MATCHING SPEAKERS AND CONNECT TO PA SYSTEM.

NEW DATA SUB HUB. RECONNECT HUB TO MAIN DATA HUB IN FRONT OF STORE WITH 12 STRAND MULTI MODE FIBER IN 2" C.

SPEAKERS OVER CHECKOUT AND SALES FLOOR ARE EXISTING UNLESS OTHERWISE NOTED. (SEE GENERAL NOTE 2)

TO SIGNAL POWER.

EXISTING VOIP EQUIPMENT AND TELEPHONE SUB HUB EQUIPMENT TO BE RELOCATED TO NEW CABINET LOCATED HERE.

SEE DETAIL 3 E-501. EXTEND AND RECONNECT ALL EXISTING AND NEW CONNECTIONS.

PROVIDE NEW MAGNETIC SWITCHES, KEYPADS, DURESS BUTTONS AND OTHER SECURITY DEVICES FOR NEW AREAS AS NOTED. VERIFY COMPATIBILITY WITH EXISTING SECURITY SYSTEM AND PROVIDE WIRING AND INTERFACE TO EXISTING

SYSTEM. COORDINATE WITH STORE OPERATIONS.

GENERAL NOTES:

1. THE TELEPHONE SYSTEM SWITCHING HAS BEEN UPGRADED TO VOIP. REPLACE ORIGINAL CAT 3 TELEPHONE CABLE WITH CAT 6 CABLE AND WITH NEW RJ-45 JACKS AT EACH AND EVERY TELEPHONE / INTERCOM OUTLET. USE EXISTING CONDUITS, CABLE HOOKS, AND WIRE WAY AS NEEDED AND PROVIDE NEW WHERE NECESSARY. TERMINATE CABLES AT NEAREST PHONE CONNECTION POINT (MAIN CABINET OR SUB HUB CABINET) AND PROVIDE PUNCH DOWN BLOCKS AND CROSS CONNECT JUMPERS TO ALLOW PROPER OPERATION OF BOTH PHONE AND INTERCOM SERVICE. CAREFULLY COORDINATE WORK WITH STORE OPERATIONS AND WITH DECA HQ IT SERVICES (RICKY ROSSER 804 734-8000 EXT 48467) TO MAINTAIN TELEPHONE SERVICE TO COMMISSARY WITH MINIMAL DISRUPTION DURING SWITCH OVER TO NEW CABLES. CONTRACTOR TO PROVIDE DETAILED SWITCH OVER STAGING PLAN FOR APPROVAL BY DECA, AND STORE MANAGEMENT. ADDITIONAL CONTRACT MODS FOR OUTAGES AND/OR OTHER UNANTICIPATED

CIRCUMSTANCES WILL NOT BE ALLOWED.

2. REMOVE AND CAREFULLY STORE ALL SPEAKERS, STROBES, AND PRICING DATA TRANSMITTERS FROM CEILING OVER SALES AND

CHECKOUT AREAS. REINSTALL EQUIPMENT AFTER NEW CEILING AND GRID ARE INSTALLED.

3. CABLE AND JACKS SHALL BE TESTED AND DOCUMENTED PER TIA / EIA STANDARDS.

4. LABELS SHALL BE PRE-PRINTED OR COMPUTER-TYPED.

5. THE EXISTING CCTV SYSTEM (APPROXIMATELY 52 CAMERAS) SHALL REMAIN FULLY OPERATIONAL. COORDINATE ANY CAMERA

RELOCATIONS WITH STORE OPERATIONS.

3 7-24-2018 REVISIONS TO BID DOCUMENTS

HDEC03-18-R-0007

1. COORDINATE ALL TEMPORARY PARTITION TYPES AND LOCATIONS AND GATE LOCATIONS WITH CONTRACTING OFFICER

2. LOCATE VERTICAL FRAMING TO PREVENT INTERFERENCE WITH LIGHT FIXTURES

3. SECURE PLYWOOD TO PARTITION FRAMING WITH SCREWS AT 12" O.C. VERT.

4. REPAIR / REPLACE ANY DAMAGED FLOOR SLAB, WALL FINISHES, OR CEILING FINISHES DUE TO INSTALLATION OR REMOVAL OF TEMPORARY PARTITIONS

TEMPORARY PARTITION NOTES:

4'

8'

8'

6' - 0"

WHERE CLG. GRID IS REMOVED,

PROVIDE 2X4 WOOD STUD BRACES TO

THE EXISTING ROOF STRUCTURE AT

MIN. 8' O.C. - ANCHOR SECURELY TO

STRUCT.

SECURELY TIE (WIRE)

TOP PLATE TO CLG. GRID

2x4 WOOD

SILL PLATE

DRILL FLOOR FOR 3/8" DIA. EXP.

ANCHOR BOLT AT 8'-0" O.C. (REMOVE

BOLT AND PATCH FLOOR AFTER

REMOVAL OF TEMPORARY WALL)

2x4 WOOD TOP PLATE

SOUND BATT INSULATION

CONT. 6 MIL

POLYETHYLENE

SHEETING (TAPE

ALL JOINTS)

EXISTING CEILING

WORK SIDE SALES AREAWORK SIDE

3/4" CD PLYWOOD (SEE

TEMP. PARTITION NOTES)2X8 AT 24" O.C.

2X8 CONT.

TEMP. FLUOR.

FIXTURES-

PROVIDE MIN. 30

FC IN CORRIDOR

2x4 WOOD

SILL PLATE

2x4 WOOD TOP PLATE2x6 WOOD STUDS AT

24" O.C. AND AT EACH

PLYWD PANEL JOINT

2x4 WOOD STUDS AT 24" O.C.

2X4 WOOD BRACE

AT ENDS & 4'-0" O.C.

2x4 WOOD TOP PLATE

2x4 WOOD

SILL PLATE

DRILL FLOOR FOR 3/8" DIA. EXP.

ANCHOR BOLT AT 8'-0" O.C. (REMOVE

BOLT & PATCH FLOOR AFTER

REMOVAL OF TEMPORARY WALL)

3/8" CD PLYWOOD

(PAINTED - SEE

TEMP. PARTITION

NOTES)

2X6 WOOD BRACE

AT ENDS & 4'-0" O.C.

TYPE 1 - SOFT CONSTRUCTION BARRIER TYPE 3 - HARD CONSTRUCTION BARRIER TYPE 4 - CONSTRUCTION BARRIER TUNNEL

SALES AREA

CONT. 6 MIL POLYETHYLENE

SHEETING (TAPE ALL JOINTS)

EXISTING CEILING

3/8" CD PLYWOOD

(PAINTED - SEE TEMP.

PARTITION NOTES)

3/8" CD PLYWOOD

(PAINTED - SEE

TEMP. PARTITION

NOTES)WORK SIDE

2x4 WOOD STUDS

AT 24" O.C.

2X4 WOOD BRACE

AT ENDS & 4'-0" O.C.

2x4 WOOD TOP PLATE

2x4 WOOD

SILL PLATE

SALES AREA

TYPE 2 - SAFETY BARRIER

5. ALL BARRIERS MUST BE PAINTED WHITE WHERE EXPOSED TO CUSTOMER AREAS.

WORK SIDE WORK SIDE

2X6 BRACE AT

8'-0" O.C. MAX.

SECURELY TIE (WIRE)

TOP PLATE TO CLG.

GRID

6. SEE GENERAL PHASING NOTES FOR ADDITIONAL INFORMATION

EXISTING STL. DECK

5/8" GLASS MAT SHEATHING (TAPED

AND SEALED) ON BACH SIDE (SEAL

TIGHT AROUND ALL STRUCTURE,

PIPING, DUCTWORK, ETC.)

5/8" MOISTURE RESISTANT GYP. BD.

(PAINTED) AT ADMIN AND SALES

AREAS TO BOTTOM OF CEILING

R-19 BATT. INSUL.

16 GA. MIN. 6005200-54

MTL. STUDS AT 12" O.C.

TYPE 5 - CONSTRUCTION

BARRIER AT AREAS OPEN TO

EXTERIOR

PATRON SIDE OF

WALL TO BE PLUMB.

STORE OPERATING HOURS

(STORE HOURS ARE - MONDAY THRU FRIDAY: 0800-1900; SATURDAY & SUNDAY: 0800-1900; EARLY BIRD

HOURS ARE - MONDAY THRU FRIDAY: 0730-0800; SATURDAY & SUNDAY: 0730-0800. VERIFY WITH STORE DIRECTOR THE STANDARD HOURS OF OPERATION AND ALL SCHEDULED EVENTS OR VARIATIONS IN

STORE HOURS.

2. THE INTENT OF THE PHASING PLANS IS TO MINIMIZE THE IMPACT OF THE CONSTRUCTION ON THE OPERATION OF THE COMMISSARY. THE PHASING PLAN MUST ENABLE FULL SERVICE COMMISSARY SALES TO CUSTOMERS AT ALL TIMES THE COMMISSARY IS OPEN TO CUSTOMERS. CONSTRUCT THE PROJECT IN SEQUENTIAL PHASES AS OUTLINED IN THE PLANS UNLESS OTHERWISE APPROVED BY

THE CONTRACTING OFFICER.

3. PHASING PLANS SHOWN ARE DIAGRAMMATIC & FOR PHASING PURPOSES ONLY. THEY SHOULD

NOT BE SCALED OR OTHERWISE USED FOR TAKE-OFFS. COORDINATE PHASING WITH DEMOLITION DRAWINGS AS WELL AS PLANS FOR NEW WORK AND REPAIRS. COORDINATE WITH PROJECT PLANS

AND SPECIFICATIONS.

16. COMMISSARY SALES AND OPERATIONAL AREAS MUST BE CLEAN AND FREE OF DEBRIS,

DUST, DIRT, MUD, CONSTRUCTION MATERIALS, EQUIPMENT, ETC AT ALL TIMES. IN INTERIOR

CONSTRUCTION AREAS WHERE SIGNIFICANT DUST IS GENERATED PROVIDE ACTIVE EXHAUST

VENTILATION TO PROVIDE A NEGATIVE AIR PRESSURE IN THE DUST AREA. PREVENT

MIGRATION OF DUST TO OCCUPIED AREAS OF THE BUILDING

11. DO NOT BEGIN A SUBSEQUENT PHASE OF CONSTRUCTION UNTIL ALL WORK IN THE PREVIOUS

PHASE IS SUBSTANTIALLY COMPLETE AND TURNED OVER TO THE COMMISSARY FOR USE.

12. DO NOT COMMENCE WORK IN ANY AREA UNTIL ALL MATERIALS, SUPPLIES AND EQUIPMENT

REQUIRED TO RETURN THAT AREA TO FULLY OPERATIONAL SERVICE HAVE ARRIVED ON SITE AND

ARE READILY AVAILABLE.

NOTES REGARDING CONSTRUCTION BARRIERS:

1. MAINTAIN MINIMUM 8' AISLE WIDTH BETWEEN CONST. BARRIERS & ADJACENT SHELVING,

REF. CASES, ETC. PROVIDE A HARD CONSTRUCTION BARRIER WITH SOUND ATTENUATION

BATT INSULATION IN ALL AREAS WHICH INVOLVE HEAVY DEMOLITION, EXCESSIVE NOISE,

OR HIGH DUST PRODUCTION (JACK HAMMERING, CONCRETE SAWING, FLOOR GRINDING,

ETC.). PROVIDE BARRIER IN ACCORDANCE WITH PLAN DETAILS.

2. PROVIDE A SOFT CONSTRUCTION BARRIER AT AREAS OF WORK WHICH CREATE MINOR

LEVELS OF DUST, DEBRIS, OFFENSIVE ODORS, AND OTHER ACTIONS WHICH COULD BE

DISRUPTIVE TO COMMISSARY OPERATION. SOFT CONSTRUCTION BARRIER CONSISTS OF A

FOUR FOOT HIGH PLYWOOD BARRIER AND 6 MIL (MIN) POLY CONSTRUCTION SHEETING TO

THE CEILING. THE SOFT BARRIER IS TO BE ADEQUATELY SUPPORTED AND COMPLETELY

SEALED AT ALL SHEET JOINTS AND AT THE FLOOR AND CEILING (OR ROOF DECK). WHERE

CEILING HEIGHTS PROHIBIT SEALING THE BARRIER TO THE CEILING, A CAP IS TO BE

PROVIDED. DURING NON OPERATIONAL STORE HOURS; SOFT BARRIERS MAY BE PLACED

OUTSIDE OF LIMITS OF CONSTRUCTION BARRIERS AS DESCRIBED ON THE PHASING PLANS

AND DIAGRAMS AND THEN TAKEN DOWN WITH THE AREA MADE CLEAN AND SAFE IN THE

MORNING PRIOR TO STORE OPERATING HOURS.

3. A PARTIAL HEIGHT CONSTRUCTION BARRIER MAY BE USED AS SAFETY BARRIER TO

AREAS OF WORK FOR SHORT PERIODS OF TIME (LESS THAN ONE WEEK) WHICH DO NOT

CREATE DUST, DEBRIS, OFFENSIVE ODORS OR EXCESSIVE NOISE. PARTIAL HEIGHT

BARRIERS WILL BE PLYWOOD FOUR FEET HIGH AND MAY REMAIN IN PLACE DURING

NORMAL STORE OPERATING HOURS.

8. SUBMIT A CONSTRUCTION PHASING/SEQUENCING PLAN (IN ACCORDANCE WITH SPECIFICATION

SECTION 013216.10) WHICH COMPLIES WITH THE OPERATIONAL AND ACCESS REQUIREMENTS

INDICATED IN THESE PHASING PLANS AND REQUIREMENTS OF THE CONTRACT DOCUMENTS. PHASING PLANS MUST BE SPECIFIC AND INCLUDE ALL WORK REQUIRED INCLUDING DEMOLITION, LOCATION & CONSTRUCTION OF TEMPORARY WALLS & BARRICADES, UTILITY DOWN TIME, TEMPORARY UTILITY AS REQUIRED TO KEEP THE COMMISSARY FACILITY OPERATIONAL AT ALL TIMES, AND WORK TO OCCUR

DURING NON-OPERATIONAL HOURS WITHIN THE COMMISSARY. COORDINATE THE PRODUCTION OF

THE CONTRACTOR'S PHASING PLAN WITH THE SPECIFIED REQUIREMENTS FOR THE CONSTRUCTION

PROGRESS MANAGEMENT SCHEDULE AND THE STORE DIRECTOR.

4. THE BOUNDARY LINES SHOWN ARE FOR GENERALIZATION PURPOSES ONLY AND DO NOT INDICATE A

BOUNDARY WITHIN WHICH ALL WORK MUST BE CONTAINED. THE CONTRACTOR MUST COORDINATE

ANY WORK THAT COULD DISRUPT REGULAR COMMISSARY BUSINESS ACTIVITY WITH THE

CONTRACTING OFFICER PRIOR TO BEGINNING WORK. MAINTAIN VEHICULAR AND PEDESTRIAN ACCESS INTO AND OUT OF FACILITIES FREE OF OBSTRUCTIONS DURING CONSTRUCTION UNLESS OTHERWISE

SHOWN.

10. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE IN WRITING UPON COMPLETION OF

EACH PHASE. DO NOT PROCEED TO THE SUBSEQUENT PHASE UNTIL THE WORK IS ACCEPTED BY

THE GOVERNMENT. PROVIDE REASONABLE TIME (14 DAYS MAX.) FOR THE COMMISSARY TO

RELOCATE PRODUCT AND GOVERNMENT EQUIPMENT WHEN MOVING IN AND OUT OF PHASES.

9. PHASING PLANS MUST IDENTIFY MEASURES TO PROVIDE FOR PUBLIC AND EMPLOYEE SAFETY

AS WELL AS CONTRACTOR'S WORKFORCE SAFETY. DIAGRAM HOW THE CONTRACTOR WILL

MAINTAIN VEHICULAR CIRCULATION, SERVICE CIRCULATION, AND PEDESTRIAN CIRCULATION

THROUGHOUT THE SITE DURING THE ENTIRE PROJECT. THE PLAN MUST SHOW CUSTOMER

ACCESS, SERVICE ACCESS AND EMERGENCY EGRESS DURING EACH PHASE AND THROUGHOUT

THE DURATION OF CONSTRUCTION.

4. MAINTAIN ALL TEMPORARY SIGNAGE, BARRIERS, FENCES, CONES, SCAFFOLDING,

COVERED SCAFFOLDING FOR OVERHEAD PROTECTION, SERVICE AND EGRESS ACCESS

CORRIDORS THROUGH WORK AREAS, TEMPORARY FIRE PROTECTION, ETC. IN GOOD

CONDITION FOR THE DURATION OF THE PROJECT.

6. UNLESS NOTED OTHERWISE, WORK IN EACH PHASE MAY BE DONE DURING STORE OPERATING

HOURS PROVIDED THE WORK DOES NOT INTERFERE WITH COMMISSARY OPERATIONS AND HAS

PRIOR APPROVAL BY THE STORE DIRECTOR AND CONTRACTING OFFICER.

2. HEATING, COOLING, ELECTRICAL & PLUMBING UTILITY INTERRUPTIONS MUST BE

COORDINATED WITH THE STORE DIRECTOR AND SUBMITTED IN WRITING TO THE

CONTRACTING OFFICER FOR REVIEW AND APPROVAL A MINIMUM OF 2 WEEKS BEFORE

WORK CAN BEGIN. RE-CONFIRM UTILITY SERVICE DISRUPTIONS WITH THE STORE

DIRECTOR A MINIMUM OF 24 HOURS PRIOR TO THE ACTUAL APPROVED OUTAGE.

18. THE REPLACEMENT OF FINISHES IN THE SALES AND CHECKOUT AREAS SHALL BE PHASED AS

INDICATED IN THE CONTRACT DOCUMENTS UNLESS OTHERWISE APPROVED BY CONTRACTING

OFFICER AND IN COORDINATION WITH THE STORE DIRECTOR.

21. EACH STORE DEPARTMENT (MEAT, PRODUCE, DAIRY, FROZEN

FOODS, DELI / BAKERY) SHOULD LOSE NO MORE THAN 50% OF THEIR

DISPLAY AT ANY TIME UNLESS OTHERWISE APPROVED BY STORE

DIRECTOR AND CONTRACTING OFFICER.

6. PROVIDE ADA ACCESSIBLE PROTECTION BARRIERS OVER ANY EXPOSED OPENING IN

FLOOR.

3. TEMPORARY UTILITIES MUST BE INSTALLED, MAINTAINED, AND REMOVED BY THE

CONTRACTOR AT THE CONTRACTOR'S EXPENSE AND IN A MANNER SATISFACTORY TO

THE CONTRACTING OFFICER. REMOVE TEMPORARY UTILITIES AND CONNECTIONS

PRIOR TO THE FINAL ACCEPTANCE OF THE CONTRACT. THE GOVERNMENT WILL NOT

BE HELD LIABLE FOR THE CONTRACT DELAYS, DAMAGES, OR COST INCREASES

INCURRED BY INTERRUPTIONS OF UTILITY SERVICE.

5. HVAC SUPPLY AND RETURN AIR DUCTWORK CROSSING THROUGH OR TERMINATING

WITHIN A CONSTRUCTION AREA SHALL BE TEMPORARILY COVERED OR BLOCKED OFF (AS

APPROPRIATE) TO PREVENT CONSTRUCTION DUST AND DEBRIS FROM ENTERING OTHER

AREAS OF THE STORE. MAINTAIN ENVIRONMENT (TEMPERATURE AND HUMIDITY) WITHIN

EXISTING COMMISSARY BUILDING THROUGHOUT ENTIRE CONSTRUCTION PERIOD.

19. DURING HOLIDAY MONTHS OF NOVEMBER AND DECEMBER, DO NOT SCHEDULE WORK IN

THE CHECKSTAND AREA DURING SALES HOURS. ALL EXISTING CHECKSTANDS MUST BE

OPERATIONAL FOR STORE USE DURING THESE MONTHS. STORE SHALL NOT LOSE USE OF

MORE THAN 1/3 OF CHECKSTANDS AT ANY ONE TIME.

6. PROVIDE POWER FOR CONTRACTOR SUPPLIED TEMPORARY REFRIGERATED

TRAILERS.

7. WHERE POSSIBLE, UNIT COOLER CHANGES ARE TO BE STAGED SO THAT NEW UNIT

COOLERS ARE RUNNING WHEN EXISTING UNIT COOLERS ARE SHUT DOWN. WHEN

STAGING IS NOT POSSIBLE, PREP IS TO BE DONE TO KEEP DOWN TIME TO A MINIMUM.

17. THE CONTRACTOR MAY USE AREAS ON COMMISSARY PROPERTY FOR CONSTRUCTION

STAGING AND EQUIPMENT STORAGE AS SHOWN ON THE PLANS AND WHERE DEEMED

APPROPRIATE. THE LOCATION OF THESE AREAS MUST BE APPROVED IN ADVANCE AND MUST

COMPLY WITH ALL CONTRACT REGULATIONS GOVERNING STAGING AND EQUIPMENT STORAGE

AREAS (I.E.: FENCING, UTILITIES, ACCESS HOURS, HAUL ROUTES, ETC.) AS PRESCRIBED BY THE

CONTRACTING OFFICER. THE CONTRACTOR IS RESPONSIBLE FOR THE SECURITY OF THESE

AREAS THROUGHOUT THE DURATION OF THE CONSTRUCTION. AFTER USE, RESTORE TO

ORIGINAL CONDITION ANY LANDSCAPING, PAVEMENT, FLOOR FINISHES, ETC. WHICH HAVE BEEN

DAMAGED OR ALTERED DURING CONSTRUCTION.

PROTECT EQUIPMENT AND MERCHANDISE IN AREAS OF WORK. EQUIPMENT AND FURNITURE THAT IS MOVED IN ORDER TO COMPLETE WORK MUST BE RETURNED TO ITS ORIGINAL POSITION, CLEANED, AND FULLY OPERATIONAL AT THE BEGINNING OF EACH BUSINESS DAY UNLESS THAT AREA OF WORK IS DESIGNATED TO BE TEMPORARILY SHUT DOWN OR RELOCATED DURING CONSTRUCTION. MAINTAIN IN OPERATION EXISTING EQUIPMENT OUTSIDE AREAS OF WORK DURING CONSTRUCTION AND PROVIDE

TEMPORARY UTILITIES AND CONNECTIONS AS REQUIRED TO DO SO.

15. MAINTAIN CLEAR PATHS THROUGH WORK AREAS FOR DELIVERY ACCESS TO PROCESSING

AND STAGING AREAS. COORDINATE WORK TO ACCOMMODATE GF/GI (GOVERNMENT

FURNISHED / GOVERNMENT INSTALLED) EQUIPMENT DELIVERY AND INSTALLATION AS

REQUIRED.

5. PHASING NOTES DO NOT LIST ALL ITEMS OF WORK REQUIRED BY THE CONSTRUCTION

DOCUMENTS BUT ARE A GUIDE TO ACCOMPLISHING MAJOR AREAS OF WORK.

14. REMOVE DEBRIS AND TRASH FROM THE CONSTRUCTION WORK AREAS DAILY AND PLACE INTO

DUMPSTERS OR OTHER APPROVED CONTAINERS. IF TRASH MUST BE HAULED WITHIN OPERATING

AREAS, IT MUST BE IN APPROVED CLOSED CONTAINERS.

5. PROVIDE TEMPORARY SIGNAGE TO DESIGNATE CONSTRUCTION AREAS, FOR EXAMPLE

"HARD HAT AREA"; "EMERGENCY EXIT"; AND NECESSARY SIGNAGE FOR RE-ROUTING

PATRONS AND EMPLOYEES AS REQUIRED BY THE CONTRACTING OFFICER.

1. COORDINATE ALL WORK SHOWN WITH MECHANICAL, ELECTRICAL, PLUMBING,

REFRIGERATION, AND FIRE PROTECTION PHASING NOTES AND DRAWINGS.

MAINTAIN ALL UTILITIES IN SERVICE AT ALL TIMES.

1. THE COMMISSARY WILL CONTINUE TO OPERATE AND PROVIDE FULL SERVICE TO CUSTOMERS

DURING CONSTRUCTION. THE FOLLOWING NOTES APPLY TO THE CONTRACTOR'S PLAN TO

ACCOMPLISH CONSTRUCTION WITHIN THE EXISTING FACILITY. THE CONTRACTOR MUST VISIT THE FACILITY AND CAREFULLY EXAMINE THOSE PORTIONS OF THE BUILDING AND SITE AFFECTED BY THIS WORK BEFORE SUBMITTING PROPOSAL AND BECOME FAMILIAR WITH THE EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT THE EXECUTION OF WORK. SUBMISSION OF A PROPOSAL WILL BE

CONSTRUED AS EVIDENCE THAT SUCH EXAMINATION WAS CONDUCTED AND LATER CLAIMS FOR

LABOR, EQUIPMENT OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE

RECOGNIZED.

GENERAL PHASING NOTES:

7. PHASES ARE TO BE COMPLETED IN SEQUENTIAL ORDER. PROPOSED DEVIATIONS TO THE SPECIFIED

SEQUENCE MUST BE SUBMITTED IN ADVANCE FOR APPROVAL BY THE CONTRACTING OFFICER.

PROVIDE A JUSTIFICATION FOR WHY THE DEVIATION IS REQUIRED TO ACCOMPLISH THE CONTRACT

1. REQUIRED MEANS OF EGRESS MUST BE MAINTAINED AT ALL TIMES. TEMPORARY

PARTITIONS MUST ALLOW ACCESS TO EXISTING EXITS, CORRIDORS, OCCUPIED SPACES,

ETC. DURING NORMAL STORE HOURS. TEMPORARY EGRESS CORRIDORS MUST MEET

APPLICABLE CODES FOR EXIT SIGNAGE, EMERGENCY LIGHTING, LIFE SAFETY SPEAKER /

STROBES, FIRE EXTINGUISHER PLACEMENT, SPRINKLERS, ETC. DO NOT CLOSE OR

OBSTRUCT EXITS, CORRIDORS, OR ACCESS TO OTHER OCCUPIED SPACES WITHOUT

APPROVED WRITTEN PERMISSION FROM CONTRACTING OFFICER.

2. LIFE SAFETY SYSTEMS MUST REMAIN FULLY OPERATIONAL THROUGHOUT DURATION

OF CONSTRUCTION. ALL EXISTING SYSTEMS (FIRE ALARM, PULL STATIONS, HORNS,

STROBES, SPEAKERS, ETC) SHOULD BE EITHER RELOCATED OR TEMPORARILY

SUSPENDED FROM THE STRUCTURE AS REQUIRED (NOTIFY CONTRACTING OFFICER).

BEFORE TEMPORARILY DISCONNECTING OR RELOCATING EXISTING FIRE ALARM

EQUIPMENT.

25. COORDINATE WORK TO ACCOMMODATE DELIVERY AND INSTALLATION OF DECOR

PACKAGE (GRAPHICS, AISLE MARKERS, BANNERS, ETC.) AS REQUIRED.

24. COORDINATE WORK TO ACCOMMODATE DELIVERY AND INSTALLATION OF NEW

GONDOLA SHELVING AS REQUIRED

26. ALL UTILITY TRENCHES, PAVEMENT CUTS, ETC. MUST BE RESURFACED IMMEDIATELY IN AREAS OF PEDESTRIAN OR VEHICULAR TRAFFIC TO PREVENT ANY HAZARD TO PEDESTRIANS AND MOTORISTS.

7. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES TO COMMISSARY FACILITY AND

PRODUCTS OCCURRING FROM INSUFFICIENT PROTECTION FROM WEATHER, DUST, ETC.

27. CONTRACTOR SHALL HAVE MANUFACTURER'S REPRESENTATIVES AVAILABLE FOR THE

INITIAL START UP, CALIBRATION AND TESTING OF CONTRACTOR FURNISHED EQUIPMENT.

8. ENSURE ADEQUATE VENTILATION IS MAINTAINED IN ALL AREAS THROUGHOUT THE

PERIOD OF CONSTRUCTION, INCLUDING PROTECTION FROM NOXIOUS FUMES AND

VAPORS THAT MAY OCCUR DURING CONSTRUCTION.

3. PROVIDE TEMPORARY FIRE EXTINGUISHERS ON PORTABLE STANDS WHERE DOING

HOT WORK AND WHERE MOUNTED EXTINGUISHERS ARE NOT ACCESSIBLE.

13. GOVERNMENT IS RESPONSIBLE FOR MIN 14 DAY NOTICE FOR REMOVAL / RELOCATION OF

MERCHANDISE WITHIN EACH AREA OF WORK & WILL DO SO AFTER RECEIPT OF CONTRACTOR'S

WRITTEN NOTICE OF INTENT TO COMMENCE WORK. CONTRACTOR SHALL TEMPORARILY REMOVE

/ RELOCATE EXISTING EQUIPMENT / FURNISHINGS AS NEEDED TO COMPLETE WORK.

MECHANICAL / ELECTRICAL / PLUMBING / FIRE PROTECTION NOTES

EGRESS / LIFE SAFETY NOTES:

28. PROVIDE TEMPORARY END PANELS ON ALL PARTIAL RUNS OF CASES NOT REQUIRED TO

HAVE PERMANENT END PANELS.

29. DRIVE ADJACENT TO PHARMACY BUILDING, TO THE WEST OF THE EXISTING

COMMISSARY, TO REMAIN OPEN AT ALL TIMES DURING CONSTRUCTION & MUST ALLOW

ACCESS FOR EMERGENCY VEHICLES, TO THE PHARMACY DUMPSTERS, AND TO THE

PHARMACY DRIVE-THRU.

30. SEE CIVIL FOR TEMPORARY TRAFFIC PLAN. TEMPORARY TRAFFIC PLAN INDICATES HOW

CUSTOMER AND EMERGENCY VEHICLE TRAFFIC WILL BE REROUTED DURING NEW PAVING

WORK AT NEW COMMISSARY ENTRY.

22. NO MORE THAN ONE RECEIVING DOOR IS TO BE OUT OF

OPERATION AT ANY ONE TIME.

23. THE CONTRACTOR IS RESPONSIBLE TO DETERMINE HOW TO

TRANSFER NEW AND EXISTING EQUIPMENT (WHICH MAY OR MAY NOT

FIT) THROUGH EXISTING OPENINGS. PROVIDE ANY TEMPORARY

MODIFICATIONS NEEDED TO ACCOMMODATE ALL EQUIPMENT. ANY

DEMOLITION, PATCH AND REPAIR WORK, AND ASSOCIATED

ENGINEERING & DESIGN WORK REQUIRED FOR EQUIPMENT TRANSFER

IS THE RESPONSIBILITY OF THE CONTRACTOR. ALL MODIFICATIONS

MADE TO THE EXISTING FACILITY AS A RESULT OF EQUIPMENT

TRANSFER REQUIREMENTS ARE TO BE RETURNED TO LIKE NEW

CONDITION

4. PROVIDE TEMPORARY HVAC UNIT DURING DHU UNIT REPLACEMENT. TEMPORARY

HVAC UNIT IS TO BE LOCATED IN THE COMMISSARY SERVICE YARD.

20. IBM TO PERFORM ALL DE-INSTALL AND RE-INSTALL WORK ON "CARTS" SYSTEM.

WORK ON "CARTS" SYSTEM PERFORMED BY ANYONE OTHER THAN IBM WILL VOID

MAINTENANCE CONTRACT. THIS WILL REQUIRE A SITE SURVEY BY IBM. COORDINATE

SCHEDULING OF SURVEY WITH DeCA AND STORE DIRECTOR.

PHASE A1 (COMMENCE AFTER COMPLETION OF PHASE A0)

- COMMISSARY WILL LOSE USE OF COMMISSARY OFFICER OFFICE 12, ADMIN ENTRY VESTIBULE 13, ADMINISTRATIVE AREA 15, AND VENDOR OFFICE 84 DURING THIS PHASE.

- RELOCATE COMMISSARY OFFICER OFFICE TO TRAINING ROOM 17, AS INDICATED IN PLAN 1/GC102.

- RELOCATE ADMINISTRATIVE AREA TO BREAK ROOM 16A AS INDICATED IN PLAN 1/GC102.

- RELOCATE VENDOR OFFICE TO LOCATION DETERMINED BY STORE DIRECTOR.

- COMMISSARY WILL LOSE USE OF MEN'S AND WOMEN'S PATRON RESTROOMS (10&11) DURING THIS PHASE.

- COMMISSARY WILL LOSE USE OF ENTRY VEST. 1 AND PATRON WAITING/CHECK WRITING 7 DURING THIS PHASE.

- EXISTING CARRYOUT/RETURN VEST. 3B IS TO BE USED AS PATRON ENTRY DURING THIS PHASE.

- PATRONS ARE TO USE WOMEN'S EMPLOYEE TOILET 26 & MEN'S EMPLOYEE TOILET 28 DURING THIS PHASE

PHASE D4

- COMMISSARY WILL LOSE USE OF 8 SECTIONS OF e2G16 WALL SHELVING AND (2) 1P07-12 DURING THIS PHASE.

- COMMISSARY TO DISPLAY IMPACTED PRODUCE MERCHANDISE IN EXISTING REFRIGERATED CASES LOCATED

IN PHASES B3 AND D2.

- MAINTAIN ACCESS TO VESTIBULE 21A & CUSTOMER SERVICE 5B DURING STORE OPERATING HOURS.

- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO

ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.

- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA

SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN

PHASE A4

- WORK IN CASHIER'S OFFICE 4 AND CASH COUNTING 5 IS TO BE DONE DURING STORE NON-OPERATIONAL

HOURS. STORE REPRESENTATIVE MUST BE PRESENT DURING WORK IN THESE ROOMS. MAINTAIN ACCESS TO AND USE OF SAME ROOMS DURING STORE OPERATING HOURS. RELOCATE IMPACTED FURNISHINGS /

EQUIPMENT TO LOCATIONS DETERMINED BY STORE DIRECTOR.

- WORK IN THE BAKERY/DELI SERVICE AREA 72, DELI PREP 73, BAKERY PREP 74, BAKERY COOLER 75, FREEZER 76, DELI COOLER 77, AND BAKERY/DELI DRY STORAGE 78 IS TO BE DONE DURING STORE NON-OPERATIONAL

HOURS. MAINTAIN ACCESS TO AND USE OF SAME ROOMS DURING STORE OPERATING HOURS.

(COMMENCE AFTER COMPLETION OF PHASE C3)

(COMMENCE AFTER NOTICE TO PROCEED & APPROVAL OF SUBMITTALS)

PHASE A3

- COMMISSARY TO LOSE USE OF (6) e1G10-5 & (1) e1G10-3 FROZEN FOOD REFRIGERATED CASES.

- COMMISSARY TO DISPLAY IMPACTED FROZEN FOOD MERCHANDISE IN NEW REFRIGERATED FROZEN

FOOD CASES INSTALLED DURING PHASES A3 & D3.

- COMMISSARY TO LOSE USE OF (2) e1G10-12 REFRIGERATED DAIRY CASES AND (5) e1G10-12 PREPACK

MEAT CASES.

- COMMISSARY TO DISPLAY IMPACTED DAIRY & PREPACK MEAT MERCHANDISE IN NEW REFRIGERATED

INSTALLED DURING PHASE B7.

- MAINTAIN MINIMUM 8' CLEAR AISLE WIDTH BETWEEN ANY REQUIRED CONSTRUCTION BARRIERS & VENT.

21C AND DELI/BAKERY SERVICE.

- MAINTAIN AISLE AND ACCESS TO ADJACENT REFRIGERATED CASES. 8' CLEAR MIN.

(COMMENCE AFTER NOTICE TO PROCEED & APPROVAL OF SUBMITTALS)

PHASE B1

- COMMISSARY WILL LOSE USE OF OPERATING SUPPLY STORAGE 33, MEDICAL FOOD INSPECTION ROOM 34, AND RECEIVING MANAGER OFFICE 35 DURING THIS PHASE.

- RELOCATE OPERATING SUPPLY STORAGE 33, MEDICAL FOOD INSPECTION ROOM 34, AND RECEIVING

MANAGER OFFICE 35 TO EXPANDED STAGING AREA 37, AS INDICATED IN PLAN 4/GC103.

(COMMENCE AFTER COMPLETION OF PHASE A1)

PHASE B2

- COMMISSARY WILL LOSE USE OF WOMEN'S LOCKER ROOM 25, WOMEN'S EMPLOYEE TOILET 26, MEN'S

LOCKER ROOM 27, AND MEN'S EMPLOYEE TOILET 28 DURING THIS PHASE.

- EMPLOYEES TO USE EXISTING RESTROOMS, 51 AND 53, LOCATED IN PHASE C6

- LOCKERS TO BE RELOCATED TO LOCATION DETERMINED BY STORE DIRECTOR.

(COMMENCE AFTER COMPLETION OF PHASE A1)

PHASE A2 (COMMENCE AFTER NOTICE TO PROCEED & APPROVAL OF SUBMITTALS)

PHASE B3

- COMMISSARY WILL LOSE USE OF (2) e1P02-12 AND (2) 1P02-08 REFRIGERATED PRODUCE CASES DURING THIS

PHASE.

- COMMISSARY TO DISPLAY IMPACTED PRODUCE MERCHANDISE IN NEW REFRIGERATED PRODUCE CASES

INSTALLED DURING PHASE A2.

- MAINTAIN ACCESS TO VESTIBULE 21B DURING STORE OPERATING HOURS

- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO

ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.

- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA

SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN

(COMMENCE AFTER COMPLETION OF PHASE A2)

PHASE A0

- COMMISSARY TO LOSE USE OF (12) e1G10-5 & (2) e1G10-3 & (2) e1G08 FROZEN FOOD

REFRIGERATED CASES DURING THIS PHASE.

- COMMISSARY TO DISPLAY IMPACTED FROZEN FOOD MERCHANDISE IN NEW REFRIGERATED FROZEN FOOD CASES LOCATED IN PHASE A3 AND EXISTING REFRIGERATED FROZEN FOOD CASES LOCATED

IN PHASE E3.

- MAINTAIN AISLE AND ACCESS TO ADJACENT REFRIGERATED FROZEN FOOD CASES 8' CLEAR MIN.

- MAINTAIN MINIMUM 8' CLEAR AISLE WIDTH AT NORTH AND SOUTH END OF AISLE AROUND ANY

REQUIRED CONSTRUCTION PARTITIONS TO MAINTAIN ACCESS TO DAIRY ALCOVE 69C AND BAKERY

DELI DISPLAY AREA 70.

(COMMENCE AFTER COMPLETION OF PHASE A1)

PHASE B6

- COMMISSARY TO LOSE THE USE OF (3) e1G02-12 & (1) e1G02-8 REFRIGERATE DAIRY CASES DURING THIS PHASE.

- COMMISSARY TO DISPLAY IMPACTED DAIRY MERCHANDISE N NEW REFRIG. DAIRY CASES INSTALLED DURING

PHASE B7.

- MAINTAIN ACCESS TO e1G11 DAIRY DOORS DURING STORE OPERATING HOURS.

- MAINTAIN ACCESS TO VESTIBULE 2K DURING STORE OPERATING HOURS.

- MAINTAIN MIN S' CLEAR AISLE WIDTH BETWEEN ANY TEMPORARY CONSTRUCTION BARRIERS & FRONT OF

REFRIG. CASE.

- MAINTAIN ACCESS TO EGRESS EXIT DOOR BETWEEN GRIDS S & R AT ALL TIMES.

(COMMENCE AFTER COMPLETION OF PHASE A5)

PHASE C1

- COMMISSARY WILL LOSE USE OF (5) CHECKSTANDS DURING THIS PHASE (SEE GENERAL PHASING

NOTES 19 & 20).

- COMMISSARY WILL LOSE THE MASS DISPLAY AREA 39 DURING THIS PHASE.

- RELOCATE MASS DISPLAY 39 TO LOCATION DETERMINED BY STORE DIRECTOR.

- MAINTAIN ACCESS TO AND USE OF CARRYOUT VESTIBULE 3B DURING THIS PHASE.

(COMMENCE AFTER COMPLETION OF PHASE B1)

PHASE C2

- COMMISSARY TO LOSE THE USE OF MEAT PROCESSING 55, MEAT WRAPPING 56, MEAT MANAGER 57

AND BULK MEAT STORAGE 59 DURING THIS PHASE.

- PRODUCE STORAGE AND PROCESSING AREAS TO MOVE TO NEW PRODUCE STORAGE AND

PROCESSING AREAS COMPLETED DURING PHASE B1.

- RELOCATE MEAT PROCESSING 55 TO EXISTING PRODUCE CHILLED STORAGE 43 & EXISTING

PRODUCE AMBIANT STORAGE 44B, AS INDICATED IN PLAN 3/GC103.

- RELOCATE MEAT WRAPPING 56, TO PRODUCE AMBIENT STORAGE 44B & EXISTING PRODUCE

PROCESSING 44A, AS INDICATED IN PLAN 3/GC103.

- RELOCATE MEAT MANAGER TO PRODUCE MANAGER 45, AS INDICATED IN PLAN 3/GC103.

- PROVIDE TEMPORARY REFRIGERATED TRAILER FOR REFRIGERATED MEAT STORAGE DURING THIS PHASE

(COMMENCE AFTER COMPLETION OF PHASE B1)

PHASE E4

- COMMISSARY TO LOSE USE OF REFRIG. FROZEN COFFIN CASES (e-1G07 AND e-1G06) DURING THIS PHASE.

- COMMISSARY TO DISPLAY IMPACTED FROZEN FOOD MERCH. IN EXIST. REFRIG. FROZEN FOOD CASES LOCATED

IN PHASES B7, D3, AND E3.

- MAINTAIN AISLE AND ACCESS TO ADJACENT REFRIGERATED FROZEN FOOD AND DAIRY CASES 8' CLEAR MIN.

- MAINTAIN MINIMUM 8' CLEAR AISLE WIDTH AT NORTH AND SOUTH END OF AISLE AROUND ANY REQUIRED

CONSTRUCTION PARTITIONS TO MAINTAIN ACCESS TO DAIRY ALCOVE 69C AND BAKERY/DELI DISPLAY AREA 70.

(COMMENCE AFTER COMPLETION OF PHASES D3)

PHASE D1

- TEMPORARY MEAT PROCESSING AND MEAT WRAPPING TO MOVE FROM EXISTING PRODUCE

STORAGE AND PROCESSING AREAS TO NEW MEAT PROCESSING AND MEAT WRAPPING AREAS

CONSTRUCTED DURING PHASE C1.

- PROVIDE TEMPORARY REFRIGERATED TRAILER FOR REFRIG. MEAT STORAGE.

PHASE B7

- COMMISSARY WILL LOSE USE OF CARRYOUT RETURN VESTIBULE 3B DURING THIS PHASE.

(COMMENCE AFTER COMPLETION OF PHASE C1)

(COMMENCE AFTER COMPLETION OF PHASE A3)

- TEMPORARILY RELOCATE AND CONNECT EXISTING BAKERY AND DELI DISPLAY EQUIPMENT AS SHOWN

ON SHEET GC101 & GC102 DURING THIS PHASE.

- COMMISSARY TO DISPLAY IMPACTED DELI BAKERY MERCHANDISE IN REFRIGERATED CASES EXISTING

LOCATION PHASES B7,D3, & E3 AND NEW REFRIG. CASES INSTALLED DURING PHASE A3.

- COMMISSARY WILL LOSE USE OF (4) QUICKCHECKS DURING THIS PHASE (SEE GENERAL NOTE 19 & 20).

PHASE D5

- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.

- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA

SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN

(COMMENCE AFTER COMPLETION OF PHASE C3)

PHASE E3 (COMMENCE AFTER COMPLETION OF PHASE D4 & D5)

PHASING AREA DESCRIPTIONS

PHASE E2

- COMMISSARY WILL LOSE USE OF (6) CHECKSTANDS DURING THIS PHASE (SEE GENERAL PHASING NOTES 19 & 20).

- MAINTAIN CHECKSTAND EXIT FLOW OF TRAFFIC DURING THIS PHASE OF CONSTRUCTION. DO NOT BLOCK TRAFFIC

FLOW BETWEEN CHECKSTANDS AND EXIT VESTIBULES MAINTAIN 8' CLEAR MIN. AISLE WIDTH.

(COMMENCE AFTER COMPLETION OF PHASE C3)

PHASE C3

- COMMISSARY WILL LOSE USE OF EMPLOYER BREAK ROOM 16B AND MENS 51 & WOMENS 53

RESTROOMS DURING THIS PHASE.

- EMPLOYERS TO USE NEW BREAK ROOM 16A CONSTRUCTED DURING PHASE B4 DURING THIS PHASE.

- EMPLOYERS TO USE A TOILETS SHOWN TO BE REMODELED IN PHASE B5.

(COMMENCE AFTER COMPLETION OF PHASE B2 & B4)

PHASE C6

- TEMPORARILY RELOCATE AND CONNECT EXISTING REFRIGERATED FRESH MEAT CASES AS

INDICATED ON OVERALL PHASING PLAN 1/GC102 DURING THIS PHASE.

- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY REMOVE & STORE

EXISTING GONDOLA SHELVING AS REQUIRED TO MAINTAIN MINIMUM 12' CLEAR AISLE WIDTH BETWEEN

FRONT OF FRESH MEAT CASES & FRONT OF GONDOLA SHELVING ROWS.

(COMMENCE AFTER COMPLETION OF PHASE B7)

PHASE D2

- COMMISSARY WILL LOSE USE OF (5) e1P02-8 & (2) e1P02-12 REFRIGERATED PRODUCE CASES

DURING THIS PHASE.

- COMMISSARY TO DISPLAY IMPACTED PRODUCE MERCHANDISE IN NEW REFRIG. PRODUCE

CASE INSTALLED DURING PHASES A2 & B3.

- MAINTAIN MIN. 8' CLEAR AISLE WIDTH BETWEEN ANY TEMPORARY CONSTRUCTION BARRIER &

GONDOLA SHELVING.

(COMMENCE AFTER COMPLETION OF PHASES B3

PHASE D3

- COMMISSARY WILL LOSE ACCESS TO COVERED STORAGE AREA-IN RECEIVING YARD DURING THIS PHASE.

- RELOCATE IMPACTED EQUIPMENT TO LOCATIONS DETERMINED BY STORE DIRECTOR

- COMMISSARY WILL LOSE ACCESS TO GRADE LEVEL RECEIVING DOORS DURING THIS PHASE.

- PROVIDE TEMP. RAMP (FORK LIFT RATED) AT PROPOSED LOCATION INDICATED ON PLANS.

- MAINTAIN ACCESS TO EXIT DOORS AT ALL TIMES DURING THIS PHASE

- COMMISSARY WILL LOSE USE OF FROZEN FOOD STORAGE 68 DURING THIS PHASE

(COMMENCE AFTER COMPLETION OF PHASE C4 & C6)

PHASE F2

- COMMISSARY WILL LOSE USE OF (4) CHECKSTANDS AND (1) CHECKOUT DURING THIS PHASE (SEE GENERAL

PHASING NOTES 19 & 20).

- MAINTAIN CHECKSTAND EXIT FLOW OF TRAFFIC DURING THIS PHASE OF CONSTRUCTION. DO NOT BLOCK TRAFFIC

FLOW BETWEEN CHECKSTANDS AND EXIT VESTIBULES MIN.

(COMMENCE AFTER COMPLETION OF PHASE E2)

- WORK IN DAIRY STORAGE AREA 67 IS TO BE DONE DURING STORE NON-OPERATIONAL HOURS.

MAINTAIN ACCESS TO AND USE OF SAME ROOM DURING STORE OPERATING HOURS.

- FROZEN FOOD STORAGE MOVES INTO NEW FROZEN FOOD STORAGE COMPLETED DURING PHASE A5.

PHASE E1 (COMMENCE AFTER COMPLETION OF PHASE D4 & D5)

PHASE G1

- COMMISSARY WILL LOSE USE OF EXIT VESTIBULE 2A DURING THIS PHASE

- MAINTAIN CHECKSTAND EXIT FLOW OF TRAFFIC DURING THIS PHASE OF CONSTRUCTION. DO NOT BLOCK TRAFFIC

FLOW BETWEEN CHECKSTANDS AND EXIT VESTIBULES MAINTAIN 8' CLEAR MIN. AISLE WIDTH.

(COMMENCE AFTER COMPLETION OF PHASE F2)

PHASE H1 (COMMENCE AFTER COMPLETION OF PHASE G1)

PHASE I1 (COMMENCE AFTER COMPLETION OF PHASE H1)

PHASE B4

- COMMISSARY WILL LOSE USE OF CUSTOMER SERVICE/STORE MANAGER OFFICE 6, PATRON SERVICE/ID 9, BREAKROOM 16, SCANNING SUPPORT 18, AND VENDOR OFFICE 86, DURING THIS PHASE.

- CUSTOMER SERVICE/STORE MANAGER TO MOVE INTO NEW OFFICE CONSTRUCTED DURING PHASE A4.

- EMPLOYEES TO USE EXISTING BREAKROOM 16B LOCATED IN PHASE C6 AND BAGGER BREAKROOM 80 LOCATED

IN PHASE A4.

(COMMENCE AFTER COMPLETION OF PHASE A1)

PHASE A5 (COMMENCE AFTER NOTICE TO PROCEED & APPROVAL OF SUBMITTALS)

PHASE C5 (COMMENCE AFTER COMPLETION OF PHASE B1)

SEE ENLARGED PLAN 1/GC103

SEE ENLARGED PLAN 1/GC103

- COMMISSARY WILL LOSE USE OF TRASH PLATFORM DURING THIS PHASE.

- DUMPSTERS TO BE RELOCATED TO LOCATION TO BE DETERMINED BY STORE DIRECTOR & CONTRACTORS

OFFICER'S REPRESENTATIVE. DUMPSTERS MUST BE LOCATED MIN. 15'-0" FROM BUILDING

- PROVIDE TEMPORARY RAMP (FORK LIFT RATED AT PROPOSED LOCATION INDICATED ON PLANS DURING

THIS PHASE

PHASE B5 (COMMENCE AFTER COMPLETION OF PHASE A1)

- COMMISSARY TO LOSE USE OF (5) e1G12-4 REFRIGERATED FROZEN FOOD CASES DURING THIS PHASE

- COMMISSARY TO DISPLAY IMPACTED FROZEN FOOD MERCHANDISE IN NEW REFRIGERATED CASES

INSTALLED DURING PHASES A3 & B7.

- COMMISSARY TO LOSE USE OF (3) e1G02-12 REFRIGERATED DAIRY CASES DURING THIS PHASE.

- COMMISSARY TO DISPLAY IMPACTED DAIRY MERCHANDISE IN EXISTING REFRIGERATED CASES LOCATED

IN PHASES D3 & E4

PHASE C4 (COMMENCE AFTER COMPLETION OF PHASE B7)

- COMMISSARY WILL LOSE USE OF EXIT VESTIBULE 2B DURING THIS PHASE

- MAINTAIN CHECKSTAND EXIT FLOW OF TRAFFIC DURING THIS PHASE OF CONSTRUCTION. DO NOT BLOCK

TRAFFIC FLOW BETWEEN CHECKSTANDS AND EXIT VESTIBULES MAINTAIN 8' CLEAR MIN. AISLE WIDTH.

- COMMISSARY WILL LOSE USE OF (2) SELF CHECKOUTS DURING THIS PHASE

- MAINTAIN ACCESS TO EXIT VESTIBULE DURING STORE OPERATING HOURS

- MAINTAIN ACCESS TO STORE MGR/CUST. SERVICE OFFICE 6B AND BREAKROOM DURING STORE OPERATING

HOURS

PHASE F1 (COMMENCE AFTER COMPLETION OF PHASE E1 & E3)

PHASE A6 (COMMENCE AFTER NOTICE TO PROCEED & APPROVAL OF SUBMITTALS)

- WORK IN RECEIVING AISLE MAY BE DONE DURING STORE OPERATING HOURS PROVIDED THE WORK DOES NOT

INTERFERE WITH COMMISSARY OPERATIONS & HAS PRIOR APPROVAL BY THE STORE DIRECTOR.

- WORK TO RECEIVING DOORS SHALL BE SEQUENCED SO THAT NO MORE THAN ONE DOOR IS OUT

OF OPERATION AT ONE TIME.

- VENDOR OFFICE 86 TO BE RELOCATED TO NEW OFFICE CONSTRUCTED IN PHASE A1.

- MAINTAIN TEMPORARY ACCESS TO NEW ADMIN. AREA COMPLETED IN PHASE A1 PER PLAN 2/GC103.

- PATRON SERVICES/ID 9 TO BE RELOCATED TO LOCATION DETERMINED BY STORE DIRECTOR.

- MAINTAIN ACCESS TO VESTIBULE 21A DURING STORE OPERATING HOURS

- FEMALE PATRON'S WILL CONTINUE USING WOMEN'S TOILET 26 UNTIL COMPLETION OF NEW WOMEN'S

PATRON TOILET.

PHASE B4 CONT.

- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.

- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA

SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN

- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.

- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA

SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN

- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.

- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA

SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN

- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.

- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA

SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN

R E

G

IS

T E R E D A R C H I T E C

T

A R K A N S A S

EDWIN C.

LEVYR

E G

IS

T E R E D A R C H I T E C

T

A R K A N S A S

EDWIN C.

LEVYR

E G

IS

T E R E D A R C H I T E C

T

A R K A N S A S

EDWIN C.

LEVY

101 south spring street little rock, ar 72201

501.372.2900 cromwell.com

SEQUENCE

NO.

SHEET NO.

OF

DATE:SOL. NO.

PROJECT NO.

DRAWING NUMBER

SUBMITTED BY:

ENGINEER:

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

TO THE BEST OF OUR KNOWLEDGE,

INFORMATION AND BELIEF, BASED

ON AND LIMITED TO OUR NORMAL

FUNCTIONS PERFORMED UNDER OUR

CONTRACT WITH THE GOVERNMENT,

IT IS OUR PROFESSIONAL OPINION

THAT THIS PROJECT IS DESIGNED

IN ACCORDANCE WITH APPLICABLE

DOD REGULATIONS.

EDWIN C. LEVY

DEFENSE COMMISSARY AGENCY

LACKLAND AFB, TEXAS

FORT LEE, VIRGINIA

DIRECTORATE OF ENGINEERING

30-MAY-2018

EA16MI05

NAVAL AIR STATION

PENSACOLA, FLORIDA

PENSACOLA COMMISSARY FACILITY

ADDITION /ALTERATION

A/E: 2016-001

RTA SOLICITATION ISSUE

SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION

1 5-30-2018 RTA SOLICITATION ISSUE

GC100

ECL

JAR

ECL

PHASING GENERAL NOTES / CONSTRUCTION BARRIER

DETAILS

05/30/18

3/8" = 1'-0"

1 TEMPORARY PARTITION DETAILS

SCALE : 3/8" = 1'-0"

0 2 4 8

3 7-24-2018 REVISIONS TO BID DOCUMENTS

HDEC03-18-R-0007

1 3

3 5 9 13

WW

14.8 17 19 23

VV

UU

SS

RR

PP

NN

MM

H

CC

BB

4 5.3 6

7 7.9 8

12 14

15 16 18 20 21

22 24 25 27

28 29 30

31 32

D

F

G

J

K

L

E

A

X

25.2

.5

.5

TT

SEE CIVIL FOR WORK AT

FRONT WALK

SEE CIVIL FOR WORK

AT LOADING DOCK

e

M

-1 e

M

-1 e

M

-1 e

M

-1 e

M

-1 e

G

-1 e

G

-1 e

G

-5 e

G

-5 e

G

-5 e

G

-5 e

G

-3 e

G

-5 e

G

-5 e

G

-3 e

G

-5 e

G

-5 e

G

-5 e

G

-5 e

G

-5 e

G

-5 e

G

-5 e

G

-5 e

G

-5 e

G

-5 e

G

-5 e

G

-3 e

G

-5 e

G

-1 e

G

-1 e

G

-1 e

G

-5 e

G

-5

G

-4 e

G

-5 e

G

-5 e

G

-1 e

G

-1 e

G

-1 e

G

-8 e

G

-5 e1M04-8 1M07-12 1M07-12 e

G

-1 e

G

-1 e

G

-1 e

G

-1 e

G

-1 e

G

-1 e

G

-1 e

P

-0 e

P

-0 e1P02-12 e1P02-12 e1P02-08 e1 P

2-e P 02-0 e

P

-1 e

P

-1 e

P

-1 e

P

-1 e

P

-0 e

P

-0 e1M02-12 e1M02-12 e1M02-12 e1M02-12 e1M02-12 e1M02-12 e1G08 e1G08 e1G06 e1G06e1G08 e1G00 e1G00 e1D01 e1D00-8 e1D00-12 e1D00-12 e1B02 e1B06 e-1D00-12 e-1D00-12 e-1B06 e-1B02 e-1M02-12 e-1M02-12 e-1M02-12 e-1M02-12 e-1M02-12 e-1M04-8 e-1M07-12 e-1M07-12

A5

A1 A0 E2 F2 G1 H1 I1

B6

A2

B3

B1 D1 C1 C5

D2 C2

B4 C3 D5 E3

A4

E1

A3 C4

C6

D4

B7D3

E4

B2

B5

F1

TEMPORARILY RELOCATE

EXISTING REFRIGERATED

FRESH MEAT CASES TO

INDICATED AREA DURING

PHASE C4

TEMPORARILY REMOVE AND STORE SECTIONS OF

GONDOLA SHELVING AS INDICATED TO

ACCOMMODATE PATRON CIRCULATION. PROVIDE

12'-0" MIN. CLEAR BETWEEN CASES AND

SHELVING.

PROVIDE TRAILER FOR

TEMPORARY PRODUCE

CHILLED STORAGE AND

TEMPORARY BULK MEAT

STORAGE DURING PHASE D1.

CONFIRM LOCATION WITH

STORE DIRECTOR. PROVIDE

POWER AS REQUIRED.

PROVIDE TRAILER FOR

TEMPORARY PRODUCE

CHILLED STORAGE AND

TEMPORARY BULK MEAT

STORAGE DURING PHASE C1.

CONFIRM LOCATION WITH

STORE DIRECTOR. PROVIDE

POWER AS REQUIRED.

PROVIDE REFERIGERATED TEMP.

RAMP (FORKLIFT RATED) DURING

PHASES A5 & B7

CONFIRM LOCATION W/ STORE

DIRECTOR & CONTRACTING

OFFICER'S REPRESENTATIVE

TEMPORARILY RELOCATE EXISTING

REFRIGERATED BAKERY AND DELI CASES

TO INDICATED AREA DURING PHASE C4

MAINTAIN 12'-0" MIN. CLEAR

BETWEEN FRONT OF TEMP.

RELOCATED DELI CASES AND

FROZEN FOOD CASES

PROVIDE CONSTRUCTION

BARRIER TUNNEL DURING

PHASE A1 & B4 FOR TEMPORARY

PATRON ACCESS TO TOILETS

PROPOSED LOCATION OF TEMPORARY

HVAC UNIT DURING REPLACEMENT OF

EXISTING HVAC UNIT IN MECH MEZZANINE

A6

PROVIDE TRAILER FOR

TEMPORARY FROZEN FOOD

STORAGE DURING PHASE A5.

CONFIRM LOCATION WITH

STORE DIRECTOR. PROVIDE

POWER AS REQUIRED.

1 3B 2B7

16A 19

21A

20A

20B

21B

35 34 43

44A

44B 47

45 59

16B

53 51

86B86A

76 75 77

21C

793A2A

6A 72

69D

69B

69C

69A

6B

20C

56 62

83B

SYMBOL LEGEND

TO REMAIN (BLACK)

TO BE REMOVED BY CONTRACTOR (RED)

EQUIPMENT TO BE REMOVED BY CONTRACTOR (RED)

EQUIPMENT TO BE RELOCATED BY GOVERNMENT (BLUE)

EQUIPMENT TO BE REMOVED BY GOVERNMENT (CYAN)

EQUIPMENT TO BE RELOCATED BY CONTRACTOR (GREEN)

A0, A1

B1

NOTICE TO PROCEED

PHASING SCHEDULE:

APPROVED SUBMITTALS

B2 B4

C3

B5 B3

A2 A4

B7

A3 A5

D2

C1 C2 C4 C6

D1

E2E1, E3

D3

E4

F2F1

G1

H1

I1

B6

C5

D4, D5

A6

W

14.8 17 19 23

V

U

S

15 22

T

UP

PROVIDE TEMP. HVAC UNIT

DURING REPLACEMENT OF

EXISTING HVAC UNIT

NEW OPENING MUST BE

CONSTRUCTED BEFORE

REPLACEMENT OF EXISTING

HVAC UNIT IN MEZZANINE

REMOVE EXISTING

REFRIGERATION RACKS -

SEE REFRIGERATION

DRAWINGS

REMOVE EXISTING

CONCRETE PAD AFTER

REMOVAL OF

REFRIGERATION RACKS

R E G

IS

T E

RED A R CH IT E

C T

A R K A N S A S

EDWIN C.

LEVYR

E G

IS

T E

RED A R CH IT E

C T

A R K A N S A S

EDWIN C.

LEVYR

E G

IS

T E

RED A R CH IT E

C T

A R K A N S A S

EDWIN C.

LEVY

101 south spring street little rock, ar 72201

501.372.2900 cromwell.com

SEQUENCE

NO.

SHEET NO.

OF

DATE:SOL. NO.

PROJECT NO.

DRAWING NUMBER

SUBMITTED BY:

ENGINEER:

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

TO THE BEST OF OUR KNOWLEDGE,

INFORMATION AND BELIEF, BASED

ON AND LIMITED TO OUR NORMAL

FUNCTIONS PERFORMED UNDER OUR

CONTRACT WITH THE GOVERNMENT,

IT IS OUR PROFESSIONAL OPINION

THAT THIS PROJECT IS DESIGNED

IN ACCORDANCE WITH APPLICABLE

DOD REGULATIONS.

EDWIN C. LEVY

DEFENSE COMMISSARY AGENCY

LACKLAND AFB, TEXAS

FORT LEE, VIRGINIA

DIRECTORATE OF ENGINEERING

30-MAY-2018

EA16MI05

NAVAL AIR STATION

PENSACOLA, FLORIDA

PENSACOLA COMMISSARY FACILITY

ADDITION /ALTERATION

A/E: 2016-001

RTA SOLICITATION ISSUE

SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION

1 5-30-2018 RTA SOLICITATION ISSUE

GC101

ECL

JAR

ECL

PHASING DEMOLITION PLAN

05/30/18

1/16" = 1'-0"

1 OVERALL PHASING DEMOLITION PLAN

ROOM INDEX (EXISTING)

ROOM

AreaNUMBER NAME

1 ENTRY VESTIBULE 120 SF

1A ENTRY 412 SF

2A EXIT VEST. 108 SF

2B EXIT VEST. 109 SF

3B CARRYOUT RETURN VEST. 105 SF

4 CASHIER 208 SF

5 CASH COUNTING 128 SF

6B STORE MANAGER / CUST. SERV. OFF. 113 SF

7 RESTROOM ALCOVE 163 SF

8 CART STORAGE 915 SF

9 PATRON ASSISTED RESTROOM 80 SF

10 MEN RESTROOM 191 SF

11 WOMEN RESTROOM 223 SF

12 STORE DIRECTOR OFFICE 256 SF

13 ADMIN. VEST. 36 SF

14 ADMIN. CORRIDOR 191 SF

15 ADMINISTRATIVE AREA 1377 SF

16A BREAKROOM 405 SF

16B BREAKROOM 363 SF

16C BREAKROOM 209 SF

17 TRAINING ROOM 256 SF

17A TRAINING STORAGE 29 SF

18 ASST. STORE DIRECTOR OFFICE 146 SF

18A STORE ADMINISTRATOR OFFICE 145 SF

19 GROCERY MGR OFFICE 171 SF

20A JANITOR 36 SF

20B JANITOR 39 SF

20C JANITOR 53 SF

20D JANITOR 36 SF

21A VESTIBULE 93 SF

21B VESTIBULE 93 SF

21C VESTIBULE 70 SF

22 ADMIN. STORAGE (ABOVE) 637 SF

22A ADMIN. STORAGE STAIRWAY 59 SF

23 DAMAGED MERCHANDISE 171 SF

24 DAMAGED MERCH. SALES ALCOVE 63 SF

25 LOCKER ROOM- WOMEN 142 SF

26 EMP. TLT - WOMEN 111 SF

27 EMP. TLT - MEN 111 SF

28 LOCKER ROOM - MEN 142 SF

30 CONTRACT STOCKER STORAGE 94 SF

31A COMM. ROOM 146 SF

31B COMM. CLOSET 34 SF

31J ELEC 95 SF

31K ELECT. 75 SF

32 CONTRACT STOCKER STORAGE 132 SF

33 MOBILE REGISTER STORAGE 116 SF

34 MEDICAL FOOD INSPEC. OFFICE 134 SF

35 RECEIVING OFFICE 71 SF

36 RECEIVING AREA 2390 SF

37 STAGING AREA 8489 SF

38 MHE CHARGING 608 SF

39 MASS DISPLAY 1321 SF

40 QAE OFFICE 86 SF

41 PLANT DISPLAY 245 SF

43A PRODUCE CHILLED STORAGE NON-GAS 833 SF

43B PRODUCE CHILLED STORAGE GAS 732 SF

44A PRODUCE PROCESSING 588 SF

44B PRODUCE AMBIENT STORAGE 591 SF

45 PRODUCE MANAGER 120 SF

47 MEAT TRAY STORAGE 368 SF

51 RESTROOM- MEN'S 115 SF

53 RESTROOM- WOMEN'S 121 SF

54 RECEIVING AISLE 3705 SF

55 MEAT PROCESSING 1274 SF

56 MEAT WRAPPING 1121 SF

57 MEAT MANAGER 174 SF

59 BULK MEAT STORAGE 2065 SF

61 PRE PAK MEAT STORAGE 330 SF

62 POULTRY STORAGE 358 SF

63 CHASE 51 SF

67 DAIRY STORAGE 2564 SF

68 FROZEN FOOD STORAGE 2561 SF

68B FROZEN VESTIBULE 235 SF

69A SALES AREA 31192 SF

69B PRODUCE ALCOVE 1203 SF

69C DAIRY ALCOVE 1271 SF

69D BAKERY/DELI DISPLAY AREA 599 SF

72 BAKERY/DELI SERVICE AREA 535 SF

73 DELI PREP. 351 SF

74 BAKERY PREP. 368 SF

75 BAKERY COOLER 129 SF

76 BAKERY FREEZER 178 SF

77 DELI COOLER 129 SF

78 BAKERY/DELI DRY STOR. 77 SF

79 DELI-BAK OFFICE 53 SF

80 BAGGER BREAKROOM 102 SF

81 CHECKOUT AREA 4119 SF

82 CUSTOMER CHECKOUT QUEUING 1080 SF

83 MECHANICAL MEZZANINE 2679 SF

83B MECHANICAL MEZZANINE STAIR 237 SF

84 VENDOR 78 SF

86A MEN'S RESTROOM 36 SF

86B WOMEN'S RESTROOM 30 SF

KEY PLAN

D C

A B

SCALE : 1/16" = 1'-0"

0 8 16 32

NORTH

3 7-24-2018 REVISIONS TO BID DOCUMENTS

INDICATES PROPOSED LOCATION OF WEATHERTIGHT, INSULATED

TEMPORARY CONSTRUCTION BARRIER (TYPE 5 - SEE SHEET GC100)

REQUIRED WHERE EXISTING BUILDING WILL BE OPEN TO EXTERIOR.

1/16" = 1'-0"

2 MEZZANINE DEMO PHASING PLAN

07/25/2018

HDEC03-18-R-0007

1 3

3 5 9 13

WW

14.8 17 19 23

VV

UU

SS

RR

PP

NN

MM

H

CC

BB

4 5.3 6

7 7.9 8

12 14

15 16 18 20 21

22 24 25 27

28 29 30

31 32

D

F

G

J

K

L

E

A

X

25.2

.5

.5

2B3B 2A 80

6B

76 75 77

69D

16C

86A86B

31J14

20D

16A

18A18

17 31A 33

21A

22A

20A

20B

21B

44B 44A

43A 43B

16B

20C

53 51

21C

68B

69B

17A

TT

A5

A1 A0 E2 F2 G1 H1 I1

B6

A2

B3

B1 D1 C1 C5

D2 C2

B4 C3 D5 E3

A4

E1

1A

SEE CIVIL FOR WORK AT

FRONT WALK

TEMPORARILY RELOCATE EXISTING

REFRIGERATED BAKERY AND DELI CASES

TO INDICATED AREA DURING PHASE C4

SEE CIVIL FOR WORK

AT LOADING DOCK

G

G D

-1

G

G D

-1

G

G D

-1

G

G D

-1

G

G D

-1

G

G D

-1

G

G D

-1

G

G D

-1

G

G D

-1

G

G D

-1

G

G D

-1

G

G D

-8

G

G

D -8

M

G D

-1

M

G D

-1

M

G D

-1

M

G D

-1

M

G D

-1

G

-5

G

-4

G

-4

G

-4

G

-4

G

-4

G

-5

G

-5

G

-5

G

-5

G

-5

G

-5

G

-5

G

-5

G

-5

G

G

-5

G

-5

G

G

-5

G

-5

G

-5

G

-5

G

-1

G

-1

G

-1

1M07-8 1M07-12 1M07-12 1M07-12 1M07-12 1M07-12

A3 C4

C6

D4

B7D3

E4

B2 e-1M02-12 e-1M02-12 e-1M02-12 e-1M02-12 e-1M02-12 e-1M04-8 e-1M07-12 e-1M07-12

P

-8

P

-1

P

-1

P

-1

P

-1

P

-1

P

-8

P

-8

P

-1

P

-1

1P03-12 1P03-12 1P07-81P07-8

P 7-1

B5

1D00-8 1D00-8 1D00-12

B

-5

B

-A

B

-2 e-1D00-12 e-1D00-12 e-1B06 e-1B02

1D24-8

1D22-12

PROVIDE TEMP. RAMP (FORKLIFT

RATED) DURING PHASES A5 & B8

CONFIRM LOCATION W/ STORE

DIRECTOR & CONTRACTING

OFFICER'S REPRESENTATIVE

MAINTAIN 12'-0" MIN. CLEAR

BETWEEN FRONT OF TEMP.

RELOCATED DELI CASES AND

FROZEN FOOD CASES

F1

PROVIDE CONSTRUCTION

BARRIER TUNNEL DURING

PHASE A1 & B4 FOR TEMPORARY

PATRON ACCESS TO TOILETS

A6

TEMPORARILY RELOCATE

EXISTING REFRIGERATED

FRESH MEAT CASES TO

INDICATED AREA DURING

PHASE C4

TEMPORARILY REMOVE AND STORE SECTIONS OF

GONDOLA SHELVING AS INDICATED TO

ACCOMMODATE PATRON CIRCULATION. PROVIDE

12'-0" MIN. CLEAR BETWEEN CASES AND

SHELVING.

PROVIDE TRAILER FOR

TEMPORARY PRODUCE

CHILLED STORAGE AND

TEMPORARY BULK MEAT

STORAGE DURING PHASE D1.

CONFIRM LOCATION WITH

STORE DIRECTOR. PROVIDE

POWER AS REQUIRED.

PROVIDE TRAILER FOR

TEMPORARY PRODUCE

CHILLED STORAGE AND

TEMPORARY BULK MEAT

STORAGE DURING PHASE C1.

CONFIRM LOCATION WITH

STORE DIRECTOR. PROVIDE

POWER AS REQUIRED.

PROPOSED LOCATION OF TEMPORARY

HVAC UNIT DURING REPLACEMENT OF

EXISTING HVAC UNIT IN MECH MEZZANINE

PROVIDE TRAILER FOR

TEMPORARY FROZEN FOOD

STORAGE DURING PHASE A5.

CONFIRM LOCATION WITH

STORE DIRECTOR. PROVIDE

POWER AS REQUIRED.

A0, A1

B1

NOTICE TO PROCEED

PHASING SCHEDULE:

APPROVED SUBMITTALS

B2 B4

C3

B5 B3

A2 A4

B7

A3 A5

D2

C1 C2 C4 C6

D1

E2E1, E3

D3

E4

F2F1

G1

H1

I1

B6

C5

D4, D5

A6

SYMBOL LEGEND

EXISTING TO REMAIN (BLACK)

N…