Attachment_02_Specs_REVISION_TO_BID_DOCS_24_JULY_2018.pdf

PDF 2 MB Posted

Attached to
Addition/Alteration to Commissary, NAS Pensacola, FL Federal contract opportunity
Solicitation number
HDEC03-18-R-0007
Issued by
Defense Commissary Agency

About this file

Attachment 2 Revised Specifications (Revision to Bid Documents)

View the file

Other files for this federal contract opportunity

Other files attached to Addition/Alteration to Commissary, NAS Pensacola, FL, newest first.
File Type Posted
Amendment_0007_Pensacola_FL.pdf PDF
Drawings_set_5_of_6.pdf PDF
Drawings_set_4_of_6.pdf PDF
Drawing_set_3_of_6.pdf PDF
Drawings_Set_6_of_6.pdf PDF
Pensacola_FL_Amendment_0006.pdf PDF
Drawings_for_Set_1_of_6.pdf PDF
Drawings_set_2_of_6.pdf PDF
Attachment_1_NAS_pensacola_QA_set_2.pdf PDF
Attachment_04_NAS_Pensacola_FL_Solicitation_Section_B.pdf PDF
Attachment_01_Pre-Proposal_Sign-in_Sheets.pdf PDF
Q&A_25_Jul_10-18.pdf PDF
Pensacola_FL_Amendment_0005.pdf PDF
Attachment_02_Perperformance_Minutes.pdf PDF
Specifications_for_Pensacola_Amendment_0004-Addendum_02.pdf PDF
Pensacola_FL_Amendment_0004.pdf PDF
Drawings_for_Pensacola_Amendment_0004-Addendum_02.pdf PDF
Pensacola_Amendment_03.pdf PDF
Amendment_02.pdf PDF
Amendment_01_to_Solicitation_HDEC03-18-R-0007.pdf PDF
Addendum_for_Section_03_35_40.pdf PDF
NAS_Pensacola_FL_Solicitation.pdf PDF
Pensacola_FL,_General_Decision_WAGE_RATE.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISIONS TO BID DOCUMENTS – JULY 24, 2018

Pensacola NAS Commissary

JULY 24, 2018 – REVISIONS TO BID DOCUMENTS

MAY 2018 – Original Issue

REVISIONS TO BID DOCUMENTS

DATE: July 24, 2018

RE: Pensacola NAS Commissary Pensacola, Florida

FROM: CROMWELL ARCHITECT ENGINEERS, INC.

1300 East 6th Street Little Rock, Arkansas 72202

TO: BIDDERS OF RECORD

This Revision forms a part of the Contract Documents and modifies the original Bidding Documents dated May 30, 2018, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification.

Each item in Contract Documents complements each of the other Contract Documents. No sheet, section, or document is to be followed without referring to all sheets, sections, and parts of the Contract Documents.

This Revision consists of the following Documents.

CHANGES TO PROCUREMENT AND CONTRACTING REQUIREMENTS:

1: Replace Section 00 01 10 – Table of Contents with revised Section issued with this Revision.

2: Insert (this) Revision Narrative and attached Documents.

CHANGES TO SPECIFICATIONS:

3: Replace Submittal Register with revised Submittal Register issued with this Revision.

4: Replace Section 01 32 16 - Construction Progress Documentation with revised Section issued with this Revision.

5: Replace Section 01 32 16.10 - Phased Construction with revised Section issued with this Revision.

6: Replace Section 01 35 40 – Environmental Management with revised Section issued with this Revision.

7: Replace Section 01 50 00 - Temporary Facilities and Controls with revised Section issued with this Revision.

8: Replace Section 02 41 00 - Demolition with revised Section issued with this Revision.

9: Replace Section 05 50 13 – Metal Fabrications with revised Section issued with this Revision.

10: Insert new Section 07 24 10 – Direct-Applied Exterior Finish Systems issued with this Revision.

HDEC03-18-R-0007

AMENDMENT 0006

ATTACHMENT 02

11: Insert new Section 07 50 20 – Metal Roof Edge with this Revision.

12: Replace Section 08 42 29.23 – Sliding Automatic Entrances with revised Section issued with this Revision.

13: Replace Section 08 42 29.43 – Sliding Automatic Entrances Impact Rated with revised Section issued with this Revision.

14: Insert new Section 11 82 36 – Facility Waste Balers issued with this Revision.

15: Delete Section 26 05 48 – Vibration and Seismic controls for Electrical Systems with this Revision.

CHANGES TO DRAWINGS:

16: Insert the attached revised and/or new Drawings issued with this Revision:

Sheet Title/Description .

GENERAL INFORMATION

1-G-002 ARCHITECTURAL INDEX, SYMBOLS & ABBREV.

GC100 PHASING GENERAL NOTES/CONSTRUCTION BARRIER DETAILS

GC101 PHASING DEMOLITION PLAN

GC102 PHASING PLAN

CIVIL

CS102 SITE PHASING AND TEMPORARY TRAFFIC PLAN

CU101 SITE UTILITY PLAN

STRUCTURAL

S-001 GENERAL NOTES

S-002 WIND UPLIFT PLAN

S-100 OVERALL FOUNDATION PLAN

S-101 FOUNDATION PLAN – AREA A

S-102 FOUNDATION PLAN – AREA C

S-103 FOUNDATION PLAN – AREA D

S-104 FRAMING PLAN – AREA A

S-105 FRAMING PLAN – AREA C

S-106 FRAMING PLAN – AREA D

S-201 SECTIONS AND DETAILS

S-202 EXTERIOR ELEVATIONS

S-301 FOUNDATION SECTIONS AND DETAILS

S-302 FOUNDATION SECTIONS AND DETAILS

S-303 FOUNDATION SECTIONS AND DETAILS

S-402 FRAMING DETAILS

S-404 FRAMING DETAILS

ARCHITECTURAL

AD100 OVERALL DEMOLITION FLOOR PLAN

AD101 DEMOLITION FLOOR PLAN – AREA A

AD102 DEMOLITION FLOOR PLAN – AREA B

AD103 DEMOLITION FLOOR PLAN – AREA C

AD104 DEMOLITION FLOOR PLAN – AREA D

HDEC03-18-R-0007

AD110 OVERALL DEMOLITION ROOF PLAN

A-100 OVERALL FLOOR PLAN

A-101 FLOOR PLAN – AREA A

A-102 FLOOR PLAN – AREA B

A-103 FLOOR PLAN – AREA C

A-104 FLOOR PLAN – AREA D

A-106 REFLECTED CEILING PLAN

A-110 OVERALL ROOF PLAN

A-301 SECTIONS

A-302 SECTIONS

A-303 SECTIONS

A-304 SECTIONS

A-308 SECTIONS

A-402 LARGE SCALE PLANS

A-403 LARGE SCALE PLANS

A-404 LARGE SCALE PLANS

A-506 ROOF DETAILS

A-507 DOOR DETAILS

A-508 ENTRY DETAILS

A-601 ROOM FINISH SCHEDULE

A-602 DOOR & WINDOW SCHEDULES & TYPES

A-802 MILLWORK DETAILS

PLUMBING

P-001 PLUMBING LEGEND AND NOTES

P-102 PLUMBING FLOOR PLAN – AREA A

P-104 PLUMBING FLOOR PLAN – AREA C

P-105 PLUMBING FLOOR PLAN – AREA D

P-503 PLUMBING DETAILS

P-601 PLUMBING FIXTURES SCHEDULE AND LEGEND

MECHANICAL

M-104 HVAC PLAN – AREA D

M-601 HVAC SCHEDULES

REFRIGERATION

R-105 REFRIGERATION PLAN – MEZZANINE AND ROOF

ELECTRICAL

E-001 ELECTRICAL LEGEND

ESD101 SITE ELECTRICAL DEMOLITION PLAN

ES101 SITE ELECTRICAL UTILITY PLAN

EG101 LIGHTNING PROTECTION PLAN

ED103 FIRST FLOOR ELECTRICAL DEMOLITION PLAN – AREA C

EL101 FIRST FLOOR LIGHTING PLAN – AREA A

EL102 FIRST FLOOR LIGHTING PLAN – AREA B

EL103 FIRST FLOOR LIGHTING PLAN – AREA C

EL104 FIRST FLOOR LIGHTING PLAN – AREA D

EP104 FIRST FLOOR POWER PLAN – AREA D

EP105 ROOF POWER PLAN

ET101 FIRST FLOOR SYSTEMS PLAN – AREA A

ET104 FIRST FLOOR SYSTEMS PLAN – AREA D

E-501 ELECTRICAL DETAILS

HDEC03-18-R-0007

E-503 ELECTRICAL DETAILS

E-601 ELECTRICAL SINGLE-LINE DIAGRAM

E-602 LIGHTING FIXTURE SCHEDULE & GENERAL NOTES FOR ALL PLANS

E-603 ELECTRICAL PANEL SCHEDULES

EQUIPMENT

QD100 DEMOLITION EQUIPMENT PLAN

QD101 DEMOLITION EQUIPMENT PLAN - AREA A & B

QD102 DEMOLITION EQUIPMENT PLAN - AREA C & D

Q-100 EQUIPMENT PLAN

Q-101 EQUIPMENT PLAN – AREA A & B

Q-102 EQUIPMENT PLAN – AREA C & D

Q-601 EQUIPMENT SCHEDULE

END OF SECTION

HDEC03-18-R-0007

MAY 2018 – Original Issue

TABLE OF CONTENTS

00 01 10-1

Pensacola NAS Commissary

TABLE OF CONTENTS

(Edited from DeCA June 2016 Design Criteria)

MODIFICATIONS

New sections indicated by [*RB_DATE], bold print and underline.

Modified sections indicated by [*RB_DATE] and underline.

Deleted sections indicated by [*RB_DATE] and strikethrough.

DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 10 Table of Contents Bid Schedule 00 31 00 Available Project Information Slab Moisture Test Report Site Environmental Assessment Site Rehabilitation Completion Order (SRCO) Corry Station Boundaries Map Cathodic Protection of Pol Systems Geotechnical Report LEED Checklist 00 91 01 Addendum 001 [*Addm_001] Revisions to Bid Documents - Roofing [*RB_7/23/18] Revisions to Bid Documents [*RB_7/24/18]

DIVISION 01 GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 13 00 Notice to Proceed Form 1413 Statement and Acknowledgement 01 14 00 Work Restrictions 01 26 00 Contract Modification Procedures 01 27 00 Fiscal Matters and Related Data 01 30 00 Administration Requirements ENG Form 4025-R Submittal Register [*RB_7/24/18] 01 31 13.13 Mechanical, Refrigeration, Food Service Equipment, and Electrical Coordination 01 31 23 Project Website 01 32 16 Construction Progress Documentation [*RB_7/24/18] Annual NOAA Summary 01 32 16.10 Phased Construction [*RB_7/24/18] 01 35 26 Government Safety Requirements [*Revision 6/28/18] 01 35 40 Environmental Management[*RB_7/24/18] 01 35 43.19 Environmental Procedures for Refrigeration 01 35 46 Indoor Air Quality Procedures 01 42 00 References 01 45 00 Quality Control and Special Inspection Forms

Statement of Special Inspections Statement of SI Requirements for Seismic Resistance Schedule of Special Inspections Final Report of Special Inspections

HDEC03-18-R-0007

MAY 2018 – Original Issue

TABLE OF CONTENTS

00 01 10-2

Contractor Statement of Responsibility Fabricator Certificate of Compliance Minimum Special Inspector Qualifications Special Inspection Daily Report Special Inspection Interim Report Special Inspection Discrepancy Notice

01 50 00 Temporary Facilities and Controls [*RB_7/24/18] 01 64 00 Government Furnished Products 01 73 29 Cutting and Patching 01 77 00 Closeout Procedures Form DD1354 Transfer Form 01 79 00 Demonstration and Training 01 91 13 General Commissioning Requirements

DIVISION 02 EXISTING CONDITIONS

02 41 00 Demolition [*RB_7/24/18] 02 84 16 Lighting Ballast and Lamp Disposal Form DD1348

DIVISION 03 CONCRETE

03 30 00 Cast-In-Place Concrete 03 30 50 Insulating Concrete Freezer Floors 03 35 40 Interior Concrete Slab Repairs and Joint Filler Replacement [*Addm_001] 03 35 43.01 Polished Concrete Floor Finishing for Existing Facilities 03 45 00 Precast Architectural Concrete

DIVISION 04 MASONRY

04 20 00 Unit Masonry

DIVISION 05 METALS

05 12 00 Structural Steel Framing 05 21 00 Steel Joist Framing 05 30 00 Steel Decking 05 40 00 Cold-Formed Metal Framing 05 50 13 Metal Fabrications [*RB_7/24/18] 05 52 00 Pipe Railings

DIVISION 06 WOOD, PLASTICS, AND COMPOSITES

06 10 00 Rough Carpentry 06 16 00 Sheathing 06 40 23 Interior Architectural Woodwork 06 83 16 Fiberglass Reinforced Paneling

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 21 00 Thermal Insulation 07 24 00 Exterior Insulation and Finish Systems (EIFS) 07 24 10 Direct-Applied Exterior Finish System [*RB_7/24/18] 07 40 00 Metal Panels 07 50 20 Metal Roof Edge Protection [*RB_7/24/18] 07 52 00 Modified Bituminous Membrane Roofing [*RB_7/23/18]

HDEC03-18-R-0007

MAY 2018 – Original Issue

TABLE OF CONTENTS

00 01 10-3

07 52 05 Roofing System Modifications [*RB_7/24/18] 07 60 00 Sheet Metal Flashing and Trim 07 71 00 Roof Specialties 07 84 00 Firestopping 07 92 00 Joint Sealants

DIVISION 08 OPENINGS

08 08 00 Commissioning of Openings 08 11 13 Hollow Metal Doors and Frames 08 14 16 Flush Wood Doors 08 31 13 Access Doors and Frames 08 33 23 Overhead Coiling Doors 08 38 00 Traffic Doors 08 41 13 Aluminum-Framed Entrances and Storefronts 08 42 29.23 Sliding Automatic Entrances [*RB_7/24/18] 08 42 29.43 Sliding Automatic Entrances Impact Rated [*RB_7/24/18] 08 71 00 Door Hardware 08 79 13 Key Storage Equipment 08 81 00 Glazing 08 83 00 Mirrors

DIVISION 09 FINISHES

09 05 61 Common Work Results for Flooring Preparation 09 29 00 Gypsum Board 09 30 00 Tiling 09 51 00 Acoustical Ceilings 09 65 19 Resilient Tile Flooring 09 67 23 Resinous Flooring 09 72 00 Wall Coverings 09 90 00 Painting and Coatings

DIVISION 10 SPECIALTIES

10 08 00 Commissioning Specialties 10 10 00 Visual Display Surfaces 10 14 00 Signage 10 15 00 Interior Decor Specialties 10 21 13 Toilet Compartments 10 26 00 Wall and Equipment Protection 10 28 13 Toilet Accessories 10 44 00 Fire-Protection Specialties 10 51 13 Metal Lockers 10 56 23 Rotating Modular System 10 56 29 Storage Racks

DIVISION 11 EQUIPMENT

11 08 00 Commissioning of Equipment 11 13 00 Loading Dock Equipment 11 40 00.19 Grocery Equipment 11 40 00.23 Meat Department Equipment 11 82 36 Facility Waste Balers [*RB_7/24/18]

HDEC03-18-R-0007

MAY 2018 – Original Issue

TABLE OF CONTENTS

00 01 10-4

DIVISION 12 FURNISHINGS

12 21 13 Horizontal Louver Blinds 12 48 13 Entrance Carpet Tile 12 59 00 Systems Furniture

DIVISION 13 SPECIAL CONSTRUCTION

13 08 00 Commissioning of Special Construction 13 10 00 Lightning Protection 13 21 26 Cold Storage Rooms

DIVISION 21 FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression 21 13 00 Fire Suppression Sprinkler Systems

DIVISION 22 PLUMBING

22 05 00 Common Work Results for Plumbing 22 05 19 Plumbing Specialties 22 05 29 Hangers and Supports for Plumbing Piping and Equipment 22 05 53 Identification for Plumbing Piping and Equipment 22 07 19 Plumbing Piping Insulation 22 08 00 Commissioning of Plumbing 22 10 00 Plumbing Piping 22 40 00 Plumbing Fixtures

DIVISION 23 HEATING VENTILATING AND AIR CONDITIONING (HVAC)

23 01 00 Maintenance and Repair for HVAC and Refrigeration 23 05 00 Common Work Results for HVAC 23 05 13 Common Motor Requirements for HVAC Equipment 23 05 29 Hangers and Supports for HVAC Piping And Equipment 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing Adjusting and Balancing for HVAC 23 07 13 Duct Insulation 23 07 19 HVAC Piping Insulation 23 08 00 Commissioning of HVAC 23 09 13 Instrumentation and Control Devices for HVAC 23 09 16 Refrigeration Monitoring and Control Systems (RMCS) 23 23 00 Refrigerant Piping for HVAC 23 31 13 Metal Ducts and Air Accessories 23 34 23 HVAC Power Ventilators 23 37 13 Diffusers Registers and Grilles 23 38 13 Commercial Kitchen Hoods 23 51 00 Breechings Chimneys and Stacks 23 54 16 Fuel-Fired Heaters 23 74 13 Packaged Rooftop HVAC Units 23 81 26 Ductless Split-System Air Conditioners 23 82 16 Air Coils 23 84 16 Mechanical Dehumidification Units 23 90 00 Product Refrigeration Systems

HDEC03-18-R-0007

MAY 2018 – Original Issue

TABLE OF CONTENTS

00 01 10-5

DIVISION 26 ELECTRICAL

26 05 00 Common Work Results for Electrical 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceways and Boxes for Electrical Systems 26 05 36 Cable Trays for Electrical Systems 26 05 48 Vibration and Seismic Controls for Electrical Systems [*RB_7/24/18] 26 05 53 Identification for Electrical Systems 26 08 00 Commissioning of Electrical Systems 26 09 23 Lighting Control Devices 26 22 00 Low-Voltage Transformers 26 24 16 Panelboards 26 25 00 Enclosed Bus Assemblies 26 27 26 Wiring Devices 26 27 73 Processing Area Signaling (Doorbell) System 26 28 13 Fuses 26 28 16 Enclosed Switches and Circuit Breakers 26 43 00 Transient Voltage Suppression 26 51 00 Interior Lighting

DIVISION 27 – COMMUNICATIONS

27 08 00 Commissioning of Communications Equipment 27 15 00 Communications Horizontal Cabling 27 51 16 Public Address and Music Systems

DIVISION 28 ELECTRONIC SAFETY

28 08 00 Commissioning of Electronic Safety and Security Systems 28 16 00 Intrusion Detection 28 31 76 Fire Alarm/Mass Notification Systems

DIVISION 31 EARTHWORK

31 00 00 Earthwork 31 10 00 Site Clearing 31 31 16 Termite Control

DIVISION 32 EXTERIOR IMPROVEMENTS

32 12 17 Hot-Mix Bituminous Pavement 32 13 13 Concrete Paving 32 13 73 Concrete Paving Joint Sealants 32 90 00 Planting

DIVISION 33 SITE UTILITIES

33 30 00 Sanitary Sewers 33 40 00 Storm Drainage Utilities

END TABLE OF CONTENTS

HDEC03-18-R-0007

This page was intentionally left blank for duplex printing.

Original Issue - MAY 2018 Revised in REVISION - JULY 24, 2018

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

01 35 26 1.4B Fire Prevention Plan X X X X 01 35 26 1.5C Safety Plan X X X X 01 35 26 1.6 Security Plan X X X X

01 35 43.19 1.3 Refrigerant log book X X

01 35 46 1.3A Supplementary Condition Schedule X X X

01 35 46 1.3B Material safety data sheets X X

01 45 00 1.4 Quality Control Plan X X 01 45 00 1.4 Complete Submittal Register and Schedule X X 01 45 00 1.4 Quality Control Report X X 01 45 00 1.4 Testing Plan and Log X X 01 45 00 1.4 Monthly summary report of field tests X X 01 45 00 1.4 QC Meeting Minutes X X 01 45 00 1.4 Rework items list X X 01 45 00 1.4 QC Certifications X X 01 45 00 1.4 QC Punch List X X

01 50 00 1.4D.1 Temporary Utilities Plan X X 01 50 00 1.5B Temporary Support Facilities Plan X X 01 50 00 1.5D.4 Temporary Administration Trailer X X 01 50 00 1.6B Temporary Security and Protection Plan X X

01 77 00 1.5A Maintenance Manuals X X 01 77 00 1.6C Instruction Certificate X X 01 77 00 1.7H Warranties X X 01 77 00 1.8B Record Drawings X X 01 77 00 1.8C Record Specifications X X 01 77 00 1.10A QC Punch List X X 01 77 00 1.11 Real Property Records X X 01 77 00 1.11B Equipment List X X

01 79 00 1.2A Instruction Program and Manuals X X 01 79 00 1.2B Qualification Data for instructor X X 01 79 00 1.2C Attendance Record for each training module X X 01 79 00 1.2D Evaluations for each participant X X 01 79 00 1.2E Demonstration and Training DVD X X

01 91 13 Append. A Commissioning Plan X X 01 91 13 3.3 Start-Up Test Reports X X 01 91 13 3.3 Pre-Functional Test Reports X X 01 91 13 3.5 Functional Test Reports X X

02 41 00 1.2A Site Plan X X 02 41 00 1.2B Demolition Plan X X 02 41 00 1.2C Proposed Protection Measures X X

02 41 00 1.2D Record locations of capped and active utilities and subsurface construction

X X

02 41 00 1.2E Warranties X X

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

02 84 16 1.4A Certificates X X 02 84 16 1.4B Field Test Reports X X

03 30 00 1.4 A

Data for Admixtures, vapor retarders, slab treatments, drainage course and toping, and curing methods or compons.

X X

03 30 00 1.4 B Design mixtures for each concrete mix X X X

03 30 00 1.4 C Statement of material content and proportions

X X

03 30 00 1.4 D Detail fabrication, bending, and placement of steel reinforcement.

X X

03 30 00 1.4 E Vapor retarder X X

03 30 00 1.4 F Field Quality Control Tests and Inspection Reports

X X

03 30 00 1.4 G ACI 301 Sections 1 through 5 X X 03 30 00 1.4 H Special Inspection Reports X X 03 30 00 1.4 1 Saw cutting system X X

03 30 50 1.2B Data on insulation materials and vent piping materials.

X X

03 35 40 1.2B All products and primary equipment X X

03 35 40 1.2C Joint Filler Installer Qualification Certification X X

03 35 43.01 1.4A All Manufacturer's equipment, chemicals, and products

X X

03 35 43.01 1.4B Installer Certification X X 03 35 43.01 1.4C Pre-Certified Installers X X

03 45 00 1.4A All products X X 03 45 00 1.4B For each concrete mix. X X 03 45 00 1.4C Precast concrete units X X

03 45 00 1.4D For each type of finish on exposed surfaces X X

03 45 00 1.4E Welding procedures and personnel X X

03 45 00 1.4F Concrete Materials and Reinforcing Materials X X

03 45 00 1.4G Installer Qualifications X X 03 45 00 1.4H Fabricator Qualifications X X 03 45 00 1.4I Special Inspeciton Reports X X 03 45 00 1.4J Test Reports X X

04 20 00 1.5 A Reinforcing Steel X X

04 20 00 1.5 B

Masonry Units and Face Brick, cementitious materials, reinforcing bard, joint reinforcement, misc anchors, ties, and metal accessories

X X

04 20 00 1.5 C

For each type and color masonry and brick and precast items

X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

04 20 00 1.5 D For each type mortar and grout X X

04 20 00 1.5 E Statement of Compressive Strength of Masonry

X X

04 20 00 1.5 F Field Quality control tests and inspection X X

04 20 00 1.5 G Special Inspection Reports X X

05 12 00 1.3 A For each type of cold-formed metal framing product and accessory indicated

X X

05 12 00 1.3 B Detail fabrication of structural steel X X 05 12 00 1.3 C Welding certificates X X

05 12 00 1.3 D

Mill test reports, hardware, direct-tension indicators, shop primers, anchor and threaded rods, anchors, and grout

X X

05 12 00 1.3 E Manufacturer Certifications X X 05 12 00 1.3 F Special inspection reports X X 05 12 00 1.3 G Sustainable Design Submittals X X

05 21 00 1.2 A For each type of joist, accessory, and product indicated.

X X

05 21 00 1.2 B

Show layout, mark, number, type, location, and spacings of joists. Indicate locations and details of anchorage devices and bearing plates. Submit calculations sealed by a Professional Engineer.

X X

05 21 00 1.2 C Bolt comply with specified requirements. X X 05 21 00 1.2 D Field quality-control test reports X X 05 21 00 1.2 E For all products having recycled content X X X

05 21 00 1.2 F Products having recycled content and cost statement

X X

05 30 00 1.2 A For each type X X 05 30 00 1.2 B Show layout and types X X

05 30 00 1.2 C Field quality-control test and inspection reports.

X X

05 30 00 1.2 D Welding certificates X X 05 30 00 1.2 E For all products having recycled content X X X

05 40 00 1.4 A For each type X X 05 40 00 1.4 B Welding Certificate X X 05 40 00 1.4 C Special Inspection Reports X X 05 40 00 1.4 D Recycled content X X X

05 40 00 1.4 E

Include layout, spacing, sizes, thicknesses, and types of cold-formed steel framing;

fabrication; and fastening and anchorage details, including mechanical fasteners.

X X

05 40 00 1.4 F Cold-formed steel framing X X

05 50 13 1.3A

Fabrication and installation details. Include plans, elevations, sections, and details of metal fabrications and their connections.

Show anchorage and accessory items.

X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

05 50 13 1.3B Stainless steel quilted wall panel 24 by 24 inches

X X

05 50 13 1.3C Welding certificates X X 05 50 13 1.3D Special Inspection Reports X X

05 50 13 1.3E Bumper Post Sleeves and ladder rung non-slip material

X X

05 50 13 1.3F

Delegated Design Criteria: For installed products indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

X X

05 50 13 1.3G Qualification Data X X

05 52 00 1.3 A Include plans, elevations, sections, details, and attachments to other work.

X X

05 52 00 1.3 B Welding Certificates X X 05 52 00 1.3 C Special Inspection Reports X X

05 52 00 1.3 D

For installed products indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation. Include design submittal with the corresponding shop drawings.

X X

06 10 00 1.3 A For each type of process and product X X

06 10 00 1.3 B

For adhesives including statement of VOC content and wood product including documentation that product contains no urea formaldehyde.

X X

06 16 00 1.2 A For each type of process and product X X

06 40 23 1.3 A All products X X

06 40 23 1.3 B

Product data to indicate wood complies with forest certification requirements. Adhesive documentation statement of VOC content.

Document indicating that products contain no urea formaldehyde.

X X

06 40 23 1.3 C

Show location of each cabinet, dimensioned plans and elevations, large-scale details, attachment devices, and other components.

X X

06 40 23 1.3 D All products and finishes X X

06 83 16 1.2 A All products X X

06 83 16 1.2 B

Product data for adhesvies and sealants, including statement of VOC content and chemical components.

X X

07 21 00 1.2 A For each type of insulation product X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

07 24 00 1.4 A For all products X X

07 24 00 1.4 B

Product data for adhesvies and sealants, including statement of VOC content and chemical components.

X X X

07 24 00 1.4 C

24" square panel for each type product.

Include sealant samples to verify color selected.

X X

07 24 00 1.4 D Certifying that EIFS and joint sealants comply with requirements.

X X

07 24 00 1.4 E Compatibility and adhesion test reports. X X

07 24 00 1.4 F

Evaluation reports: For water-resistive coating, code compliance, and EIFS systems (including insulation), from ICC Evaluation Services, LLC.

X X

07 24 00 1.4 G Field quality-control special inspection reports.

X X

07 24 10 1.4 A For all products X X

07 24 10 1.4 B

Product data for adhesvies and sealants, including statement of VOC content and chemical components.

X X X

07 24 10 1.4 C

24" square panel for each type product.

Include sealant samples to verify color selected.

X X

07 24 10 1.4 D Certifying that EIFS and joint sealants comply with requirements. X X

07 24 10 1.4 E Compatibility and adhesion test reports. X X

07 24 10 1.4 F

Evaluation reports: For water-resistive coating, code compliance, and EIFS systems (including insulation), from ICC Evaluation Services, LLC.

X X

07 24 10 1.4 G Field quality-control special inspection reports. X X

07 40 00 1.3 A All products X X

07 40 00 1.3 B

Include plans, elevations, sections, details, and attachments to other work. 2. Include details of edge conditions, joints, panel profiles, corners, anchorages, trim, flashings, closures, and accessories.

X X

07 40 00 1.3 C Product data for adhesvies and sealants, including statement of VOC content.

X X X

07 40 00 1.3 D Each exposed finish X X

07 50 20 1.3 A Product data for instructions and recommendations X X X

07 50 20 1.3 B guardrails X X 07 50 20 1.3 C Selection Samples X X

07 52 00 1.3 A

Roof plan; drawing depicting wind loads and boundaries of enhanced perimeter and corner attachments of roof system components, as applicable.

X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

07 52 00 1.3 B

Modified Bitumen Sheets; Cold-Applied Membrane Adhesive Fiberglass Felt, Primer, Modified Bitumen Roof Cement; Pre- Manufactured Accessories Fasteners And Plates.

X X

07 52 00 1.3 C

Insulation, together with requirements of this section. Include in data written acceptance by the roof membrane manufacturer of the products and accessories provided. Products must be as listed in the applicable wind uplift and fire rating classification listings, unless approved otherwise by the Contracting Officer.

X X

07 52 00 1.3 D

Wind Uplift Calculations, Qualification of Manufacturer, Qualification of Applicator, and Fire Resistance.

X X

07 52 00 1.3 E Modifued Bitumen Membrane X X 07 52 00 1.3 F Closeout Submital Warranty X X

07 52 05 1.3 B

Submit manufacturer warranty and ensure that forms have been completed in Owner's name and registered with manufacturer.

X X

07 60 00 1.3 A

Show layouts of sheet metal flashing and trim, including plans and elevations.

Distinguish between shop- and field-assembled work

X X

07 60 00 1.3 B

Sheet Metal Flashing: 12 inches long.

Include fasteners, cleats, closures, and other attachments. Trim: 12 inches long. Include fasteners and other exposed accessories.

X X

07 71 00 1.3 A Each type of product. X X

07 71 00 1.3 B

For roof specialties. Include plans, elevations, expansion-joint locations, keyed details, and attachments to other work.

Distinguish between plant- and field-assembled work.

X X

07 71 00 1.3 C

For copings and roof-edge flashings made from 12-inch lengths of full-size components including fasteners, cover joints, accessories, and attachments.

X X

07 71 00 1.3 D

Based on evaluation of comprehensive tests performed by a qualified testing agency, for copings and roof-edge flashings indicating performance requirements.

X X

07 71 00 1.3 E Warranties X X

07 84 00 1.3A For each product X X 07 84 00 1.3B For each firestop system X X 07 84 00 1.3C Field quality test reports X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

07 92 00 1.3A For each joint-sealant product indicated. X X

07 92 00 1.3B

For sealants and sealant primers used inside the weatherproofing system, including printed statement of VOC content.

X X

07 92 00 1.3C For each kind and color of joint sealant required

X X

07 92 00 1.3D Preconstruction Compatibility and Adhesion Test Reports

X X X

07 92 00 1.3E Product test reports X X

07 92 00 1.3F Preconstruction Field-Adhesion Test Reports X X X

07 92 00 1.3G Sealant, Waterproofing, and Restoration Institute (SWRI) Validation Certificate

X X

08 11 13 1.4A

Include construction details, material descriptions, core descriptions, label compliance, fire-resistance rating, and finishes for each type of steel door and frame specified.

X X X

08 11 13 1.4B Schedules, details, elevations of doors and frames

X X

08 11 13 1.4C

Drawings of each opening, including door and frame, drawn to scale and coordinating door hardware

X X

08 14 16 1.2A For each type door, core, edge, trim, finish X X

08 14 16 1.2B

Indicate location, size, and hand of each door, elevation of each kind of door, details, hardware blocking

X X

08 14 16 1.2C

Factory finishes, face materials, wood species, transparent finishes, corner sections, and edgings

X X

08 31 13 1.2A For each type product X X

08 33 23 1.4A For each type product X X 08 33 23 1.4B Sustainable Submittals X X 08 33 23 1.4C Delegated-Design Submittal X X

08 38 00 1.2A For each type product X X

08 41 13 1.3A For each type product X X 08 41 13 1.3B Include plans, elevations, sections, details X X 08 41 13 1.3C Product Test Reports X X 08 41 13 1.3D Seismic Qualification Certificates X X

08 42 29.23 1.4A For each type product X X 08 42 29.23 1.4B Include plans, elevations, sections, details X X 08 42 29.23 1.4C Sustainability Submittals X X 08 42 29.23 1.4D For each type of exposed finish required X X 08 42 29.23 1.4E Product Test Reports X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

08 42 29.23 1.4F For door operators and control systems X X

08 42 29.43 1.5 Include plans, elevations, sections, details X X

08 42 29.43 1.5 Color Samples for selection of factory-applied color finishes.

X X

08 42 29.43 1.5 Product & Design X X 08 42 29.43 1.5 Owner Manual & Warranties X X X X

08 71 00 1.2A For each type of product X X X X

08 71 00 1.2B Certify that locksets approved for use complies with “Buy American Act".

X X

08 71 00 1.2C Hardware Sets X X 08 71 00 1.2D Keying Schedule X X 08 71 00 1.2E AHC Report X X X 08 71 00 1.2F Product test report X X

08 79 13 1.2A For each type product X X 08 79 13 1.2B Key control system instruction program X X

08 81 00 1.5A For each type product X X 08 81 00 1.5B Glazing Schedule X X 08 81 00 1.5C Product certificates X X 08 81 00 1.5D Preconstruction adhesion and test reports X X 08 81 00 1.5E Field quality control reports X X

08 83 00 1.2A Preconstruction Test Results X X 08 83 00 1.2B Warranty X X

09 05 61 1.4A For each type product X X 09 05 61 1.4B Moisture and pH; floor plans and photos X X 09 05 61 1.4C Bond and Compatibility Test report X X 09 05 61 1.4D Remedial materials product data X X

09 29 00 1.2A For each type product X X 09 29 00 1.2B VOC data X X

09 30 00 1.3A For each type product X X 09 30 00 1.3B VOC data X X

09 30 00 1.3C Assembled samples with grouted joints for each type tile and each color and finish

X X

09 51 00 1.3A Each type of acoustical ceiling unit and suspension system

X X

09 51 00 1.3B VOC content X X 09 51 00 1.3C Delegated design submittal X X 09 51 00 1.3D Field quality reports X X 09 51 00 1.3E qualification for testing agency X X 09 51 00 1.3F For each acoustical panel ceiling X X 09 51 00 1.3G For each acoustical panel ceiling X X

09 51 00 1.3H For finishes to include in maintenance manuals

X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

09 65 19 1.2A Each type of product X X 09 65 19 1.2B VOC Content X X

09 65 19 1.2C Full-size units of each color and pattern of resilient floor tile

X X

09 65 19 1.2D Each type of product X X 09 65 19 1.2E Moisture/Bond Tests X X

09 67 23 1.3A Each type of product X X 09 67 23 1.3B VOC Content X X 09 67 23 1.3C For each resinous flooring system X X

09 72 00 1.2A Each type of product X X 09 72 00 1.2B VOC Content X X X

09 72 00 1.2C Show location and extent of each wall-covering type

X X

09 72 00 1.2D For each type of wall covering and for each color, texture, and pattern required

X X

09 90 00 1.2A Each type of product X X 09 90 00 1.2B VOC Content X X 09 90 00 1.2C Each finish, color, and texture required X X 09 90 00 1.2D MPI Approved Products List X X

10 08 00 Commissioning submittals X X

10 10 00 1.2A For each type product X X

10 10 00 1.2B VOC content X X

10 10 00 1.2C For each type product X X

10 14 00 1.3A For each type product X X

10 14 00 1.3B VOC Content X X

10 14 00 1.3C Showing fabrication and erection of signs X X

10 14 00 1.3D Sign message verification X X

10 15 00 1.3A For each type of interior décor X X

10 15 00 1.3B

Show fabrication and erection of interior décor specialties. Include plans, elevations, and large-scale sections

X X

10 15 00 1.3C For each type of interior décor X X

10 15 00 1.3D VOC Content and no urea formaldehyde document

X X

10 21 13 1.2A For each type product X X

10 21 13 1.2B Include plans, elevations, sections, details, and attachments to other work.

X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

10 26 00 1.2A

Include construction details, material descriptions, impact strength, dimensions of individual components and profiles, and finishes for each type of product indicated

X X

10 26 00 1.2B VOC content X X

10 28 13 1.2A For each type of product X X 10 28 13 1.2B Toilet Accessory Schedule X X

10 44 00 1.2A For fire extinguishers and cabinets X X

10 51 13 1.3A For each item of equipment required X X

10 56 23 1.3A For each item of equipment required X X

10 56 29 1.3A For each type product X X

11 08 00 Commissioning submittals X X

11 13 00 1.3A For each type product X X 11 13 00 1.3B Installer certification X X 11 13 00 1.3C Show fabrication and installation details X X

11 13 00 1.3D Maintenance manuals for loading dock equipment

X X

11 13 00 1.3E Special warranties X X 11 13 00 1.3F Special guarantees X X

11 40 00.23 1.2A For each item of product X X

11 82 36 1.2A For each item of product X X 11 82 36 1.2B Warranty X X

12 21 13 1.2A For each type product X X 12 21 13 1.2B For each type product X X 12 21 13 1.2C Window treatment schedule X X

12 48 13 1.2A For each type product X X 12 48 13 1.2B For each type product X X 12 48 13 1.2C For each type product X X

12 48 13 1.2D Submit moisture/bond tests prior to installation of entrance carpet tile.

X X

12 59 00 1.2A For each type product X X

13 08 00 Commissioning submittals X X

13 10 00 1.3A For each type product X X 13 10 00 1.3B Air terminals and mounting accessories X X 13 10 00 1.4A Qualification Data X X 13 10 00 1.4B Roof adhesivie X X 13 10 00 1.4C Field quality-control reports X X 13 10 00 1.4D Lightening protection system X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

13 10 00 1.4E As-built of grounding features X X

13 21 26 1.3A For each type product X X

13 21 26 1.3B

Layout, show construction and fabrication details of each item, and details for structural supports

X X

13 21 26 1.3C Installation Drawings X X

13 21 26 1.3D Complete written installation instructions for cold storage rooms.

X X

13 21 26 1.3E Ceiling Suspension Structural Calculations X X

13 21 26 1.3F Cold storage rooms operations and performance tests.

X X

13 21 26 1.3G Warranties X X

21 08 00 Commissioning submittals X X 21 08 00 Operation Manuals X X 21 08 00 Warranty X X X

21 13 00 1.4A For each type product listed X X

21 13 00 1.4A Working plans and hydraulic calculations sealed with PE stamp; flow tests

X X

21 13 00 1.4A

Computer program generated hydraulic calculation to substantiate compliance with hydraulic design requirement per NFPA 13, latest edition

X X

21 13 00 1.4A

Fire Sprinkler Contractor shall perform a two hydrant flow test in accordance with NFPA 291 at time of actual Working Plan design.

X X

21 13 00 1.4A

Submit complete sprinkler system Working Plans and hydraulic calculations sealed with the preparing subcontractor’s PE stamp of the FPE who prepared or supervised the preparation of the Working Plans.

X X

21 13 00 1.4A Operation and maintenance data X X

21 13 00 1.4B

Project Record Docs; Manufacturer's certificate; operation and maintenance data;

warranty; NFPA 25; certification and testing data

X X

22 05 00 1.5 Asbestos-Free product report X X

22 05 19 1.3A For all products X X X

22 05 19 1.3A Indicate dimensions, weights, and placements of openings

X X

22 05 19 1.3A Operation and Maintenance Data X X

22 05 19 1.3B Certify that grease interceptors meet or exceed specified requirements.

X x

22 05 19 1.3B Installation instructions, including assembly and support requirements

X X

22 05 19 1.3C

Record actual locations of equipment, cleanouts, backflow preventers, water hammer arrestors, insrumentation

X X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

22 05 19 1.3C Indicate frequency of treatment required X X X

22 05 19 1.3C Include instructions for calibrating instruments X X X

22 05 19 1.3C Installation instructions, spare parts list, exploded assembly views. X X X

22 05 19 1.3C Certification data that supplements previously submitted O & M Manuals

X X X

22 07 19 1.4A

Provide product data for each type of mechanical insulation identifying k-value, thickness, jackets (factory and field applied) and accessories. Include maintenance data.

X X X X

22 08 00 Commissioning submittals X X

22 10 00 1.4A Provide data on pipe materials, pipe fittings, valves and accessories. X X

22 10 00 1.4A Provide manufacturers catalog; indicate valve data and ratings.

X X

22 10 00 1.4B Record actual locations of valves X X X

22 10 00 1.4B Certifications and testing supplemental to previously submitted O & M manuals.

X X X X

22 40 00 1.3A

Provide catalog illustrations of fixtures, electric/electronic controls for lavatories and flush valves, sizes, rough-in dimensions, utility sizes, trim, and finishes.

X X

22 40 00 1.3A Maintenance data X X 22 40 00 1.3B Manufacturer's instructions X X

22 40 00 1.3C Maintenance Data: Include fixture trim exploded view and replacement parts lists.

X X X

22 40 00 1.3C Warranty X X X

22 40 00 1.3C Certifications and testing data as a supplement to previously submitted O & M

X X X X

23 01 00 3.8 Close out letter X X

23 05 00 1.6B

Prior to approval of the material to be used, the manufacturer shall furnish written certification that the material contains no asbestos.

X X

23 05 13 1.3A

For each type and size of motor, provide nameplate data and ratings; shipping, installed, and operating weights; mounting arrangements; size, type, and location of winding terminations; conduit entry and ground lug locations; and information on coatings or finishes

X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

23 05 13 1.3B

Dimensioned Plans, Elevations, Sections, and Details, including required clearances and service space around equipment

X X

23 05 13 1.3C Field Quality test reports X X

23 05 13 1.3D For field-installed motors to be included in operation and maintenance manuals

X X

23 05 93 1.4B

Submit name of adjusting and balancing agency for approval within 30 days after award of Contract.

X X

23 05 93 1.4C

Within 60 days of General Contract award conduct and review a TAB design review detailing and items that would prevent the successful balancing of the systems.

X X

23 05 93 1.4D

Field Reports: Indicate deficiencies in systems that would prevent proper testing, adjusting, and balancing of systems and equipment to achieve specified performance.

X X

23 05 93 1.4E

Prior to commencing work, submit report forms or outlines indicating adjusting, balancing, and equipment data required.

X X

23 05 93 1.4F

Submit draft copies of report for review prior to final acceptance of Project. Provide final copies for Architect/Engineer and for inclusion in operating and maintenance manuals.

X X

23 05 93 1.4G For all products and systems. X X

23 07 13 1.3A

Provide product data for each type of mechanical insulation identifying k-value, thickness, jackets (factory and field applied) and accessories.

X X

23 07 19 1.4 For all products; identifying k-value, thickness, jackets, and accessories X X X

23 08 00 Commissioning submittals X X

23 09 13 1.3A

Provide description and engineering data for each control system component, and software module.

X X

23 09 13 1.3B

Include inspection period, cleaning methods, recommended cleaning materials, and calibration tolerances

X X X

23 09 13 1.3B Certifications and testing supplement to previously submitted O & M manuals

X X X X

23 09 16 1.3 B

Equipment cut sheets for all products, systems, components indicated and installation and user manuals.

X X X X

23 09 16 1.3 B

Provide drawings showing; components locations in commissary and required wiring between components.

X X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

23 09 16 1.3 B RMCS Manufacturer's resume X X 23 09 16 1.3 B Startup technician's resume X X

23 09 16 1.3 B RMCS Manufacturer's approval of startup technician.

X X

23 09 16 1.3 B Display case/Compressor Manufacturer coordination.

X X X

23 09 16 1.3 B RMCS Installer qualifications X X

23 09 16 1.3 B RMCS Manufacturer's approval of startup technician.

X X

23 09 16 1.3 C Operation and Maintenance data X X

23 23 00 1.3B

Indicate schematic layout of system, including equipment, critical dimensions, and sizes developed by the Condensing Unit Manufacturer.

X X

23 23 00 1.3B Record actual locations of components. X X X

23 23 00 1.3B

Include operation, maintenance, and inspection data, replacement part numbers and availability, and service depot location and telephone number.

X X X

23 23 00 1.3B

Submit compressor manufacturer warranty and ensure forms have been completed in Owner's name and registered with manufacturer.

X X X

23 23 00 1.3B

Submit all certifications and testing data as a supplement to previously submitted O & M manuals at contract closeout.

X X X X

23 31 13 1.4A

Indicate pressure tests performed. Include date; section tested, test pressure, and leakage rate, following SMACNA HVAC Air Duct Leakage Test Manual.

X X X

23 31 13 1.4B

Record actual locations of ducts and duct fittings. Record changes in fitting location and type. Show additional fittings used.

X X X

23 31 13 1.4B

Submit all certifications and testing data as a supplement to previously submitted O & M manuals at contract closeout.

X X X X X

23 34 23 1.3A

Include rated capacities, furnished specialties, and accessories for each type of product indicated

X X

23 34 23 1.3A For each type product X X

23 34 23 1.3B

Include manufacturers’ descriptive literature, instructions for lubrication, motor and drive replacement, spare parts list, and wiring diagrams.

X X X

23 34 23 1.3B

Submit all certifications and testing data as a supplement to previously submitted O & M manuals at contract closeout.

X X X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

JE

CT

R

EC

O

RD

D

O

CU

M

EN

TS

-O

&M D

AT

A

-S

US

TA

IN

AB

LE

R

EQ

UI

RE

M

EN

TS

-C

LO

SE

O

UT

S

UB

M

IT

TA

LS

In fo rm at io n

O nl y

A /E

A pp ro va l G

, A E

G ov er nm en t A pp ro ve d

G , A

O

Submit Approval Needed By

Material Needed By

A ct io n

C od e

Date of Action

A ct io n

C od e

Date of Action

SUBMITTAL REGISTER

TITLE AND LOCATION: Pensacola Commissary

A/E Project: 2016-001

23 37 13 1.3A

Provide data for equipment required for this project. Include outlets, inlets, size, finish, type of mounting, schedule of outlets.

X X X

23 38 13 1.3B For each type product X X

23 38 13 1.3C

Provide drawings showing; components locations and required wiring between components.

X X

23 38 13 1.3D

Detail fire-suppression piping and components and differentiate between manufacturer-installed and field-installed piping.

X X

23 38 13 1.3E Field test reports X X 23 38 13 1.3F Operation and Maintenance data X X X

23 51 00 1.5A For each product type X X 23 51 00 1.5A Operation and Maintenance Data X X X

23 54 16 1.3A

Provide manufacturer's literature and data indicating rated capacities, weights, accessories, electrical nameplate data, and wiring diagrams

X X

23 54 16 1.3A Indicate assembly, required clearances, and locations and sizes of field connections

X X

23 54 16 1.3A For all products X X

23 54 16 1.3B Indicate rigging, assembly, and installation instructions

X X

23 54 16 1.3C

Include manufacturer's descriptive literature, operating instructions, maintenance and repair data, and parts listing

X X X

23 54 16 1.3C Submit warranty, fill out in government's name and register with manufacturer

X X X

23 54 16 1.3C Manufacturer's qualifications X X X

23 54 16 1.3C

Submit all certifications and testing data as a supplement to previously submitted O & M manuals at contract closeout.

X X X X

23 74 13 1.3A

Indicate capacity and dimensions of manufactured products and assemblies required for this project. Indicate electrical service with electrical characteristics and connection requirements, and duct connections.

X X

23 74 13 1.3A

Provide capacity and dimensions of manufactured products and assemblies required for this project. Indicate electrical service with electrical characteristics and connection requirements, and duct connections.

X X

23 74 13 1.3A Operation and Maintenance Data X

23 74 13 1.3B

Include manufacturer's descriptive literature, operating instructions, installation instructions, maintenance and repair data, and parts listing.

X X

HDEC03-18-R-0007

A ct iv ity

N o.

Tr an sm itt al N o.

Section Number Paragraph Number Description of Submittal

-P

RE

CO

N

SU

BM

IT

TA

LS

-S

HO

P

DR

AW

IN

G

S

-P

RO

DU

CT

D

AT

A

-W

AR

RA

NT

IE

S

-S

AM

PL

ES

-D

ES

IG

N

DA

TA

-T

ES

T

RE

PO

RT

S

-C

ER

TI

FI

CA

TE

S

-M

FR

S

IN

ST

RU

CT

IO

NS

-M

FR

S

FI

EL

D

RE

PO

RT

-P

RO

J…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.