20100210_NGW_Section_J_Attachment_C_Cross_Reference_Matrix_FINAL.doc

DOC document 391 KB Posted

Attached to
Military Sealift Command Next Generation Wideband Federal contract opportunity
Solicitation number
HC1013-09-R-2004
Issued by
Defense Information Systems Agency

About this file

Attachment C-Compliance and Cross Reference Matrix

View the file

Other files for this federal contract opportunity

Other files attached to Military Sealift Command Next Generation Wideband, newest first.
File Type Posted
20100422_AMEND0009_MSC_NGW_Section_J_Attachment_Q_Pricing_Schedule.xls XLS spreadsheet
20100422_AMEND0009_MSC_NGW_Section_L.pdf PDF
20100416_AMEND0007_MSC_NGW_Section_M.pdf PDF
20100416_AMEND0007_MSC_NGW_RFP_QA_.pdf PDF
HC1013-09-R-2004_Amend_0007.pdf PDF
HC1013-09-R-2004_AMEND_6.pdf PDF
20100412_AMEND0005_MSC_NGW_Section_M.pdf PDF
HC1013-09-R-2004_AMEND_5.pdf PDF
20100402_AMEND0004_MSC_NGW_Section_J_Attachment_A_SOO.pdf PDF
20100402_AMEND0004_MSC_NGW__RFP_QA.pdf PDF
HC1013-09-R-2004_Amend_4.pdf PDF
20100402_AMEND0004_MSC_NGW_Section_J_Attachment_Q_Pricing_Schedule.xls XLS spreadsheet
20100323_AMEND0003_MSC_NGW_RFP_QA_.pdf PDF
HC1013-09-R-2004_Amend_3.pdf PDF
20100317_AMEND0002_List of Attachments.v2.doc DOC document
20100317_AMEND0002_MSC_NGW_Section_L.doc DOC document
HC1013-09-R-2004_Amend_2.doc DOC document
20100317_AMEND0002_MSC_NGW_Section_J_Attachment_Q_Pricing_Schedule.xls XLS spreadsheet
20100317_AMEND0002_MSC_NGW_Section_J_Attachment_I_QASP_Template.doc DOC document
20100317_AMEND0002_MSC_NGW_Section_J_Attachment_U_DD254.pdf PDF
Section_M_04-March-2010.doc DOC document
MSC NGW Drawings.zip ZIP file
20100210_NGW_CDRL_Item_11_List_of_Support_Equipment_ dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_13_Cost_Summary_Report_dd1423-2_FINAL.pdf PDF
ngw Material list per ship package cdrl item 3 dd1423.pdf PDF
20100210_NGW_Section_J_Attachment_E_CDRLs_FINAL.doc DOC document
ngw Installation Checkout Spares Data cdrl item 9 dd1423.pdf PDF
20100210_NGW_CDRL_Item_12_Support_Service_Report_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_5_Classroom_Training_Report_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_7_Technical_Manual_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_1_Monthly_Reports_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_8_Onboard_Repair_Parts_Data_dd1423-2_FINAL.pdf PDF
List of Attachments.doc DOC document
HC101309R2004.doc DOC document
20100210_NGW_Section_J_Attachment_B_Afloat_Background_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_J_PCA_Questionnaire.doc DOC document
20100210_NGW_Section_J_Attachment_M_Consent_Letter_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_H_PWS_Template_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_D_Ships_by_Location_FINAL.xls XLS spreadsheet
20100210_NGW_Section_J_Attachment_L_Client_Authorization_Letter_FINAL.doc DOC document
20100301__NGW Section_J_Attachment_Q_Pricing Schedule.xls XLS spreadsheet
20100210_NGW_Section_J_Attachment_G_Acronyms_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_F_Standards_and_Specifications_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_K_Questionnaire_ Cover_Letter_FINAL.doc DOC document
Questions 28-Oct-09.pdf PDF
Draft SF33.Rev1.pdf PDF
Att A NGW SOO.pdf PDF
Section B.pdf PDF
Draft SF33.pdf PDF
Att C MSC Ships by Location.pdf PDF
Show all 50

Military Sealift Command Next Generation Wideband has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C: Compliance and Cross Reference Matrix The offeror shall fill out the following Compliance and Cross Reference Matrix indicating the proposal reference information as it relates to the SOO, CLIN numbers, Sections L and M, CDRL references found therein, and the corresponding paragraph in the Technical volume which addresses the referenced item.

The offeror can also add rows to the matrix as they see fit to provide clarity to their submittal. If this matrix conflicts with any other requirement, direction, or provision of this solicitation, the other reference shall take precedence over this matrix. In addition, to the extent this matrix discloses details as to the extent or manner by which the Government intends to evaluate the offeror’s proposals for award, Section M references in the matrix are for information purposes only and the Government shall be obligated to evaluate proposals solely in conformance with the provisions of Section M of the solicitation.

Objectives, Constraints and Related Documentation
Technical Proposal Volume

Evaluation Criteria

Section M, Subfactors for Technical/ Management Factor

SOO
Instructions to Offerors

Section L

CDRL
CLIN
SAS
PWS
QASP
Transition Plan
Technical Proposal
Risk Matrix
1
2a
SF1

CLINs 0001–0076

1
2d
SF1
1a, 1d
5a
SF1
1
CLINs 0001–0032
1b
5b
SF1

CLIN 0076

1c
5c
SF1

Even CLINs 0002–0032

1
6.2a
SF1

CLINs 0001–0032

1
6.2b
SF1
1
6.2c
SF1
1
6.2d
SF1
1
6.2e
SF1
1
6.2f
SF1
1
6.2g
SF1
1
6.2h
SF1
1
1
6.2i
SF1
1
1
6.3a
SF1

CLINs 0035–0063 pertaining to terminal equipment

1
6.3b
SF1
1
6.3c
SF1
1
6.4.1a
SF1

CLINs 0035–0063 pertaining to terminal equipment

1
6.4.1b
SF1
1
6.4.2a
SF1
1
6.4.2b
SF1
1
6.4.2c
SF1
1
6.4.2d
SF1
1
6.5
SF1

CLINs 0035–0063 pertaining to terminal equipment

1
6.5.1a
SF1
1
6.5.1b
SF1
1
6.5.2a
SF1
1
6.5.2b
SF1
2
2c
SF2

CLINs 0035–0063 pertaining to installation services

2
2d
SF2
2d
2e
SF2
2a
5b
SF2

CLIN 0076

2a
5d
SF2
1
2b
5e
SF2
2
5g
SF2d
5
CLIN 0071
2
5h
SF2d

CLINs 0035–0063 pertaining to training in SOO 5h

2
5i
SF2
10
2
6.2b
SF2
2
6.2c
SF2
2
6.2d
SF2
2
6.2e
SF2
2
6.2f
SF2
2
6.2g
SF2
2
6.2h
SF2
1
2
6.2i
SF2
1
2
6.7a
SF2

CLINs 0064–0067 pertaining to Deployment/ Installation

2
6.7b
SF2
4, 5, 8, 11, 12
2
6.7c
SF2
2
6.7d
SF2
2c
6.1a
SF2
2c
6.1b
SF2
2c
6.1c
SF2
2c
6.1d
SF2

CLIN 0072

2c
6.1e
SF2

CLIN 0072

2c
6.1f
SF2
3
2b
SF3

CLINs 0035–0063 pertaining to installation services as part of the transition plan

3
2c
SF3

CLINs 0035–0063 pertaining to installation services

3
5f
SF3
2, 11
CLINs 0035–0073, 0075
3
5g
SF2d
5
CLIN 0071 pertaining to role of training in SOO 5g as part of the transition plan
3
5h
SF2d

CLINs 0035–0063 pertaining to role of training in SOO 5h as part of the transition plan

3
6.6
SF3
2, 3, 6, 7, 9
CLIN 0035–0063 pertaining to Deployment/

Installation

4
2
SF4
4
5
SF4
2, 11
CLINs 0035–0073, 0075
4
6.1
SF4
4
6.2
SF4
4
6.6
SF4
4
6.7
SF4

Evaluation Criteria

Section M, Factor 1

Reference
Factor 1 Evaluation Criteria
1
Subfactor 1: System Performance: All relevant standards.
1a
System Performance, Standard a: Provides the flexibility to expand the per-ship voice and data communications capacity in an efficient and cost-effective manner to optimize:

a. Service availability and quality of service.

b. Total primary Committed Information Rate (CIR) and secondary Burstable Information Rate (BIR) bandwidth available to each ship. The preferred per-ship CIR is 64 Kbps (symmetric), ideally providing assured access without contention, whether during session initiation or information transfer. The preferred per-ship minimum for BIR is 256 Kbps downlink/128 Kbps uplink. MSC desires to maximize the amount of BIR bandwidth available within current budget constraints.

c. The ability to multicast large data packages (estimated maximum size of 500MB) to the fleet (e.g., software updates/patches/service packs).

d. Coverage area with emphasis on the concentration areas (see SOO Section 6.8), commercial sea routes, and areas of publicly disclosed major Naval operations. Land mass coverage is littoral with the exception of the Mobile Sealift Operations Center (MSOC) vans, which operate inland occasionally (98% littoral, 2% inland). The extent that a solution requires MB service (charged in the optional CLINs) rather than Kbps service (charged in the mandatory CLINs) will be penalized proportionately. Deep blue water use of MB service will be penalized least, followed by major sea routes, followed by littoral regions and major Naval bases.

e. Service delivery, as necessary, to provide highest data rates in the aforementioned concentration areas (see SOO Section 6.8), commercial sea routes, areas of publicly disclosed major Naval operations, and land mass coverage where MSOC vans operate. Best effort service delivery provided in all other covered regions.

1b
System Performance, Standard b: Maximizes flexibility in the allocation of primary and contingent space segment resources (i.e., portability) to maintain full service across the MSC fleet as ship deployments change locations.
1c
System Performance, Standard c: Offers the means to acquire additional capacity to support unanticipated growth in fleet size or per-ship consumption as it pertains to scalability, capacity, and allocation of contingent space segment resources (i.e., surge).
1d
System Performance, Standard d: The effectiveness of terminals and other required equipment to provide service requested in the SOO.
2
Subfactor 2: Operations and Maintenance: All relevant standards
2a
Subfactor 2: Operations and Maintenance, Standard a: The staging, delivery, and O&M support processes of the offeror’s solution maximize flexibility to maintain full system support process and team service across the MSC fleet as ship deployments change locations.
2b
Subfactor 2: Operations and Maintenance, Standard b: The staging, delivery, and O&M support processes of the offeror’s solution minimize the role of shore and shipboard personnel in satellite communication (SATCOM) sustainment activities.
2c
Subfactor 2: Operations and Maintenance, Standard c: The staging, delivery, and O&M support processes of the offeror’s solution demonstrate the ability to meet DoD information assurance requirements as defined in the SOO.
2d
Subfactor 2: Operations and Maintenance, Standard d: The staging, delivery, and O&M support processes of the offeror’s solution present a policy for warranties and non-obsolescence. This includes a process for addressing parts obsolescence, including periodic technology updates for commercial hardware and software changes through the operational life of the system.
3
Subfactor 3: Transition Plan: The offeror’s proposed WBSs, OCD Plan, installation package and support, Government resources required, and fielding plans are determined to be realistic and would result in a full system-wide operational capability by December 2012. Realism will be assessed to ensure the offeror’s plan reflects a clear understanding of MSC operational and mission requirements.
4
Subfactor 4: Management: All relevant standards:
4a
Subfactor 4: Management Approach: Standard a: A comprehensive and effective management structure for the NGW program.
4b
Subfactor 4: Management Approach: Standard b: An effective resource management structure to include key personnel and subcontractors.

Instructions to Offerors Section L

Reference
Instructions to Offerors, Section L

The relevant instructions to address the SOO subject specified in the row are in section:

SF1
“Subfactor 1: System Performance”
SF2
“Subfactor 2: Operations and Maintenance”
SF3
“Subfactor 3: Transition Plan”
SF4
“Subfactor 4: Management Approach”

CLIN

Reference
Description
CLINs 0001–0032
Bandwidth CLINs
CLIN 0033
Terrestrial Circuits (MSC PoPs for all NGW active ships)—(inclusive CLIN providing all circuit costs from Teleport to the PoP)
CLIN 0034
Management
CLINs 0035–0063
Shipboard/Van Equipment/Deployment: Offerors shall provide a detailed listing of the equipment (including spares) with prices required to support each type of ship
CLINs 0064–0067
Shipboard/Van Equipment Maintenance (Depot level maintenance starts after warranty expires)
CLINs 0068–0069
NOCs: Fleet SATCOM System Equipment
CLIN 0070
Personnel Support Services
CLIN 0071
Training
CLIN 0072
Integration (Start-up, IA Certificate/Accreditation, MAC Levels)
CLIN 0073
Travel (Government Directed Only): Will not be paid via this CLIN; travel costs will be paid in accordance with the Joint Travel Regulations
CLIN 0074
CDRLs
CLIN 0075
Upgrades/Enhancements
CLIN 0076
Portability
CLIN 0077
OCD Demonstration

CDRL

Reference
CDRL Item Name
1
Monthly metrics report and bandwidth usage reports
2
Installation Report
3
Material List for each ship package
4
Ship Support Visit Report
5
Classroom Training Report
6
Engineering Reference Package
7
Technical Manuals
8
Onboard Repair Parts (OBRPs) Data
9
Installation and Checkout Spares (INCOs) Data
10
Configuration Baseline Data
11
List of Support Equipment
12
Monthly Support Service Report
13
Cost Summary Report

PAGE

Section J, Attachment C: Compliance and Cross Reference Matrix v 1.0

File details come from the government source that posted it. Updated .