Drawings_set_4_of_6.pdf
PDF 11 MB Posted
- Attached to
- Addition/Alteration to Commissary, NAS Pensacola, FL Federal contract opportunity
- Solicitation number
- HDEC03-18-R-0007
- Issued by
- Defense Commissary Agency
About this file
Attachment 06 Drawing Set 4 of 6
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SSS
S
S
S
S
S
S
S
S
S
S
S
S S
VV
V
S
S
V
S
S
S
V V V
S
S
S
S
S
S S S
V
.5 1
P
N
M
E
C
B
1412107.975.342
C.8
H
LOCKER ROOM - MEN
EMP. TLT - MEN
EMP. TLT - WOMEN
LOCKER ROOM- WOMEN
QAE OFFICE
JANITOR
20A
VESTIBULE
21A
MOBILE REGISTER
STORAGE
CONTRACT STOCKER
STORAGE
COMM. ROOM
31A
TRAINING ROOM
MHE CHARGING
ADMINISTRATIVE AREA
STORE DIRECTOR OFFICE
ASST. STORE DIRECTOR
OFFICE
STORE ADMINISTRATOR
OFFICE
18A
ADMIN. CORRIDOR
VENDOR
ELEC
31J
PATRON ASSISTED
RESTROOM
BREAKROOM
16A
WOMEN RESTROOM
JANITOR
20D
MEN RESTROOM
ENTRY
1A
MASS DISPLAY
CARRYOUT RETURN VEST.
3B
EXIT VEST.
2B
POS
WIC
POS
WIC
POS
WIC
POS
WIC
POS
WIC
M
M
D D D
M
KS
W
FOR COPY
TYP
W 3
POS W
W
.5 1
P
N
M
E
C
B
1412107.975.342
A
H
C.8
POS
WIC
M M
NEW POS /
DATA
CABINETS
NEW
TELEPHONE
CABINET
24" CABLE TRAY
M
M
DA
DA
E-501
V
V
V
V
V
V V V8
TYP
TYP
E-501
TYP
TYP
POS
WP
WITH KEY LOCK
AP
AP
ADMIN. STORAGE
STAIRWAY
22A
VENDOR
TYP
PROFESSIONAL
REGISTERED
ARKANSAS
S T
A T E O F
ENGINEER
No. 7509
W I L
L I A M A . F U L
L E R
PROFESSIONAL
REGISTERED
ARKANSAS
S T
A T E O F
ENGINEER
No. 7509
W I L
L I A M A . F U L
L E R
PROFESSIONAL
REGISTERED
ARKANSAS
S T
A T E O F
ENGINEER
No. 7509
W I L
L I A M A . F U L
L E R
101 south spring street little rock, ar 72201
501.372.2900 cromwell.com
SEQUENCE
NO.
SHEET NO.
OF
DATE:SOL. NO.
PROJECT NO.
DRAWING NUMBER
SUBMITTED BY:
ENGINEER:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
TO THE BEST OF OUR KNOWLEDGE,
INFORMATION AND BELIEF, BASED
ON AND LIMITED TO OUR NORMAL
FUNCTIONS PERFORMED UNDER OUR
CONTRACT WITH THE GOVERNMENT,
IT IS OUR PROFESSIONAL OPINION
THAT THIS PROJECT IS DESIGNED
IN ACCORDANCE WITH APPLICABLE
DOD REGULATIONS.
ALLAN FULLER
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
FORT LEE, VIRGINIA
DIRECTORATE OF ENGINEERING
30-MAY-2018
EA16MI05
NAVAL AIR STATION
PENSACOLA, FLORIDA
PENSACOLA COMMISSARY FACILITY
ADDITION /ALTERATION
A/E: 2016-001
RTA SOLICITATION ISSUE
SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION
1 5-30-2018 RTA SOLICITATION ISSUE
ET101
WAF
JRD
PSM
FIRST FLOOR SYSTEMS PLAN - AREA A
05/30/18
1/8" = 1'-0"
1 FIRST FLOOR SYSTEMS PLAN - AREA A
KEYED NOTES (SOME NOTES MAY NOT BE USED):
PROVIDE DATA / COMM OUTLETS FOR PHONES AND REGISTERS.
NEW DATA / COMM JACK LOCATION.
KNOWN TELEPHONE / INTERCOM LOCATIONS NEEDING CONVERSION TO CAT 6 (SEE GENERAL NOTE 1).
USE CONTRACTOR-PROVIDED POWER POLES TO PROVIDE DATA DROPS.
NEW POS DROPS ARE ROUTED VIA NEW CABLEWAY TO POS EQUIPMENT ROOM (31A). COORDINATE WITH
STORE OPERATIONS.
CABLE AND JACKS SHALL BE TESTED AND DOCUMENTED PER TIA / EIA STANDARDS.
EXISTING TO REMAIN.
ADD NEW SPEAKERS. CONNECT TO EXISTING PA SYSTEM.
PROVIDE NEW DATA / COMM DROPS TO REGISTERS. ROUTE TO NEW COMM ROOM 31A.
SPEAKERS OVER CHECKOUT AND SALES FLOOR ARE EXISTING UNLESS OTHERWISE NOTED. (SEE
GENERAL NOTE 2)
NEW PA/PAGING/MUSIC CABINET. PROVIDE ALL NEW EQUIPMENT AND CONNECT TO VOIP TELEPHONE
SYSTEM FOR PAGING. RE-CONNECT ALL EXISTING AND NEW SPEAKERS. SEE E-501 DETAIL 5.
PROVIDE NEW MAGNETIC SWITCHES, KEYPADS, DURESS BUTTONS AND OTHER SECURITY DEVICES FOR NEW AREAS AS NOTED. VERIFY COMPATIBILITY WITH EXISTING SECURITY SYSTEM AND PROVIDE WIRING
AND INTERFACE TO EXISTING SYSTEM. COORDINATE WITH STORE OPERATIONS.
GENERAL NOTES:
1. THE TELEPHONE SYSTEM SWITCHING HAS BEEN UPGRADED TO VOIP. REPLACE ORIGINAL CAT 3 TELEPHONE CABLE WITH CAT 6 CABLE AND WITH NEW RJ-45 JACKS AT EACH AND EVERY TELEPHONE / INTERCOM OUTLET. USE EXISTING CONDUITS, CABLE HOOKS, AND WIRE WAY AS NEEDED AND PROVIDE NEW WHERE NECESSARY. TERMINATE CABLES AT NEAREST PHONE CONNECTION POINT (MAIN CABINET OR SUB HUB CABINET) AND PROVIDE PUNCH DOWN BLOCKS AND CROSS CONNECT JUMPERS TO ALLOW PROPER OPERATION OF BOTH PHONE AND INTERCOM SERVICE. CAREFULLY COORDINATE WORK WITH STORE OPERATIONS AND WITH DECA HQ IT SERVICES (RICKY ROSSER 804 734-8000 EXT 48467) TO MAINTAIN TELEPHONE SERVICE TO COMMISSARY WITH MINIMAL DISRUPTION DURING SWITCH OVER TO NEW CABLES.
CONTRACTOR TO PROVIDE DETAILED SWITCH OVER STAGING PLAN FOR APPROVAL BY DECA, AND STORE MANAGEMENT.
ADDITIONAL CONTRACT MODS FOR OUTAGES AND/OR OTHER UNANTICIPATED CIRCUMSTANCES WILL NOT BE ALLOWED.
2. REMOVE AND CAREFULLY STORE ALL SPEAKERS, STROBES, AND PRICING DATA TRANSMITTERS FROM CEILING OVER SALES AND CHECKOUT AREAS. REINSTALL EQUIPMENT AFTER NEW CEILING AND GRID ARE INSTALLED.
3. CABLE AND JACKS SHALL BE TESTED AND DOCUMENTED PER TIA / EIA STANDARDS.
4. LABELS SHALL BE PRE-PRINTED OR COMPUTER-TYPED.
5. THE EXISTING CCTV SYSTEM (APPROXIMATELY 52 CAMERAS) SHALL REMAIN FULLY OPERATIONAL. COORDINATE ANY
CAMERA RELOCATIONS WITH STORE OPERATIONS.
SCALE : 1/8" = 1'-0"
0 4 8 16
NORTH
KEY PLAN
D C
A B
3 7-24-2018 REVISIONS TO BID DOCUMENTS
HDEC03-18-R-0007
AMENDMENT 0006
ATTACHMENT 06
S S
S S
S S
S S S S
SSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S S
S S
S S
S S
S
S
S
S
S
.5 1
3 5 9 13 W.5
W
V.5
V
U
T
S
R
P
RECEIVING AISLE
MEDICAL FOOD INSPEC.
OFFICE
CONTRACT STOCKER
STORAGE
PRODUCE CHILLED
STORAGE NON-GAS
43A
PRODUCE AMBIENT
STORAGE
44B
PRODUCE PROCESSING
44A
PRODUCE MANAGER
VESTIBULE
21B
JANITOR
20B
DAMAGED MERCHANDISE
GROCERY MGR OFFICE
MEAT PROCESSING
MEAT WRAPPING
BULK MEAT STORAGE
PRODUCE CHILLED
STORAGE GAS
43B
W
W
W
.5 1
3 5 9 13
X
W.5
W
V.5
V
U
T
S
R
P
4 4
4 4
4 4
4 4 4 4
RING FOR
PRODUCE
DELIVERY
TYP
A
A
AP
A A
AP
AP
AP
A
A
AP
4 4
M M
PROFESSIONAL
REGISTERED
ARKANSAS
S T
A T E O F
ENGINEER
No. 7509
W I L
L I A M A . F U L
L E R
PROFESSIONAL
REGISTERED
ARKANSAS
S T
A T E O F
ENGINEER
No. 7509
W I L
L I A M A . F U L
L E R
PROFESSIONAL
REGISTERED
ARKANSAS
S T
A T E O F
ENGINEER
No. 7509
W I L
L I A M A . F U L
L E R
101 south spring street little rock, ar 72201
501.372.2900 cromwell.com
SEQUENCE
NO.
SHEET NO.
OF
DATE:SOL. NO.
PROJECT NO.
DRAWING NUMBER
SUBMITTED BY:
ENGINEER:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
TO THE BEST OF OUR KNOWLEDGE,
INFORMATION AND BELIEF, BASED
ON AND LIMITED TO OUR NORMAL
FUNCTIONS PERFORMED UNDER OUR
CONTRACT WITH THE GOVERNMENT,
IT IS OUR PROFESSIONAL OPINION
THAT THIS PROJECT IS DESIGNED
IN ACCORDANCE WITH APPLICABLE
DOD REGULATIONS.
ALLAN FULLER
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
FORT LEE, VIRGINIA
DIRECTORATE OF ENGINEERING
30-MAY-2018
EA16MI05
NAVAL AIR STATION
PENSACOLA, FLORIDA
PENSACOLA COMMISSARY FACILITY
ADDITION /ALTERATION
A/E: 2016-001
RTA SOLICITATION ISSUE
SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION
1 5-30-2018 RTA SOLICITATION ISSUE
ET104
WAF
JRD
PSM
FIRST FLOOR SYSTEMS PLAN - AREA D
05/30/18
1/8" = 1'-0"
1 FIRST FLOOR SYSTEMS PLAN - AREA D
SCALE : 1/8" = 1'-0"
0 4 8 16
NORTH
KEY PLAN
D C
A B
KEYED NOTES (SOME NOTES MAY NOT USED):
KNOWN TELEPHONE / INTERCOM OUTLETS NEEDING CONVERSION TO CAT 6 (SEE GENERAL NOTE 1).
RELOCATE OLD "RING FOR SERVICE" BUTTON TO THIS POINT. COORDINATE WITH STORE MANAGER.
PROVIDE NEW WP SPEAKERS AND CONNECT TO EXISTING SYSTEM.
PROVIDE NEW MATCHING SPEAKERS AND CONNECT TO PA SYSTEM.
NEW DATA SUB HUB. RECONNECT HUB TO MAIN DATA HUB IN FRONT OF STORE WITH 12 STRAND MULTI MODE FIBER IN 2" C.
SPEAKERS OVER CHECKOUT AND SALES FLOOR ARE EXISTING UNLESS OTHERWISE NOTED. (SEE GENERAL NOTE 2)
TO SIGNAL POWER.
EXISTING VOIP EQUIPMENT AND TELEPHONE SUB HUB EQUIPMENT TO BE RELOCATED TO NEW CABINET LOCATED HERE.
SEE DETAIL 3 E-501. EXTEND AND RECONNECT ALL EXISTING AND NEW CONNECTIONS.
PROVIDE NEW MAGNETIC SWITCHES, KEYPADS, DURESS BUTTONS AND OTHER SECURITY DEVICES FOR NEW AREAS AS NOTED. VERIFY COMPATIBILITY WITH EXISTING SECURITY SYSTEM AND PROVIDE WIRING AND INTERFACE TO EXISTING
SYSTEM. COORDINATE WITH STORE OPERATIONS.
GENERAL NOTES:
1. THE TELEPHONE SYSTEM SWITCHING HAS BEEN UPGRADED TO VOIP. REPLACE ORIGINAL CAT 3 TELEPHONE CABLE WITH CAT 6 CABLE AND WITH NEW RJ-45 JACKS AT EACH AND EVERY TELEPHONE / INTERCOM OUTLET. USE EXISTING CONDUITS, CABLE HOOKS, AND WIRE WAY AS NEEDED AND PROVIDE NEW WHERE NECESSARY. TERMINATE CABLES AT NEAREST PHONE CONNECTION POINT (MAIN CABINET OR SUB HUB CABINET) AND PROVIDE PUNCH DOWN BLOCKS AND CROSS CONNECT JUMPERS TO ALLOW PROPER OPERATION OF BOTH PHONE AND INTERCOM SERVICE. CAREFULLY COORDINATE WORK WITH STORE OPERATIONS AND WITH DECA HQ IT SERVICES (RICKY ROSSER 804 734-8000 EXT 48467) TO MAINTAIN TELEPHONE SERVICE TO COMMISSARY WITH MINIMAL DISRUPTION DURING SWITCH OVER TO NEW CABLES. CONTRACTOR TO PROVIDE DETAILED SWITCH OVER STAGING PLAN FOR APPROVAL BY DECA, AND STORE MANAGEMENT. ADDITIONAL CONTRACT MODS FOR OUTAGES AND/OR OTHER UNANTICIPATED
CIRCUMSTANCES WILL NOT BE ALLOWED.
2. REMOVE AND CAREFULLY STORE ALL SPEAKERS, STROBES, AND PRICING DATA TRANSMITTERS FROM CEILING OVER SALES AND
CHECKOUT AREAS. REINSTALL EQUIPMENT AFTER NEW CEILING AND GRID ARE INSTALLED.
3. CABLE AND JACKS SHALL BE TESTED AND DOCUMENTED PER TIA / EIA STANDARDS.
4. LABELS SHALL BE PRE-PRINTED OR COMPUTER-TYPED.
5. THE EXISTING CCTV SYSTEM (APPROXIMATELY 52 CAMERAS) SHALL REMAIN FULLY OPERATIONAL. COORDINATE ANY CAMERA
RELOCATIONS WITH STORE OPERATIONS.
3 7-24-2018 REVISIONS TO BID DOCUMENTS
HDEC03-18-R-0007
1. COORDINATE ALL TEMPORARY PARTITION TYPES AND LOCATIONS AND GATE LOCATIONS WITH CONTRACTING OFFICER
2. LOCATE VERTICAL FRAMING TO PREVENT INTERFERENCE WITH LIGHT FIXTURES
3. SECURE PLYWOOD TO PARTITION FRAMING WITH SCREWS AT 12" O.C. VERT.
4. REPAIR / REPLACE ANY DAMAGED FLOOR SLAB, WALL FINISHES, OR CEILING FINISHES DUE TO INSTALLATION OR REMOVAL OF TEMPORARY PARTITIONS
TEMPORARY PARTITION NOTES:
4'
8'
8'
6' - 0"
WHERE CLG. GRID IS REMOVED,
PROVIDE 2X4 WOOD STUD BRACES TO
THE EXISTING ROOF STRUCTURE AT
MIN. 8' O.C. - ANCHOR SECURELY TO
STRUCT.
SECURELY TIE (WIRE)
TOP PLATE TO CLG. GRID
2x4 WOOD
SILL PLATE
DRILL FLOOR FOR 3/8" DIA. EXP.
ANCHOR BOLT AT 8'-0" O.C. (REMOVE
BOLT AND PATCH FLOOR AFTER
REMOVAL OF TEMPORARY WALL)
2x4 WOOD TOP PLATE
SOUND BATT INSULATION
CONT. 6 MIL
POLYETHYLENE
SHEETING (TAPE
ALL JOINTS)
EXISTING CEILING
WORK SIDE SALES AREAWORK SIDE
3/4" CD PLYWOOD (SEE
TEMP. PARTITION NOTES)2X8 AT 24" O.C.
2X8 CONT.
TEMP. FLUOR.
FIXTURES-
PROVIDE MIN. 30
FC IN CORRIDOR
2x4 WOOD
SILL PLATE
2x4 WOOD TOP PLATE2x6 WOOD STUDS AT
24" O.C. AND AT EACH
PLYWD PANEL JOINT
2x4 WOOD STUDS AT 24" O.C.
2X4 WOOD BRACE
AT ENDS & 4'-0" O.C.
2x4 WOOD TOP PLATE
2x4 WOOD
SILL PLATE
DRILL FLOOR FOR 3/8" DIA. EXP.
ANCHOR BOLT AT 8'-0" O.C. (REMOVE
BOLT & PATCH FLOOR AFTER
REMOVAL OF TEMPORARY WALL)
3/8" CD PLYWOOD
(PAINTED - SEE
TEMP. PARTITION
NOTES)
2X6 WOOD BRACE
AT ENDS & 4'-0" O.C.
TYPE 1 - SOFT CONSTRUCTION BARRIER TYPE 3 - HARD CONSTRUCTION BARRIER TYPE 4 - CONSTRUCTION BARRIER TUNNEL
SALES AREA
CONT. 6 MIL POLYETHYLENE
SHEETING (TAPE ALL JOINTS)
EXISTING CEILING
3/8" CD PLYWOOD
(PAINTED - SEE TEMP.
PARTITION NOTES)
3/8" CD PLYWOOD
(PAINTED - SEE
TEMP. PARTITION
NOTES)WORK SIDE
2x4 WOOD STUDS
AT 24" O.C.
2X4 WOOD BRACE
AT ENDS & 4'-0" O.C.
2x4 WOOD TOP PLATE
2x4 WOOD
SILL PLATE
SALES AREA
TYPE 2 - SAFETY BARRIER
5. ALL BARRIERS MUST BE PAINTED WHITE WHERE EXPOSED TO CUSTOMER AREAS.
WORK SIDE WORK SIDE
2X6 BRACE AT
8'-0" O.C. MAX.
SECURELY TIE (WIRE)
TOP PLATE TO CLG.
GRID
6. SEE GENERAL PHASING NOTES FOR ADDITIONAL INFORMATION
EXISTING STL. DECK
5/8" GLASS MAT SHEATHING (TAPED
AND SEALED) ON BACH SIDE (SEAL
TIGHT AROUND ALL STRUCTURE,
PIPING, DUCTWORK, ETC.)
5/8" MOISTURE RESISTANT GYP. BD.
(PAINTED) AT ADMIN AND SALES
AREAS TO BOTTOM OF CEILING
R-19 BATT. INSUL.
16 GA. MIN. 6005200-54
MTL. STUDS AT 12" O.C.
TYPE 5 - CONSTRUCTION
BARRIER AT AREAS OPEN TO
EXTERIOR
PATRON SIDE OF
WALL TO BE PLUMB.
STORE OPERATING HOURS
(STORE HOURS ARE - MONDAY THRU FRIDAY: 0800-1900; SATURDAY & SUNDAY: 0800-1900; EARLY BIRD
HOURS ARE - MONDAY THRU FRIDAY: 0730-0800; SATURDAY & SUNDAY: 0730-0800. VERIFY WITH STORE DIRECTOR THE STANDARD HOURS OF OPERATION AND ALL SCHEDULED EVENTS OR VARIATIONS IN
STORE HOURS.
2. THE INTENT OF THE PHASING PLANS IS TO MINIMIZE THE IMPACT OF THE CONSTRUCTION ON THE OPERATION OF THE COMMISSARY. THE PHASING PLAN MUST ENABLE FULL SERVICE COMMISSARY SALES TO CUSTOMERS AT ALL TIMES THE COMMISSARY IS OPEN TO CUSTOMERS. CONSTRUCT THE PROJECT IN SEQUENTIAL PHASES AS OUTLINED IN THE PLANS UNLESS OTHERWISE APPROVED BY
THE CONTRACTING OFFICER.
3. PHASING PLANS SHOWN ARE DIAGRAMMATIC & FOR PHASING PURPOSES ONLY. THEY SHOULD
NOT BE SCALED OR OTHERWISE USED FOR TAKE-OFFS. COORDINATE PHASING WITH DEMOLITION DRAWINGS AS WELL AS PLANS FOR NEW WORK AND REPAIRS. COORDINATE WITH PROJECT PLANS
AND SPECIFICATIONS.
16. COMMISSARY SALES AND OPERATIONAL AREAS MUST BE CLEAN AND FREE OF DEBRIS,
DUST, DIRT, MUD, CONSTRUCTION MATERIALS, EQUIPMENT, ETC AT ALL TIMES. IN INTERIOR
CONSTRUCTION AREAS WHERE SIGNIFICANT DUST IS GENERATED PROVIDE ACTIVE EXHAUST
VENTILATION TO PROVIDE A NEGATIVE AIR PRESSURE IN THE DUST AREA. PREVENT
MIGRATION OF DUST TO OCCUPIED AREAS OF THE BUILDING
11. DO NOT BEGIN A SUBSEQUENT PHASE OF CONSTRUCTION UNTIL ALL WORK IN THE PREVIOUS
PHASE IS SUBSTANTIALLY COMPLETE AND TURNED OVER TO THE COMMISSARY FOR USE.
12. DO NOT COMMENCE WORK IN ANY AREA UNTIL ALL MATERIALS, SUPPLIES AND EQUIPMENT
REQUIRED TO RETURN THAT AREA TO FULLY OPERATIONAL SERVICE HAVE ARRIVED ON SITE AND
ARE READILY AVAILABLE.
NOTES REGARDING CONSTRUCTION BARRIERS:
1. MAINTAIN MINIMUM 8' AISLE WIDTH BETWEEN CONST. BARRIERS & ADJACENT SHELVING,
REF. CASES, ETC. PROVIDE A HARD CONSTRUCTION BARRIER WITH SOUND ATTENUATION
BATT INSULATION IN ALL AREAS WHICH INVOLVE HEAVY DEMOLITION, EXCESSIVE NOISE,
OR HIGH DUST PRODUCTION (JACK HAMMERING, CONCRETE SAWING, FLOOR GRINDING,
ETC.). PROVIDE BARRIER IN ACCORDANCE WITH PLAN DETAILS.
2. PROVIDE A SOFT CONSTRUCTION BARRIER AT AREAS OF WORK WHICH CREATE MINOR
LEVELS OF DUST, DEBRIS, OFFENSIVE ODORS, AND OTHER ACTIONS WHICH COULD BE
DISRUPTIVE TO COMMISSARY OPERATION. SOFT CONSTRUCTION BARRIER CONSISTS OF A
FOUR FOOT HIGH PLYWOOD BARRIER AND 6 MIL (MIN) POLY CONSTRUCTION SHEETING TO
THE CEILING. THE SOFT BARRIER IS TO BE ADEQUATELY SUPPORTED AND COMPLETELY
SEALED AT ALL SHEET JOINTS AND AT THE FLOOR AND CEILING (OR ROOF DECK). WHERE
CEILING HEIGHTS PROHIBIT SEALING THE BARRIER TO THE CEILING, A CAP IS TO BE
PROVIDED. DURING NON OPERATIONAL STORE HOURS; SOFT BARRIERS MAY BE PLACED
OUTSIDE OF LIMITS OF CONSTRUCTION BARRIERS AS DESCRIBED ON THE PHASING PLANS
AND DIAGRAMS AND THEN TAKEN DOWN WITH THE AREA MADE CLEAN AND SAFE IN THE
MORNING PRIOR TO STORE OPERATING HOURS.
3. A PARTIAL HEIGHT CONSTRUCTION BARRIER MAY BE USED AS SAFETY BARRIER TO
AREAS OF WORK FOR SHORT PERIODS OF TIME (LESS THAN ONE WEEK) WHICH DO NOT
CREATE DUST, DEBRIS, OFFENSIVE ODORS OR EXCESSIVE NOISE. PARTIAL HEIGHT
BARRIERS WILL BE PLYWOOD FOUR FEET HIGH AND MAY REMAIN IN PLACE DURING
NORMAL STORE OPERATING HOURS.
8. SUBMIT A CONSTRUCTION PHASING/SEQUENCING PLAN (IN ACCORDANCE WITH SPECIFICATION
SECTION 013216.10) WHICH COMPLIES WITH THE OPERATIONAL AND ACCESS REQUIREMENTS
INDICATED IN THESE PHASING PLANS AND REQUIREMENTS OF THE CONTRACT DOCUMENTS. PHASING PLANS MUST BE SPECIFIC AND INCLUDE ALL WORK REQUIRED INCLUDING DEMOLITION, LOCATION & CONSTRUCTION OF TEMPORARY WALLS & BARRICADES, UTILITY DOWN TIME, TEMPORARY UTILITY AS REQUIRED TO KEEP THE COMMISSARY FACILITY OPERATIONAL AT ALL TIMES, AND WORK TO OCCUR
DURING NON-OPERATIONAL HOURS WITHIN THE COMMISSARY. COORDINATE THE PRODUCTION OF
THE CONTRACTOR'S PHASING PLAN WITH THE SPECIFIED REQUIREMENTS FOR THE CONSTRUCTION
PROGRESS MANAGEMENT SCHEDULE AND THE STORE DIRECTOR.
4. THE BOUNDARY LINES SHOWN ARE FOR GENERALIZATION PURPOSES ONLY AND DO NOT INDICATE A
BOUNDARY WITHIN WHICH ALL WORK MUST BE CONTAINED. THE CONTRACTOR MUST COORDINATE
ANY WORK THAT COULD DISRUPT REGULAR COMMISSARY BUSINESS ACTIVITY WITH THE
CONTRACTING OFFICER PRIOR TO BEGINNING WORK. MAINTAIN VEHICULAR AND PEDESTRIAN ACCESS INTO AND OUT OF FACILITIES FREE OF OBSTRUCTIONS DURING CONSTRUCTION UNLESS OTHERWISE
SHOWN.
10. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE IN WRITING UPON COMPLETION OF
EACH PHASE. DO NOT PROCEED TO THE SUBSEQUENT PHASE UNTIL THE WORK IS ACCEPTED BY
THE GOVERNMENT. PROVIDE REASONABLE TIME (14 DAYS MAX.) FOR THE COMMISSARY TO
RELOCATE PRODUCT AND GOVERNMENT EQUIPMENT WHEN MOVING IN AND OUT OF PHASES.
9. PHASING PLANS MUST IDENTIFY MEASURES TO PROVIDE FOR PUBLIC AND EMPLOYEE SAFETY
AS WELL AS CONTRACTOR'S WORKFORCE SAFETY. DIAGRAM HOW THE CONTRACTOR WILL
MAINTAIN VEHICULAR CIRCULATION, SERVICE CIRCULATION, AND PEDESTRIAN CIRCULATION
THROUGHOUT THE SITE DURING THE ENTIRE PROJECT. THE PLAN MUST SHOW CUSTOMER
ACCESS, SERVICE ACCESS AND EMERGENCY EGRESS DURING EACH PHASE AND THROUGHOUT
THE DURATION OF CONSTRUCTION.
4. MAINTAIN ALL TEMPORARY SIGNAGE, BARRIERS, FENCES, CONES, SCAFFOLDING,
COVERED SCAFFOLDING FOR OVERHEAD PROTECTION, SERVICE AND EGRESS ACCESS
CORRIDORS THROUGH WORK AREAS, TEMPORARY FIRE PROTECTION, ETC. IN GOOD
CONDITION FOR THE DURATION OF THE PROJECT.
6. UNLESS NOTED OTHERWISE, WORK IN EACH PHASE MAY BE DONE DURING STORE OPERATING
HOURS PROVIDED THE WORK DOES NOT INTERFERE WITH COMMISSARY OPERATIONS AND HAS
PRIOR APPROVAL BY THE STORE DIRECTOR AND CONTRACTING OFFICER.
2. HEATING, COOLING, ELECTRICAL & PLUMBING UTILITY INTERRUPTIONS MUST BE
COORDINATED WITH THE STORE DIRECTOR AND SUBMITTED IN WRITING TO THE
CONTRACTING OFFICER FOR REVIEW AND APPROVAL A MINIMUM OF 2 WEEKS BEFORE
WORK CAN BEGIN. RE-CONFIRM UTILITY SERVICE DISRUPTIONS WITH THE STORE
DIRECTOR A MINIMUM OF 24 HOURS PRIOR TO THE ACTUAL APPROVED OUTAGE.
18. THE REPLACEMENT OF FINISHES IN THE SALES AND CHECKOUT AREAS SHALL BE PHASED AS
INDICATED IN THE CONTRACT DOCUMENTS UNLESS OTHERWISE APPROVED BY CONTRACTING
OFFICER AND IN COORDINATION WITH THE STORE DIRECTOR.
21. EACH STORE DEPARTMENT (MEAT, PRODUCE, DAIRY, FROZEN
FOODS, DELI / BAKERY) SHOULD LOSE NO MORE THAN 50% OF THEIR
DISPLAY AT ANY TIME UNLESS OTHERWISE APPROVED BY STORE
DIRECTOR AND CONTRACTING OFFICER.
6. PROVIDE ADA ACCESSIBLE PROTECTION BARRIERS OVER ANY EXPOSED OPENING IN
FLOOR.
3. TEMPORARY UTILITIES MUST BE INSTALLED, MAINTAINED, AND REMOVED BY THE
CONTRACTOR AT THE CONTRACTOR'S EXPENSE AND IN A MANNER SATISFACTORY TO
THE CONTRACTING OFFICER. REMOVE TEMPORARY UTILITIES AND CONNECTIONS
PRIOR TO THE FINAL ACCEPTANCE OF THE CONTRACT. THE GOVERNMENT WILL NOT
BE HELD LIABLE FOR THE CONTRACT DELAYS, DAMAGES, OR COST INCREASES
INCURRED BY INTERRUPTIONS OF UTILITY SERVICE.
5. HVAC SUPPLY AND RETURN AIR DUCTWORK CROSSING THROUGH OR TERMINATING
WITHIN A CONSTRUCTION AREA SHALL BE TEMPORARILY COVERED OR BLOCKED OFF (AS
APPROPRIATE) TO PREVENT CONSTRUCTION DUST AND DEBRIS FROM ENTERING OTHER
AREAS OF THE STORE. MAINTAIN ENVIRONMENT (TEMPERATURE AND HUMIDITY) WITHIN
EXISTING COMMISSARY BUILDING THROUGHOUT ENTIRE CONSTRUCTION PERIOD.
19. DURING HOLIDAY MONTHS OF NOVEMBER AND DECEMBER, DO NOT SCHEDULE WORK IN
THE CHECKSTAND AREA DURING SALES HOURS. ALL EXISTING CHECKSTANDS MUST BE
OPERATIONAL FOR STORE USE DURING THESE MONTHS. STORE SHALL NOT LOSE USE OF
MORE THAN 1/3 OF CHECKSTANDS AT ANY ONE TIME.
6. PROVIDE POWER FOR CONTRACTOR SUPPLIED TEMPORARY REFRIGERATED
TRAILERS.
7. WHERE POSSIBLE, UNIT COOLER CHANGES ARE TO BE STAGED SO THAT NEW UNIT
COOLERS ARE RUNNING WHEN EXISTING UNIT COOLERS ARE SHUT DOWN. WHEN
STAGING IS NOT POSSIBLE, PREP IS TO BE DONE TO KEEP DOWN TIME TO A MINIMUM.
17. THE CONTRACTOR MAY USE AREAS ON COMMISSARY PROPERTY FOR CONSTRUCTION
STAGING AND EQUIPMENT STORAGE AS SHOWN ON THE PLANS AND WHERE DEEMED
APPROPRIATE. THE LOCATION OF THESE AREAS MUST BE APPROVED IN ADVANCE AND MUST
COMPLY WITH ALL CONTRACT REGULATIONS GOVERNING STAGING AND EQUIPMENT STORAGE
AREAS (I.E.: FENCING, UTILITIES, ACCESS HOURS, HAUL ROUTES, ETC.) AS PRESCRIBED BY THE
CONTRACTING OFFICER. THE CONTRACTOR IS RESPONSIBLE FOR THE SECURITY OF THESE
AREAS THROUGHOUT THE DURATION OF THE CONSTRUCTION. AFTER USE, RESTORE TO
ORIGINAL CONDITION ANY LANDSCAPING, PAVEMENT, FLOOR FINISHES, ETC. WHICH HAVE BEEN
DAMAGED OR ALTERED DURING CONSTRUCTION.
PROTECT EQUIPMENT AND MERCHANDISE IN AREAS OF WORK. EQUIPMENT AND FURNITURE THAT IS MOVED IN ORDER TO COMPLETE WORK MUST BE RETURNED TO ITS ORIGINAL POSITION, CLEANED, AND FULLY OPERATIONAL AT THE BEGINNING OF EACH BUSINESS DAY UNLESS THAT AREA OF WORK IS DESIGNATED TO BE TEMPORARILY SHUT DOWN OR RELOCATED DURING CONSTRUCTION. MAINTAIN IN OPERATION EXISTING EQUIPMENT OUTSIDE AREAS OF WORK DURING CONSTRUCTION AND PROVIDE
TEMPORARY UTILITIES AND CONNECTIONS AS REQUIRED TO DO SO.
15. MAINTAIN CLEAR PATHS THROUGH WORK AREAS FOR DELIVERY ACCESS TO PROCESSING
AND STAGING AREAS. COORDINATE WORK TO ACCOMMODATE GF/GI (GOVERNMENT
FURNISHED / GOVERNMENT INSTALLED) EQUIPMENT DELIVERY AND INSTALLATION AS
REQUIRED.
5. PHASING NOTES DO NOT LIST ALL ITEMS OF WORK REQUIRED BY THE CONSTRUCTION
DOCUMENTS BUT ARE A GUIDE TO ACCOMPLISHING MAJOR AREAS OF WORK.
14. REMOVE DEBRIS AND TRASH FROM THE CONSTRUCTION WORK AREAS DAILY AND PLACE INTO
DUMPSTERS OR OTHER APPROVED CONTAINERS. IF TRASH MUST BE HAULED WITHIN OPERATING
AREAS, IT MUST BE IN APPROVED CLOSED CONTAINERS.
5. PROVIDE TEMPORARY SIGNAGE TO DESIGNATE CONSTRUCTION AREAS, FOR EXAMPLE
"HARD HAT AREA"; "EMERGENCY EXIT"; AND NECESSARY SIGNAGE FOR RE-ROUTING
PATRONS AND EMPLOYEES AS REQUIRED BY THE CONTRACTING OFFICER.
1. COORDINATE ALL WORK SHOWN WITH MECHANICAL, ELECTRICAL, PLUMBING,
REFRIGERATION, AND FIRE PROTECTION PHASING NOTES AND DRAWINGS.
MAINTAIN ALL UTILITIES IN SERVICE AT ALL TIMES.
1. THE COMMISSARY WILL CONTINUE TO OPERATE AND PROVIDE FULL SERVICE TO CUSTOMERS
DURING CONSTRUCTION. THE FOLLOWING NOTES APPLY TO THE CONTRACTOR'S PLAN TO
ACCOMPLISH CONSTRUCTION WITHIN THE EXISTING FACILITY. THE CONTRACTOR MUST VISIT THE FACILITY AND CAREFULLY EXAMINE THOSE PORTIONS OF THE BUILDING AND SITE AFFECTED BY THIS WORK BEFORE SUBMITTING PROPOSAL AND BECOME FAMILIAR WITH THE EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT THE EXECUTION OF WORK. SUBMISSION OF A PROPOSAL WILL BE
CONSTRUED AS EVIDENCE THAT SUCH EXAMINATION WAS CONDUCTED AND LATER CLAIMS FOR
LABOR, EQUIPMENT OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE
RECOGNIZED.
GENERAL PHASING NOTES:
7. PHASES ARE TO BE COMPLETED IN SEQUENTIAL ORDER. PROPOSED DEVIATIONS TO THE SPECIFIED
SEQUENCE MUST BE SUBMITTED IN ADVANCE FOR APPROVAL BY THE CONTRACTING OFFICER.
PROVIDE A JUSTIFICATION FOR WHY THE DEVIATION IS REQUIRED TO ACCOMPLISH THE CONTRACT
1. REQUIRED MEANS OF EGRESS MUST BE MAINTAINED AT ALL TIMES. TEMPORARY
PARTITIONS MUST ALLOW ACCESS TO EXISTING EXITS, CORRIDORS, OCCUPIED SPACES,
ETC. DURING NORMAL STORE HOURS. TEMPORARY EGRESS CORRIDORS MUST MEET
APPLICABLE CODES FOR EXIT SIGNAGE, EMERGENCY LIGHTING, LIFE SAFETY SPEAKER /
STROBES, FIRE EXTINGUISHER PLACEMENT, SPRINKLERS, ETC. DO NOT CLOSE OR
OBSTRUCT EXITS, CORRIDORS, OR ACCESS TO OTHER OCCUPIED SPACES WITHOUT
APPROVED WRITTEN PERMISSION FROM CONTRACTING OFFICER.
2. LIFE SAFETY SYSTEMS MUST REMAIN FULLY OPERATIONAL THROUGHOUT DURATION
OF CONSTRUCTION. ALL EXISTING SYSTEMS (FIRE ALARM, PULL STATIONS, HORNS,
STROBES, SPEAKERS, ETC) SHOULD BE EITHER RELOCATED OR TEMPORARILY
SUSPENDED FROM THE STRUCTURE AS REQUIRED (NOTIFY CONTRACTING OFFICER).
BEFORE TEMPORARILY DISCONNECTING OR RELOCATING EXISTING FIRE ALARM
EQUIPMENT.
25. COORDINATE WORK TO ACCOMMODATE DELIVERY AND INSTALLATION OF DECOR
PACKAGE (GRAPHICS, AISLE MARKERS, BANNERS, ETC.) AS REQUIRED.
24. COORDINATE WORK TO ACCOMMODATE DELIVERY AND INSTALLATION OF NEW
GONDOLA SHELVING AS REQUIRED
26. ALL UTILITY TRENCHES, PAVEMENT CUTS, ETC. MUST BE RESURFACED IMMEDIATELY IN AREAS OF PEDESTRIAN OR VEHICULAR TRAFFIC TO PREVENT ANY HAZARD TO PEDESTRIANS AND MOTORISTS.
7. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES TO COMMISSARY FACILITY AND
PRODUCTS OCCURRING FROM INSUFFICIENT PROTECTION FROM WEATHER, DUST, ETC.
27. CONTRACTOR SHALL HAVE MANUFACTURER'S REPRESENTATIVES AVAILABLE FOR THE
INITIAL START UP, CALIBRATION AND TESTING OF CONTRACTOR FURNISHED EQUIPMENT.
8. ENSURE ADEQUATE VENTILATION IS MAINTAINED IN ALL AREAS THROUGHOUT THE
PERIOD OF CONSTRUCTION, INCLUDING PROTECTION FROM NOXIOUS FUMES AND
VAPORS THAT MAY OCCUR DURING CONSTRUCTION.
3. PROVIDE TEMPORARY FIRE EXTINGUISHERS ON PORTABLE STANDS WHERE DOING
HOT WORK AND WHERE MOUNTED EXTINGUISHERS ARE NOT ACCESSIBLE.
13. GOVERNMENT IS RESPONSIBLE FOR MIN 14 DAY NOTICE FOR REMOVAL / RELOCATION OF
MERCHANDISE WITHIN EACH AREA OF WORK & WILL DO SO AFTER RECEIPT OF CONTRACTOR'S
WRITTEN NOTICE OF INTENT TO COMMENCE WORK. CONTRACTOR SHALL TEMPORARILY REMOVE
/ RELOCATE EXISTING EQUIPMENT / FURNISHINGS AS NEEDED TO COMPLETE WORK.
MECHANICAL / ELECTRICAL / PLUMBING / FIRE PROTECTION NOTES
EGRESS / LIFE SAFETY NOTES:
28. PROVIDE TEMPORARY END PANELS ON ALL PARTIAL RUNS OF CASES NOT REQUIRED TO
HAVE PERMANENT END PANELS.
29. DRIVE ADJACENT TO PHARMACY BUILDING, TO THE WEST OF THE EXISTING
COMMISSARY, TO REMAIN OPEN AT ALL TIMES DURING CONSTRUCTION & MUST ALLOW
ACCESS FOR EMERGENCY VEHICLES, TO THE PHARMACY DUMPSTERS, AND TO THE
PHARMACY DRIVE-THRU.
30. SEE CIVIL FOR TEMPORARY TRAFFIC PLAN. TEMPORARY TRAFFIC PLAN INDICATES HOW
CUSTOMER AND EMERGENCY VEHICLE TRAFFIC WILL BE REROUTED DURING NEW PAVING
WORK AT NEW COMMISSARY ENTRY.
22. NO MORE THAN ONE RECEIVING DOOR IS TO BE OUT OF
OPERATION AT ANY ONE TIME.
23. THE CONTRACTOR IS RESPONSIBLE TO DETERMINE HOW TO
TRANSFER NEW AND EXISTING EQUIPMENT (WHICH MAY OR MAY NOT
FIT) THROUGH EXISTING OPENINGS. PROVIDE ANY TEMPORARY
MODIFICATIONS NEEDED TO ACCOMMODATE ALL EQUIPMENT. ANY
DEMOLITION, PATCH AND REPAIR WORK, AND ASSOCIATED
ENGINEERING & DESIGN WORK REQUIRED FOR EQUIPMENT TRANSFER
IS THE RESPONSIBILITY OF THE CONTRACTOR. ALL MODIFICATIONS
MADE TO THE EXISTING FACILITY AS A RESULT OF EQUIPMENT
TRANSFER REQUIREMENTS ARE TO BE RETURNED TO LIKE NEW
CONDITION
4. PROVIDE TEMPORARY HVAC UNIT DURING DHU UNIT REPLACEMENT. TEMPORARY
HVAC UNIT IS TO BE LOCATED IN THE COMMISSARY SERVICE YARD.
20. IBM TO PERFORM ALL DE-INSTALL AND RE-INSTALL WORK ON "CARTS" SYSTEM.
WORK ON "CARTS" SYSTEM PERFORMED BY ANYONE OTHER THAN IBM WILL VOID
MAINTENANCE CONTRACT. THIS WILL REQUIRE A SITE SURVEY BY IBM. COORDINATE
SCHEDULING OF SURVEY WITH DeCA AND STORE DIRECTOR.
PHASE A1 (COMMENCE AFTER COMPLETION OF PHASE A0)
- COMMISSARY WILL LOSE USE OF COMMISSARY OFFICER OFFICE 12, ADMIN ENTRY VESTIBULE 13, ADMINISTRATIVE AREA 15, AND VENDOR OFFICE 84 DURING THIS PHASE.
- RELOCATE COMMISSARY OFFICER OFFICE TO TRAINING ROOM 17, AS INDICATED IN PLAN 1/GC102.
- RELOCATE ADMINISTRATIVE AREA TO BREAK ROOM 16A AS INDICATED IN PLAN 1/GC102.
- RELOCATE VENDOR OFFICE TO LOCATION DETERMINED BY STORE DIRECTOR.
- COMMISSARY WILL LOSE USE OF MEN'S AND WOMEN'S PATRON RESTROOMS (10&11) DURING THIS PHASE.
- COMMISSARY WILL LOSE USE OF ENTRY VEST. 1 AND PATRON WAITING/CHECK WRITING 7 DURING THIS PHASE.
- EXISTING CARRYOUT/RETURN VEST. 3B IS TO BE USED AS PATRON ENTRY DURING THIS PHASE.
- PATRONS ARE TO USE WOMEN'S EMPLOYEE TOILET 26 & MEN'S EMPLOYEE TOILET 28 DURING THIS PHASE
PHASE D4
- COMMISSARY WILL LOSE USE OF 8 SECTIONS OF e2G16 WALL SHELVING AND (2) 1P07-12 DURING THIS PHASE.
- COMMISSARY TO DISPLAY IMPACTED PRODUCE MERCHANDISE IN EXISTING REFRIGERATED CASES LOCATED
IN PHASES B3 AND D2.
- MAINTAIN ACCESS TO VESTIBULE 21A & CUSTOMER SERVICE 5B DURING STORE OPERATING HOURS.
- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO
ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.
- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA
SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN
PHASE A4
- WORK IN CASHIER'S OFFICE 4 AND CASH COUNTING 5 IS TO BE DONE DURING STORE NON-OPERATIONAL
HOURS. STORE REPRESENTATIVE MUST BE PRESENT DURING WORK IN THESE ROOMS. MAINTAIN ACCESS TO AND USE OF SAME ROOMS DURING STORE OPERATING HOURS. RELOCATE IMPACTED FURNISHINGS /
EQUIPMENT TO LOCATIONS DETERMINED BY STORE DIRECTOR.
- WORK IN THE BAKERY/DELI SERVICE AREA 72, DELI PREP 73, BAKERY PREP 74, BAKERY COOLER 75, FREEZER 76, DELI COOLER 77, AND BAKERY/DELI DRY STORAGE 78 IS TO BE DONE DURING STORE NON-OPERATIONAL
HOURS. MAINTAIN ACCESS TO AND USE OF SAME ROOMS DURING STORE OPERATING HOURS.
(COMMENCE AFTER COMPLETION OF PHASE C3)
(COMMENCE AFTER NOTICE TO PROCEED & APPROVAL OF SUBMITTALS)
PHASE A3
- COMMISSARY TO LOSE USE OF (6) e1G10-5 & (1) e1G10-3 FROZEN FOOD REFRIGERATED CASES.
- COMMISSARY TO DISPLAY IMPACTED FROZEN FOOD MERCHANDISE IN NEW REFRIGERATED FROZEN
FOOD CASES INSTALLED DURING PHASES A3 & D3.
- COMMISSARY TO LOSE USE OF (2) e1G10-12 REFRIGERATED DAIRY CASES AND (5) e1G10-12 PREPACK
MEAT CASES.
- COMMISSARY TO DISPLAY IMPACTED DAIRY & PREPACK MEAT MERCHANDISE IN NEW REFRIGERATED
INSTALLED DURING PHASE B7.
- MAINTAIN MINIMUM 8' CLEAR AISLE WIDTH BETWEEN ANY REQUIRED CONSTRUCTION BARRIERS & VENT.
21C AND DELI/BAKERY SERVICE.
- MAINTAIN AISLE AND ACCESS TO ADJACENT REFRIGERATED CASES. 8' CLEAR MIN.
(COMMENCE AFTER NOTICE TO PROCEED & APPROVAL OF SUBMITTALS)
PHASE B1
- COMMISSARY WILL LOSE USE OF OPERATING SUPPLY STORAGE 33, MEDICAL FOOD INSPECTION ROOM 34, AND RECEIVING MANAGER OFFICE 35 DURING THIS PHASE.
- RELOCATE OPERATING SUPPLY STORAGE 33, MEDICAL FOOD INSPECTION ROOM 34, AND RECEIVING
MANAGER OFFICE 35 TO EXPANDED STAGING AREA 37, AS INDICATED IN PLAN 4/GC103.
(COMMENCE AFTER COMPLETION OF PHASE A1)
PHASE B2
- COMMISSARY WILL LOSE USE OF WOMEN'S LOCKER ROOM 25, WOMEN'S EMPLOYEE TOILET 26, MEN'S
LOCKER ROOM 27, AND MEN'S EMPLOYEE TOILET 28 DURING THIS PHASE.
- EMPLOYEES TO USE EXISTING RESTROOMS, 51 AND 53, LOCATED IN PHASE C6
- LOCKERS TO BE RELOCATED TO LOCATION DETERMINED BY STORE DIRECTOR.
(COMMENCE AFTER COMPLETION OF PHASE A1)
PHASE A2 (COMMENCE AFTER NOTICE TO PROCEED & APPROVAL OF SUBMITTALS)
PHASE B3
- COMMISSARY WILL LOSE USE OF (2) e1P02-12 AND (2) 1P02-08 REFRIGERATED PRODUCE CASES DURING THIS
PHASE.
- COMMISSARY TO DISPLAY IMPACTED PRODUCE MERCHANDISE IN NEW REFRIGERATED PRODUCE CASES
INSTALLED DURING PHASE A2.
- MAINTAIN ACCESS TO VESTIBULE 21B DURING STORE OPERATING HOURS
- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO
ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.
- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA
SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN
(COMMENCE AFTER COMPLETION OF PHASE A2)
PHASE A0
- COMMISSARY TO LOSE USE OF (12) e1G10-5 & (2) e1G10-3 & (2) e1G08 FROZEN FOOD
REFRIGERATED CASES DURING THIS PHASE.
- COMMISSARY TO DISPLAY IMPACTED FROZEN FOOD MERCHANDISE IN NEW REFRIGERATED FROZEN FOOD CASES LOCATED IN PHASE A3 AND EXISTING REFRIGERATED FROZEN FOOD CASES LOCATED
IN PHASE E3.
- MAINTAIN AISLE AND ACCESS TO ADJACENT REFRIGERATED FROZEN FOOD CASES 8' CLEAR MIN.
- MAINTAIN MINIMUM 8' CLEAR AISLE WIDTH AT NORTH AND SOUTH END OF AISLE AROUND ANY
REQUIRED CONSTRUCTION PARTITIONS TO MAINTAIN ACCESS TO DAIRY ALCOVE 69C AND BAKERY
DELI DISPLAY AREA 70.
(COMMENCE AFTER COMPLETION OF PHASE A1)
PHASE B6
- COMMISSARY TO LOSE THE USE OF (3) e1G02-12 & (1) e1G02-8 REFRIGERATE DAIRY CASES DURING THIS PHASE.
- COMMISSARY TO DISPLAY IMPACTED DAIRY MERCHANDISE N NEW REFRIG. DAIRY CASES INSTALLED DURING
PHASE B7.
- MAINTAIN ACCESS TO e1G11 DAIRY DOORS DURING STORE OPERATING HOURS.
- MAINTAIN ACCESS TO VESTIBULE 2K DURING STORE OPERATING HOURS.
- MAINTAIN MIN S' CLEAR AISLE WIDTH BETWEEN ANY TEMPORARY CONSTRUCTION BARRIERS & FRONT OF
REFRIG. CASE.
- MAINTAIN ACCESS TO EGRESS EXIT DOOR BETWEEN GRIDS S & R AT ALL TIMES.
(COMMENCE AFTER COMPLETION OF PHASE A5)
PHASE C1
- COMMISSARY WILL LOSE USE OF (5) CHECKSTANDS DURING THIS PHASE (SEE GENERAL PHASING
NOTES 19 & 20).
- COMMISSARY WILL LOSE THE MASS DISPLAY AREA 39 DURING THIS PHASE.
- RELOCATE MASS DISPLAY 39 TO LOCATION DETERMINED BY STORE DIRECTOR.
- MAINTAIN ACCESS TO AND USE OF CARRYOUT VESTIBULE 3B DURING THIS PHASE.
(COMMENCE AFTER COMPLETION OF PHASE B1)
PHASE C2
- COMMISSARY TO LOSE THE USE OF MEAT PROCESSING 55, MEAT WRAPPING 56, MEAT MANAGER 57
AND BULK MEAT STORAGE 59 DURING THIS PHASE.
- PRODUCE STORAGE AND PROCESSING AREAS TO MOVE TO NEW PRODUCE STORAGE AND
PROCESSING AREAS COMPLETED DURING PHASE B1.
- RELOCATE MEAT PROCESSING 55 TO EXISTING PRODUCE CHILLED STORAGE 43 & EXISTING
PRODUCE AMBIANT STORAGE 44B, AS INDICATED IN PLAN 3/GC103.
- RELOCATE MEAT WRAPPING 56, TO PRODUCE AMBIENT STORAGE 44B & EXISTING PRODUCE
PROCESSING 44A, AS INDICATED IN PLAN 3/GC103.
- RELOCATE MEAT MANAGER TO PRODUCE MANAGER 45, AS INDICATED IN PLAN 3/GC103.
- PROVIDE TEMPORARY REFRIGERATED TRAILER FOR REFRIGERATED MEAT STORAGE DURING THIS PHASE
(COMMENCE AFTER COMPLETION OF PHASE B1)
PHASE E4
- COMMISSARY TO LOSE USE OF REFRIG. FROZEN COFFIN CASES (e-1G07 AND e-1G06) DURING THIS PHASE.
- COMMISSARY TO DISPLAY IMPACTED FROZEN FOOD MERCH. IN EXIST. REFRIG. FROZEN FOOD CASES LOCATED
IN PHASES B7, D3, AND E3.
- MAINTAIN AISLE AND ACCESS TO ADJACENT REFRIGERATED FROZEN FOOD AND DAIRY CASES 8' CLEAR MIN.
- MAINTAIN MINIMUM 8' CLEAR AISLE WIDTH AT NORTH AND SOUTH END OF AISLE AROUND ANY REQUIRED
CONSTRUCTION PARTITIONS TO MAINTAIN ACCESS TO DAIRY ALCOVE 69C AND BAKERY/DELI DISPLAY AREA 70.
(COMMENCE AFTER COMPLETION OF PHASES D3)
PHASE D1
- TEMPORARY MEAT PROCESSING AND MEAT WRAPPING TO MOVE FROM EXISTING PRODUCE
STORAGE AND PROCESSING AREAS TO NEW MEAT PROCESSING AND MEAT WRAPPING AREAS
CONSTRUCTED DURING PHASE C1.
- PROVIDE TEMPORARY REFRIGERATED TRAILER FOR REFRIG. MEAT STORAGE.
PHASE B7
- COMMISSARY WILL LOSE USE OF CARRYOUT RETURN VESTIBULE 3B DURING THIS PHASE.
(COMMENCE AFTER COMPLETION OF PHASE C1)
(COMMENCE AFTER COMPLETION OF PHASE A3)
- TEMPORARILY RELOCATE AND CONNECT EXISTING BAKERY AND DELI DISPLAY EQUIPMENT AS SHOWN
ON SHEET GC101 & GC102 DURING THIS PHASE.
- COMMISSARY TO DISPLAY IMPACTED DELI BAKERY MERCHANDISE IN REFRIGERATED CASES EXISTING
LOCATION PHASES B7,D3, & E3 AND NEW REFRIG. CASES INSTALLED DURING PHASE A3.
- COMMISSARY WILL LOSE USE OF (4) QUICKCHECKS DURING THIS PHASE (SEE GENERAL NOTE 19 & 20).
PHASE D5
- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.
- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA
SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN
(COMMENCE AFTER COMPLETION OF PHASE C3)
PHASE E3 (COMMENCE AFTER COMPLETION OF PHASE D4 & D5)
PHASING AREA DESCRIPTIONS
PHASE E2
- COMMISSARY WILL LOSE USE OF (6) CHECKSTANDS DURING THIS PHASE (SEE GENERAL PHASING NOTES 19 & 20).
- MAINTAIN CHECKSTAND EXIT FLOW OF TRAFFIC DURING THIS PHASE OF CONSTRUCTION. DO NOT BLOCK TRAFFIC
FLOW BETWEEN CHECKSTANDS AND EXIT VESTIBULES MAINTAIN 8' CLEAR MIN. AISLE WIDTH.
(COMMENCE AFTER COMPLETION OF PHASE C3)
PHASE C3
- COMMISSARY WILL LOSE USE OF EMPLOYER BREAK ROOM 16B AND MENS 51 & WOMENS 53
RESTROOMS DURING THIS PHASE.
- EMPLOYERS TO USE NEW BREAK ROOM 16A CONSTRUCTED DURING PHASE B4 DURING THIS PHASE.
- EMPLOYERS TO USE A TOILETS SHOWN TO BE REMODELED IN PHASE B5.
(COMMENCE AFTER COMPLETION OF PHASE B2 & B4)
PHASE C6
- TEMPORARILY RELOCATE AND CONNECT EXISTING REFRIGERATED FRESH MEAT CASES AS
INDICATED ON OVERALL PHASING PLAN 1/GC102 DURING THIS PHASE.
- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY REMOVE & STORE
EXISTING GONDOLA SHELVING AS REQUIRED TO MAINTAIN MINIMUM 12' CLEAR AISLE WIDTH BETWEEN
FRONT OF FRESH MEAT CASES & FRONT OF GONDOLA SHELVING ROWS.
(COMMENCE AFTER COMPLETION OF PHASE B7)
PHASE D2
- COMMISSARY WILL LOSE USE OF (5) e1P02-8 & (2) e1P02-12 REFRIGERATED PRODUCE CASES
DURING THIS PHASE.
- COMMISSARY TO DISPLAY IMPACTED PRODUCE MERCHANDISE IN NEW REFRIG. PRODUCE
CASE INSTALLED DURING PHASES A2 & B3.
- MAINTAIN MIN. 8' CLEAR AISLE WIDTH BETWEEN ANY TEMPORARY CONSTRUCTION BARRIER &
GONDOLA SHELVING.
(COMMENCE AFTER COMPLETION OF PHASES B3
PHASE D3
- COMMISSARY WILL LOSE ACCESS TO COVERED STORAGE AREA-IN RECEIVING YARD DURING THIS PHASE.
- RELOCATE IMPACTED EQUIPMENT TO LOCATIONS DETERMINED BY STORE DIRECTOR
- COMMISSARY WILL LOSE ACCESS TO GRADE LEVEL RECEIVING DOORS DURING THIS PHASE.
- PROVIDE TEMP. RAMP (FORK LIFT RATED) AT PROPOSED LOCATION INDICATED ON PLANS.
- MAINTAIN ACCESS TO EXIT DOORS AT ALL TIMES DURING THIS PHASE
- COMMISSARY WILL LOSE USE OF FROZEN FOOD STORAGE 68 DURING THIS PHASE
(COMMENCE AFTER COMPLETION OF PHASE C4 & C6)
PHASE F2
- COMMISSARY WILL LOSE USE OF (4) CHECKSTANDS AND (1) CHECKOUT DURING THIS PHASE (SEE GENERAL
PHASING NOTES 19 & 20).
- MAINTAIN CHECKSTAND EXIT FLOW OF TRAFFIC DURING THIS PHASE OF CONSTRUCTION. DO NOT BLOCK TRAFFIC
FLOW BETWEEN CHECKSTANDS AND EXIT VESTIBULES MIN.
(COMMENCE AFTER COMPLETION OF PHASE E2)
- WORK IN DAIRY STORAGE AREA 67 IS TO BE DONE DURING STORE NON-OPERATIONAL HOURS.
MAINTAIN ACCESS TO AND USE OF SAME ROOM DURING STORE OPERATING HOURS.
- FROZEN FOOD STORAGE MOVES INTO NEW FROZEN FOOD STORAGE COMPLETED DURING PHASE A5.
PHASE E1 (COMMENCE AFTER COMPLETION OF PHASE D4 & D5)
PHASE G1
- COMMISSARY WILL LOSE USE OF EXIT VESTIBULE 2A DURING THIS PHASE
- MAINTAIN CHECKSTAND EXIT FLOW OF TRAFFIC DURING THIS PHASE OF CONSTRUCTION. DO NOT BLOCK TRAFFIC
FLOW BETWEEN CHECKSTANDS AND EXIT VESTIBULES MAINTAIN 8' CLEAR MIN. AISLE WIDTH.
(COMMENCE AFTER COMPLETION OF PHASE F2)
PHASE H1 (COMMENCE AFTER COMPLETION OF PHASE G1)
PHASE I1 (COMMENCE AFTER COMPLETION OF PHASE H1)
PHASE B4
- COMMISSARY WILL LOSE USE OF CUSTOMER SERVICE/STORE MANAGER OFFICE 6, PATRON SERVICE/ID 9, BREAKROOM 16, SCANNING SUPPORT 18, AND VENDOR OFFICE 86, DURING THIS PHASE.
- CUSTOMER SERVICE/STORE MANAGER TO MOVE INTO NEW OFFICE CONSTRUCTED DURING PHASE A4.
- EMPLOYEES TO USE EXISTING BREAKROOM 16B LOCATED IN PHASE C6 AND BAGGER BREAKROOM 80 LOCATED
IN PHASE A4.
(COMMENCE AFTER COMPLETION OF PHASE A1)
PHASE A5 (COMMENCE AFTER NOTICE TO PROCEED & APPROVAL OF SUBMITTALS)
PHASE C5 (COMMENCE AFTER COMPLETION OF PHASE B1)
SEE ENLARGED PLAN 1/GC103
SEE ENLARGED PLAN 1/GC103
- COMMISSARY WILL LOSE USE OF TRASH PLATFORM DURING THIS PHASE.
- DUMPSTERS TO BE RELOCATED TO LOCATION TO BE DETERMINED BY STORE DIRECTOR & CONTRACTORS
OFFICER'S REPRESENTATIVE. DUMPSTERS MUST BE LOCATED MIN. 15'-0" FROM BUILDING
- PROVIDE TEMPORARY RAMP (FORK LIFT RATED AT PROPOSED LOCATION INDICATED ON PLANS DURING
THIS PHASE
PHASE B5 (COMMENCE AFTER COMPLETION OF PHASE A1)
- COMMISSARY TO LOSE USE OF (5) e1G12-4 REFRIGERATED FROZEN FOOD CASES DURING THIS PHASE
- COMMISSARY TO DISPLAY IMPACTED FROZEN FOOD MERCHANDISE IN NEW REFRIGERATED CASES
INSTALLED DURING PHASES A3 & B7.
- COMMISSARY TO LOSE USE OF (3) e1G02-12 REFRIGERATED DAIRY CASES DURING THIS PHASE.
- COMMISSARY TO DISPLAY IMPACTED DAIRY MERCHANDISE IN EXISTING REFRIGERATED CASES LOCATED
IN PHASES D3 & E4
PHASE C4 (COMMENCE AFTER COMPLETION OF PHASE B7)
- COMMISSARY WILL LOSE USE OF EXIT VESTIBULE 2B DURING THIS PHASE
- MAINTAIN CHECKSTAND EXIT FLOW OF TRAFFIC DURING THIS PHASE OF CONSTRUCTION. DO NOT BLOCK
TRAFFIC FLOW BETWEEN CHECKSTANDS AND EXIT VESTIBULES MAINTAIN 8' CLEAR MIN. AISLE WIDTH.
- COMMISSARY WILL LOSE USE OF (2) SELF CHECKOUTS DURING THIS PHASE
- MAINTAIN ACCESS TO EXIT VESTIBULE DURING STORE OPERATING HOURS
- MAINTAIN ACCESS TO STORE MGR/CUST. SERVICE OFFICE 6B AND BREAKROOM DURING STORE OPERATING
HOURS
PHASE F1 (COMMENCE AFTER COMPLETION OF PHASE E1 & E3)
PHASE A6 (COMMENCE AFTER NOTICE TO PROCEED & APPROVAL OF SUBMITTALS)
- WORK IN RECEIVING AISLE MAY BE DONE DURING STORE OPERATING HOURS PROVIDED THE WORK DOES NOT
INTERFERE WITH COMMISSARY OPERATIONS & HAS PRIOR APPROVAL BY THE STORE DIRECTOR.
- WORK TO RECEIVING DOORS SHALL BE SEQUENCED SO THAT NO MORE THAN ONE DOOR IS OUT
OF OPERATION AT ONE TIME.
- VENDOR OFFICE 86 TO BE RELOCATED TO NEW OFFICE CONSTRUCTED IN PHASE A1.
- MAINTAIN TEMPORARY ACCESS TO NEW ADMIN. AREA COMPLETED IN PHASE A1 PER PLAN 2/GC103.
- PATRON SERVICES/ID 9 TO BE RELOCATED TO LOCATION DETERMINED BY STORE DIRECTOR.
- MAINTAIN ACCESS TO VESTIBULE 21A DURING STORE OPERATING HOURS
- FEMALE PATRON'S WILL CONTINUE USING WOMEN'S TOILET 26 UNTIL COMPLETION OF NEW WOMEN'S
PATRON TOILET.
PHASE B4 CONT.
- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.
- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA
SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN
- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.
- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA
SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN
- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.
- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA
SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN
- USING GONDOLA MOVING EQUIPMENT, CONTRACTOR IS TO TEMPORARILY RELOCATE GONDOLA SHELVING TO ALLOW WORK REQUIRED IN PHASE. MAINTAIN MINIMUM 6'-0" AISLE WIDTH BETWEEN GONDOLA ROWS.
- AFTER COMPLETION OF FLOORING AND CEILING WORK, CONTRACTOR IS TO RELOCATE EXISTING GONDOLA
SHELVING TO NEW LOCATION SHOWN ON PHASING PLAN
R E
G
IS
T E R E D A R C H I T E C
T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E R E D A R C H I T E C
T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E R E D A R C H I T E C
T
A R K A N S A S
EDWIN C.
LEVY
101 south spring street little rock, ar 72201
501.372.2900 cromwell.com
SEQUENCE
NO.
SHEET NO.
OF
DATE:SOL. NO.
PROJECT NO.
DRAWING NUMBER
SUBMITTED BY:
ENGINEER:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
TO THE BEST OF OUR KNOWLEDGE,
INFORMATION AND BELIEF, BASED
ON AND LIMITED TO OUR NORMAL
FUNCTIONS PERFORMED UNDER OUR
CONTRACT WITH THE GOVERNMENT,
IT IS OUR PROFESSIONAL OPINION
THAT THIS PROJECT IS DESIGNED
IN ACCORDANCE WITH APPLICABLE
DOD REGULATIONS.
EDWIN C. LEVY
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
FORT LEE, VIRGINIA
DIRECTORATE OF ENGINEERING
30-MAY-2018
EA16MI05
NAVAL AIR STATION
PENSACOLA, FLORIDA
PENSACOLA COMMISSARY FACILITY
ADDITION /ALTERATION
A/E: 2016-001
RTA SOLICITATION ISSUE
SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION
1 5-30-2018 RTA SOLICITATION ISSUE
GC100
ECL
JAR
ECL
PHASING GENERAL NOTES / CONSTRUCTION BARRIER
DETAILS
05/30/18
3/8" = 1'-0"
1 TEMPORARY PARTITION DETAILS
SCALE : 3/8" = 1'-0"
0 2 4 8
3 7-24-2018 REVISIONS TO BID DOCUMENTS
HDEC03-18-R-0007
1 3
3 5 9 13
WW
14.8 17 19 23
VV
UU
SS
RR
PP
NN
MM
H
CC
BB
4 5.3 6
7 7.9 8
12 14
15 16 18 20 21
22 24 25 27
28 29 30
31 32
D
F
G
J
K
L
E
A
X
25.2
.5
.5
TT
SEE CIVIL FOR WORK AT
FRONT WALK
SEE CIVIL FOR WORK
AT LOADING DOCK
e
M
-1 e
M
-1 e
M
-1 e
M
-1 e
M
-1 e
G
-1 e
G
-1 e
G
-5 e
G
-5 e
G
-5 e
G
-5 e
G
-3 e
G
-5 e
G
-5 e
G
-3 e
G
-5 e
G
-5 e
G
-5 e
G
-5 e
G
-5 e
G
-5 e
G
-5 e
G
-5 e
G
-5 e
G
-5 e
G
-5 e
G
-3 e
G
-5 e
G
-1 e
G
-1 e
G
-1 e
G
-5 e
G
-5
G
-4 e
G
-5 e
G
-5 e
G
-1 e
G
-1 e
G
-1 e
G
-8 e
G
-5 e1M04-8 1M07-12 1M07-12 e
G
-1 e
G
-1 e
G
-1 e
G
-1 e
G
-1 e
G
-1 e
G
-1 e
P
-0 e
P
-0 e1P02-12 e1P02-12 e1P02-08 e1 P
2-e P 02-0 e
P
-1 e
P
-1 e
P
-1 e
P
-1 e
P
-0 e
P
-0 e1M02-12 e1M02-12 e1M02-12 e1M02-12 e1M02-12 e1M02-12 e1G08 e1G08 e1G06 e1G06e1G08 e1G00 e1G00 e1D01 e1D00-8 e1D00-12 e1D00-12 e1B02 e1B06 e-1D00-12 e-1D00-12 e-1B06 e-1B02 e-1M02-12 e-1M02-12 e-1M02-12 e-1M02-12 e-1M02-12 e-1M04-8 e-1M07-12 e-1M07-12
A5
A1 A0 E2 F2 G1 H1 I1
B6
A2
B3
B1 D1 C1 C5
D2 C2
B4 C3 D5 E3
A4
E1
A3 C4
C6
D4
B7D3
E4
B2
B5
F1
TEMPORARILY RELOCATE
EXISTING REFRIGERATED
FRESH MEAT CASES TO
INDICATED AREA DURING
PHASE C4
TEMPORARILY REMOVE AND STORE SECTIONS OF
GONDOLA SHELVING AS INDICATED TO
ACCOMMODATE PATRON CIRCULATION. PROVIDE
12'-0" MIN. CLEAR BETWEEN CASES AND
SHELVING.
PROVIDE TRAILER FOR
TEMPORARY PRODUCE
CHILLED STORAGE AND
TEMPORARY BULK MEAT
STORAGE DURING PHASE D1.
CONFIRM LOCATION WITH
STORE DIRECTOR. PROVIDE
POWER AS REQUIRED.
PROVIDE TRAILER FOR
TEMPORARY PRODUCE
CHILLED STORAGE AND
TEMPORARY BULK MEAT
STORAGE DURING PHASE C1.
CONFIRM LOCATION WITH
STORE DIRECTOR. PROVIDE
POWER AS REQUIRED.
PROVIDE REFERIGERATED TEMP.
RAMP (FORKLIFT RATED) DURING
PHASES A5 & B7
CONFIRM LOCATION W/ STORE
DIRECTOR & CONTRACTING
OFFICER'S REPRESENTATIVE
TEMPORARILY RELOCATE EXISTING
REFRIGERATED BAKERY AND DELI CASES
TO INDICATED AREA DURING PHASE C4
MAINTAIN 12'-0" MIN. CLEAR
BETWEEN FRONT OF TEMP.
RELOCATED DELI CASES AND
FROZEN FOOD CASES
PROVIDE CONSTRUCTION
BARRIER TUNNEL DURING
PHASE A1 & B4 FOR TEMPORARY
PATRON ACCESS TO TOILETS
PROPOSED LOCATION OF TEMPORARY
HVAC UNIT DURING REPLACEMENT OF
EXISTING HVAC UNIT IN MECH MEZZANINE
A6
PROVIDE TRAILER FOR
TEMPORARY FROZEN FOOD
STORAGE DURING PHASE A5.
CONFIRM LOCATION WITH
STORE DIRECTOR. PROVIDE
POWER AS REQUIRED.
1 3B 2B7
16A 19
21A
20A
20B
21B
35 34 43
44A
44B 47
45 59
16B
53 51
86B86A
76 75 77
21C
793A2A
6A 72
69D
69B
69C
69A
6B
20C
56 62
83B
SYMBOL LEGEND
TO REMAIN (BLACK)
TO BE REMOVED BY CONTRACTOR (RED)
EQUIPMENT TO BE REMOVED BY CONTRACTOR (RED)
EQUIPMENT TO BE RELOCATED BY GOVERNMENT (BLUE)
EQUIPMENT TO BE REMOVED BY GOVERNMENT (CYAN)
EQUIPMENT TO BE RELOCATED BY CONTRACTOR (GREEN)
A0, A1
B1
NOTICE TO PROCEED
PHASING SCHEDULE:
APPROVED SUBMITTALS
B2 B4
C3
B5 B3
A2 A4
B7
A3 A5
D2
C1 C2 C4 C6
D1
E2E1, E3
D3
E4
F2F1
G1
H1
I1
B6
C5
D4, D5
A6
W
14.8 17 19 23
V
U
S
15 22
T
UP
PROVIDE TEMP. HVAC UNIT
DURING REPLACEMENT OF
EXISTING HVAC UNIT
NEW OPENING MUST BE
CONSTRUCTED BEFORE
REPLACEMENT OF EXISTING
HVAC UNIT IN MEZZANINE
REMOVE EXISTING
REFRIGERATION RACKS -
SEE REFRIGERATION
DRAWINGS
REMOVE EXISTING
CONCRETE PAD AFTER
REMOVAL OF
REFRIGERATION RACKS
R E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVY
101 south spring street little rock, ar 72201
501.372.2900 cromwell.com
SEQUENCE
NO.
SHEET NO.
OF
DATE:SOL. NO.
PROJECT NO.
DRAWING NUMBER
SUBMITTED BY:
ENGINEER:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
TO THE BEST OF OUR KNOWLEDGE,
INFORMATION AND BELIEF, BASED
ON AND LIMITED TO OUR NORMAL
FUNCTIONS PERFORMED UNDER OUR
CONTRACT WITH THE GOVERNMENT,
IT IS OUR PROFESSIONAL OPINION
THAT THIS PROJECT IS DESIGNED
IN ACCORDANCE WITH APPLICABLE
DOD REGULATIONS.
EDWIN C. LEVY
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
FORT LEE, VIRGINIA
DIRECTORATE OF ENGINEERING
30-MAY-2018
EA16MI05
NAVAL AIR STATION
PENSACOLA, FLORIDA
PENSACOLA COMMISSARY FACILITY
ADDITION /ALTERATION
A/E: 2016-001
RTA SOLICITATION ISSUE
SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION
1 5-30-2018 RTA SOLICITATION ISSUE
GC101
ECL
JAR
ECL
PHASING DEMOLITION PLAN
05/30/18
1/16" = 1'-0"
1 OVERALL PHASING DEMOLITION PLAN
ROOM INDEX (EXISTING)
ROOM
AreaNUMBER NAME
1 ENTRY VESTIBULE 120 SF
1A ENTRY 412 SF
2A EXIT VEST. 108 SF
2B EXIT VEST. 109 SF
3B CARRYOUT RETURN VEST. 105 SF
4 CASHIER 208 SF
5 CASH COUNTING 128 SF
6B STORE MANAGER / CUST. SERV. OFF. 113 SF
7 RESTROOM ALCOVE 163 SF
8 CART STORAGE 915 SF
9 PATRON ASSISTED RESTROOM 80 SF
10 MEN RESTROOM 191 SF
11 WOMEN RESTROOM 223 SF
12 STORE DIRECTOR OFFICE 256 SF
13 ADMIN. VEST. 36 SF
14 ADMIN. CORRIDOR 191 SF
15 ADMINISTRATIVE AREA 1377 SF
16A BREAKROOM 405 SF
16B BREAKROOM 363 SF
16C BREAKROOM 209 SF
17 TRAINING ROOM 256 SF
17A TRAINING STORAGE 29 SF
18 ASST. STORE DIRECTOR OFFICE 146 SF
18A STORE ADMINISTRATOR OFFICE 145 SF
19 GROCERY MGR OFFICE 171 SF
20A JANITOR 36 SF
20B JANITOR 39 SF
20C JANITOR 53 SF
20D JANITOR 36 SF
21A VESTIBULE 93 SF
21B VESTIBULE 93 SF
21C VESTIBULE 70 SF
22 ADMIN. STORAGE (ABOVE) 637 SF
22A ADMIN. STORAGE STAIRWAY 59 SF
23 DAMAGED MERCHANDISE 171 SF
24 DAMAGED MERCH. SALES ALCOVE 63 SF
25 LOCKER ROOM- WOMEN 142 SF
26 EMP. TLT - WOMEN 111 SF
27 EMP. TLT - MEN 111 SF
28 LOCKER ROOM - MEN 142 SF
30 CONTRACT STOCKER STORAGE 94 SF
31A COMM. ROOM 146 SF
31B COMM. CLOSET 34 SF
31J ELEC 95 SF
31K ELECT. 75 SF
32 CONTRACT STOCKER STORAGE 132 SF
33 MOBILE REGISTER STORAGE 116 SF
34 MEDICAL FOOD INSPEC. OFFICE 134 SF
35 RECEIVING OFFICE 71 SF
36 RECEIVING AREA 2390 SF
37 STAGING AREA 8489 SF
38 MHE CHARGING 608 SF
39 MASS DISPLAY 1321 SF
40 QAE OFFICE 86 SF
41 PLANT DISPLAY 245 SF
43A PRODUCE CHILLED STORAGE NON-GAS 833 SF
43B PRODUCE CHILLED STORAGE GAS 732 SF
44A PRODUCE PROCESSING 588 SF
44B PRODUCE AMBIENT STORAGE 591 SF
45 PRODUCE MANAGER 120 SF
47 MEAT TRAY STORAGE 368 SF
51 RESTROOM- MEN'S 115 SF
53 RESTROOM- WOMEN'S 121 SF
54 RECEIVING AISLE 3705 SF
55 MEAT PROCESSING 1274 SF
56 MEAT WRAPPING 1121 SF
57 MEAT MANAGER 174 SF
59 BULK MEAT STORAGE 2065 SF
61 PRE PAK MEAT STORAGE 330 SF
62 POULTRY STORAGE 358 SF
63 CHASE 51 SF
67 DAIRY STORAGE 2564 SF
68 FROZEN FOOD STORAGE 2561 SF
68B FROZEN VESTIBULE 235 SF
69A SALES AREA 31192 SF
69B PRODUCE ALCOVE 1203 SF
69C DAIRY ALCOVE 1271 SF
69D BAKERY/DELI DISPLAY AREA 599 SF
72 BAKERY/DELI SERVICE AREA 535 SF
73 DELI PREP. 351 SF
74 BAKERY PREP. 368 SF
75 BAKERY COOLER 129 SF
76 BAKERY FREEZER 178 SF
77 DELI COOLER 129 SF
78 BAKERY/DELI DRY STOR. 77 SF
79 DELI-BAK OFFICE 53 SF
80 BAGGER BREAKROOM 102 SF
81 CHECKOUT AREA 4119 SF
82 CUSTOMER CHECKOUT QUEUING 1080 SF
83 MECHANICAL MEZZANINE 2679 SF
83B MECHANICAL MEZZANINE STAIR 237 SF
84 VENDOR 78 SF
86A MEN'S RESTROOM 36 SF
86B WOMEN'S RESTROOM 30 SF
KEY PLAN
D C
A B
SCALE : 1/16" = 1'-0"
0 8 16 32
NORTH
3 7-24-2018 REVISIONS TO BID DOCUMENTS
INDICATES PROPOSED LOCATION OF WEATHERTIGHT, INSULATED
TEMPORARY CONSTRUCTION BARRIER (TYPE 5 - SEE SHEET GC100)
REQUIRED WHERE EXISTING BUILDING WILL BE OPEN TO EXTERIOR.
1/16" = 1'-0"
2 MEZZANINE DEMO PHASING PLAN
07/25/2018
HDEC03-18-R-0007
1 3
3 5 9 13
WW
14.8 17 19 23
VV
UU
SS
RR
PP
NN
MM
H
CC
BB
4 5.3 6
7 7.9 8
12 14
15 16 18 20 21
22 24 25 27
28 29 30
31 32
D
F
G
J
K
L
E
A
X
25.2
.5
.5
2B3B 2A 80
6B
76 75 77
69D
16C
86A86B
31J14
20D
16A
18A18
17 31A 33
21A
22A
20A
20B
21B
44B 44A
43A 43B
16B
20C
53 51
21C
68B
69B
17A
TT
A5
A1 A0 E2 F2 G1 H1 I1
B6
A2
B3
B1 D1 C1 C5
D2 C2
B4 C3 D5 E3
A4
E1
1A
SEE CIVIL FOR WORK AT
FRONT WALK
TEMPORARILY RELOCATE EXISTING
REFRIGERATED BAKERY AND DELI CASES
TO INDICATED AREA DURING PHASE C4
SEE CIVIL FOR WORK
AT LOADING DOCK
G
G D
-1
G
G D
-1
G
G D
-1
G
G D
-1
G
G D
-1
G
G D
-1
G
G D
-1
G
G D
-1
G
G D
-1
G
G D
-1
G
G D
-1
G
G D
-8
G
G
D -8
M
G D
-1
M
G D
-1
M
G D
-1
M
G D
-1
M
G D
-1
G
-5
G
-4
G
-4
G
-4
G
-4
G
-4
G
-5
G
-5
G
-5
G
-5
G
-5
G
-5
G
-5
G
-5
G
-5
G
G
-5
G
-5
G
G
-5
G
-5
G
-5
G
-5
G
-1
G
-1
G
-1
1M07-8 1M07-12 1M07-12 1M07-12 1M07-12 1M07-12
A3 C4
C6
D4
B7D3
E4
B2 e-1M02-12 e-1M02-12 e-1M02-12 e-1M02-12 e-1M02-12 e-1M04-8 e-1M07-12 e-1M07-12
P
-8
P
-1
P
-1
P
-1
P
-1
P
-1
P
-8
P
-8
P
-1
P
-1
1P03-12 1P03-12 1P07-81P07-8
P 7-1
B5
1D00-8 1D00-8 1D00-12
B
-5
B
-A
B
-2 e-1D00-12 e-1D00-12 e-1B06 e-1B02
1D24-8
1D22-12
PROVIDE TEMP. RAMP (FORKLIFT
RATED) DURING PHASES A5 & B8
CONFIRM LOCATION W/ STORE
DIRECTOR & CONTRACTING
OFFICER'S REPRESENTATIVE
MAINTAIN 12'-0" MIN. CLEAR
BETWEEN FRONT OF TEMP.
RELOCATED DELI CASES AND
FROZEN FOOD CASES
F1
PROVIDE CONSTRUCTION
BARRIER TUNNEL DURING
PHASE A1 & B4 FOR TEMPORARY
PATRON ACCESS TO TOILETS
A6
TEMPORARILY RELOCATE
EXISTING REFRIGERATED
FRESH MEAT CASES TO
INDICATED AREA DURING
PHASE C4
TEMPORARILY REMOVE AND STORE SECTIONS OF
GONDOLA SHELVING AS INDICATED TO
ACCOMMODATE PATRON CIRCULATION. PROVIDE
12'-0" MIN. CLEAR BETWEEN CASES AND
SHELVING.
PROVIDE TRAILER FOR
TEMPORARY PRODUCE
CHILLED STORAGE AND
TEMPORARY BULK MEAT
STORAGE DURING PHASE D1.
CONFIRM LOCATION WITH
STORE DIRECTOR. PROVIDE
POWER AS REQUIRED.
PROVIDE TRAILER FOR
TEMPORARY PRODUCE
CHILLED STORAGE AND
TEMPORARY BULK MEAT
STORAGE DURING PHASE C1.
CONFIRM LOCATION WITH
STORE DIRECTOR. PROVIDE
POWER AS REQUIRED.
PROPOSED LOCATION OF TEMPORARY
HVAC UNIT DURING REPLACEMENT OF
EXISTING HVAC UNIT IN MECH MEZZANINE
PROVIDE TRAILER FOR
TEMPORARY FROZEN FOOD
STORAGE DURING PHASE A5.
CONFIRM LOCATION WITH
STORE DIRECTOR. PROVIDE
POWER AS REQUIRED.
A0, A1
B1
NOTICE TO PROCEED
PHASING SCHEDULE:
APPROVED SUBMITTALS
B2 B4
C3
B5 B3
A2 A4
B7
A3 A5
D2
C1 C2 C4 C6
D1
E2E1, E3
D3
E4
F2F1
G1
H1
I1
B6
C5
D4, D5
A6
SYMBOL LEGEND
EXISTING TO REMAIN (BLACK)
N…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.