Attachment 1 Question and Answers Set 2 # 91-100
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HDEC03-18-R-0007
AMENDMENT 0006
ATTACHMENT 01
Pensacola NAS, FL DECA Project Date: 27 July 2018 Pre-Bid RFI’s with Responses Set 2
91. S102 - Freezer slab vent indicates "see architectural." However, no architectural drawing exists to detail this component. What is it? What is the size?
Response: The ventilation piping is noted in indicated in the architectural and structural documents. See detail 8/S-303 and A-103. The mechanical ventilator is shown on M-103.
92. S-Drawings - The concrete demo for the rear coolers is not clearly shown. Please verify that the concrete is intended to be demo'd at all exiting coolers (except dairy).
Response: All coolers and existing freezer storage concrete are to be demo’d, except for the dairy.
93. Arch. Demolition drawings show removal of drywall partitions above existing walk-ins to the deck.
Are new partitions required from new cooler edge to deck? This is shown on the cuts but not the floor plans.
Response: See Sheet A-104: Rooms 43A, 43B, & 59 - North wall shall be Wall Type P-9, which includes the gypsum wallboard wall from top of cooler panel to structural deck above. Sheet A-404 indicates P-9 Wall Type above the coolers in this area.
94. The Paradience 30 CRFR is no longer available per the Siplast Rep. They have suggested to use the 30 FRBW product in its place. Please confirm. Reference: Spec 07 52 00
Response: 30 FRBW is acceptable.
95. What is the thickness of the existing roof and what is the decking composition?
Response: The existing roof thickness has not been verified. Contractor shall assume for the purpose of bidding, existing roof has 6" insulation (R-29 per original drawings) and 1/2" cover board.
96. Are the existing roof drains exposed or encapsulated by drywall?
Response: Assume existing roof drains are NOT encapsulated.
97. Will the Pensacola NAS commissary roof renovation having spray foam applied? Any info would be greatly appreciated.
Response?
HDEC03-18-R-0007
AMENDMENT 0006
ATTACHMENT 01
98. The Legend on Sheet AD-108 does not include demolition of the Frozen Food Storage 68 ceiling panels. Is removal of the ceiling panels & associated work required?
Response: Yes, existing cold storage panel ceiling & associated work in existing Frozen Food Storage 68 is to be demolished and replaced with new cold storage panel ceiling. Install gypsum wallboard partition from top of ceiling panel to roof deck above similar to Wall Type P-9. Salvage and re-install existing access door. Install Pattern shown for new ceiling on sheet AD-108 should match what is shown for other new cold storage panel ceilings. Note on sheet A-404 indicating ceiling to remain in existing Frozen Food Storage 68 should be deleted.
99. With regards to the roof, please indicate if the entire roof is to be replaced.
Response? See Sheet A-110 with Revisions 1, 2 & 3, dated 7/24/2018, for extent of roof replacement.
All Walk Pads indicated shall be new in accordance with roofing manufacturer’s requirements.
100. In Division 10 26 00 Wall and Equip Protection, the specs lists Protection Posts and Cart Rails.
Please indicate the location of these items with respect to the drawings.
Response? See Protection Posts & Car Rails typically indicated on Floor Plan Sheets & Enlarged Plan Sheets.