Initial Task Order Performance Work Statement for 38” Fountain Center Console (FCC), Over and Above Work Package.

1.0 Project Overview:

1.1 The contractor shall replace one forward fuel tank, install bow to stern bilge drainage capability with installation of snipe cutouts on transverse bulkheads and reinstall fish box/bow deck and covering in the forward bow section to include all labor and material necessary to complete the task on one 38’ center console Fountain. Repair is required to be of composite material only, no wood will be used. Require 10 to 12 weeks from drop off date for completion and delivery to the government.

2.0 Task Description and Minimum Specifications: The contractor shall:

2.1 Remove T-top and base floor plate, all wiring in center

console, electronics, engine controls, gauges, lights, accessory switches and associated equipment.

2.2 Remove toilet, plumbing, electrical and other

interference as needed to access fuel tank.

2.3 Remove forward fuel tank, foam bedding, hoses, tank

sending units, vent lines and associated hardware.

2.4 Remove all compromised wood from water intrusion on

forward fuel tank bulkhead. Grind, clean and complete necessary fiberglass to bulkhead with Coosa board.

2.5 Repair the fish box and bow deck, grind, clean area and

prep area for fiberglass repair using Coosa board; remarry to existing cap floor plate; cut/install bilge drainage snipes;

resin and gelcoat seam that was cut. Fiberglass new fish box and supports.

2.6 Construct or obtain a USCG certified fuel tank

manufactured from aluminum or stainless steel with a capacity rating based on final construction configuration determined by maximum available hull area where the tank is to be placed.

2.7 Clean and prep area for new fuel tank and foam bedding.

2.8 Reinstall 2 fuel tank sending units one electronic and

one mechanical and verify operability.

2.9 Reinstall center console insert, toilet, sink, plumbing, Electrical and replace marine quality faucet. Test the plumbing to ensure no leaks are present.

2.10 Reinstall center console, reconnect all wiring, cables, throttle controls, lights, switches, radios, radar wiring, seat, install and recalibrate mechanical trim tab indicators and all other interference and miscellaneous equipment associated with fuel tank replacement.

3.0 Hazardous Material Use, Handling, or Disposal:

3.1 The contractor shall comply with all Federal, State, and

Local laws regarding the use, handling, or disposal of hazardous materials (petroleum products, paints, coatings, etc.)

3.2 The contractor shall provide all materials necessary to

accomplish work as outlined in this PWS.

4.0 Place of Performance:

All repairs shall be done at the contractor’s facility. The Government will provide delivery and pick-up of one 38’ center console Fountain to the contractor’s facility.

5.0 Vessel Acceptance:

5.1 The Government will conduct an inspection of the cleaned

and prepared hull and bilge area upon completion of 2.4 prior to the contractor starting re-assembly. This is to verify all damage has been removed and re-assembly preparation has been completed to the Government’s satisfaction.

5.2 The Government will observe testing of the plumbing

fixtures upon completion of installation.

5.3 The Government will witness a hydrostatic test of the new fuel tank and associated fuel lines to verify there are no leaks. Additionally, the Government will conduct a functional waterborne test of the craft to verify functionality and operation of the newly installed fuel tank and associated fuel lines.

5.4 The Government will ensure compliance with this PWS upon

completion of work. Completion of work shall be 10 to 12 weeks following award and delivery of vessel to the contractor’s place of business.