Attachment 10- Task Order 1 QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD3_QA.docx | DOCX document | |
| AMD03_HC1047-18-R-4002.pdf | ||
| AMD02_HC1047-18-R-4002.pdf | ||
| AMD2_QA.DOCX | DOCX document | |
| Attch_1-IDIQLaborCategories_Nov30.docx | DOCX document | |
| Attach_9-_TO1PWS_Nov30.docx | DOCX document | |
| Attach_11-_TO1_Skill_Summary_Nov30.xlsx | XLSX spreadsheet | |
| HC1047-18-R-4002_AMD01.pdf | ||
| NLCCPESTS_QandA_Final.DOCX | DOCX document | |
| Attach_9-_TO1PWS_FINALv2.docx | DOCX document | |
| HC1047-18-R-4002_Nov162017.docx | DOCX document | |
| Attach_11-_TO1_Skill_Summary.xlsx | XLSX spreadsheet | |
| Attch_2-_DD254_solicitation.pdf | ||
| Attach_6-_PPQ_Questionnaire.doc | DOC document | |
| Attch_1-IDIQLaborCategories.docx | DOCX document | |
| Attach_7-_PPQ_consent.doc | DOC document | |
| Attach_3-_QAtemplate.docx | DOCX document | |
| HC1047-18-R-4002_Nov162017.pdf | ||
| Attach_5-_PP_References.doc | DOC document | |
| Attach_8-Offeror_Staffing_Summary.xlsx | XLSX spreadsheet | |
| Attach_4-_Pricing_Worksheet_Final.xlsx | XLSX spreadsheet |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. Contract or Task Order Title : National Leadership Command Capability (NLCC) Directorate Program Engineering Security & Technical Support (PEST Support) Task Order 1
2. Purpose: This QASP provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
3. Roles and Responsibilities:
The following personnel shall oversee and coordinate surveillance activities.
Program/Project Manager (PM) – The PM provides program oversight and supports the COR’s performance assessment activities.
Contracting Officer (KO) – The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.
Contracting Officer’s Representative (COR) – The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.
Other Key Government Personnel- Technical Government Leads will also help to monitor the contractor’s performance and provide feedback to the COR. Technical Government Leads include Lead Government Engineer, Lead Government Cybersecurity and Lead Government Security. In addition, this may include performance monitors, inspectors, technical experts, or others (i.e. users) who provide information that helps the COR monitor contractor performance.
4. Primary Method of Surveillance:
100% inspection will be scheduled for the Integrated Portfolio, Spend Plan, and Monthly Status Reports. Periodic inspection will be scheduled for the Network Management Plan, Network Design, and Cyber Risk Assessment Report.
Surveillance Matrix
The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performance surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The AQL performance Standard Table should be used to form the foundation of the COR’s inspection checklist.
5. Performance Standards:
The contractor shall be contractually obligated to perform every requirement in the performance work statement. Not every performance requirement has a related performance standard or assessment measure as expressed in this document. In such cases the performance standard or performance measure is either inherent in the requirement or performance is to be in accordance with standard commercial practice (that is performance substantially complies with customary trade practice). When a performance standard or measure is specified, it may be used to achieve a variety of objectives. Such objectives include, but are not limited to, collection of data to test the practicality of a performance standard, the identification of performance when the standard requires less than 100 percent compliance, emphasis on the most critical performance requirements, the collection of data to support quality assurance, assessment of remedies, and documenting performance for inclusion in a past performance information database. The performance standard for the various categories outlined in the surveillance matrix, is that deliverables shall be delivered on time and IAW COR per the PWS.
6. Documenting Performance:
Acceptable Performance.
The Government shall document positive performance. A Performance Assessment Report (PAR) template is attached (Appendix 2). Any report may become part of the supporting documentation for fixed price payments, award/incentive fee payments, Contractor Performance Assessment Reporting System (CPARS) entries, or other actions. Government acceptance of services permits the contractor to invoice for the service fee.
Unacceptable performance.
Unacceptable contractor performance can be identified by customer complaints (Appendix 3) or upon schedule surveillance evaluations. When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. The COR shall document the discussion and place it in the COR file and provide a copy to the KO.
When the COR determines formal written communication is required, the COR shall prepare a Corrective Action Report (CAR). The CAR is forwarded to the KO for dissemination to the contractor. A CAR template is attached to this QASP (Appendix 4).
The contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the contractor has to present this corrective action plan to the KO and COR. The Government may withhold payment for services until corrective action is taken. The Government shall review the contractor's corrective action plan to determine acceptability. Upon Government acceptance of the corrected services the contractor will be permitted to invoice for the service fee.
Any CAR may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, CPARS or other actions deemed necessary by the KO.
7. Mandatory or regulatory compliance items: The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer (KO) will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO.
8. Acceptable Quality Level (AQL): The AQL for all categories of surveillance is that the materials contain the required information and are delivered on time at least ninety-five percent (95%) of time, eighty percent (80%) of final products are error free.
9. Evaluation Method:
100% inspection will be scheduled for the Integrated Portfolio, Spend Plan, and Monthly Status Reports. Periodic inspection will be scheduled for the Network Management Plan, Network Design, and Cyber Risk Assessment Re-port. The COR, ACOR and/or Government POC will document deficiencies in performance initially through verbal notification to the on-site contract lead. The COR, ACOR and/or Government POC will review all draft deliverables and make comments within ten (10) workdays. The Contractor will have ten (10) workdays to make corrections unless a longer period is specified in writing by the COR. Upon receipt of the final deliverables, the COR will have five (5) workdays for final review prior to acceptance or providing documented reason for non-acceptance. If deficiencies are not resolved in the agreed upon timeframe between the contractor and COR, the issue will be escalated to the next level of government and contract oversight. The issues will escalate to the Contracting Officer for resolution if the issue cannot be resolved in a timely manner.
10. Performance Rating
This is a Firm Fixed Price Labor and Cost Reimbursable Other Direct Costs Contract. Firm Fixed Price payments will be based on a Contractor proposed and Government accepted deliverable schedule. The Government will positively and / or negatively review the Contractor's performance based on the success or failure in meeting quality assurance surveillance plan objectives. The Contractor is incentivized to earn favorable Government reviews to support continuation of similar work, and to support contract awards with other Government agencies seeking DISA's input on the Contractor's past performance in the Contract Performance Assessment Reporting System (CPARS). Failure to meet the acceptable quality levels shall result in an unsatisfactory past performance report by the Government. In evaluating the quality of contractor’s performance, the following performance ratings may be used (same as CPAR ratings).
Performance Rating Criteria
| Exceptional |
| Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Appendix 1 - Surveillance Matrix
| Category |
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Method of Surveillance |
| Integrated Portfolio |
| Integrated Portfolio Schedule |
deliverables shall be delivered on time and IAW COR per the PWS.
| Materials contain required information and are delivered on time at least ninety-five percent (95%) of time, eighty percent (80%) of final products are error free. |
| 100% Inspection – COR will review assigned tasks for completeness, accuracy & timeliness. |
| Spend Plan |
| Spend Plan deliverables shall be delivered on time and IAW COR per the PWS. |
| Materials contain required information and are delivered on time at least ninety-five percent (95%) of time, eighty percent (80%) of final products are error free. |
| 100% Inspection – COR will review each product for |
completeness, accuracy & timeliness.
| Monthly Status Report |
| Monthly Status Report deliverables shall be delivered on time and IAW COR per the PWS. |
| Materials contain required information and are delivered on time at least ninety-five percent (95%) of time, eighty percent (80%) of final products are error free. |
| 100% Inspection – COR will review assigned tasks for completeness, accuracy & timeliness. |
| Network Management Plan |
| Network Management Plan deliverables shall be delivered on time and IAW COR per the PWS. |
| Materials contain required information and are delivered on time at least ninety-five percent (95%) of time, eighty percent (80%) of final products are error free. |
| Periodic Inspection – COR will review each product for completeness, accuracy & timeliness. |
| Network Design |
| Network Design Objectives & Plans deliverables shall be delivered on time and IAW COR per the PWS. |
| Materials contain required information and are delivered on time at least ninety-five percent (95%) of time, eighty percent (80%) of final products are error free. |
| Period Inspection – COR will review each product for completeness, accuracy & timeliness. |
| Cyber Risk Assessment Report |
| Cyber Risk Assessment Report deliverables shall be delivered on time and IAW COR per the PWS |
| Materials contain required information and are delivered on time at least ninety-five percent (95%) of time, eighty percent (80%) of final products are error free. |
| Period Inspection – COR will review each product for completeness, accuracy & timeliness. |
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)
|_| NEW
|_| REPEAT
|_| NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
Appendix 2 – Performance Assessment Report
Appendix 3 – Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Appendix 4 – Corrective Action Report
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY |_| MAJOR |_| MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
|_| ACCEPTED |_| REJECTED
12. CLOSE DATE
Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2