H14278 Baker Blvd Bridge - Special Provision 1 of 2.pdf

PDF 39 MB Posted

Attached to
Baker Boulevard over Mojave River Bridge Replacement
Solicitation number
PWG127-LANDD-6482
Issued by
San Bernardino County, San Francisco City, California

About this file

File Type and Overview

This is a Notice to Bidders and Special Provisions document issued by the San Bernardino County Department of Public Works for a construction contract to replace the Baker Boulevard Bridge over the Mojave River. The project involves demolition of an existing two-lane, 22-span timber bridge and replacement with a four-lane, 10-span cast-in-place reinforced concrete slab structure founded on cast-in-drilled hole piles, along with roadway approach modifications including bridge approach slabs, curb and gutter improvements, sidewalk improvements, highway lighting, channel rock slope lining, storm drains, and erosion control work. The project is 0.31 miles in length, located from east of Mill Road to west of Route 127. A non-mandatory pre-bid meeting is scheduled for 10:00 a.m. on Wednesday, August 26, 2026, via video teleconference. Sealed proposals must be submitted by 10:00 a.m. on Thursday, September 17, 2026, either through the San Bernardino County ePro electronic procurement system or in person at the Department of Public Works, 825 East 3rd Street, San Bernardino, California 92415-0835. The contract requires a Class A Contractor's license and is anticipated for award within 60 days of bid opening.

Funding, Bonding, and Compliance Requirements

The project is funded in whole or in part with federal funds administered by Caltrans (Federal-Aid Project No. 5954(193), Work Order No. H14278, Road No. 150500-010). Bidders must provide a proposal guaranty in cash, cashier's check, certified check, or bidder's bond equal to at least 10 percent of the bid amount, payable to San Bernardino County. The successful contractor must furnish both labor and materials bonds and a faithful performance bond, each equal to 100 percent of the contract price. All contractors and subcontractors must register with the California Department of Industrial Relations prior to bid submission, and prevailing wage requirements apply to both state and federal determinations, with the higher rate required when differences exist. The project is subject to Build America Buy America Act domestic content requirements, California Air Resources Board In-Use Off-Road Diesel-Fueled Fleets regulations, Cargo Preference Act requirements, and federal prevailing wage determinations. Contractors must comply with equal employment opportunity requirements, Title VI assurances, and Iran Contracting Act and Russian Sanctions provisions where applicable. Payment will be made exclusively by electronic funds transfer to the contractor's designated banking account.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE TO BIDDERS AND SPECIAL PROVISIONS

FOR CONSTRUCTION ON

BAKER BOULEVARD

OVER MOJAVE RIVER BRIDGE REPLACEMENT

FROM EAST OF MILL ROAD TO WEST OF ROUTE 127

LENGTH = 0.31 MILES

WORK ORDER NO. H14278

ROAD NO. 150500-010

FEDERAL NO. 5954(193)

For use in connection with the following publications of the State of California, Department of Transportation:

1. California Department of Transportation (Caltrans) 2025 Standard Specifications, including the Caltrans 2025 Revised Standard Specifications, unless specified otherwise in these Special Provisions.

2. Caltrans Standard Plans dated 2025 (Latest revisions), unless specified otherwise in these Special Provisions.

3. Labor Surcharge and Equipment Rental Rates effective on the date work is accomplished.

SAN BERNARDINO COUNTY

DEPARTMENT OF PUBLIC WORKS

-- TRANSPORTATION --

The Notice to Bidders and Special Provisions, prepared for construction on

BAKER BOULEVARD BRIDGE

OVER MOJAVE RIVER BRIDGE REPLACEMENT FROM

EASTOF MILL ROAD TO WEST OF ROUTE 127

have been recommended for approval under the direction of the following:

Noel Castillo, P.E.

Director of Public Works Date:

Mervat Mikhail, P.E.

Deputy Director of Public Works Date:

Chris Nguyen, P.E.

Engineering Manager, DPW/Transportation Design Date:

Wilfried P Niemann, P.E., T.E.

Supervising Engineer, DPW/Transportation Design Date:

NOEL

CASTILLO

78044

9/30/2027

MERVAT

MIKHAIL

72136

6/30/2028

CHRIS

NGUYEN

63582

9/30/2026

WILFRIED

NIEMANN

46776

6/30/2027

7/21/2026

7/21/2026

7/28/2026

7/29/26 have been prepared by or under the direction of the following Registered Engineers:

Jeremy Nottnagel, P.E.

Bridge Project Engineer Date: 7/17/2026

Lindsay Katt, P.E.

Roadway Project Engineer Date: 7/17/2026

Jose Ostdiek Ostidiek, P.E.

Electrical Design Date: 7/17/2026

JEREMY

NOTTNAGEL

93270

3/31/2028

LINDSAY KATT

68432

9/30/2027

JOSE J.

OSTDIEK

65334

9/30/2027

TABLE OF CONTENTS

Notice to Bidders ........................................................................................... NB-1

Special Provisions .......................................................................................... SP-1

DIVISION I GENERAL PROVISIONS ............................................................ SP-1

Section 1. General ............................................................................... SP-1

Section 2. Bidding ................................................................................ SP-5

Section 3. Contract Award and Execution ............................................ SP-9

Section 4. Scope of Work .................................................................. SP-15

Section 5. Control of Work ................................................................. SP-17

Section 6. Control of Materials ........................................................... SP-25

Section 7. Legal Relations and Responsibility to the Public ............................................................................... SP-37

Section 8. Prosecution and Progress ................................................. SP-49

Section 9. Payment ............................................................................ SP-52

DIVISION II GENERAL CONSTRUCTION ................................................... SP-55

Section 10. General…......................................................................... .SP-55

Section 12. Temporary Traffic Control ................................................. SP-57

Section 13. Water Pollution Control ..................................................... SP-71

Section 14. Environmental Stewardship ............................................... SP-75

Section 15. Existing Facilities .............................................................. SP-84

Section 16. Temporary Facilities .......................................................... SP-85

DIVISION III EARTHWORK AND LANDSCAPE ......................................... SP-86

Section 17. General ............................................................................. SP-86

Section 19. Earthwork .......................................................................... SP-87

Section 21. Erosion Control ................................................................. SP-89

Section 22. Finishing Roadway ............................................................ SP-89

Division IV SUBBASES AND BASES ........................................................ SP-89

Section 26. Aggregate Bases .............................................................. SP-89

DIVISION V SURFACINGS AND PAVEMENTS .......................................... SP-89

Section 39. Asphalt Concrete .............................................................. SP-89

DIVISION VI STRUCTURES ........................................................................ SP-91

Section 48. Temporary Structures ....................................................... SP-91

Section 49. Piling ................................................................................. SP-91

Section 51. Concrete Structures .......................................................... SP-98

Section 52. Reinforcement ................................................................... SP-99

Section 56. Overhead Sign Structures, Standards, And Poles ....................................................................... SP-103

Section 60. Existing Structures .......................................................... SP-104

DIVISION VII DRAINAGE FACILITIES ...................................................... SP-104

DIVISION VIII MISCELLANEOUS CONSTRUCTION ................................ SP-104

Section 73. Concrete Curbs and Sidewalks ....................................... SP-104

Section 78. Incidental Construction .................................................... SP-105

DIVISION IX TRAFFIC CONTROL DEVICES ............................................ SP-106

Section 82. Signs And Markers .......................................................... SP-106

Section 83. Railing and Barriers ......................................................... SP-107

Section 84. Markings ......................................................................... SP-108

DIVISION X ELECTRICAL WORK ............................................................ SP-109

Section 86 General ........................................................................... SP-109

Section 87 Electrical Systems ........................................................... SP-109

DIVISION XI MATERIALS ......................................................................... SP-109

Section 90 Concrete ......................................................................... SP-109

Section 96 Geosynthetics ................................................................. SP-109

ATTACHMENTS

Attachment A General Prevailing Wage Rates ............................... Blue Pages

Attachment B Federal Prevailing Wage Rates ................................. Pink Pages

Attachment C Permits and Agreements ....................................... Brown Pages

Attachment D Standard and Special Drawings ............................. Green Pages

Attachment E Proposal .................................................................... P-1 to P-25

Attachment F Contract ............................................................................. 1 to 8

Exhibit A - Prevailing Wage Requirements ...................... 1 to 25

NB-1

NOTICE TO BIDDERS

NOTICE IS HEREBY GIVEN that the Board of Supervisors of the San Bernardino County, State of California, will receive sealed proposals until

10:00 A.M., THURSDAY, SEPTEMBER 17, 20 26

in the building of:

San Bernardino County Department of Public Works

Front Reception Desk

825 East 3rd Street

San Bernardino, CA 92415-0835

PLEASE NOTE: All bidders and subcontractors, including, but not limited to persons or entities that deliver ready-mix concrete, must be registered with: 1) the Department of Industrial Relations (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)); and

2) the County’s ePro system prior to the date and time to receive sealed proposals or they will be disqualified. The lowest responsive and responsible bidder and its subcontractors must also be registered with the Department of Industrial Relations at the time of award of the contract and must remain registered throughout the term of the contract pursuant to Labor Code section 1771.1. For more information on the requirements of Labor Code section 1771.1, , please see http://www.dir.ca.gov/Public- Works/SB854.html.

Bids (also referred to as “proposals”) in response to this solicitation can be submitted through the San Bernardino County Electronic Procurement Network (ePro) https://epro.sbcounty.gov/bso/ . (However, if the bid is submitted in ePro, the bidder’s security described herein must still be submitted in person in a sealed envelope prior to the proposal opening date and time) or hard copy in person, with the bidder’s security described herein in a sealed envelope prior to the proposal opening date and time, to the San Bernardino County Department of Public Works at which time they will be transmitted, publicly opened and declared via video and teleconference via goto.com/Meeting using meeting ID 434-769-549. See the flyer available under the bid posting on ePRO for further login information for the following project:

BAKER BOULEVARD OVER MOJAVE RIVER BRIDGE REPLACEMENT

FROM EAST OF MILL ROAD TO WEST OF ROUTE 127

LENGTH = 0.31 MILES

WORK ORDER: H14278

ROAD NO.: 150500-010

FEDERAL-AID PROJECT NO.: 5954(193)

The work, in general, consists of demolition of the existing two-lane 22 span simple supported stringer timber bridge and its replacement with a four-lane 10 span cast-in-place reinforced concrete slab structure founded on cast-in-drilled hole piles, along with roadway approach modifications - including inclusion of bridge approach slabs, curb, gutter and sidewalk improvements, highway lighting, channel rock slope lining, storm drains, erosion control and other appurtenant work thereto.

This project requires a Class A Contractor’s license issued by the state of California Contractors State Licensing Board. The Contractor must maintain this license from contract award through acceptance. All contractors, including any out-of-state contractors/subcontractors, must comply with all applicable laws and regulations of the State of California at the time of bid and award.

http://www.dir.ca.gov/Public-Works/SB854.html http://www.dir.ca.gov/Public-Works/SB854.html

NB-2

SPECIAL NOTICE

The contract is funded in whole or in part with federal funds administered by the California Department of Transportation (Caltrans). As a result, please note the state and federal requirements identified in these Special Provisions and in the Contract (with attachments).

San Bernardino County is implementing contract requirements for submittal of the Data Universal Numbering System (D-U-N-S) Number form. Refer to section 3 of these Special Provisions.

A non-mandatory pre-bid meeting is scheduled for: 10:00 A.M., WEDNESDAY, AUGUST 26, 20 26

To be held via video and teleconference via goto.com/meeting using meeting ID 434-769-549. See the flyer available under the bid posting on ePro for further login information. All bidders and interested small businesses are encouraged to attend this meeting.

This meeting is to inform bidders of project requirements and subcontractors of subcontracting and material supply opportunities. Bidder’s attendance at this meeting is not mandatory, but all bidders are encouraged to attend this meeting.

NOTICE: BIDDERS MUST OBTAIN BIDDING DOCUMENTS AND PREPARE THEIR BIDS ON FORMS

OBTAINED DIRECTLY FROM THE SAN BERNARDINO COUNTY DEPARTMENT OF PUBLIC WORKS OR

FROM THE COUNTY OF SAN BERNARDINO ELECTRONIC PROCUREMENT NETWORK (ePRO) https://epro.sbcounty.gov/bso/. BIDS PREPARED ON FORMS OBTAINED FROM OTHER SOURCES WILL BE DEEMED NON-RESPONSIVE. BIDDERS MUST BE LISTED ON THE OFFICIAL PLAN HOLDERS LIST AT THE TIME BIDS ARE PUBLICLY OPENED. BIDS RECEIVED FROM BIDDERS WHO ARE NOT LISTED ON

THE OFFICIAL PLAN HOLDERS LIST WILL NOT BE ACCEPTED.

Bids shall be prepared in accordance with these Special Provisions and the following:

1. Caltrans 2025 Standard Specifications, including the Caltrans 2025 Revised Standard Specifications, unless specified otherwise in these Special Provisions.

2. Caltrans Standard Plans dated 2025, unless specified otherwise in these Special Provisions.

3. Labor Surcharge and Equipment Rental Rates effective on the date work is accomplished.

These publications are published by Caltrans and may be reviewed at the Department of Public Works located at 825 East 3rd Street, Room 147, San Bernardino, California or at the following website:

https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications

The bids must also be accompanied by cash, cashier's check, certified check, or bidder's bond executed by an admitted surety insurer, made payable to the San Bernardino County in the amount of at least ten percent of the amount of the bid given as a guarantee that the bidder will enter into a contract. The contract shall be signed by the successful bidder and returned within 10 days, and the contract bonds, copy of insurance policies, and Certificates of Insurance, with documents to verify any self-insurance coverage shall be provided within 10 days, not including Saturdays, Sundays, and legal holidays, after the bidder has received the contract for execution.

The Engineer will issue two (2) Notices to Proceed, the first being a Notice to Proceed with Submittals, and the second being a Notice to Proceed with Construction. The Contractor shall begin construction work within 15 days after the Notice to Proceed with Construction (excluding Saturday, Sunday, and holidays). Pursuant to Section 1-1.07, “DEFINITIONS”, of the Caltrans Standard Specifications, “day” means “24 consecutive hours running from midnight to midnight; calendar day”.

https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications

NB-3

The Plans and Special Provisions may be obtained at no cost by visiting http:\\epro.sbcounty.gov\bso

With the purchase, a return address must be furnished which the purchaser thereby agrees is sufficient to reach him/her. Please note that, upon payment of the purchase price, the purchased copy of the plans and Special Provisions become the property of the purchaser and are not to be returned to the County for refund.

QUESTIONS: Bidders must submit all questions in writing, by e-pro, mail, or e-mail. The deadline for bidder questions is 4:00 P.M. on Friday, August 28, 2026.

BONDS: The successful bidder will be required to furnish a Labor and Materials Bond and a Faithful Performance Bond, each in a penal sum equal to one hundred percent of the Contract price.

Notice is hereby given that the successful bidder who is awarded the contract may avail itself to Public Contract Code section 22300 which allows substitute securities to be deposited in lieu of retention payments withheld to insure performance.

ePRO: Attention is directed to Section 2, “Proposal Requirements and Conditions” regarding the County of San Bernardino’s Electronic Procurement Network (ePro) system. THIS SYSTEM REQUIRES NEW REGISTRATION

FOR ALL VENDORS DOING BUSINESS WITH THE COUNTY.

EQUAL EMPLOYMENT OPPORTUNITY: During the term of the Agreement, Contractor shall not discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, sexual orientation, age, or military and veteran status. Contractor shall comply with Executive Orders 11246, 11375, 11625, 12138, 12432, 12250, 13672, Title VI and Title VII of the Civil Rights Act of 1964, the California Fair Housing and Employment Act and other applicable Federal, State of California and County laws and regulations and policies relating to equal employment and contracting opportunities, including laws and regulations hereafter enacted.

This contract is subject to the State of California contract nondiscrimination and compliance requirements pursuant to Government Code section 12990.

EMERGING SMALL BUSINESS ENTERPRISE PROGRAM: Contractors are encouraged to participate in the San Bernardino County Emerging Small Business Enterprise (ESBE) Program. Questions regarding the ESBE Program should be directed to the Contracts Division at (909) 387-7920.

CONFLICT OF INTEREST AND FORMER COUNTY OFFICIALS: Attention is directed to the Conflict of Interest and Former County Officials requirements in the special provisions.

REPORT BID RIGGING: The U.S. Department of Transportation (DOT) provides a toll-free hotline to report bid rigging activities. Use the hotline to report bid rigging, bidder collusion, and other fraudulent activities. The hotline number is (800) 424-9071. The service is available 24 hours 7 days a week and is confidential and anonymous.

The hotline is part of the DOT's effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General.

PREVAILING WAGES: Pursuant to section 1773 of the Labor Code, the general prevailing rates of wages in the San Bernardino County have been determined and are listed in the State of California Department of Industrial Relations Director’s General Prevailing Wage Determinations (https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). In addition, these wages are set forth in the General Prevailing Wage Rates included in these Special Provisions. The Contractor and subcontractors shall not pay less than the prevailing wage. Copies of the prevailing wage rates are also on file at the San Bernardino County Department of Public Works Contracts Division office (address identified above) and shall be made available to any interested party on request. A copy of the determination of the Director of prevailing rate of per diem wages shall be posted at each job site. More specifically, the Contractor shall post the general prevailing wage rates at a prominent place at the job site (Labor Code section 1773.2).

Future effective general prevailing wage rates, which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates.

https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm

NB-4

The Federal prevailing wages for this project as predetermined by the United States Secretary of Labor are set forth in the Federal Prevailing Wages included in these Special Provisions and also available on the internet at:

https://sam.gov/content/home.

Addenda to modify the Federal prevailing wage rates, if necessary, will be issued to holders of the Special Provisions for the project.

Attention is directed to the prevailing wage requirements in the Special Provisions. The contractor and subcontractors shall pay not less than the federal prevailing wages or the general prevailing wage rates. If there is a difference between the prevailing wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. The Department will not accept lower State wage rates not specifically included in the Federal prevailing wage determinations. This includes "helper" (or other classifications based on hours of experience) or any other classification not appearing in the Federal wage determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal prevailing wage rate, which most closely approximates the duties of the employees in question.

LABOR CODE REQUIREMENTS REGARDING REGISTRATION AS CONTRACTOR OR SUBCONTRACTOR

REQUIRED PRIOR TO BID PROPOSAL SUBMISSION: Contractor shall comply with Labor Code section 1771.1, including, but not limited to, the following requirements: (1) no contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)); (2) no contractor or subcontractor may be awarded a contract for public work or perform work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5; (3) this Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations; (4) Contractor shall post job site notices regarding compliance monitoring and enforcement by the Department of Industrial Relations; and (5) Contractor must submit certified payroll at least monthly to the Labor Commissioner in a format prescribed by the Labor Commissioner.

As provided in Labor Code section 1771.1:

(a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.

(b) Notice of the requirement described in subdivision (a) shall be included in all bid invitations and public works contracts, and a bid shall not be accepted nor any contract or subcontract entered into without proof of the contractor or subcontractor’s current registration to perform public work pursuant to Section 1725.5.

(c) An inadvertent error in listing a subcontractor who is not registered pursuant to Section 1725.5 in a bid proposal shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive, provided that any of the following apply:

(1) The subcontractor is registered prior to the bid opening.

(2) Within 24 hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in subparagraph (E) of paragraph (2) of subdivision (a) of Section 1725.5.

(3) The subcontractor is replaced by another registered subcontractor pursuant to Section 4107 of the Public Contract Code.

https://sam.gov/content/home

NB-5

(d) Failure by a subcontractor to be registered to perform public work as required by subdivision

(a) shall be grounds under Section 4107 of the Public Contract Code for the contractor, with the consent of the awarding authority, to substitute a subcontractor who is registered to perform public work pursuant to Section 1725.5 in place of the unregistered subcontractor.

(e) The department shall maintain on its Internet Web site a list of contractors who are currently registered to perform public work pursuant to Section 1725.5.

(f) A contract entered into with any contractor or subcontractor in violation of subdivision (a) shall be subject to cancellation, provided that a contract for public work shall not be unlawful, void, or voidable solely due to the failure of the awarding body, contractor, or any subcontractor to comply with the requirements of Section 1725.5 or this section.

(g) If the Labor Commissioner or his or her designee determines that a contractor or subcontractor engaged in the performance of any public work contract without having been registered in accordance with this section, the contractor or subcontractor shall forfeit, as a civil penalty to the state, one hundred dollars ($100) for each day of work performed in violation of the registration requirement, not to exceed an aggregate penalty of eight thousand dollars ($8,000) in addition to any penalty registration fee assessed pursuant to clause (ii) of subparagraph (E) of paragraph (2) of subdivision (a) of Section 1725.5.

(h) (1) In addition to, or in lieu of, any other penalty or sanction authorized pursuant to this chapter, a higher tiered public works contractor or subcontractor who is found to have entered into a subcontract with an unregistered lower tier subcontractor to perform any public work in violation of the requirements of Section 1725.5 or this section shall be subject to forfeiture, as a civil penalty to the state, of one hundred dollars ($100) for each day the unregistered lower tier subcontractor performs work in violation of the registration requirement, not to exceed an aggregate penalty of ten thousand dollars ($10,000).

(2) The Labor Commissioner shall use the same standards specified in subparagraph (A) of paragraph (2) of subdivision (a) of Section 1775 when determining the severity of the violation and what penalty to assess, and may waive the penalty for a first time violation that was unintentional and did not hinder the Labor Commissioner’s ability to monitor and enforce compliance with the requirements of this chapter.

(3) A higher tiered public works contractor or subcontractor shall not be liable for penalties assessed pursuant to paragraph (1) if the lower tier subcontractor’s performance is in violation of the requirements of Section 1725.5 due to the revocation of a previously approved registration.

(4) A subcontractor shall not be liable for any penalties assessed against a higher tiered public works contractor or subcontractor pursuant to paragraph (1). A higher tiered public works contractor or subcontractor may not require a lower tiered subcontractor to indemnify or otherwise be liable for any penalties pursuant to paragraph (1).

(i) The Labor Commissioner or his or her designee shall issue a civil wage and penalty assessment, in accordance with the provisions of Section 1741, upon determination of penalties pursuant to subdivision (g) and subparagraph (B) of paragraph (1) of subdivision (h). Review of a civil wage and penalty assessment issued under this subdivision may be requested in accordance with the provisions of Section 1742. The regulations of the Director of Industrial Relations, which govern proceedings for review of civil wage and penalty assessments and the withholding of contract payments under Article 1 (commencing with Section 1720) and Article 2 (commencing with Section 1770), shall apply.

(j) (1) Where a contractor or subcontractor engages in the performance of any public work contract without having been registered in violation of the requirements of Section 1725.5 or this section, the Labor Commissioner shall issue and serve a stop order prohibiting the use of the unregistered contractor or the unregistered subcontractor on all public works until the unregistered contractor or unregistered subcontractor is registered. The stop order shall not apply to work by registered contractors or subcontractors on the public work.

NB-6

(2) A stop order may be personally served upon the contractor or subcontractor by either of the following methods:

(A) Manual delivery of the order to the contractor or subcontractor personally.

(B) Leaving signed copies of the order with the person who is apparently in charge at the site of the public work and by thereafter mailing copies of the order by first class mail, postage prepaid to the contractor or subcontractor at the address on file with either of the following:

(i) The Contractors’ State License Board.

(ii) The Secretary of State.

(3) The stop order shall be effective immediately upon service and shall be subject to appeal by the party contracting with the unregistered contractor or subcontractor, by the unregistered contractor or subcontractor, or both. The appeal, hearing, and any further review of the hearing decision shall be governed by the procedures, time limits, and other requirements specified in subdivision (a) of Section 238.1.

(k) Failure of a contractor or subcontractor, owner, director, officer, or managing agent of the contractor or subcontractor to observe a stop order issued and served upon him or her pursuant to subdivision (j) is guilty of a misdemeanor punishable by imprisonment in county jail not exceeding 60 days or by a fine not exceeding ten thousand dollars ($10,000), or both.

(l) This section shall apply to any bid proposal submitted on or after March 1, 2015, and any contract for public work entered into on or after April 1, 2015. This section shall also apply to the performance of any public work, as defined in this chapter, on or after January 1, 2018, regardless of when the contract for public work was entered.

(m) Penalties received pursuant to this section shall be deposited in the State Public Works Enforcement Fund established by Section 1771.3 and shall be used only for the purposes specified in that section.

(n) This section shall not apply to work performed on a public works project of twenty-five thousand dollars ($25,000) or less when the project is for construction, alteration, demolition, installation, or repair work or to work performed on a public works project of fifteen thousand dollars ($15,000) or less when the project is for maintenance work.

LABOR CODE REQUIREMENTS FOR ENTITIES HAULING OR DELIVERING READY-MIXED CONCRETE:

Adherence to the prevailing wage requirements found in Labor Code section 1720.9 for the hauling and delivery of ready-mixed concrete is required. This includes, but is not limited to, a requirement for the person or entity that delivers ready-mixed concrete to register with the Department of Industrial Relations (DIR) as specified in Labor Code section 1725.5. For more information, please see the DIR website: http://www.dir.ca.gov/.

IRAN CONTRACTING ACT OF 2010 (Public Contract Code section 2200 et seq.) (Applicable only to Contracts of One Million Dollars ($1,000,000) or More): In accordance with Public Contract Code section 2204(a), the bidder certifies that at the time the bid is submitted, the bidder signing the bid is not identified on a list created pursuant to subdivision (b) of Public Contract Code section 2203 as a person (as defined in Public Contract Code section 2202(e)) engaging in investment activities in Iran described in subdivision (a) of Public Contract Code section 2202.5, or as a person described in subdivision (b) of Public Contract Code section 2202.5, as applicable.

RUSSIAN SANCTION/EXECUTIVE ORDER N-6-22 (Applicable for all Contracts of five million dollars ($5,000,000) or more utilizing State funding.): On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals.

“Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine (https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions), as well as any sanctions imposed under state law (https://www.dgs.ca.gov/OLS/Ukraine-Russia). The EO directs state agencies and their contractors (including by agreement or receipt of a grant) to terminate contracts with, and to refrain from entering any new contracts with, http://www.dir.ca.gov/ https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://www.dgs.ca.gov/OLS/Ukraine-Russia

NB-7

individuals or entities that are determined to be a target of Economic Sanctions. Accordingly, should it be determined that Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for termination of this agreement. Contractor shall be provided advance written notice of such termination, allowing Contractor at least 30 calendar days to provide a written response. Termination shall be at the sole discretion of the County.

BUILD AMERICA BUY AMERICA (BABA): This project is subject to the Build America Buy America Act, enacted by section 70911 of the of the Infrastructure Investment and Jobs Act (135 Stat, 429, 117 P.L. 58) on November 15, 2021, established a domestic content procurement preference for all Federal financial assistance obligated for infrastructure projects after May 14, 2022. The domestic content procurement preference requires that all iron, steel, manufactured products, and construction materials used in covered infrastructure projects are produced in the United States.

CARGO PREFERENCE ACT: This project is subject to the Cargo Preference Act requirements.

The Contractor agrees-

1. To utilize privately owned United States-flag commercial vessels to ship at least 50 percent of the gross tonnage (computed separately for dry bulk carries, dry cargo liners, and tankers) involved, whenever shipping any equipment, material, or commodities pursuant to the resulting contract, to the extent such vessels are available at fair and reasonable rates for United States-flag commercial vessels.

2. To Furnish within 20 days following the date of loading for shipments originating within the United State or within 30 working days following the date of loading for shipments originating outside the United States, a legible copy of a rated “on-board” commercial ocean bill-of-lading in English for each shipment of cargo described in paragraph (1) of this section to both the Contracting Officer (through the prime contractor in the case of subcontractor bills-of-lading) and to the Division of National Cargo, Office of Market Development, Maritime Administration, Washington, DC 20590.

3. To insert the substance of the provisions of this clause in all subcontracts issued pursuant to the resulting contract.

PAYMENT BY ELECTRONIC FUND TRANSFER: Contractor shall accept all payments from County via electronic funds transfer (EFT) directly deposited into the Contractor’s designated checking or other banking account. Contractor shall promptly comply with directions and accurately complete forms provided by County required to process EFT payments.

CALIFORNIA AIR RESOURCES BOARD (CARB) IN-USE OFF-ROAD DIESEL-FUELED FLEETS

REGULATION COMPLIANCE CERTIFICATION: This Project is subject to the California Air Resources Board (CARB) approved amendments relating to In-Use Off Road Diesel-Fueled Fleets found at California Code of Regulations Title 13, sections 2449, 2449.1, and 2449.2 (the “Regulations”). The Regulations require a Prime Contractor, bidding on a public works project to be awarded by any public works awarding body, to certify that the Contractors off-road diesel-fueled fleets comply with CARB regulations. Section 2249(b) includes a list of off-road diesel-fueled fleets subject to these regulations. It is the responsibility of the Contractor to verify if their fleet is subject to these regulations.

Contractor is required to obtain and submit Certificates of Reported Compliance from all subcontractors that are listed in the bid submission. Failure to provide Contractor’s CARB compliance number may constitute a material irregularity rendering their bid non-responsive and non-responsible, and subject to rejection for non-responsiveness.

No award shall be made to a Contractor that has failed to provide its CARB compliance certificates, unless the Contractor confirms that no equipment subject to the regulation will be used to execute the Contract Work. By submitting a bid, the Bidder hereby certifies that it is aware of the requirements set forth in Sections 2449, 2449.1, and 2449.2, Title 13, California Code of Regulations and any successful Bidder and its subcontractors shall comply with sections 2449, 2449.1, 2449.2 of Title 13 of the California Code of Regulations, including by providing Certificate(s) of Reported Compliance for In-Use Off-Road Diesel-Fueled Fleets for the fleet selected for the contract and their listed subcontractors, if applicable, with its bid.

Contractor shall not enter into a contract with a fleet for which it does not have a valid Certificate of Reported Compliance for the fleet and Contractor’s listed subcontractors, if applicable, prior to entering into a new or https://www.hud.gov/sites/dfiles/GC/documents/Build%20America,%20Buy%20America%20Act%20Provisions.pdf

NB-8

renewed contract with that fleet. Contractor shall only allow fleets with valid Certificates of Reported Compliance on Contractor’s job sites. The Certificates of Reported Compliance received by the Contractor for this Project must be retained for three (3) years after the Project’s completion. Upon request by CARB, these records must be provided to CARB within five (5) business days of the request. Between March 1 and June 1 of each year, Contractor must collect new valid Certificates of Reported Compliance for the current compliance year, as defined in Regulation Section 2449(n), from all fleets that have an ongoing contract with the Contractor as of March 1 of that year. Contractor must not write contracts to evade this requirement.

If Contractor discovers that any fleet intending to operate vehicles subject to the Regulation for Contractor does not have a valid Certificate of Reported Compliance, as defined in Regulation section 2449(n), or if Contractor observes any noncompliant vehicles subject to the Regulation on Contractor’s job site, then Contractor must report the required information to CARB within the time period contained in in the Regulations.

Upon request by CARB, Contractor must immediately disclose to CARB the name and contact information of each responsible party for all vehicles subject to the Regulation operating at the job site or for Contractor. If applicable, Contractor shall prominently display signage for any project where vehicles subject to the Regulation as provided and within the time period contained in the Regulation.

Situations in which prime contractors or public works awarding bodies, as applicable, are contracting for projects that are considered emergency operations, as defined in section 2449(c)(18), are exempt from the requirements in section 2449(i)(1)-(3), but must still retain records verifying vehicles subject to the regulation that are operating on the emergency operations project are actually being operated on the project for emergency operations only.

These records must include a description of the emergency, the address or a description of the specific location of the emergency, the dates on which the emergency operations were performed, and an attestation by the fleet that the vehicles are operated on the project for emergency operations only.

Contractor shall complete and return the “California Air Resources Board (CARB) In-Use Off-Road Diesel-Fueled Fleets Certification of Compliance” form attached hereto as a condition to bidding this Project.

The addition of these requirements shall be considered in concert with existing documents in preparation of bids.

NOEL CASTILLO, P.E., DIRECTOR

DEPARTMENT OF PUBLIC WORKS

By:

ANDY SILAO, P.E., Engineering Manager Contracts Division

DATE:

8/10/26

SP-1

SPECIAL PROVISIONS

ORGANIZATION

Special provisions are under headings that correspond with the main-section headings of the Standard Specifications. A main-section heading is a heading shown in the table of contents of the Standard Specifications.

Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications.

Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Standard Specifications for any other reference to a paragraph of the Standard Specifications.

DIVISION I GENERAL PROVISIONS

1 GENERAL

Add to section 1-1.01:

Add the following paragraph to section 1-1.01, “GENERAL”:

The Notice to Bidders is incorporated into these Special Provisions by this reference.

The work embraced herein shall be done in accordance with:

1) California Department of Transportation (Caltrans) 2025 Standard Specifications, including the Caltrans 2025 Revised Standard Specifications, unless specified otherwise in these Special Provisions.

2) Caltrans Standard Plans dated 2025 (Latest revisions), unless specified otherwise in these Special Provisions.

3) Project Plans and these Special Provisions.

4) The Contract.

5) All other documents identified in the Contract.

Both the Standard Specifications and the Standard Plans are published by the State of California, Department of Transportation (Caltrans) and may be reviewed at the following website:

http://www.dot.ca.gov/hq/esc/oe/construction_standards.html.

In case of a conflict between the Standard Specifications and these Special Provisions, the Special Provisions shall take precedence over and be used in lieu of such conflicting portions.

Amendments to the Standard Specifications set forth in these Special Provisions shall be considered as part of the Standard Specifications for the purposes set forth in Section 5-1.02, "Contract Components," of the Standard Specifications. Whenever either the term "Standard Specifications is amended" is used in the Special Provisions, the indented text or table following the term shall be considered an amendment to the Standard Specifications. In case of conflict between such amendments and the Standard Specifications, the amendments shall take precedence over and be used in lieu of the conflicting portions.

Whenever in these Special Provisions the term section is used in an introductory instruction, it shall be understood to mean and refer to the section of the Standard Specifications unless otherwise specified.

http://www.dot.ca.gov/hq/esc/oe/construction_standards.html

SP-2

The special provision introductory instructions begin with the words “Delete,” “Replace,” or “Add,” and appear as bold text, centered in the page.

Bid Items and Applicable Sections

Caltrans Item Code

Item description Applicable section

040010A Supplemental Work at Force Account (Unforeseen Differing Site Conditions) 4

060010A Quality Control Program 6

070010A Fire Prevention Plan 7

130005A Water Pollution Control Work 13

153123A Remove Grouted Rock 15

153123B Remove Bollard 15

153123C Remove Object Marker 15

153123D Remove Abandoned Sprint Conduit 15

153123E Remove Precast Wheelstop 15

160100A Resident Engineer’s Field Office 16

510054A Concrete Surface Smoothness Testing 51

520001A Welding Quality Control Plan 52

520115A Bar Reinforcing Steel (Stainless) 52

568051A Salvage Mobil Pylon Sign 15,56

568051B Salvage Billboard Panel 15,56

770091A Luminaires (Standard) 77

833085A Steel Picket Railing 83

Add to Bid Item List Abbreviations Table within Section 1-1.06 below EA/each:

Abbreviation Meaning

FA Force Account

Add the following paragraphs to section 1-1.07B, “GLOSSARY”:

Whenever in the Standard Specifications the following terms are used, they shall be understood to mean and refer to the following:

1. Department – San Bernardino County.

2. Office Engineer, Engineer or Director -- The Director of the Department of Public Works acting either directly or through properly authorized agents, engineers, assistants, inspectors and superintendents acting severally within the scope of the particular duties delegated to them.

3. Attorney General -- The San Bernardino County Board of Supervisors.

4. Laboratory -- Any laboratory authorized by the Department of Public Works to test materials and work involved in the contract.

5. Liquidated Damages -- In accordance with Section 8-1.10 of the Standard Specifications, the amount prescribed in Section 8 of the Special Provisions to be paid to the County pursuant to the indicated conditions.

6. Engineer’s Estimate -- The lists of estimated quantities of work to be performed as contained in the contract documents.

7. State – San Bernardino County.

SP-3

8. Awarding Authority - Means the authorized body or officer that awarded the public works contract.

9. Consultant - Means person(s), sole proprietorships, partnerships, associations, joint ventures, corporations, institutions or other entities who provide expert, professional assistance to the County under a contract.

10. Contract - Means an agreement between two parties consisting of an offer and an acceptance resulting from solicitation of bids or proposals, in which each party commits to stipulated prices, terms and conditions, or materials or services.

11. Contractor - Means any person, sole proprietorship, partnership, association, corporation, joint venture, institution or other entity which is a party to a contract.

12. Minority – Means the same as defined in Public Contract Code section 2051(c).

13. Small Business Concern – Means a small business as defined by Section 3 of the Small Business Act and relevant regulations found in Title 13 Part 121 of the CFR.

14. Procurement - Includes the acquisition of material, supplies, goods, equipment, systems, construction and services through both formal (including competitive bids) and informal transactions which result in purchase orders and/or contracts.

15. Public Works Contract - Is an agreement to perform the work described in Public Contract Code section 22002.

16. Purchase - Means a method of procurement which results in an order for materials, supplies, goods, equipment, systems or services.

17. Purchase Order - Is defined as a form of contract which is used to order supplies, equipment, goods, systems or services. These are either unilateral, or one signature in nature, subject to performance by a vendor to form a contractual obligation.

18. Purchasing Agent - Means the Director of the Purchasing Department.

19. Bidder/Proposer - Means any person or entity making an offer or proposal to provide goods and/or services to the County.

20. Subcontractor - Means an individual or business firm contracting to perform part or all of another’s contract.

21. Bid Item List – Means the schedule of items found in the Proposal pages starting on P-1 of these Special Provisions.

22. Bid book – Means the Proposal pages starting on P-1 of these Special Provisions.

23. Estimated Cost – Is the estimated cost of the project.

24. Holiday – Holidays shown in the following

SP-4

Holidays

Holiday Date observed

Every Sunday Every Sunday

New Year's Day January 1st

Birthday of Martin Luther King, Jr. 3rd Monday in January

Washington's Birthday 3rd Monday in February

Memorial Day Last Monday in May

Juneteenth June 19

Independence Day July 4th

Labor Day 1st Monday in September

Columbus Day 2nd Monday in October

Veterans Day November 11th

Thanksgiving Day 4th Thursday in November

Day after Thanksgiving Day Day after Thanksgiving Day

Christmas Day Eve December 24th

Christmas Day December 25th

New Year’s Day Eve December 31st

If a holiday falls on a Sunday the next weekday that is not a holiday will be taken as a holiday.

If a holiday falls on a Saturday the previous weekday that is not a holiday will be taken as a holiday.

25. Informal-bid contract – Means a contract that has "Informal Bid Authorized by Public Contract Code section 22032(b)" on the cover of the Notice to Bidders and Special Provisions.

26. Labor Surcharge and Equipment Rental Rates - Means Caltrans publication that lists labor surcharge and equipment rental rates.

27. Offices of Structure Design or OSD means the Engineer.

28. “Labor Compliance Office of the district” or “Labor Compliance Office” means the Department’s Contracts Division.

29. Business Day - Day on the calendar except a Saturday, Sunday and a holiday.

30. Working Day – This definition is the same as that provided in the Standard Specifications except for the exclusion in subsection 2.1 of the definition of “working day” found in section 1-1.07B, “Glossary,” which is revised to state “Saturday, Sunday and a holiday.”

Other terms appearing in the Standard Specifications and these Special Provisions shall have the intent and meaning specified in Section 1, "General," of the Standard Specifications. In the event of a conflict between the above terms and definitions and the terms and definitions identified in the Standard Specifications, the terms and definitions used in these Special Provisions shall control. Pursuant to section 1-1.07, “DEFINITIONS,” of the Standard Specifications, unless otherwise noted as a “working day” or “business day,” “day” in these Special Provisions means “24 consecutive hours running from midnight to midnight; calendar day.”

Delete section 1-1.08, “DISTRICTS.”

Delete section 1-1.11, “WEB SITES, ADDRESSES, AND TELEPHONE NUMBERS.”

Replace section 1-1.12, “MISCELLANY,” with:

1-1.12 MISCELLANY

Make checks and bonds payable to the San Bernardino County.

SP-5

2 BIDDING

Add the following paragraphs to section 2-1.01, “GENERAL”:

The bidder must comply with the provisions in Section 2, "Bidding" of the Standard Specifications and these Special Provisions for the requirements and conditions which the bidder must observe in the preparation of the proposal form and the submission of the bid.

In addition to the subcontractors required to be listed in conformance with Section 2-1.10, “Subcontractor List,” of the Standard Specifications, each proposal must have listed therein the portion of work that will be done by each subcontractor listed. A sheet for listing the subcontractors is included in the Proposal.

In accordance with Public Contract Code section 7106, a Noncollusion Declaration is included in the Proposal. All bidders must review, sign and submit the Noncollusion Declaration with their bid. Any bid that fails to include an executed Noncollusion Declaration shall be considered nonresponsive.

The Proposal, including all required forms, must be signed by the bidder or an authorized representative of bidder. PROPOSALS THAT ARE NOT SIGNED WILL BE DEEMED

NONRESPONSIVE…

This is the start of the file's text. The full file is on GovTribe.