Drawings_for_Set_1_of_6.pdf
PDF 13 MB Posted
- Attached to
- Addition/Alteration to Commissary, NAS Pensacola, FL Federal contract opportunity
- Solicitation number
- HDEC03-18-R-0007
- Issued by
- Defense Commissary Agency
About this file
Attachment 03 Drawing Set 1 of 6
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOLS LEGEND
DOOR LABEL
101 DOOR NUMBER PER SCHEDULE
SEE DOOR SCHEDULE AND ELEVATIONS
WINDOW LABEL
1i WINDOW PER ELEVATIONS
SECTION SYMBOL
SECTION IDENTIFICATION NUMBER
SHEET NUMBER WHERE SECTION IS DRAWN
DETAIL SYMBOL
DETAIL IDENTIFICATION NUMBER
SHEET NUMBER WHERE DETAIL IS DRAWN
ELEVATION SYMBOL
A-101
ELEVATION IDENTIFICATION NUMBER
SHEET NUMBER WHERE ELEVATION IS DRAWN
A-101
ROOM NAME
150 SF
ROOM LABEL
ROOM NAME
ROOM NUMBER
ROOM AREA
REVISION IDENTIFICATION
REVISION NUMBER
GENERAL AREA OR
DETAIL INCLUDED IN
REVISION
A101
SIM
EARTH
CONCRETE
GRAVEL
BRICK
CONCRETE MASONRY UNIT (CMU)
CERAMIC TILE
ACOUSTICAL TILE
WOOD, ROUGH CARPENTRY
COOLER/FREEZER WALL PANEL
WOOD, FINISH CARPENTRY
WOOD, BLOCKING
PLYWOOD
METAL
GLASS
GYPSUM BOARD (GWB)
BATT INSULATION
RIGID INSULATION
SECTION INDICATIONS
ARCHITECTURAL ABBREVIATIONS
AB
ACOUST.
AD
ADJ.
ADMIN.
A.F.F.
AGGRE.
ALUM.
BD
B.F.F.
BLKG
BM
B.O.
BPL
BS
BTWN.
B.U.R.
CAL.
CL
CFC
CSF
CG
CJ
CLG
CMU
COL.
CONC.
CONC. BLK
CONST.
CONT.
CT
DB
DIM.
DR
DTL
DWG
EA
E.B.
EF
E.I.F.S.
EJ
ELEC.
ELEV.
EQ
EQUIP.
EW
EWC
EXIST.
EXP
EXT.
F
FD
FE
FEC
FIN.
FLR
FND
F.O.C.
FRP
FTG
GA
GALV
GR
GP
GYP
GYP.BD.
H
HD
HC
HDW
HM
HORIZ.
HP
HT
INFO.
INSUL.
INT
JAN
JT
JST
KCJ
LAV.
ANCHOR BOLT
ACOUSTICAL
AUXILIARY DRAIN
ADJUSTABLE
ADMINISTRATION
ABOVE FINISH FLOOR
AGGREGATE
ALUMINUM
BOARD
BELOW FINISH FLOOR
BLOCKING
BREAM
BOTTOM OF
BASE PLATE
BOTH SIDES
BETWEEN
BUILT-UP ROOF
CALIPER
CENTERLINE
COMBINED FACILITIES COMPLEX
COMBINED SHARED FACILITIES
CORNER GUARD
CONTROL JOINT
CEILING
CONCRETE MASONRY UNIT
COLUMN
CONCRETE BLOCK
CONSTRUCTION
CONTINUOUS
CERAMIC TILE
DECK BEARING
DIMENSION
DOOR
DETAIL
DRAWING
EACH
EXPANSION BOLT
EXHAUST FAN
EXTERIOR INSULATION AND FINISH SYSTEM
EXPANSION JOINT
ELECTRICAL
ELEVATION
EQUAL
EQUIPMENT
EACH WAY
ELECTRIC WATER COOLER
EXISTING
EXPANSION
EXTERIOR
FEMALE
FLOOR DRAIN
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH
FLOOR
FOUNDATION
FACE OF CONCRETE
FIBERGLASS REINFORCED PANEL
FOOTING
GAGE
GALVANIZED
GUARD RAIL
GUARD POST
GYPSUM BOARD
HIGH
HANDICAP
HOLLOW CORE
HARDWARE
HOLLOW METAL
HORIZONTAL
HORSEPOWER
HEIGHT
INFORMATION
INSULATION
INTERIOR
JANITOR.
JOINT
JOIST
KEYED CONTROL JOINT
LAVATORY
KG
LCB
LM
LG
MAS
MATL.
MAX
MB
M.D.
MECH.
MEMB.
MEZZ.
MFR
MISC.
MO
M.S.
MTL.
N.I.C.
NS
N.T.S.
OC
OD
OFW
OPNG
OPP.
P.LAM
PL
PLYWD.
PNL
PROD
KG/SQM
KG/SQCM
QTY
R R
RD
REFRIG
REINF
REQD
RM
RPP
SC
SCHED.
SECT.
SHT.
SIM.
SPECS
SMFE
SRFE
S
SS
S.S.
SSC
SST
STB
STL
STO.
STRUCT.
SYM.
T T & B
THK
THRESH.
TJ
TO
T.O.S.
T.O.P.
TS
TYP
T.O.M.
U.N.O.
VCT
VERT.
VEST.
V.I.F.
W W/
WC
WD
WDW
WG
W/O
WP
WT
WWF
KILOGRAM
LIQUID CHALK BOARD
LINEAL METER
LONG
MASONRY
MATERIAL
MAXIMUM
MINI-BLINDS
METAL DECK
MECHANICAL
MEMBRANE
MEZZANINE
MANUFACTURER
MISCELLANEOUS
MASONRY OPENING
METAL STUD
METAL
NOT IN CONTRACT
NON-SHRINK
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OUTSIDE FACE OF WALL
OPENING
OPPOSITE
PLASTIC LAMINATE
PLATE
PLYWOOD
PANEL
PRODUCE
KILOGRAMS PER SQUARE METER
KILOGRAMS PER SQUARE CENTIMETER
QUANTITY
RISER
RADIUS
ROOF DRAIN
REFRIGERATION
REINFORCING
REQUIRED
ROOM
RACK POST PROTECTOR
SOLID CORE
SCHEDULE
SECTION
SHEET
SIMILAR
SPECIFICATIONS
SURFACE MOUNTED FEC
SEMI-RECESSED FEC
SEWER
SANITARY SEWER
STAINLESS STEEL
STAINLESS STEEL CLOSURE
STAINLESS STEEL THRESHOLD
STAFF TRAINING BUILDING
STEEL
STORAGE
STRUCTURAL
SYMBOL
TREAD
TOP AND BOTTOM
THICK
THRESHOLD
TOOLED JOINT
TOP OF
TOP OF STEEL
TOP OF PANEL
TUBE STEEL
TYPICAL
TOP OF MASONRY
UNLESS NOTED OTHERWISE
VINYL COMPOSITION TILE
VERTICAL
VESTIBULE
VERIFY IN FIELD
WIDE
WITH
WATER CLOSET
WOOD
WINDOW
WALL GUARD
WITHOUT
WATERPROOFING
WEIGHT
WELDED WIRE FABRIC
R E
G
IS
T E R E D A R C H IT E
C
T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E R E D A R C H IT E
C
T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E R E D A R C H IT E
C
T
A R K A N S A S
EDWIN C.
LEVY
101 south spring street little rock, ar 72201
501.372.2900 cromwell.com
SEQUENCE
NO.
SHEET NO.
OF
DATE:SOL. NO.
PROJECT NO.
DRAWING NUMBER
SUBMITTED BY:
ENGINEER:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
TO THE BEST OF OUR KNOWLEDGE,
INFORMATION AND BELIEF, BASED
ON AND LIMITED TO OUR NORMAL
FUNCTIONS PERFORMED UNDER OUR
CONTRACT WITH THE GOVERNMENT,
IT IS OUR PROFESSIONAL OPINION
THAT THIS PROJECT IS DESIGNED
IN ACCORDANCE WITH APPLICABLE
DOD REGULATIONS.
EDWIN C. LEVY
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
FORT LEE, VIRGINIA
DIRECTORATE OF ENGINEERING
30-MAY-2018
EA16MI05
NAVAL AIR STATION
PENSACOLA, FLORIDA
PENSACOLA COMMISSARY FACILITY
ADDITION /ALTERATION
A/E: 2016-001
RTA SOLICITATION ISSUE
SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION
1 5-30-2018 RTA SOLICITATION ISSUE
1-G-002
ECL
JAR
ECL
ARCHITECTURAL INDEX, SYMBOLS & ABBREV.
05/30/18
SHEET
NUMBER SHEET NAME
A-108 REFLECTED CEILING PLAN - AREA C
A-109 REFLECTED CEILING PLAN - AREA D
A-110 OVERALL ROOF PLAN
A-201 EXTERIOR ELEVATIONS
A-202 EXTERIOR ELEVATIONS
A-301 SECTIONS
A-302 SECTIONS
A-303 SECTIONS
A-304 SECTIONS
A-305 SECTIONS
A-306 SECTIONS
A-307 SECTIONS
A-308 SECTIONS
A-401 LARGE SCALE PLANS
A-402 LARGE SCALE PLANS
A-403 LARGE SCALE PLANS
A-404 LARGE SCALE PLANS
A-405 LARGE SCALE PLANS
A-406 LARGE SCALE PLANS
A-407 LARGE SCALE PLANS
A-501 INTERIOR DETAILS
A-502 INTERIOR DOOR DETAILS
A-503 COLD STORAGE ROOM DETAILS
A-504 DETAILS
A-505 ROOF DETAILS
A-506 ROOF DETAILS
A-507 DOOR DETAILS
A-508 ENTRY DETAILS
A-509 INTERIOR DETAILS
A-600 ROOM FINISH NOTES AND LEGENDS
A-601 ROOM FINISH SCHEDULE
A-602 DOOR & WINDOW SCHEDULES & TYPES
A-701 PARTITION TYPES
A-702 PARTITION TYPE DETAILS
A-801 MILLWORK DETAILS
A-802 MILLWORK DETAILS
A-803 MILLWORK DETAILS
INTERIORS
I-101 FLOOR FINISH & SIGNAGE PLAN
I-102 SALES AREA DECOR PLAN
I-201 SALES AREA ELEVATIONS
I-202 DECOR DETAILS
I-203 DECOR DETAILS
I-204 DECOR DETAILS
I-205 DECOR DETAILS
EQUIPMENT
QD100 DEMOLITION EQUIPMENT PLAN
QD101 DEMOLITION EQUIPMENT PLAN - AREA A & B
QD102 DEMOLITION EQUIPMENT PLAN - AREA C & D
Q-100 EQUIPMENT PLAN
Q-101 EQUIPMENT PLAN - AREA A & B
Q-102 EQUIPMENT PLAN - AREA C & D
Q-601 EQUIPMENT SCHEDULE
SHEET
NUMBER SHEET NAME
GENERAL INFORMATION
1-G-001 COVER
1-G-002 ARCHITECTURAL INDEX, SYMBOLS & ABBREV.
1-G-003 GENERAL SITE INFORMATION
G-004 GENERAL INFORMATION (FIXTURE CLEARANCES / MOUNTING HEIGHTS)
GC100 PHASING GENERAL NOTES / CONSTRUCTION BARRIER DETAILS
GC101 PHASING DEMOLITION PLAN
GC102 PHASING PLAN
GC103 ENLARGED PHASING PLANS
GC104 ENLARGED PHASING PLANS
LIFE SAFETY
GI001 LIFE SAFETY AND CODE ANALYSIS
GI100 LIFE SAFETY PLAN - OVERALL
CIVIL
VF101 SITE SURVEY
CD101 SITE DEMOLITION PLAN
CS101 SITE LAYOUT PLAN
CS102 SITE PHASING AND TEMPORARY TRAFFIC PLAN
CG101 SITE GRADING & DRAINAGE PLAN
CU101 SITE UTILITY PLAN
C-501 SITE DETAILS
STRUCTURAL
S-001 GENERAL NOTES
S-002 WIND UPLIFT PLAN
S-100 OVERALL FOUNDATION PLAN
S-101 FOUNDATION PLAN - AREA A
S-102 FOUNDATION PLAN - AREA C
S-103 FOUNDATION PLAN - AREA D
S-104 FRAMING PLAN - AREA A
S-105 FRAMING PLAN - AREA C
S-106 FRAMING PLAN - AREA D
S-201 SECTIONS AND DETAILS
S-202 EXTERIOR ELEVATIONS
S-301 FOUNDATION SECTIONS AND DETAILS
S-302 FOUNDATION SECTIONS AND DETAILS
S-303 FOUNDATION SECTIONS AND DETAILS
S-304 FOUNDATION SECTION AND DETAILS
S-401 FRAMING DETAILS
S-402 FRAMING DETAILS
S-403 FRAMING DETAILS
S-404 FRAMING DETAILS
S-501 CFS WALL DETAILS
S-502 MASONRY WALL FRAMING DETAILS
ARCHITECTURAL
AD100 OVERALL DEMOLITION FLOOR PLAN
AD101 DEMOLITION FLOOR PLAN - AREA A
AD102 DEMOLITION FLOOR PLAN - AREA B
AD103 DEMOLITION FLOOR PLAN - AREA C
AD104 DEMOLITION FLOOR PLAN - AREA D
AD105 OVERALL REFLECTED CEILING DEMOLITION PLAN
AD106 REFLECTED CEILING DEMOLITION PLAN - AREA A
AD107 REFLECTED CEILING DEMOLITION PLAN - AREA B
AD108 REFLECTED CEILING DEMOLITION PLAN - AREA C
AD109 REFLECTED CEILING DEMOLITION PLAN - AREA D
AD110 OVERALL DEMOLITION ROOF PLAN
AD201 EXTERIOR DEMOLIITON ELEVATIONS
AD202 INTERIOR DEMOLITION ELEVATIONS
A-100 OVERALL FLOOR PLAN
A-101 FLOOR PLAN - AREA A
A-102 FLOOR PLAN - AREA B
A-103 FLOOR PLAN - AREA C
A-104 FLOOR PLAN - AREA D
A-105 OVERALL REFLECTED CEILING PLAN
A-106 REFLECTED CEILING PLAN - AREA A
A-107 REFLECTED CEILING PLAN - AREA B
INDEX OF DRAWINGS - VOLUME 1
3 7-24-2018 REVISIONS TO BID DOCUMENTS
HDEC03-18-R-0007
AMENDMENT 0006
ATTACHMENT 03
1 3
3 5 9 13
WW
14.8 17 19 23
VV
UU
SS
RR
PP
NN
MM
H
CC
BB
4 5.3 6
7 7.9 8 10 11
12 14
15 16 18 20 21
22 24 25 27
28 29 30
31 32
D
F
G
J
K
L
E
A A
2B3B 2A
6B
76 75 77
69D
16C
86A
86B
931J
20D
16A
18A18
17 31A
21A
22A
20A
20B
21B
44B 44A
43A
43B
59 55
16B 20C
53 51
61 62
21C
68B
X
25.2.5
.5
69B
69C
17A
TT
1A
83B
31K
SEE CIVIL FOR WORK
AT FRONT WALK
31B
SEE CIVIL FOR WORK
AT LOADING DOCK
A-201
A-201
A-201
A-201
A-201
A-201
A-303
A-304
A-304
A-301
A-302
A-304
A-303
A-304
A-305
A-305
A-305
A-308
69A
7 3/4"
GENERAL NOTES:
1. DIVIDE BID INTO THREE BID CATEGORIES.
ANNOTATE EACH ITEM OF WORK WITHIN ITS APPROPRIATE BID
CATEGORY.
THE THREE BID CATEGORIES ARE AS FOLLOWS:
(C): NEW CONSTRUCTION - CLIN 0001
(E): EQUIPMENT - CLIN 0002
(M&R): MAINTENANCE & REPAIR - CLIN 0003
SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION
2. EXISTING CONDITIONS SHOWN IN THESE PLANS ARE FROM LIMITED FIELD
OBSERVATIONS BY THE ARCHITECT AND ORIGINAL DESIGN DRAWINGS.
VERIFY ALL EXISTING MATERIAL, DIMENSIONS, ELEVATIONS, AND GENERAL
CONDITIONS OF THE BUILDING (INCLUDING IF EXISTING MATERIALS &
PRODUCTS ARE METRIC OR IMPERIAL BASED) BEFORE PURCHASE OF
NEW MATERIALS & PRODUCTS AND CONSTRUCTION. NOTIFY THE
CONTRACTING OFFICER OF ANY DISCREPANCIES BETWEEN PLANS AND
FIELD CONDITIONS IMMEDIATELY.
3. THE TERM "PROVIDE" MEANS FURNISH AND INSTALL.
4. REWORK EXISTING FACILITIES (I.E. FLOOR SLAB, WALLS, PARTITIONS,
SOFFITS, CEILING, ROOF, ETC.) AS REQUIRED TO ACCOMMODATE NEW
WORK. PATCH TO MATCH EXISTING, UNLESS NOTED OTHERWISE.
5. COORDINATE ALL WORK TO ENSURE THAT THE INSTALLATION, SIZE OF
NEW PIPES, EQUIPMENT, FIXTURES, CONDUIT, DUCTS, OPENINGS,
SWITCHES, OUTLETS, ETC. DO NOT INTERFERE WITH THE INSTALLATION,
OR PROGRESS, OF OTHER WORK TO BE DONE ON THE PROJECT.
SYMBOL LEGEND
EXISTING TO REMAIN (BLACK)
NEW BY CONTRACTOR (RED)
NEW EQUIPMENT BY CONTRACTOR (RED)
EXISTING EQUIPMENT RELOCATED
BY GOVERNMENT (BLUE)
NEW EQUIPMENT BY GOVERNMENT (CYAN)
EXISTING EQUIPMENT RELOCATED BY
CONTRACTOR (GREEN)
P
N
M
NO ARCHITECTURAL
WORK TO BE PERFORMED
IN ADMIN. STORAGE. SEE
ALL OTHER DISCIPLINES
FOR ADDITIONAL
INFORMATION
W
14.8 17 19 23
V
U
S
15 22
T
UP
SEE ALL OTHER
DISCIPLINES FOR
WORK IN MEZZANINE
83B
12' - 0"
V.I.F.
6' - 6"
VERTICAL
MEZZANINE
GATE (VMG)
R E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVY
101 south spring street little rock, ar 72201
501.372.2900 cromwell.com
SEQUENCE
NO.
SHEET NO.
OF
DATE:SOL. NO.
PROJECT NO.
DRAWING NUMBER
SUBMITTED BY:
ENGINEER:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
TO THE BEST OF OUR KNOWLEDGE,
INFORMATION AND BELIEF, BASED
ON AND LIMITED TO OUR NORMAL
FUNCTIONS PERFORMED UNDER OUR
CONTRACT WITH THE GOVERNMENT,
IT IS OUR PROFESSIONAL OPINION
THAT THIS PROJECT IS DESIGNED
IN ACCORDANCE WITH APPLICABLE
DOD REGULATIONS.
EDWIN C. LEVY
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
FORT LEE, VIRGINIA
DIRECTORATE OF ENGINEERING
30-MAY-2018
EA16MI05
NAVAL AIR STATION
PENSACOLA, FLORIDA
PENSACOLA COMMISSARY FACILITY
ADDITION /ALTERATION
A/E: 2016-001
RTA SOLICITATION ISSUE
SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION
1 5-30-2018 RTA SOLICITATION ISSUE
A-100
ECL
JAR
ECL
OVERALL FLOOR PLAN
05/30/18
1/16" = 1'-0"
1 OVERALL FLOOR PLAN
KEY PLAN
D C
A B
NORTH
SCALE : 1/16" = 1'-0"
0 8 16 32
1/16" = 1'-0"
2 ADMIN. STOR. PLAN
1/16" = 1'-0"
3 MECH. MEZZ. PLAN
NOTE: THIS DRAWING IS TO BE
VIEWED / PRINTED IN COLOR
ROOM INDEX (NEW)
ROOM
AreaNUMBER NAME
1 ENTRY VESTIBULE 120 SF
1A ENTRY 412 SF
2A EXIT VEST. 108 SF
2B EXIT VEST. 109 SF
3B CARRYOUT RETURN VEST. 105 SF
4 CASHIER 208 SF
5 CASH COUNTING 128 SF
6B STORE MANAGER / CUST. SERV. OFF. 113 SF
7 RESTROOM ALCOVE 163 SF
8 CART STORAGE 915 SF
9 PATRON ASSISTED RESTROOM 80 SF
10 MEN RESTROOM 191 SF
11 WOMEN RESTROOM 223 SF
12 STORE DIRECTOR OFFICE 256 SF
13 ADMIN. VEST. 36 SF
14 ADMIN. CORRIDOR 191 SF
15 ADMINISTRATIVE AREA 1377 SF
16A BREAKROOM 405 SF
16B BREAKROOM 363 SF
16C BREAKROOM 209 SF
17 TRAINING ROOM 256 SF
17A TRAINING STORAGE 29 SF
18 ASST. STORE DIRECTOR OFFICE 146 SF
18A STORE ADMINISTRATOR OFFICE 145 SF
19 GROCERY MGR OFFICE 171 SF
20A JANITOR 36 SF
20B JANITOR 39 SF
20C JANITOR 53 SF
20D JANITOR 36 SF
21A VESTIBULE 93 SF
21B VESTIBULE 93 SF
21C VESTIBULE 70 SF
22 ADMIN. STORAGE (ABOVE) 637 SF
22A ADMIN. STORAGE STAIRWAY 59 SF
23 DAMAGED MERCHANDISE 171 SF
24 DAMAGED MERCH. SALES ALCOVE 63 SF
25 LOCKER ROOM- WOMEN 142 SF
26 EMP. TLT - WOMEN 111 SF
27 EMP. TLT - MEN 111 SF
28 LOCKER ROOM - MEN 142 SF
30 CONTRACT STOCKER STORAGE 94 SF
31A COMM. ROOM 146 SF
31B COMM. CLOSET 34 SF
31J ELEC 95 SF
31K ELECT. 75 SF
32 CONTRACT STOCKER STORAGE 132 SF
33 MOBILE REGISTER STORAGE 116 SF
34 MEDICAL FOOD INSPEC. OFFICE 134 SF
35 RECEIVING OFFICE 71 SF
36 RECEIVING AREA 2390 SF
37 STAGING AREA 8489 SF
38 MHE CHARGING 608 SF
39 MASS DISPLAY 1321 SF
40 QAE OFFICE 86 SF
41 PLANT DISPLAY 245 SF
43A PRODUCE CHILLED STORAGE NON-GAS 833 SF
43B PRODUCE CHILLED STORAGE GAS 732 SF
44A PRODUCE PROCESSING 588 SF
44B PRODUCE AMBIENT STORAGE 591 SF
45 PRODUCE MANAGER 120 SF
47 MEAT TRAY STORAGE 368 SF
51 RESTROOM- MEN'S 115 SF
53 RESTROOM- WOMEN'S 121 SF
54 RECEIVING AISLE 3705 SF
55 MEAT PROCESSING 1274 SF
56 MEAT WRAPPING 1121 SF
57 MEAT MANAGER 174 SF
59 BULK MEAT STORAGE 2065 SF
61 PRE PAK MEAT STORAGE 330 SF
62 POULTRY STORAGE 358 SF
63 CHASE 51 SF
67 DAIRY STORAGE 2564 SF
68 FROZEN FOOD STORAGE 2561 SF
68B FROZEN VESTIBULE 235 SF
69A SALES AREA 31192 SF
69B PRODUCE ALCOVE 1203 SF
69C DAIRY ALCOVE 1271 SF
69D BAKERY/DELI DISPLAY AREA 599 SF
72 BAKERY/DELI SERVICE AREA 535 SF
73 DELI PREP. 351 SF
74 BAKERY PREP. 368 SF
75 BAKERY COOLER 129 SF
76 BAKERY FREEZER 178 SF
77 DELI COOLER 129 SF
78 BAKERY/DELI DRY STOR. 77 SF
79 DELI-BAK OFFICE 53 SF
80 BAGGER BREAKROOM 102 SF
81 CHECKOUT AREA 4119 SF
82 CUSTOMER CHECKOUT QUEUING 1080 SF
83 MECHANICAL MEZZANINE 2679 SF
83B MECHANICAL MEZZANINE STAIR 237 SF
84 VENDOR 78 SF
86A MEN'S RESTROOM 36 SF
86B WOMEN'S RESTROOM 30 SF
BUILDING AREA:
EXISTING GROSS BUILDING AREA =
ADMIN . STORAGE MEZZANINE =
MECHANICAL MEZZANINE =
CANOPIES AT 1/2 SCOPE =
TOTAL BUILDING AREA =
SALES FLOOR AREA =
72,529 S.F.
660 S.F.
2,679 S.F.
2,398 S.F.
SALES FLOOR % OF TOTAL BLDG. AREA =
91,677 S.F.
40,959 S.F.
45%.
WAREHOUSE / ADMIN. ADDITION AREA = 9,359 S.F.
FROZEN FOOD FREEZER ADDITION AREA = 3,340 S.F.
ENCLOSE CART STORAGE AREA = 712 S.F.
3 7-24-2018 REVISIONS TO BID DOCUMENTS
07/25/2018
HDEC03-18-R-0007
P
N
M
H
C
B
2 4 5.3 6 7 7.9 8
11 12 14
A
STORE
DIRECTOR
OFFICE
ASST. STORE
DIRECTOR
OFFICE
STORE
ADMINISTRATOR
OFFICE
18A
ADMINISTRATIVE
AREA
TRAINING
ROOM
COMM. ROOM
31A
CONTRACT
STOCKER
STORAGE
MOBILE
REGISTER
STORAGE
MHE
CHARGING
VESTIBULE
21A
STAGING AREA
ADMIN.
STORAGE
STAIRWAY
22A
JANITOR
20A
QAE OFFICE
LOCKER
ROOM- WOMEN
EMP. TLT -
WOMEN
EMP. TLT - MEN
LOCKER ROOM
- MEN
BREAKROOM
16A
WOMEN
RESTROOM
JANITOR
20D
ENTRY
VESTIBULE
MEN
RESTROOM
PATRON
ASSISTED
RESTROOM
ELEC
31J
ADMIN.
CORRIDOR
VENDOR
CARRYOUT
RETURN VEST.
3B
CHECKOUT
AREA
MATCHLINE
M A T C H L
IN
E
CART
STORAGE
MASS DISPLAY
RESTROOM
ALCOVE
.5
PLANT
DISPLAY
ENTRY
1A
TRAINING
STORAGE
17A
P6A
A-501
BOTH
SIDES
SUSHI LOW DISPLAY
- SEE DETAIL 7/A-801
SUSHI LOW DISPLAY
- SEE DETAIL 7/A-801
4' - 0"
SUSHI STEPPED DISPLAY
(TYP. OF 4) - SEE DETAIL 6/A-801
LINE OF CANOPY ABOVE
SEE CIVIL FOR WORK AT
FRONT WALK
NEW SIDEWALK
SEE CIVIL
A-403
A-402
/4
9"
6'
3' 6'
3'
0"
6' - 9" 3' - 4" 19' - 2" 3' - 4" 19' - 2" 3' - 4" 13' - 4" 3' - 4" 13' - 4" 3' - 4" 13' - 4" 3' - 4"
5 8 14
5 8 14
5 8
5 8
2 3
2 3 15
2 3
CUSTOMER
CHECKOUT
QUEUING
LINE OF EXISTING FURRDOWN
ABOVE
LINE OF NEW
FURRDOWN ABOVE
LINE OF EXISTING
FURRDOWN ABOVE
ELECT.
31K
A-306
BP-2 BP-2
BP-2
BP-2BP-2
BP-2
BP-2
BP-2
BP-2
ROOF DRAIN PIPE
SEE PLUMBING
EXISTING ROOF DRAIN PIPE
3'
7' " 10
EXISTING
FEC
A-508
TYP.
2 3 15
EYEWASH STATION
SEE PLUMBING
P5A
P5A
2 3 15
ADMIN. VEST.
SALES AREA
69A
INSTALL 3/4" FIRE RETARDANT
TREATED PLYWOOD ON ALL WALL
SURFACES. SET BOTTOM OF PANEL
3'-0" A.F.F. AND RUN 8'-0" x 4'-0"
PLYWOOD PANELS HORIZONTALLY.
1' - 1"
GENERAL NOTES:
1. DIVIDE BID INTO THREE BID CATEGORIES.
ANNOTATE EACH ITEM OF WORK WITHIN ITS APPROPRIATE BID
CATEGORY.
THE THREE BID CATEGORIES ARE AS FOLLOWS:
(C): NEW CONSTRUCTION - CLIN 0001
(E): EQUIPMENT - CLIN 0002
(M&R): MAINTENANCE & REPAIR - CLIN 0003
SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION
2. EXISTING CONDITIONS SHOWN IN THESE PLANS ARE FROM LIMITED FIELD
OBSERVATIONS BY THE ARCHITECT AND ORIGINAL DESIGN DRAWINGS.
VERIFY ALL EXISTING MATERIAL, DIMENSIONS, ELEVATIONS, AND GENERAL
CONDITIONS OF THE BUILDING (INCLUDING IF EXISTING MATERIALS &
PRODUCTS ARE METRIC OR IMPERIAL BASED) BEFORE PURCHASE OF
NEW MATERIALS & PRODUCTS AND CONSTRUCTION. NOTIFY THE
CONTRACTING OFFICER OF ANY DISCREPANCIES BETWEEN PLANS AND
FIELD CONDITIONS IMMEDIATELY.
3. THE TERM "PROVIDE" MEANS FURNISH AND INSTALL.
4. REWORK EXISTING FACILITIES (I.E. FLOOR SLAB, WALLS, PARTITIONS,
SOFFITS, CEILING, ROOF, ETC.) AS REQUIRED TO ACCOMMODATE NEW
WORK. PATCH TO MATCH EXISTING, UNLESS NOTED OTHERWISE.
5. COORDINATE ALL WORK TO ENSURE THAT THE INSTALLATION, SIZE OF
NEW PIPES, EQUIPMENT, FIXTURES, CONDUIT, DUCTS, OPENINGS,
SWITCHES, OUTLETS, ETC. DO NOT INTERFERE WITH THE INSTALLATION,
OR PROGRESS, OF OTHER WORK TO BE DONE ON THE PROJECT.
SYMBOL LEGEND
EXISTING TO REMAIN (BLACK)
NEW BY CONTRACTOR (RED)
NEW EQUIPMENT BY CONTRACTOR (RED)
EXISTING EQUIPMENT RELOCATED
BY GOVERNMENT (BLUE)
NEW EQUIPMENT BY GOVERNMENT (CYAN)
EXISTING EQUIPMENT RELOCATED BY
CONTRACTOR (GREEN)
SS WG - STAINLESS STEEL WALL GUARD
DRYWALL PARTITION
WB - INDICATES NEW WOOD BUMPER RAILING - SEE DETAIL 1/A-501
CMU PARTITION
PARTITION TYPE - SEE SHEET A-701
PP PROTECTION POST - SEE DETAIL 3/A-501
BP BUMPER POST - SEE DETAIL 5/A-501
SSB - STAINLESS STEEL BUMPER SYSTEM - SEE DETAIL 1/Q-601
FIRE EXTINGUISHER - SEE DETAIL 6/A-501
FIRE EXTINGUISHER CABINET - SEE DETAIL 6/A-501
EXISTING FIRE EXTINGUISHER CABINET
WINDOW INDICATION - SEE SHEET A-602 FOR
WINDOW TYPES
DOOR INDICATION - SEE SHEET A-602 FOR
DOOR TYPES
ELECTRIC WATER COOLER - SEE PLUMBING
STAINLESS STEEL CLOSURE TRIM - SEE DETAIL 10/A-501.
SEE GENERAL FLOOR PLAN NOTE 11.
P2
A
86B
EWC
FE
FEC
XFEC
LEGEND
SSC
1. INSTALL MATERIALS & EQUIPMENT IN A MANNER TO CONFORM TO THE
STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM, AND KEEP
OPENINGS AND PASSAGEWAYS CLEAR. IN ALL CASES, ADEQUATE ACCESS
(PER FR. RECOMMENDATIONS & CODE COMPLIANCE) FOR MAINTENANCE AND
REPLACEMENT OF EQUIPMENT SHALL BE PROVIDED. ANY DEVIATIONS AND/OR
OBSTRUCTIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT
PRIOR TO PROCEEDING WITH WORK.
2. SEE SHEET Q-601 FOR EQUIPMENT SCHEDULE.
3. COORDINATE ALL DIMENSIONS BETWEEN WALLS AT REFRIGERATED
CASES WITH EQUIPMENT MANUFACTURER.
4. EXISTING REFRIGERATION TUNNEL IS CONSIDERED A CONFINED SPACE.
FOLLOW ALL OSHA AND INSTALLATION (PENSACOLA) SPECIAL REQUIREMENTS
FOR WORK IN THESE AREAS.
5. PROVIDE SOUND ATTENUATION BATT INSULATION IN ALL NEW STUD
PARTITIONS AT ALL OFFICES, TOILETS, LOCKER ROOMS, AND TRAINING ROOMS.
6. PROVIDE MOISTURE RESISTANT GYPSUM BOARD ON ALL STUD PARTITIONS
BEHIND AND AT SIDES OF REFRIGERATED CASES.
7. SEE INTERIORS SHEETS I-101 - I-205 FOR FLOORING AND SIGNAGE
INFORMATION.
8. ALL DIMENSIONS ARE FROM FINISH FACE OF PARTITION UNLESS OTHERWISE
NOTED.
9. PROVIDE COMPRESSIBLE FOAM SEAL TO FILL GAP BETWEEN NEW DISPLAY
CASE END PANELS AND ADJACENT WALLS UNLESS OTHERWISE NOTED.
SEE DETAIL 4/A-501.
10. PROVIDE 6'-0" HIGH S.S. COLUMN COVERS AT ALL EXPOSED COLUMNS
WITHIN CUSTOMER AREAS, INCLUDING THOSE LOCATIONS WITHIN GONDOLA
SHELVING UNLESS OTHERWISE NOTED. SEE DETAIL 8/A-501.
11. PROVIDE STAINLESS STEEL CLOSURE STRIPS (SSC) AT ALL LOCATIONS
WHERE AIR SPACE BETWEEN COLD STORAGE PANELS AND ADJACENT
WALLS IS EXPOSED TO VIEW. ALSO PROVIDE STAINLESS STEEL CLOSURE
STRIPS WHERE GYP/STUD AND CMU WALLS MEET COLD STORAGE PANELS.
SEE DETAIL 10/A-501
GENERAL FLOOR PLAN NOTES
R E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVY
101 south spring street little rock, ar 72201
501.372.2900 cromwell.com
SEQUENCE
NO.
SHEET NO.
OF
DATE:SOL. NO.
PROJECT NO.
DRAWING NUMBER
SUBMITTED BY:
ENGINEER:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
TO THE BEST OF OUR KNOWLEDGE,
INFORMATION AND BELIEF, BASED
ON AND LIMITED TO OUR NORMAL
FUNCTIONS PERFORMED UNDER OUR
CONTRACT WITH THE GOVERNMENT,
IT IS OUR PROFESSIONAL OPINION
THAT THIS PROJECT IS DESIGNED
IN ACCORDANCE WITH APPLICABLE
DOD REGULATIONS.
EDWIN C. LEVY
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
FORT LEE, VIRGINIA
DIRECTORATE OF ENGINEERING
30-MAY-2018
EA16MI05
NAVAL AIR STATION
PENSACOLA, FLORIDA
PENSACOLA COMMISSARY FACILITY
ADDITION /ALTERATION
A/E: 2016-001
RTA SOLICITATION ISSUE
SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION
1 5-30-2018 RTA SOLICITATION ISSUE
A-101
ECL
JAR
ECL
FLOOR PLAN - AREA A
05/30/18
1/8" = 1'-0"
1 FLOOR PLAN - AREA A
ITEMS OF WORK (NEW)
NUMBER DESCRIPTION
14 PROVIDE NEW PLUMBING FIXTURES, TOILET PARTITIONS, AND TOILET ACCESSORIES.
MATCH EXISTING LOCATIONS
15 PROVIDE NEW WOOD BUMPER RAILS. SEE DETAIL 1/A-501. LOCATION INDICATED BY
DASHED LINE
16 REFINISH EXISTING WOOD BUMPER RAILS - MATCH EXISTING FINISH
17 PROVIDE NEW MILLWORK
18 INSTALL NEW DOCK BUMPERS - MATCH EXISTING LOCATIONS
19 INSTAL NEW DOCK SEALS - MATCH EXISTING LOCATIONS
20 REPAIR DOOR HARDWARE AND CLOSER
21 PAINT DOOR AND FRAME, BOTH SIDES
22 PAINT DOOR FRAME, BOTH SIDES
23 INSTALL NEW WINDOW SILL - SEE DTL. 5/A-307
24 PROVIDE WINDOW BLINDS
25 PROVIDE NEW VINYL STRIP CURTAIN
26 GROUT FILL VOID WHERE THRESHOLD HEATER REMOVED
27 EXISTING GONDOLA SHELVING TO BE RELOCATED BY CONTRACTOR
ITEMS OF WORK (NEW)
NUMBER DESCRIPTION
1 REPAIR DAMAGED CONCRETE FLOOR INCLUDING CRACKS, PITS, DIPS, ETC.
2 INSTALL NEW FLOOR FINISH - SEE ROOM FINISH SCHEDULE
3 INSTALL NEW BASE - SEE ROOM FINISH SCHEDULE
4 INSTALL NEW CONCRETE CURB. SEE SHEET A-405
5 INSTALL NEW CERAMIC FLOOR AND BASE TILE - SEE ROOM FINISH SCHEDULE
6 CLEAN EXISTING CERAMIC FLOOR AND BASE TILE. REPLACE DAMAGED CERAMIC FLOOR
AND BASE TILE. REPLACE DAMAGED AND MISSING GROUT
7 INSTALL NEW CERAMIC WALL TILE - SEE ROOM FINISH SCHEDULE & SUBSTRATE
8 CLEAN EXISTING CERAMIC WALL TILE. REPLACE DAMAGED CERAMIC WALL TILE.
REPLACE DAMAGED AND MISSING GROUT
9 DEEP CLEAN ROOM INCLUDING FLOORS, BASE, WALLS, CEILIING, AND DOORS
10 REPAIR DAMAGED GYPSUM BOARD WALL
11 INSTALL NEW GYPSUM BOARD WALL FINISH WHERE WOOD PANELING WAS REMOVED.
MURAL TO BE APPLIED OVER GYPSUM BOARD. SEE 6/I-201
12 REPAIR FURRDOWN WHERE PORTION WAS REMOVED
13 INSTALL NEW WAINSCOT - SEE ROOM FINISH SCHEDULE
KEY PLAN
D C
A B
SCALE : 1/8" = 1'-0"
0 4 8 16
NORTH NOTE: THIS DRAWING IS TO BE VIEWED / PRINTED IN COLOR
NOTE: NOT ALL ITEMS
LISTED APPLY TO AREA A
3 7-24-2018 REVISIONS TO BID DOCUMENTS
07/25/2018
HDEC03-18-R-0007
N
M
C
B
12 14 15 16 18 20 21 22 24 25 27 28 29 30 31 32
D
BAKERY/DELI
DISPLAY AREA
69D
BAKERY/DELI
SERVICE AREA
BAKERY PREP.
DELI PREP.
DELI COOLER
BAKERY
COOLER
BAKERY
FREEZER
WOMEN'S
RESTROOM
86B
MEN'S
RESTROOM
86A
BAKERY/DELI
DRY STOR.
CASHIER
CASH
COUNTING
BREAKROOM
16C
STORE
MANAGER /
CUST. SERV.
OFF.
6B
BAGGER
BREAKROOM
EXIT VEST.
2A
EXIT VEST.
2B
CHECKOUT
AREA
M A T C H L
IN
E
MATCHLINE
15 15
DELI-BAK
OFFICE
LINE OF NEW FURRDOWN
ABOVE
6B
LINE OF
EXISTING
FURRDOWN
ABOVE
5' - 0"
9'
6' 0"
P-1
LINE OF EXISTING
SOFFIT ABOVE
LINE OF EXISTING
FURRDOWN ABOVE
LINE OF EXISTING
REFRIGERATION
TUNNEL BELOW
TO REMAIN
LINE OF EXISTING
REFRIGERATION
TUNNEL BELOW
TO REMAIN
LINE OF EXISTING
REFRIGERATION
TUNNEL BELOW
TO REMAIN
LINE OF EXISTING
REFRIGERATION
TUNNEL BELOW
TO REMAIN
LINE OF
EXISTING
REFRIG.
TUNNEL
BELOW
TO
REMAIN
A-406
A-406
A-406
CUSTOMER
CHECKOUT
QUEUING
2 3 82 3 8
2 3
2 3 2 3 8
20 21
20 21
6 7 146 7 142 32 3
232323
2 3
2 3
2 3
11 15 23
A-501
A-501
A-501
A-307
SS
WG
SS
WG
A-307
A-403
A-403
FEC
XFEC
XFEC
SIM.
A-802
LINE OF EXISTING CANOPY
ABOVE
A-504
A-504
NEW STORE HOURS SIGN
1 1
SALES AREA
69A
2 3
2 3
P-1P-1
P-1
P-1
XFEC
FE
GENERAL NOTES:
1. DIVIDE BID INTO THREE BID CATEGORIES.
ANNOTATE EACH ITEM OF WORK WITHIN ITS APPROPRIATE BID
CATEGORY.
THE THREE BID CATEGORIES ARE AS FOLLOWS:
(C): NEW CONSTRUCTION - CLIN 0001
(E): EQUIPMENT - CLIN 0002
(M&R): MAINTENANCE & REPAIR - CLIN 0003
SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION
2. EXISTING CONDITIONS SHOWN IN THESE PLANS ARE FROM LIMITED FIELD
OBSERVATIONS BY THE ARCHITECT AND ORIGINAL DESIGN DRAWINGS.
VERIFY ALL EXISTING MATERIAL, DIMENSIONS, ELEVATIONS, AND GENERAL
CONDITIONS OF THE BUILDING (INCLUDING IF EXISTING MATERIALS &
PRODUCTS ARE METRIC OR IMPERIAL BASED) BEFORE PURCHASE OF
NEW MATERIALS & PRODUCTS AND CONSTRUCTION. NOTIFY THE
CONTRACTING OFFICER OF ANY DISCREPANCIES BETWEEN PLANS AND
FIELD CONDITIONS IMMEDIATELY.
3. THE TERM "PROVIDE" MEANS FURNISH AND INSTALL.
4. REWORK EXISTING FACILITIES (I.E. FLOOR SLAB, WALLS, PARTITIONS,
SOFFITS, CEILING, ROOF, ETC.) AS REQUIRED TO ACCOMMODATE NEW
WORK. PATCH TO MATCH EXISTING, UNLESS NOTED OTHERWISE.
5. COORDINATE ALL WORK TO ENSURE THAT THE INSTALLATION, SIZE OF
NEW PIPES, EQUIPMENT, FIXTURES, CONDUIT, DUCTS, OPENINGS,
SWITCHES, OUTLETS, ETC. DO NOT INTERFERE WITH THE INSTALLATION,
OR PROGRESS, OF OTHER WORK TO BE DONE ON THE PROJECT.
SYMBOL LEGEND
EXISTING TO REMAIN (BLACK)
NEW BY CONTRACTOR (RED)
NEW EQUIPMENT BY CONTRACTOR (RED)
EXISTING EQUIPMENT RELOCATED
BY GOVERNMENT (BLUE)
NEW EQUIPMENT BY GOVERNMENT (CYAN)
EXISTING EQUIPMENT RELOCATED BY
CONTRACTOR (GREEN)
1. INSTALL MATERIALS & EQUIPMENT IN A MANNER TO CONFORM TO THE
STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM, AND KEEP
OPENINGS AND PASSAGEWAYS CLEAR. IN ALL CASES, ADEQUATE ACCESS
(PER FR. RECOMMENDATIONS & CODE COMPLIANCE) FOR MAINTENANCE AND
REPLACEMENT OF EQUIPMENT SHALL BE PROVIDED. ANY DEVIATIONS AND/OR
OBSTRUCTIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT
PRIOR TO PROCEEDING WITH WORK.
2. SEE SHEET Q-601 FOR EQUIPMENT SCHEDULE.
3. COORDINATE ALL DIMENSIONS BETWEEN WALLS AT REFRIGERATED
CASES WITH EQUIPMENT MANUFACTURER.
4. EXISTING REFRIGERATION TUNNEL IS CONSIDERED A CONFINED SPACE.
FOLLOW ALL OSHA AND INSTALLATION (PENSACOLA) SPECIAL REQUIREMENTS
FOR WORK IN THESE AREAS.
5. PROVIDE SOUND ATTENUATION BATT INSULATION IN ALL NEW STUD
PARTITIONS AT ALL OFFICES, TOILETS, LOCKER ROOMS, AND TRAINING ROOMS.
6. PROVIDE MOISTURE RESISTANT GYPSUM BOARD ON ALL STUD PARTITIONS
BEHIND AND AT SIDES OF REFRIGERATED CASES.
7. SEE INTERIORS SHEETS I-101 - I-205 FOR FLOORING AND SIGNAGE
INFORMATION.
8. ALL DIMENSIONS ARE FROM FINISH FACE OF PARTITION UNLESS OTHERWISE
NOTED.
9. PROVIDE COMPRESSIBLE FOAM SEAL TO FILL GAP BETWEEN NEW DISPLAY
CASE END PANELS AND ADJACENT WALLS UNLESS OTHERWISE NOTED.
SEE DETAIL 4/A-501.
10. PROVIDE 6'-0" HIGH S.S. COLUMN COVERS AT ALL EXPOSED COLUMNS
WITHIN CUSTOMER AREAS, INCLUDING THOSE LOCATIONS WITHIN GONDOLA
SHELVING UNLESS OTHERWISE NOTED. SEE DETAIL 8/A-501.
11. PROVIDE STAINLESS STEEL CLOSURE STRIPS (SSC) AT ALL LOCATIONS
WHERE AIR SPACE BETWEEN COLD STORAGE PANELS AND ADJACENT
WALLS IS EXPOSED TO VIEW. ALSO PROVIDE STAINLESS STEEL CLOSURE
STRIPS WHERE GYP/STUD AND CMU WALLS MEET COLD STORAGE PANELS.
SEE DETAIL 10/A-501
GENERAL FLOOR PLAN NOTES
SS WG - STAINLESS STEEL WALL GUARD
DRYWALL PARTITION
WB - INDICATES NEW WOOD BUMPER RAILING - SEE DETAIL 1/A-501
CMU PARTITION
PARTITION TYPE - SEE SHEET A-701
PP PROTECTION POST - SEE DETAIL 3/A-501
BP BUMPER POST - SEE DETAIL 5/A-501
SSB - STAINLESS STEEL BUMPER SYSTEM - SEE DETAIL 1/Q-601
FIRE EXTINGUISHER - SEE DETAIL 6/A-501
FIRE EXTINGUISHER CABINET - SEE DETAIL 6/A-501
EXISTING FIRE EXTINGUISHER CABINET
WINDOW INDICATION - SEE SHEET A-602 FOR
WINDOW TYPES
DOOR INDICATION - SEE SHEET A-602 FOR
DOOR TYPES
ELECTRIC WATER COOLER - SEE PLUMBING
STAINLESS STEEL CLOSURE TRIM - SEE DETAIL 10/A-501.
SEE GENERAL FLOOR PLAN NOTE 11.
P2
A
86B
EWC
FE
FEC
XFEC
LEGEND
SSC
R E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVY
101 south spring street little rock, ar 72201
501.372.2900 cromwell.com
SEQUENCE
NO.
SHEET NO.
OF
DATE:SOL. NO.
PROJECT NO.
DRAWING NUMBER
SUBMITTED BY:
ENGINEER:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
TO THE BEST OF OUR KNOWLEDGE,
INFORMATION AND BELIEF, BASED
ON AND LIMITED TO OUR NORMAL
FUNCTIONS PERFORMED UNDER OUR
CONTRACT WITH THE GOVERNMENT,
IT IS OUR PROFESSIONAL OPINION
THAT THIS PROJECT IS DESIGNED
IN ACCORDANCE WITH APPLICABLE
DOD REGULATIONS.
EDWIN C. LEVY
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
FORT LEE, VIRGINIA
DIRECTORATE OF ENGINEERING
30-MAY-2018
EA16MI05
NAVAL AIR STATION
PENSACOLA, FLORIDA
PENSACOLA COMMISSARY FACILITY
ADDITION /ALTERATION
A/E: 2016-001
RTA SOLICITATION ISSUE
SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION
1 5-30-2018 RTA SOLICITATION ISSUE
A-102
ECL
JAR
ECL
FLOOR PLAN - AREA B
05/30/18
1/8" = 1'-0"
1 FLOOR PLAN - AREA B
KEY PLAN
D C
A B
SCALE : 1/8" = 1'-0"
0 4 8 16
NORTH NOTE: THIS DRAWING IS TO BE VIEWED / PRINTED IN COLOR
ITEMS OF WORK (NEW)
NUMBER DESCRIPTION
14 PROVIDE NEW PLUMBING FIXTURES, TOILET PARTITIONS, AND TOILET ACCESSORIES.
MATCH EXISTING LOCATIONS
15 PROVIDE NEW WOOD BUMPER RAILS. SEE DETAIL 1/A-501. LOCATION INDICATED BY
DASHED LINE
16 REFINISH EXISTING WOOD BUMPER RAILS - MATCH EXISTING FINISH
17 PROVIDE NEW MILLWORK
18 INSTALL NEW DOCK BUMPERS - MATCH EXISTING LOCATIONS
19 INSTAL NEW DOCK SEALS - MATCH EXISTING LOCATIONS
20 REPAIR DOOR HARDWARE AND CLOSER
21 PAINT DOOR AND FRAME, BOTH SIDES
22 PAINT DOOR FRAME, BOTH SIDES
23 INSTALL NEW WINDOW SILL - SEE DTL. 5/A-307
24 PROVIDE WINDOW BLINDS
25 PROVIDE NEW VINYL STRIP CURTAIN
26 GROUT FILL VOID WHERE THRESHOLD HEATER REMOVED
27 EXISTING GONDOLA SHELVING TO BE RELOCATED BY CONTRACTOR
ITEMS OF WORK (NEW)
NUMBER DESCRIPTION
1 REPAIR DAMAGED CONCRETE FLOOR INCLUDING CRACKS, PITS, DIPS, ETC.
2 INSTALL NEW FLOOR FINISH - SEE ROOM FINISH SCHEDULE
3 INSTALL NEW BASE - SEE ROOM FINISH SCHEDULE
4 INSTALL NEW CONCRETE CURB. SEE SHEET A-405
5 INSTALL NEW CERAMIC FLOOR AND BASE TILE - SEE ROOM FINISH SCHEDULE
6 CLEAN EXISTING CERAMIC FLOOR AND BASE TILE. REPLACE DAMAGED CERAMIC FLOOR
AND BASE TILE. REPLACE DAMAGED AND MISSING GROUT
7 INSTALL NEW CERAMIC WALL TILE - SEE ROOM FINISH SCHEDULE & SUBSTRATE
8 CLEAN EXISTING CERAMIC WALL TILE. REPLACE DAMAGED CERAMIC WALL TILE.
REPLACE DAMAGED AND MISSING GROUT
9 DEEP CLEAN ROOM INCLUDING FLOORS, BASE, WALLS, CEILIING, AND DOORS
10 REPAIR DAMAGED GYPSUM BOARD WALL
11 INSTALL NEW GYPSUM BOARD WALL FINISH WHERE WOOD PANELING WAS REMOVED.
MURAL TO BE APPLIED OVER GYPSUM BOARD. SEE 6/I-201
12 REPAIR FURRDOWN WHERE PORTION WAS REMOVED
13 INSTALL NEW WAINSCOT - SEE ROOM FINISH SCHEDULE
NOTE: NOT ALL ITEMS
LISTED APPLY TO AREA B
3 7-24-2018 REVISIONS TO BID DOCUMENTS
07/25/2018
HDEC03-18-R-0007
W
14.8 17 19 23
V
U
S
R
P
12 15 22
28 3126
VESTIBULE
21C
POULTRY
STORAGE
RECEIVING
AISLE
DAIRY
STORAGE
FROZEN FOOD
STORAGE
FROZEN
VESTIBULE
68B
RECEIVING
OFFICE
JANITOR
20C
CHASE
RESTROOM-
MEN'S
MEAT
MANAGER
MEAT TRAY
STORAGE
MEAT
PROCESSING
MEAT
WRAPPING
RESTROOM-
WOMEN'S
BREAKROOM
16B
PRE PAK MEAT
STORAGE
M A T C H L
IN
E
MATCHLINE
X
25.2
DAIRY ALCOVE
69C
(19 TOTAL)
A-307
A-306
A-306
T
EXPANSION JOINT -
SEE STRUCTURAL
68-A
68B-A
68-B
A
LI
G N
3' /4
8' /4
2'
/2
1/ 2"
9"
12' - 0" 59' - 6"
1' - 7" 10' - 5" 2' - 0" 55' - 5" 2' - 1"
1' - 5 1/4"
6' - 0"
4' - 11 3/4"
3' - 7"
3'
6'
2'
1'
3'
55A
56D55D
A
LI
G N
ALIGN
P2A
P2A
P4P4 P4
P2
P2
P2
P2
P5
P8
35' - 7 1/2" 6' - 0" 10' - 0"
3' - 0 1/2"
6' - 4" 3' - 2"
6"
3'
9"
4"
4"
51' - 7 1/2" 12' - 6 1/2" 6"
3'
1'
4'
1'
28' - 3 1/2" 6' - 0" 17' - 4"
20' - 11" 6' - 0" 24' - 8 1/2"
ALIGNALIGN
EXPANSION
JOINT - SEE
STRUCTURAL
A-403
LINE OF EXISTING
REFRIGERATION
TUNNEL BELOW
TO REMAIN
LINE OF NEW
FURRDOWN ABOVE
LINE OF EXISTING
REFRIGERATION
TUNNEL BELOW
TO REMAIN
LINE OF EXISTING
REFRIGERATION
TUNNEL BELOW
TO REMAIN
LINE OF EXISTING
REFRIGERATION
TUNNEL BELOW
TO REMAIN
LINE OF EXISTING
REFRIGERATION
TUNNEL BELOW
TO REMAIN
LINE OF EXISTING
REFRIGERATION
TUNNEL BELOW
TO REMAIN
LINE OF
EXISTING
FURRDOWN
ABOVE
LINE OF EXISTING
FURRDOWN ABOVE
A-406
A-406
SB
SB
SB
SB
SB SB
SB
SB
15' - 10 1/2" 7' - 4 1/2" 15' - 0"
A-403
P9
P9
P9
P5A
ALIGN
INFILL EXISTING OPENING AFTER
DEMOLITION OF EXISTING DOOR,
FRAME, AND HARDWARE
2 3
2 4
5 8 5 8
2 3
21202120
2 3 10 13
2 4
2 4
A-501
A-501
A-501
A-501
BP-2
BP-2
BP-2
BP-2
A
A-802
B
68-C
69A
SALES AREA
69A
PROVIDE PLUMBING FIXTURES
AND TOILET PARTITIONS TO BE
INSTALLED AFTER REMOVE
CERAMIC FLOOR TILE WORK AS
COMPLETE.
A-503
TYPICAL PLAN AT
SLIDING COOLER
DOORS
56A
ACCESS DOOR TO ATTIC
PIPE TO ABOVE- SEE MECH
DASHED LINES INDICATE VENTILATION SYSTEM
BELOW FLOOR SLAB
12" DIA NON-PERFORATED PIPE @ PERIMETER
4" DIA. PERFORATED PIPES @ 36" O.C. MAX.
SET IN MIN. 3'-0" BED OF DRAINABLE FILL
(CRUSHED ROCK OR GRAVEL)
4" DIA. VENT PIPES SHALL STUB UP 4"
A.F.F. COVER OPEN ENDS OF VENT PIPES
W/ 11 GA. STAINLESS STL. WIRE MESH
(1/4" CENTER TO CENTER OF WIRES)
13' - 11"BP-2
BP-2
BP-2
SSC
DS DS
CONCRETE
SPLASHBLOCK
CONCRETE
SPLASHBLOCK 3
DS
GENERAL NOTES:
1. DIVIDE BID INTO THREE BID CATEGORIES.
ANNOTATE EACH ITEM OF WORK WITHIN ITS APPROPRIATE BID
CATEGORY.
THE THREE BID CATEGORIES ARE AS FOLLOWS:
(C): NEW CONSTRUCTION - CLIN 0001
(E): EQUIPMENT - CLIN 0002
(M&R): MAINTENANCE & REPAIR - CLIN 0003
SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION
2. EXISTING CONDITIONS SHOWN IN THESE PLANS ARE FROM LIMITED FIELD
OBSERVATIONS BY THE ARCHITECT AND ORIGINAL DESIGN DRAWINGS.
VERIFY ALL EXISTING MATERIAL, DIMENSIONS, ELEVATIONS, AND GENERAL
CONDITIONS OF THE BUILDING (INCLUDING IF EXISTING MATERIALS &
PRODUCTS ARE METRIC OR IMPERIAL BASED) BEFORE PURCHASE OF
NEW MATERIALS & PRODUCTS AND CONSTRUCTION. NOTIFY THE
CONTRACTING OFFICER OF ANY DISCREPANCIES BETWEEN PLANS AND
FIELD CONDITIONS IMMEDIATELY.
3. THE TERM "PROVIDE" MEANS FURNISH AND INSTALL.
4. REWORK EXISTING FACILITIES (I.E. FLOOR SLAB, WALLS, PARTITIONS,
SOFFITS, CEILING, ROOF, ETC.) AS REQUIRED TO ACCOMMODATE NEW
WORK. PATCH TO MATCH EXISTING, UNLESS NOTED OTHERWISE.
5. COORDINATE ALL WORK TO ENSURE THAT THE INSTALLATION, SIZE OF
NEW PIPES, EQUIPMENT, FIXTURES, CONDUIT, DUCTS, OPENINGS,
SWITCHES, OUTLETS, ETC. DO NOT INTERFERE WITH THE INSTALLATION,
OR PROGRESS, OF OTHER WORK TO BE DONE ON THE PROJECT.
SYMBOL LEGEND
EXISTING TO REMAIN (BLACK)
NEW BY CONTRACTOR (RED)
NEW EQUIPMENT BY CONTRACTOR (RED)
EXISTING EQUIPMENT RELOCATED
BY GOVERNMENT (BLUE)
NEW EQUIPMENT BY GOVERNMENT (CYAN)
EXISTING EQUIPMENT RELOCATED BY
CONTRACTOR (GREEN)
1. INSTALL MATERIALS & EQUIPMENT IN A MANNER TO CONFORM TO THE
STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM, AND KEEP
OPENINGS AND PASSAGEWAYS CLEAR. IN ALL CASES, ADEQUATE ACCESS
(PER FR. RECOMMENDATIONS & CODE COMPLIANCE) FOR MAINTENANCE AND
REPLACEMENT OF EQUIPMENT SHALL BE PROVIDED. ANY DEVIATIONS AND/OR
OBSTRUCTIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT
PRIOR TO PROCEEDING WITH WORK.
2. SEE SHEET Q-601 FOR EQUIPMENT SCHEDULE.
3. COORDINATE ALL DIMENSIONS BETWEEN WALLS AT REFRIGERATED
CASES WITH EQUIPMENT MANUFACTURER.
4. EXISTING REFRIGERATION TUNNEL IS CONSIDERED A CONFINED SPACE.
FOLLOW ALL OSHA AND INSTALLATION (PENSACOLA) SPECIAL REQUIREMENTS
FOR WORK IN THESE AREAS.
5. PROVIDE SOUND ATTENUATION BATT INSULATION IN ALL NEW STUD
PARTITIONS AT ALL OFFICES, TOILETS, LOCKER ROOMS, AND TRAINING ROOMS.
6. PROVIDE MOISTURE RESISTANT GYPSUM BOARD ON ALL STUD PARTITIONS
BEHIND AND AT SIDES OF REFRIGERATED CASES.
7. SEE INTERIORS SHEETS I-101 - I-205 FOR FLOORING AND SIGNAGE
INFORMATION.
8. ALL DIMENSIONS ARE FROM FINISH FACE OF PARTITION UNLESS OTHERWISE
NOTED.
9. PROVIDE COMPRESSIBLE FOAM SEAL TO FILL GAP BETWEEN NEW DISPLAY
CASE END PANELS AND ADJACENT WALLS UNLESS OTHERWISE NOTED.
SEE DETAIL 4/A-501.
10. PROVIDE 6'-0" HIGH S.S. COLUMN COVERS AT ALL EXPOSED COLUMNS
WITHIN CUSTOMER AREAS, INCLUDING THOSE LOCATIONS WITHIN GONDOLA
SHELVING UNLESS OTHERWISE NOTED. SEE DETAIL 8/A-501.
11. PROVIDE STAINLESS STEEL CLOSURE STRIPS (SSC) AT ALL LOCATIONS
WHERE AIR SPACE BETWEEN COLD STORAGE PANELS AND ADJACENT
WALLS IS EXPOSED TO VIEW. ALSO PROVIDE STAINLESS STEEL CLOSURE
STRIPS WHERE GYP/STUD AND CMU WALLS MEET COLD STORAGE PANELS.
SEE DETAIL 10/A-501
GENERAL FLOOR PLAN NOTES
SS WG - STAINLESS STEEL WALL GUARD
DRYWALL PARTITION
WB - INDICATES NEW WOOD BUMPER RAILING - SEE DETAIL 1/A-501
CMU PARTITION
PARTITION TYPE - SEE SHEET A-701
PP PROTECTION POST - SEE DETAIL 3/A-501
BP BUMPER POST - SEE DETAIL 5/A-501
SSB - STAINLESS STEEL BUMPER SYSTEM - SEE DETAIL 1/Q-601
FIRE EXTINGUISHER - SEE DETAIL 6/A-501
FIRE EXTINGUISHER CABINET - SEE DETAIL 6/A-501
EXISTING FIRE EXTINGUISHER CABINET
WINDOW INDICATION - SEE SHEET A-602 FOR
WINDOW TYPES
DOOR INDICATION - SEE SHEET A-602 FOR
DOOR TYPES
ELECTRIC WATER COOLER - SEE PLUMBING
STAINLESS STEEL CLOSURE TRIM - SEE DETAIL 10/A-501.
SEE GENERAL FLOOR PLAN NOTE 11.
P2
A
86B
EWC
FE
FEC
XFEC
LEGEND
SSC
R E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVY
101 south spring street little rock, ar 72201
501.372.2900 cromwell.com
SEQUENCE
NO.
SHEET NO.
OF
DATE:SOL. NO.
PROJECT NO.
DRAWING NUMBER
SUBMITTED BY:
ENGINEER:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
TO THE BEST OF OUR KNOWLEDGE,
INFORMATION AND BELIEF, BASED
ON AND LIMITED TO OUR NORMAL
FUNCTIONS PERFORMED UNDER OUR
CONTRACT WITH THE GOVERNMENT,
IT IS OUR PROFESSIONAL OPINION
THAT THIS PROJECT IS DESIGNED
IN ACCORDANCE WITH APPLICABLE
DOD REGULATIONS.
EDWIN C. LEVY
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
FORT LEE, VIRGINIA
DIRECTORATE OF ENGINEERING
30-MAY-2018
EA16MI05
NAVAL AIR STATION
PENSACOLA, FLORIDA
PENSACOLA COMMISSARY FACILITY
ADDITION /ALTERATION
A/E: 2016-001
RTA SOLICITATION ISSUE
SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION
1 5-30-2018 RTA SOLICITATION ISSUE
A-103
ECL
JAR
ECL
FLOOR PLAN - AREA C
05/30/18 1/8" = 1'-0"
1 FLOOR PLAN - AREA C
KEY PLAN
D C
A B
SCALE : 1/8" = 1'-0"
0 4 8 16
NORTH
NOTE: THIS DRAWING IS TO BE VIEWED / PRINTED IN COLOR
ITEMS OF WORK (NEW)
NUMBER DESCRIPTION
14 PROVIDE NEW PLUMBING FIXTURES, TOILET PARTITIONS, AND TOILET ACCESSORIES.
MATCH EXISTING LOCATIONS
15 PROVIDE NEW WOOD BUMPER RAILS. SEE DETAIL 1/A-501. LOCATION INDICATED BY
DASHED LINE
16 REFINISH EXISTING WOOD BUMPER RAILS - MATCH EXISTING FINISH
17 PROVIDE NEW MILLWORK
18 INSTALL NEW DOCK BUMPERS - MATCH EXISTING LOCATIONS
19 INSTAL NEW DOCK SEALS - MATCH EXISTING LOCATIONS
20 REPAIR DOOR HARDWARE AND CLOSER
21 PAINT DOOR AND FRAME, BOTH SIDES
22 PAINT DOOR FRAME, BOTH SIDES
23 INSTALL NEW WINDOW SILL - SEE DTL. 5/A-307
24 PROVIDE WINDOW BLINDS
25 PROVIDE NEW VINYL STRIP CURTAIN
26 GROUT FILL VOID WHERE THRESHOLD HEATER REMOVED
27 EXISTING GONDOLA SHELVING TO BE RELOCATED BY CONTRACTOR
ITEMS OF WORK (NEW)
NUMBER DESCRIPTION
1 REPAIR DAMAGED CONCRETE FLOOR INCLUDING CRACKS, PITS, DIPS, ETC.
2 INSTALL NEW FLOOR FINISH - SEE ROOM FINISH SCHEDULE
3 INSTALL NEW BASE - SEE ROOM FINISH SCHEDULE
4 INSTALL NEW CONCRETE CURB. SEE SHEET A-405
5 INSTALL NEW CERAMIC FLOOR AND BASE TILE - SEE ROOM FINISH SCHEDULE
6 CLEAN EXISTING CERAMIC FLOOR AND BASE TILE. REPLACE DAMAGED CERAMIC FLOOR
AND BASE TILE. REPLACE DAMAGED AND MISSING GROUT
7 INSTALL NEW CERAMIC WALL TILE - SEE ROOM FINISH SCHEDULE & SUBSTRATE
8 CLEAN EXISTING CERAMIC WALL TILE. REPLACE DAMAGED CERAMIC WALL TILE.
REPLACE DAMAGED AND MISSING GROUT
9 DEEP CLEAN ROOM INCLUDING FLOORS, BASE, WALLS, CEILIING, AND DOORS
10 REPAIR DAMAGED GYPSUM BOARD WALL
11 INSTALL NEW GYPSUM BOARD WALL FINISH WHERE WOOD PANELING WAS REMOVED.
MURAL TO BE APPLIED OVER GYPSUM BOARD. SEE 6/I-201
12 REPAIR FURRDOWN WHERE PORTION WAS REMOVED
13 INSTALL NEW WAINSCOT - SEE ROOM FINISH SCHEDULE
NOTE: NOT ALL ITEMS LISTED APPLY TO AREA C
3 7-24-2018 REVISIONS TO BID DOCUMENTS
07/25/2018
HDEC03-18-R-0007
1 3 5 9
V
U
S
R
P
4 7 12
RECEIVING
AISLE
BULK MEAT
STORAGE
PRODUCE
CHILLED
STORAGE GAS
43B
PRODUCE
CHILLED
STORAGE
NON-GAS
43A
PRODUCE
PROCESSING
44A
PRODUCE
AMBIENT
STORAGE
44B
PRODUCE
MANAGER
MEDICAL FOOD
INSPEC.
OFFICE
CONTRACT
STOCKER
STORAGE
STAGING AREA
GROCERY MGR
OFFICE
DAMAGED
MERCHANDISE
JANITOR
20B
VESTIBULE
21B
LOCKER ROOM
- MEN
MATCHLINE
M A T C H L
IN
E
.5
T
1' - 1 1/2"
6' - 0" 2' - 2"
37' - 3 1/2"
16' - 6"
45.00°
11' - 10" 15' - 8" 6' - 0" 13' - 0" 4' - 4" 17' - 8"
3"
1' - 2"
1' - 10"
3' - 4" 5' - 6" 9' - 8" 6' - 0" 19' - 0" 22' - 0" 9' - 2" 6' - 0" 42' - 9"
1' - 2"
10' - 8" 34' - 8" 22' - 0" 57' - 11"
4'
7'
1'
6'
3'
6'
4'
1'
5'
3'
4"
6'
3'
4' 0"
3" 11' - 9" 6' - 0" 5' - 0" 4' - 7" 6' - 0" 3' - 9" 3"
4' 0"
PRODUCE
ALCOVE
69B
DAMAGED
MERCH. SALES
ALCOVE
3"
9"
43A-A
43A-B
44B-B
44B-A 44A-A
43B-B
59A
A-403
43B-A
9 1/4"
7' - 5 3/4" 8' - 0" 4' - 6" 8' - 0" 8' - 11 1/2"
1' - 0 3/4"
LINE OF
EXISTING
FURRDOWN
ABOVE
P9 P9P9P2A
P2A
P2A
P8
P7
P2A
P7
P9 P9
P7
4 4 4
4 4 4
2 2 2
2 3
BP-2
BP-2BP-2
BP-2BP-2
BP-2
BP-2
BP-2
BP-2
B P -2
B P -2
B P -2
B P
-2 BP-2
BP-2
BP-2
BP-2
BP-2
B P -2
B P -2
BP-2
EXISTING ROOF DRAIN PIPE
P5
1' /4
EXISTING ROOF
DRAIN PIPE
FEC
FEC
FOLDING STAIR FOR
ACCESS TO AREA
ABOVE - EQUAL TO
ALACO LADDER
COMPANY MODEL 435
36A 36B
BP-2
BP-2
COMM.
CLOSET
31B
P7
P7
P7
31B
5' - 4"
8'
P5AP5A
P5A
P5A
P5A
1918 1918 1918 19
55B
56C
MEAT
PROCESSING
MEAT
WRAPPING
6'
8'
8'
6'
8'
NEW B
A-802
A
A-407
SALES AREA
69A
P9 P9
P9
P9
55C
56B
A-503
TYPICAL PLAN AT
SLIDING COOLER
DOORS
59B
ROOF OVER DOCK
P5
RECEIVING
AREA
GENERAL NOTES:
1. DIVIDE BID INTO THREE BID CATEGORIES.
ANNOTATE EACH ITEM OF WORK WITHIN ITS APPROPRIATE BID
CATEGORY.
THE THREE BID CATEGORIES ARE AS FOLLOWS:
(C): NEW CONSTRUCTION - CLIN 0001
(E): EQUIPMENT - CLIN 0002
(M&R): MAINTENANCE & REPAIR - CLIN 0003
SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION
2. EXISTING CONDITIONS SHOWN IN THESE PLANS ARE FROM LIMITED FIELD
OBSERVATIONS BY THE ARCHITECT AND ORIGINAL DESIGN DRAWINGS.
VERIFY ALL EXISTING MATERIAL, DIMENSIONS, ELEVATIONS, AND GENERAL
CONDITIONS OF THE BUILDING (INCLUDING IF EXISTING MATERIALS &
PRODUCTS ARE METRIC OR IMPERIAL BASED) BEFORE PURCHASE OF
NEW MATERIALS & PRODUCTS AND CONSTRUCTION. NOTIFY THE
CONTRACTING OFFICER OF ANY DISCREPANCIES BETWEEN PLANS AND
FIELD CONDITIONS IMMEDIATELY.
3. THE TERM "PROVIDE" MEANS FURNISH AND INSTALL.
4. REWORK EXISTING FACILITIES (I.E. FLOOR SLAB, WALLS, PARTITIONS,
SOFFITS, CEILING, ROOF, ETC.) AS REQUIRED TO ACCOMMODATE NEW
WORK. PATCH TO MATCH EXISTING, UNLESS NOTED OTHERWISE.
5. COORDINATE ALL WORK TO ENSURE THAT THE INSTALLATION, SIZE OF
NEW PIPES, EQUIPMENT, FIXTURES, CONDUIT, DUCTS, OPENINGS,
SWITCHES, OUTLETS, ETC. DO NOT INTERFERE WITH THE INSTALLATION,
OR PROGRESS, OF OTHER WORK TO BE DONE ON THE PROJECT.
SYMBOL LEGEND
EXISTING TO REMAIN (BLACK)
NEW BY CONTRACTOR (RED)
NEW EQUIPMENT BY CONTRACTOR (RED)
EXISTING EQUIPMENT RELOCATED
BY GOVERNMENT (BLUE)
NEW EQUIPMENT BY GOVERNMENT (CYAN)
EXISTING EQUIPMENT RELOCATED BY
CONTRACTOR (GREEN)
1. INSTALL MATERIALS & EQUIPMENT IN A MANNER TO CONFORM TO THE
STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM, AND KEEP
OPENINGS AND PASSAGEWAYS CLEAR. IN ALL CASES, ADEQUATE ACCESS
(PER FR. RECOMMENDATIONS & CODE COMPLIANCE) FOR MAINTENANCE AND
REPLACEMENT OF EQUIPMENT SHALL BE PROVIDED. ANY DEVIATIONS AND/OR
OBSTRUCTIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT
PRIOR TO PROCEEDING WITH WORK.
2. SEE SHEET Q-601 FOR EQUIPMENT SCHEDULE.
3. COORDINATE ALL DIMENSIONS BETWEEN WALLS AT REFRIGERATED
CASES WITH EQUIPMENT MANUFACTURER.
4. EXISTING REFRIGERATION TUNNEL IS CONSIDERED A CONFINED SPACE.
FOLLOW ALL OSHA AND INSTALLATION (PENSACOLA) SPECIAL REQUIREMENTS
FOR WORK IN THESE AREAS.
5. PROVIDE SOUND ATTENUATION BATT INSULATION IN ALL NEW STUD
PARTITIONS AT ALL OFFICES, TOILETS, LOCKER ROOMS, AND TRAINING ROOMS.
6. PROVIDE MOISTURE RESISTANT GYPSUM BOARD ON ALL STUD PARTITIONS
BEHIND AND AT SIDES OF REFRIGERATED CASES.
7. SEE INTERIORS SHEETS I-101 - I-205 FOR FLOORING AND SIGNAGE
INFORMATION.
8. ALL DIMENSIONS ARE FROM FINISH FACE OF PARTITION UNLESS OTHERWISE
NOTED.
9. PROVIDE COMPRESSIBLE FOAM SEAL TO FILL GAP BETWEEN NEW DISPLAY
CASE END PANELS AND ADJACENT WALLS UNLESS OTHERWISE NOTED.
SEE DETAIL 4/A-501.
10. PROVIDE 6'-0" HIGH S.S. COLUMN COVERS AT ALL EXPOSED COLUMNS
WITHIN CUSTOMER AREAS, INCLUDING THOSE LOCATIONS WITHIN GONDOLA
SHELVING UNLESS OTHERWISE NOTED. SEE DETAIL 8/A-501.
11. PROVIDE STAINLESS STEEL CLOSURE STRIPS (SSC) AT ALL LOCATIONS
WHERE AIR SPACE BETWEEN COLD STORAGE PANELS AND ADJACENT
WALLS IS EXPOSED TO VIEW. ALSO PROVIDE STAINLESS STEEL CLOSURE
STRIPS WHERE GYP/STUD AND CMU WALLS MEET COLD STORAGE PANELS.
SEE DETAIL 10/A-501
GENERAL FLOOR PLAN NOTES
SS WG - STAINLESS STEEL WALL GUARD
DRYWALL PARTITION
WB - INDICATES NEW WOOD BUMPER RAILING - SEE DETAIL 1/A-501
CMU PARTITION
PARTITION TYPE - SEE SHEET A-701
PP PROTECTION POST - SEE DETAIL 3/A-501
BP BUMPER POST - SEE DETAIL 5/A-501
SSB - STAINLESS STEEL BUMPER SYSTEM - SEE DETAIL 1/Q-601
FIRE EXTINGUISHER - SEE DETAIL 6/A-501
FIRE EXTINGUISHER CABINET - SEE DETAIL 6/A-501
EXISTING FIRE EXTINGUISHER CABINET
WINDOW INDICATION - SEE SHEET A-602 FOR
WINDOW TYPES
DOOR INDICATION - SEE SHEET A-602 FOR
DOOR TYPES
ELECTRIC WATER COOLER - SEE PLUMBING
STAINLESS STEEL CLOSURE TRIM - SEE DETAIL 10/A-501.
SEE GENERAL FLOOR PLAN NOTE 11.
P2
A
86B
EWC
FE
FEC
XFEC
LEGEND
SSC
R E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVY
101 south spring street little rock, ar 72201
501.372.2900 cromwell.com
SEQUENCE
NO.
SHEET NO.
OF
DATE:SOL. NO.
PROJECT NO.
DRAWING NUMBER
SUBMITTED BY:
ENGINEER:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
TO THE BEST OF OUR KNOWLEDGE,
INFORMATION AND BELIEF, BASED
ON AND LIMITED TO OUR NORMAL
FUNCTIONS PERFORMED UNDER OUR
CONTRACT WITH THE GOVERNMENT,
IT IS OUR PROFESSIONAL OPINION
THAT THIS PROJECT IS DESIGNED
IN ACCORDANCE WITH APPLICABLE
DOD REGULATIONS.
EDWIN C. LEVY
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
FORT LEE, VIRGINIA
DIRECTORATE OF ENGINEERING
30-MAY-2018
EA16MI05
NAVAL AIR STATION
PENSACOLA, FLORIDA
PENSACOLA COMMISSARY FACILITY
ADDITION /ALTERATION
A/E: 2016-001
RTA SOLICITATION ISSUE
SYM. D.O. NO. ACTION DATE DESCRIPTION OF REVISION
1 5-30-2018 RTA SOLICITATION ISSUE
A-104
ECL
JAR
ECL
FLOOR PLAN - AREA D
05/30/18
1/8" = 1'-0"
1 FLOOR PLAN - AREA D
KEY PLAN
D C
A B
SCALE : 1/8" = 1'-0"
0 4 8 16
NORTH
NOTE: THIS DRAWING IS TO BE VIEWED / PRINTED IN COLOR
ITEMS OF WORK (NEW)
NUMBER DESCRIPTION
14 PROVIDE NEW PLUMBING FIXTURES, TOILET PARTITIONS, AND TOILET ACCESSORIES.
MATCH EXISTING LOCATIONS
15 PROVIDE NEW WOOD BUMPER RAILS. SEE DETAIL 1/A-501. LOCATION INDICATED BY
DASHED LINE
16 REFINISH EXISTING WOOD BUMPER RAILS - MATCH EXISTING FINISH
17 PROVIDE NEW MILLWORK
18 INSTALL NEW DOCK BUMPERS - MATCH EXISTING LOCATIONS
19 INSTAL NEW DOCK SEALS - MATCH EXISTING LOCATIONS
20 REPAIR DOOR HARDWARE AND CLOSER
21 PAINT DOOR AND FRAME, BOTH SIDES
22 PAINT DOOR FRAME, BOTH SIDES
23 INSTALL NEW WINDOW SILL - SEE DTL. 5/A-307
24 PROVIDE WINDOW BLINDS
25 PROVIDE NEW VINYL STRIP CURTAIN
26 GROUT FILL VOID WHERE THRESHOLD HEATER REMOVED
27 EXISTING GONDOLA SHELVING TO BE RELOCATED BY CONTRACTOR
ITEMS OF WORK (NEW)
NUMBER DESCRIPTION
1 REPAIR DAMAGED CONCRETE FLOOR INCLUDING CRACKS, PITS, DIPS, ETC.
2 INSTALL NEW FLOOR FINISH - SEE ROOM FINISH SCHEDULE
3 INSTALL NEW BASE - SEE ROOM FINISH SCHEDULE
4 INSTALL NEW CONCRETE CURB. SEE SHEET A-405
5 INSTALL NEW CERAMIC FLOOR AND BASE TILE - SEE ROOM FINISH SCHEDULE
6 CLEAN EXISTING CERAMIC FLOOR AND BASE TILE. REPLACE DAMAGED CERAMIC FLOOR
AND BASE TILE. REPLACE DAMAGED AND MISSING GROUT
7 INSTALL NEW CERAMIC WALL TILE - SEE ROOM FINISH SCHEDULE & SUBSTRATE
8 CLEAN EXISTING CERAMIC WALL TILE. REPLACE DAMAGED CERAMIC WALL TILE.
REPLACE DAMAGED AND MISSING GROUT
9 DEEP CLEAN ROOM INCLUDING FLOORS, BASE, WALLS, CEILIING, AND DOORS
10 REPAIR DAMAGED GYPSUM BOARD WALL
11 INSTALL NEW GYPSUM BOARD WALL FINISH WHERE WOOD PANELING WAS REMOVED.
MURAL TO BE APPLIED OVER GYPSUM BOARD. SEE 6/I-201
12 REPAIR FURRDOWN WHERE PORTION WAS REMOVED
13 INSTALL NEW WAINSCOT - SEE ROOM FINISH SCHEDULE
NOTE: NOT ALL ITEMS
LISTED APPLY TO AREA D
3 7-24-2018 REVISIONS TO BID DOCUMENTS
307/25/2018
HDEC03-18-R-0007
N
M
H
C
B
2 4 5.3 6 7 7.9 8
11 12
A
MATCHLINE
M A T C H L
IN
E
.5
STORE
DIRECTOR
OFFICE
ASST. STORE
DIRECTOR
OFFICE
STORE
ADMINISTRATOR
OFFICE
18A
VENDOR
ADMIN.
CORRIDOR
ELEC
31J
PATRON
ASSISTED
RESTROOM
MEN
RESTROOM
RESTROOM
ALCOVE
JANITOR
20D
WOMEN
RESTROOM
BREAKROOM
16A
ADMINISTRATIVE
AREA
TRAINING
ROOM
COMM. ROOM
31A
TRAINING
STORAGE
17A
VESTIBULE
21A
MHE
CHARGING
STAGING AREA
ADMIN.
STORAGE
STAIRWAY
22A
JANITOR
20A
QAE OFFICE
LOCKER
ROOM- WOMEN
EMP. TLT -
WOMEN
EMP. TLT - MEN
LOCKER ROOM
- MEN
MASS DISPLAY
ENTRY
1A
ENTRY
VESTIBULE
PLANT
DISPLAY
CART
STORAGE
CARRYOUT
RETURN VEST.
3B
CUSTOMER
CHECKOUT
QUEUING
CHECKOUT
AREA
EXISTING FURRDOWN TO REMAIN
NEW FURRDOWN
PRODUCE DECOR GRID
SEE DETAIL 3/I-203
PRODUCE DECOR GRID ABOVE
SEE DETAIL 3/I-203
A
LI
G N
A-307
A-306
A-307
A
LI
G N
A-307
SIM.
SIM.
NEW DEFS
SOFFIT
NEW DEFS
SOFFIT
NEW DEFS
SOFFIT
DEFS JOINT
TO ALIGN
WITH EDGE
OF WALL
HEATER
SEE MECHANICAL
AIR CIRCULATING FAN
SEE MECHANICAL
AIR CIRCULATING FAN
SEE MECHANICAL
HEATER
SEE MECHANICAL
FURRDOWN AT
UPPER CABINETS
SEE DTL. 3/A-801
DEFS JOINT
TO ALIGN
WITH EDGE
OF WALL
NEW DEFS
SOFFIT
DEFS JOINT
TO ALIGN
WITH EDGE
OF WALL
ADMIN. VEST.
SALES AREA
69A
GENERAL NOTES:
1. DIVIDE BID INTO THREE BID CATEGORIES.
ANNOTATE EACH ITEM OF WORK WITHIN ITS APPROPRIATE BID
CATEGORY.
THE THREE BID CATEGORIES ARE AS FOLLOWS:
(C): NEW CONSTRUCTION - CLIN 0001
(E): EQUIPMENT - CLIN 0002
(M&R): MAINTENANCE & REPAIR - CLIN 0003
SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION
2. EXISTING CONDITIONS SHOWN IN THESE PLANS ARE FROM LIMITED FIELD
OBSERVATIONS BY THE ARCHITECT AND ORIGINAL DESIGN DRAWINGS.
VERIFY ALL EXISTING MATERIAL, DIMENSIONS, ELEVATIONS, AND GENERAL
CONDITIONS OF THE BUILDING (INCLUDING IF EXISTING MATERIALS &
PRODUCTS ARE METRIC OR IMPERIAL BASED) BEFORE PURCHASE OF
NEW MATERIALS & PRODUCTS AND CONSTRUCTION. NOTIFY THE
CONTRACTING OFFICER OF ANY DISCREPANCIES BETWEEN PLANS AND
FIELD CONDITIONS IMMEDIATELY.
3. THE TERM "PROVIDE" MEANS FURNISH AND INSTALL.
4. REWORK EXISTING FACILITIES (I.E. FLOOR SLAB, WALLS, PARTITIONS,
SOFFITS, CEILING, ROOF, ETC.) AS REQUIRED TO ACCOMMODATE NEW
WORK. PATCH TO MATCH EXISTING, UNLESS NOTED OTHERWISE.
5. COORDINATE ALL WORK TO ENSURE THAT THE INSTALLATION, SIZE OF
NEW PIPES, EQUIPMENT, FIXTURES, CONDUIT, DUCTS, OPENINGS,
SWITCHES, OUTLETS, ETC. DO NOT INTERFERE WITH THE INSTALLATION,
OR PROGRESS, OF OTHER WORK TO BE DONE ON THE PROJECT.
REFLECTED CEILING
SYMBOLS LEGEND
EXISTING EXIT LIGHT
EXISTING EMERGENCY FIXTURE
EXISTING MECHANICAL GRILLE
EXISTING LIGHT FIXTURE
EXISTING TRACK LIGHTING
EXISTING LIGHT FIXTURES
EXISTING EMERGENCY LIGHT FIXTURE
EXISTING SUSPENDED ACOUSTICAL TILE CEILING
SYSTEM
NEW SUSPENDED ACOUSTICAL PANELS IN EXISTING
GRID. CLEAN, PATCH & REPAIR EXISTING GRID. (REMOVE
AND RELOCATE EXISTING LIGHT FIXTURES,
DIFFUSERS,SPEAKERS, SPRINKLERS, ETC AS REQUIRED
WITH REPLACEMENT OF CEILING TILES). REPAIR AS READ
& CLEAN EXIST. GRID AND PRIME & PAINT
NEW CEILING MOUNTED REFRIG UNIT
COOLERS (UC) - SEE REFRIGERATION
NEW LIGHT FIXTURES - SEE ELECTRICAL
NEW SUSPENDED ACOUSTICAL CEILING PANELS AND GRID.
( REMOVE AND RELOCATE EXISTING LIGHT FIXTURES,
DIFFUSERS, SPEAKERS, SPRINKLERS, ETC. THAT ARE TO
REMAIN AS REQUIRED WITH REPLACEMENT OF CEILING
SYSTEM)
NEW MECHANICAL GRILLE - SEE HVAC
EXISTING GYPSUM BOARD CEILING / SOFFIT
NEW GYPSUM BOARD CEILING / SOFFIT
EXISTING COLD STORAGE PANEL CEILING
NEW COLD STORAGE PANEL CEILING
SYMBOL LEGEND
EXISTING TO REMAIN (BLACK)
NEW BY CONTRACTOR (RED)
GENERAL RCP NOTES
1. REFER TO ROOM FINISH SCHEDULE, A-601, FOR CEILING HEIGHT,
MATERIAL, AND COLOR INFORMATION
R E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVYR
E G
IS
T E
RED A R CH IT E
C T
A R K A N S A S
EDWIN C.
LEVY
101 south spring street little rock, ar 72201
501.372.2900 cromwell.com
SEQUENCE
NO.
SHEET NO.
OF
DATE:SOL. NO.
PROJECT NO.
DRAWING NUMBER
SUBMITTED BY:
ENGINEER:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
TO THE BEST OF OUR KNOWLEDGE,
INFORMATION AND BELIEF, BASED
ON AND LIMITED TO OUR NORMAL
FUNCTIONS PERFORMED UNDER OUR
CONTRACT WITH THE GOVERNMENT,
IT IS OUR PROFESSIONAL OPINION
THAT THIS PROJECT IS DESIGNED
IN ACCORDANCE WITH APPLICABLE
DOD REGULATIONS.
EDWIN C. LEVY
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
FORT LEE, VIRGINIA
DIRECTORATE OF ENGINEERING
30-MAY-2018
EA16MI05
NAVAL AIR STATION
PENSACOLA, FLORIDA
PENSACOLA COMMISSARY…