This construction plan document pertains to the Baker Boulevard over Mojave River Bridge Replacement project in San Bernardino County, California, prepared by the San Bernardino County Department of Public Works. The project involves the replacement of an existing bridge structure spanning the Mojave River west of Route 127, with work limits extending 0.31 miles from east of Mill Road. The plans encompass comprehensive construction details including typical road sections, removal procedures, grading and drainage specifications, utility relocations, traffic handling measures, and construction sequencing. The project includes 12 driveways requiring reconstruction, extensive asphalt pavement work with cold-plane overlays, curb and gutter installation, sidewalk and concrete work, and rock slope protection details. The plans reference San Bernardino County Standard Plans and Specifications, 2025 Caltrans standards, and AASHTO design guidelines, with design exceptions documented for vertical and horizontal curve requirements based on existing site conditions and speed design standards.
The project incorporates multiple design and construction features including staged construction phases, temporary traffic handling measures, and utility protection and relocation requirements for existing electrical, water, fiber optic, telecommunications, and sewer lines. Roadway excavation involves removal of aerially deposited lead materials and existing asphalt concrete pavement, with recompaction requirements and overexcavation specifications. The plans establish control points using NGS monuments with NAD83 California Zone 5 horizontal datum and NAVD88 vertical datum. Project supervision and approval authority rests with the San Bernardino County Department of Public Works, with the engineer responsible for inspection and certification of all improvements prior to project completion. The contractor assumes sole and complete responsibility for site safety and for the protection of all utilities shown on the plans during construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
SAN BERNARDINO
COUNTY
TOT. SHT'S.
CHANGESMARK
RESIDENT ENGINEER
SHT. NO.
NO CHANGES DATE
TITLE SHEET
SAN BERNARDINO COUNTY
PROJECT LOCATION
INTERSTATE
INTERSTATE
LOCATION MAP
NOT TO SCALE
M E
V E R
L
N
N
L
R E
V E
M
B A
K E R
B L
V D
D E
A T
H
V
L L
Y
D
KELBAKER RD
M O J
A
I
V E
R
PRESERVE
MOJAVE NATIONAL
M I L L
R
D
WORK ORDER NO.
PLANS FOR CONSTRUCTION ON
ROAD NO.
LIMITS
TRANSPORTATION
LENGTH =
SAN BERNARDINO COUNTY
DEPARTMENT OF PUBLIC WORKS
BRIDGE REPLACEMENT
BAKER BOULEVARD OVER MOJAVE RIVER
WEST OF ROUTE 127
FROM EAST OF MILL ROAD TO
H14278
0.31 MILES
150500-010
M I
APPROVED BY:
BYANKA VELASCO, P.E., ASSISTANT DIRECTOR OF PUBLIC WORKS R.C.E. 86679 DATE
APPROVED BY:
NOEL CASTILLO, P.E., DIRECTOR OF PUBLIC WORKS R.C.E. 78044 DATE
WEST OF THE PROJECT SITE. A CURVE LENGTH OF 450 FT IS SET.
AND EAST LOCATED ZONES SPEED MPH 45 AND MPH, 45 FOR RATED MASH
LIMIT OF 35 MPH WITHIN THE PROJECT LIMITS, A BRIDGE BARRIER RAILING
SPEED POSTED A ON BASED JUSTIFIED IS EXCEPTION THIS FT. 595 IS
LENGTH PROVIDED THE FT. 600 IS LENGTH CURVE MINIMUM REQUIRED THE
MPH, 60 OF SPEED DESIGN A AT 204.4. SECTION MANUAL DESIGN HIGHWAY
CALTRANS PER 10V IS LENGTH CURVE VERTICAL MINIMUM THE 2%, THAN
GREATER IS DIFFERENCE GRADE ALGEBRAIC THE WHERE MANUAL. DESIGN
HIGHWAY CALTRANS THE OR AASHTO WITH COMPLIANCE IDENTIFIES STANDARD
DESIGN AND PLANNING ROAD COUNTY BERNARDINO SAN THE SPEED; DESIGN
FT.450 OF MINIMUM RECOMMENDED THE EXCEEDS
LENGTH CURVE PROPOSED THE ADDITIONALLY, SITE. PROJECT THE OF WEST
AND EAST THE TO ZONES SPEED MPH 45 AND MPH, 45 FOR RATED RAILING
BARRIER BRIDGE A LIMITS, PROJECT THE WITHIN MPH 35 OF LIMIT SPEED
POSTED A ON BASED JUSTIFIED IS EXCEPTION THIS FT. 595 IS LENGTH
CURVE PROPOSED THE FT. 600 OF LENGTH CURVE MINIMUM MANUAL DESIGN
HIGHWAY CALTRANS REQUIRES WHICH MPH 60 IS SPEED DESIGN STANDARDS
DESIGN AND PLANNING ROAD COUNTY BERNARDINO SAN SPEED; DESIGN
GRADE.LONGITUDINAL EXISTING THE MEET TO 0.02% TO LOWERED
BE WILL GRADE PROPOSED 0.5%.THE IS GRADIENT MINIMUM STANDARD
DESIGN AND PLANNING ROAD COUNTY BERNARDINO SAN GRADIENT; STREET
3.
2.
1.
DESIGN EXCEPTIONS:
04/23/26
INDEX MAP
NOT TO SCALE
INDEX SHEET
HORIZONTAL DATUM
WORK LIMITS
THE 2010 EPOCH GRID COORDINATE DATUM OF NGS.
OBTAIN TO #2 POINT CONTROL FROM 0.9999995519 BY HEREON SHOWN COORDINATES
AND DISTANCES THE MULTIPLY MEASUREMENTS. GROUND ARE HEREON SHOWN
COORDINATES AND DISTANCES THE FT1609 PID AND FT1128 FS1410, PID MONUMENTS
NGS FOUND TO OBSERVATIONS FROM ESTABLISHED 5, ZONE CALIFORNIA 83 NAD
PRIVATE ENGINEER'S NOTE TO CONTRACTOR
SHEET NO. DESCRIPTION
INDEX OF PLANS
ENGINEER.
THEOR OWNER THE OF NEGLIGENCE SOLE THE FROM ARISING LIABILITY FOR EXCEPTING
PROJECT,THIS ON WORK OF PERFORMANCE THE WITH CONNECTION IN ALLEGED, OR REAL
LIABILITY,ALL AND ANY FROM HARMLESS ENGINEER THE AND OWNER THE
COUNTY,BERNARDINO SAN HOLD AND INDEMNIFY DEFEND, SHALL CONTRACTOR THE
THATAND HOURS, WORKING NORMAL TO LIMITED BE NOT AND CONTINUOUSLY APPLY
SHALLREQUIREMENT THIS THAT PROPERTY, AND PERSONS ALL OF SAFETY INCLUDING
PROJECT,THIS OF CONSTRUCTION OF COURSE THE DURING CONDITIONS SITE JOB FOR
CONTRACTOR AGREES THAT HE/SHE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY
DRAWINGS.THESE
ONSHOWN STRUCTURES OR CONDUITS PIPES, UTILITY THE FOR RESPONSIBILITY
ANDLIABILITY ALL ASSUMES FURTHER CONTRACTOR THE DRAWINGS. THESE
ONSHOWN UTILITIES THE PROTECT TO MEASURES PRECAUTIONARY DUE TAKE TO
REQUIREDIS CONTRACTOR THE PLANS. THESE ON SHOWN AS EXCEPT UTILITIES
EXISTINGNO ARE THERE KNOWLEDGE OUR OF BEST THE TO RECORDS. AVAILABLE
THEOF SEARCH A BY OBTAINED ARE PLANS THESE ON SHOWN STRUCTURES OR
CONDUITS,PIPES, UTILITY UNDERGROUND ANY OF LOCATION AND EXISTENCE THE
INTERSTATE
D E
A
L L
BAKER BLVD
P R
O S P E C T
R
D
MILL RDM
I
M O J
A
V
E R
SHEET ID
ADDITIONAL ALTERNATIVE PLANS
BORING LOGS AND LAYOUT
BRIDGE PLANS
LIGHTING PLAN
SUMMARY OF QUANTITIES
SIGNING AND STRIPING PLAN AND QUANTITIES
TRAFFIC HANDLING PLAN
STAGE CONSTRUCTION
UTILITY PLAN
DRAINAGE PLANS AND PROFILE
GRADING PLANS
CONSTRUCTION DETAILS
PLAN & PROFILE
REMOVAL PLAN
PROJECT CONTROL
TYPICAL SECTIONS
INDEX SHEETS
TITLE SHEET
94-101
87-93
58-86
56-57
54-55
52-53
38-51
34-37
32-33
30-31
28-29
10-27
8-9
6-7
2-3
E
Q
SS
TH
SC
U
D
G
C
L
RV
PC
X
SAN BERNARDINO COUNTY.
FOR DETERMINING AN ACCEPTABLE SOLUTION AND REVISE THE PLAN FOR APPROVAL BY THE
IN THE EVENT OF DISCREPANCIES ARISING DURING CONSTRUCTION, THE ENGINEER SHALL BE RESPONSIBLE
THE ENGINEER IS RESPONSIBLE FOR ASSURING THE ACCURACY AND ACCEPTABILITY OF WORK HEREON.
TIMES WITH ADEQUATE DETOURS DURING ACTUAL CONSTRUCTION.
EXISTING COUNTY ROADS THAT WILL REQUIRE RECONSTRUCTION SHALL REMAIN OPEN FOR TRAFFIC AT ALL
IN ACCORDANCE WITH THE APPROVED PLANS.
THE ENGINEER SHALL INSPECT AND CERTIFY THAT ALL ROAD AND DRAINAGE IMPROVEMENTS HAVE BEEN BUILT
DEPARTMENT OF PUBLIC WORKS APPROVAL DOES NOT INCLUDE ESTIMATE OF QUANTITIES.
THE CONTRACTOR SHALL DILIGENTLY PURSUE THIS PORTION OF WORK UNTIL COMPLETION.
IMMEDIATELY FOLLOWING REMOVAL OF EXISTING PAVEMENT OR DIKE OR CURB AND/OR GUTTER, IN SECTION 6 OF THE SAN BERNARDINO COUNTY STANDARDS AND SPECIFICATIONS.
ALL LONGITUDINAL CUTS SHALL BE TESTED IN ACCORDANCE WITH THE SPECIFIED LIMITS AND AS OUTLINED
B. STABILITY, OIL CONTENT AND SIEVE ANALYSIS OF ASPHALT SURFACING.
A. R-VALUE, SIEVE ANALYSIS AND SAND EQUIVALENT OF AGGREGATE BASES.
SECTION, LISTING ALL TESTS OR DETERMINATIONS COMPLETED TO VERIFY:
COUNTY PUBLIC WORKS DEPARTMENT, PERMITS/OPERATION SUPPORT DIVISION, TRANSPORTATION PERMIT
AT THE COMPLETION OF PAVING, A MATERIALS REPORT SHALL BE SUBMITTED TO THE SAN BERNARDINO
PRIOR TO PLACEMENT OF BASE MATERIALS AND/OR SURFACING.
PUBLIC WORKS, PERMITS/OPERATION SUPPORT DIVISION, TRANSPORTATION PERMIT SECTION FOR APPROVAL
WITH THESE COMPACTION TESTS SHALL BE SUBMITTED TO THE SAN BERNARDINO COUNTY DEPARTMENT OF
ALL SUBGRADES SHALL BE PERFORMED AT NO COSTS TO SAN BERNARDINO COUNTY. A WRITTEN REPORT
COMPACTION TESTS OF EMBANKMENT CONSTRUCTION, TRENCH BACKFILL, COMPACTING ORIGINAL GROUND, APPLIED AT THE MANUFACTURER'S RECOMMENDED RATE FOR THE FULL PAVEMENT WIDTH PRIOR TO PAVING.
A SOIL STERILANT REGISTERED BY THE E.P.A. FOR USE UNDER A.C. AND P.C.C. SHALL BE UNIFORMLY
IF ASPHALT CONCRETE IS TO BE PLACED DIRECTLY ON SUBGRADE OF ROAD OR DRAINAGE FACILITIES
TO ANY ENCROACHMENT OR CONSTRUCTION WITHIN SAN BERNARDINO COUNTY EASEMENT OR RIGHTS-OF-WAY.
A PERMIT WILL BE REQUIRED FROM SAN BERNARDINO COUNTY DEPARTMENT OF PUBLIC WORKS PRIOR
STAMPED ELEVATION IS NGVD29.
TIDEWATER RAILROAD BRIDGE LOCATED BETWEEN I-15 AND BAKER BOULEVARD.
LOCATED IN THE TOP OF THE NORTHERN ABUTMENT OF THE ABANDONED TONOPAH AND
GEODETIC SURVEY BENCHMARK ELEV. 923.83 FEET ABOVE MEAN SEA LEVEL X162 1933"
VERTICAL DATUM: NAVD 88, BM PID FT0057 EL = 925.66' 2" DISC STAMPED "U.S. COAST &
CONDITIONS AND TRENCH SPECIFICATIONS.
SPECIFICATIONS, AND THE SAN BERNARDINO COUNTY DEPARTMENT OF PUBLIC WORKS GENERAL PERMIT
SAN BERNARDINO COUNTY STANDARDS AND SPECIFICATIONS, 2025 CALTRANS STANDARD PLANS AND
SAN BERNARDINO COUNTY ROAD PLANNING AND DESIGN STANDARDS MANUAL AS WELL AS THE
ALL IMPROVEMENTS SHALL BE COMPLETED IN ACCORDANCE WITH THIS PLAN AND COMPLY WITH LATEST
STREET IMPROVEMENTS GENERAL NOTES
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
SAN BERNARDINO COUNTY STANDARD PLANS
TO BE SUPPLEMENTED BY THE FOLLOWING
403303B303A303211208
206205B129A (MODIFIED)127115109 (MODIFIED)(MODIFIED)101
ABBREVIATIONS LEGEND:
Var
TOC
TCE
SW
STD
STA
Shld
SDD
SD
SBC
RSP
RCP
R/W, ROW
PR
P/L
OG
MN
ISA
HMA
GB
FL
Exist
EVC
ETW
EP
Elev
CP
Cl
BVC
BOW
BOC
BMP
BB
AP
AC
AB
VARIES
TOP OF CURB
TEMPORARY CONSTRUCTION EASEMENT
SIDEWALK
STANDARD
STATION
SHOULDER
SPECIAL DISTRICTS DEPARTMENT
STORM DRAIN
SAN BERNARDINO COUNTY
ROCK SLOPE PROTECTION
REINFORCED CONCRETE PIPE
RIGHT OF WAY
PRESSURE RATED
PROPERTY LINE
ORIGINAL GROUND
MANHOLE
INTERNATIONAL SYMBOL OF ACCESSIBILITY
HOT MIX ASPHALT
GRADE BREAK
FLOW LINE
EXISTING
END VERTICAL CURVE
EDGE OF TRAVELED WAY
EDGE OF PAVEMENT
ELEVATION
CATCH POINT
CLASS
BEGIN VERTICAL CURVE
BACK OF WALK
BACK OF CURB
BEST MANAGEMENT PRACTICE
BEGIN BRIDGE
ANGLE POINT
ASPHALT CONCRETE
AGGREGATE BASE
150500-010
WILFRIED NIEMANN, P.E., T.E.
DIVISION H STANDARD DRAWINGS
SPECIAL DISTRICTS DEPARTMENT COUNTY OF SAN BERNARDINO
TO BE SUPPLEMENTED BY THE FOLLOWING
H-14H-4BH-4AH-2B
PEDESTRIAN ACCESSIBILITY GUIDELINES FOR HIGHWAY PROJECTS SECTIONS
CALTRANS DESIGN INFORMATION BULLETIN (DIB) 82-06
TO BE SUPPLEMENTED BY THE FOLLOWING
4.3.11(5)4.3.11(4)4.3.11(3)4.3.11(1)
HOT MIX ASPHALT (TYPE A)
CLASS 2 AGGREGATE BASE
OVEREXCAVATION
CONSTRUCTION / UTILITY LEGEND
REMOVE CONCRETE
AND HMA OVERLAY
COLD PLANE AC PAVEMENT
ROADWAY EXCAVATION
REMOVE TREE
(AERIALLY DEPOSITED LEAD)
ROADWAY EXCAVATION (TYPE COM)
REMOVE PAINTED TRAFFIC STRIPE
REMOVE ASPHALT CONCRETE PAVEMENT
OVEREXCAVATION
CALTRANS PLANNED IMPROVEMENT
REMOVE GROUTED ROCK
SEE CONSTRUCTION NOTE 1
ROADWAY PAVEMENT SECTION,
CUT AND FILL
P/L
TCE
DRAINAGE EASEMENT
R/W
TEMPORARY HIGH-VISIBILITY FENCE
FENCE
MINOR CONCRETE
PRECAST WHEELSTOP
Exist ELEC OVERHEAD (SCE)
Exist ELEC LINE (SCE)
Exist WATER LINE (BCSD)
Exist FIBER OPTIC LINE (SPRINT/COGENT)
Exist TELECOMM LINE (AT&T)
Exist SEWER LINE (BCSD)
PROPOSED FIBER OPTIC LINE (SPRINT/COGENT)
PROPOSED TELECOMM LINE (AT&T)
PROPOSED ELEC LINE (SCE)
ABANDONED FIBER OPTIC LINE (SPRINT/COGENT)
CIVIL
S T
A
TE OF CALIF
O R
N
IA
R E
G
IS
T E
R E
D
P
ROFESSION
A
L E
N G
IN
E E
R
CIVIL
DATELINDSAY KATT, PROJECT ENGINEER
C A
L L
B
EFORE YOU
D I
G
110 BLUE RAVINE ROAD SUITE 200, FOLSOM CA. 916-858-0642
DEPARTMENT OF PUBLIC WORKS
W.O. NO.
1SHEET OF
ROAD NO.
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
APPR DATEMARK REVISIONSPREPARED BY:VERTICAL DATUM:
TWO WORKING DAYS BEFORE YOU DIG
1-800-227-2600
Underground Service Alert
Call: TOLL FREE
F I L
E N
O
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
F I L
E N
O
BRIDGE REPLACEMENT
OVER MOJAVE RIVER
BAKER BOULEVARD
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
150500-010
STAMPED ELEVATION IS NGVD29.
I-15 AND BAKER BOULEVARD.
RAILROAD BRIDGE LOCATED BETWEEN
ABANDONED TONOPAH AND TIDEWATER
THE NORTHERN ABUTMENT OF THE
X162 1933" LOCATED IN THE TOP OF
923.83 FEET ABOVE MEAN SEA LEVEL
GEODETIC SURVEY BENCHMARK ELEV.
2" DISC STAMPED "U.S. COAST &
NAVD 88, BM PID FT0057 EL = 925.66'
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
H14278DN DN LK
KATT
LINDSAY
No.
Exp.
68432
9-30-27
3/13/26
WILFRIED NIEMANN, P.E., T.E.
DEPARTMENT OF PUBLIC WORKS
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
DN DN LK
04/23/2604/23/26
INDEX SHEET
REMOVE CONCRETE (SQYD).
REMOVE CONCRETE CURB (LF).
RELOCATE SCE POWER POLE (BY OTHERS).
RELOCATE ROADSIDE SIGN.
CURB WITH KEY, SEE CONSTRUCTION DETAIL SHEETS.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE REDUCED RETAINING
RELOCATE UTILITY CABINET (BY OTHERS).
VAULT COVER, RAISE TO GRADE.
PROTECT-IN-PLACE LIGHTING FEATURE.
STANDARD DRAWINGS H-4A & H-4B.
RELOCATE BACKFLOW PREVENTER, SEE SDD DIVISION "H"
DETAIL SHEETS.
RELOCATE SPRINKLER VALVE ASSEMBLY, SEE CONSTRUCTION
DRAWINGS H-4A & H-4B.
RELOCATE WATER METER, SEE SDD DIVISION "H" STANDARD
DRAWING NO. H-2B.
RELOCATE FIRE HYDRANT, SEE SDD DIVISION "H" STANDARD
SALVAGE MOBIL PYLON SIGN.
PLACE ROADSIDE SIGN 1 POST.
PLACE TEMPORARY CRASH CUSHION (TL-2).
PLACE TEMPORARY RAILING (TYPE K).
PLACE TEMPORARY TRAFFIC STRIPE (PAINT).
PLACE CHANNELIZER (SURFACE MOUNTED) 12' SPACING.
PLACE CHANNELIZER (SURFACE MOUNTED) 25' SPACING.
SHEETS.
FOR OVEREXCATION DETAILS, SEE CONSTRUCTION DETAIL
WITH KEY, SEE CONSTRUCTION DETAIL SHEETS.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE RETAINING CURB
SEE CONSTRUCTION DETAIL SHEETS.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE RETAINING CURB,
PLACE 0.33' HOT MIX ASPHALT (TYPE A).
GUTTER, PER SBC STD PLAN NO. 115.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 8" CURB AND
FINISH THROUGHOUT ROADWAY LIMITS.
HOT MIX ASPHALT (TYPE A) TO PROVIDE A SMOOTH, UNIFORM
SEE TYPICAL SECTIONS SHEET. FINAL LIFT SHALL BE 0.20'
(0.20' MIN.) AND PLACE 0.20' MIN HOT MIX ASPHALT (TYPE A).
COLD PLANE ASPHALT CONCRETE PAVEMENT DEPTH VARIES
ASPHALT (TYPE A).
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 0.50' HOT MIX
PER CONSTRUCTION DETAIL SHEETS.
CONCRETE (DRIVEWAY). SEE SBC STD PLAN 129A, MODIFIED
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 0.50' MINOR
PLANS.
CONCRETE (SIDEWALK). SEE SBC STD PLAN 109, MODIFIED PER
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 0.33' MINOR
THROUGHOUT ROADWAY LIMITS.
ASPHALT (TYPE A) TO PROVIDE A SMOOTH, UNIFORM FINISH
COAT IN BETWEEN. FINAL LIFT SHALL BE 0.20' HOT MIX
0.70' CLASS 2 AGGREGATE BASE WITH 2 LAYERS OF TACK
PLACE 0.80' HOT MIXED ASPHALT (TYPE A) IN 3 LIFTS OVER
CONSTRUCTION NOTES
RELOCATE SCE MANHOLE (BY OTHERS).
EXISTING 5" ASPHALT CONCRETE OVER 9" AGGREGATE BASE.
REMOVE SIGN.
GRUBBING.
REMOVE TREE, NON-PAY ITEM. INCLUDED IN CLEARING AND
PLACE TYPE II BARRICADE.
NIGHT VISIBILITY).
END THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET
NIGHT VISIBILITY).
BEGIN THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET
ROADWAY EXCAVATION.
MANHOLE RAISE TO GRADE (BY OTHERS).
SAWCUT NEAT LINE.
PROTECT-IN-PLACE SCE POWER POLE.
PROTECT-IN-PLACE ARCO DISPLAY SIGN.
PROTECT-IN-PLACE REFLECTOR PADDLE.
PROTECT-IN-PLACE UTILITY VENT.
PROTECT-IN-PLACE ROADSIDE SIGN.
PROTECT-IN-PLACE FRAME.
PROTECT-IN-PLACE MANHOLE.
PROTECT-IN-PLACE PYLON SIGN.
SIGN TO BE REMOVED BY OTHERS PRIOR TO PROJECT.
REMOVE 2 POST SIGN.
REMOVE POST.
REMOVE OBJECT MARKER.
REMOVE PAINTED TRAFFIC STRIPE (LF).
PROTECT-IN-PLACE EXIST RIPRAP.
REMOVE GROUTED ROCK.
INCLUDED IN CLEARING AND GRUBBING.
REMOVE TREE STUMPS AND VEGETATION, NON-PAY ITEM.
REMOVE BOLLARD.
REMOVE BRIDGE, SEE BRIDGE PLANS.
SECTION 14 OF THE SPECIAL PROVISIONS.
FOR ADDITIONAL INFORMATION, SEE REMOVE GUARDRAIL.
REMOVE ASPHALT CONCRETE PAVEMENT (SQYD).
WILFRIED NIEMANN, P.E., T.E.
REMOVE PRECAST WHEELSTOP.86
PLACE CHANNELIZER (SURFACE MOUNTED) 10' SPACING.85
PLACE OBJECT MARKER.84
ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD).83
82 REMOVE ABANDONED SPRINT CONDUIT.
CONTROL JOINTS.
MATCH Exist CONCRETE GRADE. EXTEND TO Exist81
REMOVE CHAIN LINK FENCE.80
PLACE DOUBLE DRIVE GATE, SEE SBC STD PLAN NO. 403.79
PLACE FENCE, SEE SBC STD PLAN NO. 403.78
PAINT TRAFFIC MARKING.77
PROTECT-IN-PLACE MONITORING WELL.76
(ENHANCED WET NIGHT VISIBILITY).
75 PLACE THERMOPLASTIC PAVEMENT MARKING
REMOVE WATER VALVE.74
73 PAINT TRAFFIC STRIPE.
72 PLACE TEMPORARY PAVEMENT MARKING (PAINT).
PROTECT-IN-PLACE WATER METER/WATER VALVE BOX.71
ENGINEER TO DETERMINE MESSAGE AND LOCATION.
70 PLACE GENERAL TEMPORARY TRAFFIC HANDLING SIGN,
69 PLACE TEMPORARY HIGH-VISIBILITY FENCE.
68 PAVEMENT MARKING TO REMAIN IN PLACE.
67 REMOVE PAINTED PAVEMENT MARKING.
DRAWING NO. H-2B.
PLACE WATER VALVE, SEE SDD DIVISION "H" STANDARD66
SALVAGE BILLBOARD PANEL.65
TEMPORARY HMA, PLACE 0.50' HOT MIX ASPHALT (TYPE A).64
SHEETS.
PLACE PRECAST WHEELSTOP, SEE CONSTRUCTION DETAIL 63
SEE CONSTRUCTION DETAIL SHEETS.
PLACE RETAINING CURB WITH STEEL PICKET RAILING,62
OVER 1.00' CLASS 2 AGGREGATE BASE.
(CURB AND GUTTER), SEE SBC STD PLAN NO. 115,
PLACE 8" CURB AND GUTTER, MINOR CONCRETE 61
REMOVE SCE POWER POLE (BY OTHERS).60
ENGINEER TO DETERMINE MESSAGE AND LOCATION.
PLACE GENERAL TEMPORARY TRAFFIC HANDLING SIGN,
PLACE TYPE III BARRICADE.
REMOVE PAINTED TRAFFIC STRIPE.
PLACE TEMPORARY CRASH CUSHION (TL-2).
PLACE TEMPORARY RAILING (TYPE K).
PLACE TEMPORARY TRAFFIC STRIPE (PAINT).
PLACE CHANNELIZER (SURFACE MOUNTED) 17' SPACING.
PLACE CHANNELIZER (SURFACE MOUNTED) 35' SPACING.
CONSTRUCTION NOTES CONSTRUCTION NOTES
CIVIL
S T
A
TE OF CALIF
O R
N
IA
R E
G
IS
T E
R E
D
P
ROFESSION
A
L E
N G
IN
E E
R
CIVIL
DATELINDSAY KATT, PROJECT ENGINEER
C A
L L
B
EFORE YOU
D I
G
110 BLUE RAVINE ROAD SUITE 200, FOLSOM CA. 916-858-0642
DEPARTMENT OF PUBLIC WORKS
W.O. NO.
1SHEET OF
ROAD NO.
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
APPR DATEMARK REVISIONSPREPARED BY:VERTICAL DATUM:
TWO WORKING DAYS BEFORE YOU DIG
1-800-227-2600
Underground Service Alert
Call: TOLL FREE
F I L
E N
O
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
F I L
E N
O
BAKER BOULEVARD
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
150500-010
STAMPED ELEVATION IS NGVD29.
I-15 AND BAKER BOULEVARD.
RAILROAD BRIDGE LOCATED BETWEEN
ABANDONED TONOPAH AND TIDEWATER
THE NORTHERN ABUTMENT OF THE
X162 1933" LOCATED IN THE TOP OF
923.83 FEET ABOVE MEAN SEA LEVEL
GEODETIC SURVEY BENCHMARK ELEV.
2" DISC STAMPED "U.S. COAST &
NAVD 88, BM PID FT0057 EL = 925.66'
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
H14278DN DN LK
KATT
LINDSAY
No.
Exp.
68432
9-30-27
3/13/26
WILFRIED NIEMANN, P.E., T.E.
DEPARTMENT OF PUBLIC WORKS
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
DN DN LK
CIVIL
S T
A
TE OF CALIF
O R
N
IA
R E
G
IS
T E
R E
D
P
ROFESSION
A
L E
N G
IN
E E
R
CIVIL
DATELINDSAY KATT, PROJECT ENGINEER
C A
L L
B
EFORE YOU
D I
G
110 BLUE RAVINE ROAD SUITE 200, FOLSOM CA. 916-858-0642
DEPARTMENT OF PUBLIC WORKS
W.O. NO.
SHEET OF
ROAD NO.
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
APPR DATEMARK REVISIONSPREPARED BY:VERTICAL DATUM:
TWO WORKING DAYS BEFORE YOU DIG
1-800-227-2600
Underground Service Alert
Call: TOLL FREE
F I L
E N
O
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
F I L
E N
O
BAKER BOULEVARD
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
150500-010
STAMPED ELEVATION IS NGVD29.
I-15 AND BAKER BOULEVARD.
RAILROAD BRIDGE LOCATED BETWEEN
ABANDONED TONOPAH AND TIDEWATER
THE NORTHERN ABUTMENT OF THE
X162 1933" LOCATED IN THE TOP OF
923.83 FEET ABOVE MEAN SEA LEVEL
GEODETIC SURVEY BENCHMARK ELEV.
2" DISC STAMPED "U.S. COAST &
NAVD 88, BM PID FT0057 EL = 925.66'
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
TYPICAL SECTIONS
H14278DN DN LK
KATT
LINDSAY
No.
Exp.
68432
9-30-27
3/13/26
BOW
BAKER BOULEVARD TYPICAL SECTION
"B" 103+58.13 TO 106+85.50
R/W R/W
"B" 114+60.83 TO 117+91.50
"B" 106+85.50 TO 109.95.83
"B" 117+91.50 TO 119+59.67
50'50'
BAKER BOULEVARD TYPICAL SECTION
OG
OG, CONCRETE
PG
BAKER BOULEVARD TYPICAL SECTION
R/W R/W
50'50'
BOW
Var 5.9'
16.8' - 19.9' 20.0' - 20.2'
OG
Var
1.5%
1.5%
1.5%
1.5%
OG, AC PAVEMENT
9'
BOWTC
TC
1.5%
TC BOW
OG, AC PAVEMENT
2.0% 2.0%
BOW
R/W R/W
50'
40'
50'
TC
40'
TC BOW
2.0% 2.0%
19.8' - 20'
Var
TC
2.0% 2.0%
10'
9'9'
9' 9' 1'
1'
0.5'
1'
1'
2.0% 2.0%
1.5%OG, AC
TCE
8.5'
TCE
10'
TCE
16.5'
TCE
11.5'
TCE
8.5'
"B" LINE
C L
"B" LINE
C L
"B" LINE
C L
1.5%
BOW
R/W
TC
6'4'
50'
VarVar
13.5' - 36.8'
2.0%
VarVar
28.2' - 29.1'
2.0%
10.9' - 11.8'3.2' - 26.5'
Var
14.2' - 17.3'
2.0%
R/W
50'
BOW
Var Var
6.8'
4.6'
18.6'
4.4'
1.5%
9.5'
TC
2.0%OG, AC
"B" LINE
C L
Var
5.8' - 20.0'
"B" 118+75.00 TO 119+59.67
BAKER BOULEVARD TYPICAL SECTION
2.0%
10.3'
8.0%
2.0%
X-1
NOTES:
AT LEAST 24 INCHES HORIZONTALLY BEYOND THE EDGES OF NEW FILL.
DEPTH IS MEASURED FROM THE EXISTING GROUND SURFACE AND MUST EXTEND
IN ALL AREAS WHERE COMPACTED FILL WILL BE PLACED. THE OVEREXCAVATION
A MINIMUM OF 12 INCHES OF OVEREXCAVATION AND RECOMPACTION IS REQUIRED 5.
OR OTHERWISE UNSUITABLE MATERIAL IS REQUIRED PRIOR TO FILL PLACEMENT.
LOOSE OR SOFT ALLUVIUM, DRY OR SATURATED SOIL, WET, UNSTABLE,
OF COMPRESSIBLE SURFICIAL MATERIALS INCLUDING VEGETATION, TOPSOIL,
IN AREAS WHERE COMPACTED FILL WILL BE PLACED, COMPLETE REMOVAL 4.
GEOTECHNICAL REPORT. ACTUAL EXISTING PAVEMENT SECTION MAY VARY.
EXISTING PAVEMENT SECTION BASED ON LIMITED BORING INFORMATION FROM3.
TABLE 12, USING A 20 YEAR DESIGN LIFE AND TI OF 12.5.
PAVEMENT STRUCTURAL SECTIONS ARE BASED ON EMI'S FOUNDATION REPORT, 2.
SEE CONSTRUCTION DETAILS FOR LOCATION OF PAVEMENT SECTIONS/LIMITS.1.
SEE SBC STD PLAN NO. 115, OVER 1.00' CLASS 2 AGGREGATE BASE.
PLACE 8" CURB AND GUTTER, MINOR CONCRETE (CURB & GUTTER), 61
EXISTING 5" ASPHALT CONCRETE OVER 9" AGGREGATE BASE.58
SAWCUT NEAT LINE.50
REMOVE ASPHALT CONCRETE PAVEMENT (SQYD).30
REMOVE CONCRETE (SQYD).29
SEE CONSTRUCTION DETAIL SHEETS.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE REDUCED RETAINING CURB WITH KEY, 25
FOR OVEREXCAVATION DETAILS, SEE CONSTRUCTION DETAIL SHEETS.10
SEE CONSTRUCTION DETAIL SHEETS.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE RETAINING CURB WITH KEY, 9
SEE CONSTRUCTION DETAIL SHEETS.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE RETAINING CURB, 8
PER SBC STD PLAN NO. 115.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 8" CURB AND GUTTER, 6
PLACE 0.20' MIN HOT MIX ASPHALT (TYPE A).
COLD PLANE ASPHALT CONCRETE PAVEMENT DEPTH VARIES (0.20' MIN.) AND 5
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 0.50' HOT MIX ASPHALT (TYPE A).4
SEE SBC STD PLAN 109, MODIFIED PER PLANS.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 0.33' MINOR CONCRETE (SIDEWALK).2
WITH 2 LAYERS OF TACK COAT IN BETWEEN.
PLACE 0.80' HOT MIXED ASPHALT TYPE A IN 3 LIFTS OVER 0.70' CLASS 2 AGGREGATE BASE 1
CONSTRUCTION NOTES
5 5
LEGEND
HOT MIX ASPHALT (TYPE A)
CLASS 2 AGGREGATE BASE
OVEREXCAVATION
"B" 114+99.33 TO 115+47.77
BAKER BOULEVARD TYPICAL SECTION
2 61
OR
FLATTER
2:
SLOPE
EMBANKMENT
50 50
WILFRIED NIEMANN, P.E., T.E.
DEPARTMENT OF PUBLIC WORKS
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
DN DN LK
P P
GGGG
GG
P
AHEAD
STOP
T
EPB
M
S S
C A
L L
B
EFORE YOU
D I
G
DEPARTMENT OF PUBLIC WORKS
W.O. NO.
SHEET OF
ROAD NO.
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DESIGNED BY:
APPR DATEMARK REVISIONSPREPARED BY:VERTICAL DATUM:
TWO WORKING DAYS BEFORE YOU DIG
1-800-227-2600
Underground Service Alert
Call: TOLL FREE
F I L
E N
O
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
F I L
E N
O
BAKER BOULEVARD
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
150500-010
STAMPED ELEVATION IS NGVD29.
I-15 AND BAKER BOULEVARD.
RAILROAD BRIDGE LOCATED BETWEEN
ABANDONED TONOPAH AND TIDEWATER
THE NORTHERN ABUTMENT OF THE
X162 1933" LOCATED IN THE TOP OF
923.83 FEET ABOVE MEAN SEA LEVEL
GEODETIC SURVEY BENCHMARK ELEV.
2" DISC STAMPED "U.S. COAST &
NAVD 88, BM PID FT0057 EL = 925.66'
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
H14278
PROJECT CONTROL
CONTROL POINTS
EASTING
7136485.93
7135506.02
DESCRIPTION
CP MAG N SHINER
CP MAG N SHINER
MAG NAIL
MAG
60D
CP MAG N WASHER
NORTHING
2288610.54
2287814.35
2287448.58
2288054.01
7135136.71
7135893.62
7136332.99
7134501.93
2288392.31
2287032.40
POINT #
ELEVATION
934.16
928.78
926.79
928.55
933.93
926.81
DATUM NOTE
STAMPED ELEVATION IS NGVD29.
RAILROAD BRIDGE LOCATED BETWEEN I-15 AND BAKER BOULEVARD.
OF THE NORTHERN ABUTMENT OF THE ABANDONED TONOPAH AND TIDEWATER
923.83 FEET ABOVE MEAN SEA LEVEL X162 1933" LOCATED IN THE TOP
2" DISC STAMPED "U.S. COAST & GEODETIC SURVEY BENCHMARK ELEV.
NAVD 88, BM PID FT0057 EL=925.66'
VERTICAL DATUM:
GRID COORDINATE DATUM OF NGS.
BY 0.9999995519 FROM CONTROL POINT #2 TO OBTAIN THE 2010 EPOCH
MEASUREMENTS.MULTIPLY THE DISTANCES AND COORDINATES SHOWN HEREON
DISTANCES AND COORDINATES SHOWN HEREON ARE GROUND
FOUND NGS MONUMENTS PID FS1410, FT1128 AND PID FT1609 THE
S TO NNAD 83 CALIFORNIA ZONE 5, ESTABLISHED FROM OBERSERVATIO
HORIZONTAL DATUM:
PC-1
BAKER BLVD
BAKER BLVD
D E
A T
H V
A L
L E
Y R
D
S T
A
G
H W
A Y
M O J
A
V
E R
ADAM R. BISHOP, PROFESSIONAL LAND SURVEYOR DATE
S T
A
TE OF CALIF
O R
N
IA
R E
K
CI
SNUH
N
A Y
R
No. 8302
R O
Y E
V R
U S
DNAL LANOI
S
S E
F O
R P
COUNTY SURVEYOR
RYAN HUNSICKER, PLS 5
DEPARTMENT OF
DATE
DATE
SUPERVISING ENGINEER
SAN BERNARD
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
P
GGGG
GG
P
T
P
EPB
P
P
P
JP
CIVIL
S T
A
TE OF CALIF
O R
N
IA
R E
G
IS
T E
R E
D
P
ROFESSION
A
L E
N G
IN
E E
R
CIVIL
DATELINDSAY KATT, PROJECT ENGINEER
C A
L L
B
EFORE YOU
D I
G
110 BLUE RAVINE ROAD SUITE 200, FOLSOM CA. 916-858-0642
DEPARTMENT OF PUBLIC WORKS
W.O. NO.
1SHEET OF
ROAD NO.
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
APPR DATEMARK REVISIONSPREPARED BY:VERTICAL DATUM:
TWO WORKING DAYS BEFORE YOU DIG
1-800-227-2600
Underground Service Alert
Call: TOLL FREE
F I L
E N
O
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
F I L
E N
O
BAKER BOULEVARD
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
150500-010
STAMPED ELEVATION IS NGVD29.
I-15 AND BAKER BOULEVARD.
RAILROAD BRIDGE LOCATED BETWEEN
ABANDONED TONOPAH AND TIDEWATER
THE NORTHERN ABUTMENT OF THE
X162 1933" LOCATED IN THE TOP OF
923.83 FEET ABOVE MEAN SEA LEVEL
GEODETIC SURVEY BENCHMARK ELEV.
2" DISC STAMPED "U.S. COAST &
NAVD 88, BM PID FT0057 EL = 925.66'
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
REMOVAL PLAN
H14278DN DN LK
KATT
LINDSAY
No.
Exp.
68432
9-30-27
3/13/26
105 110103 104 106 107 108 109 111 112 113
S
E
M A
T C
RV-1
BAKER BOULEVARD
R/W
R/W R/W
R/W
2588.81'
N51°19'12"E
FL
BOW
FL
BOW
M O J
A V E
R
IV
E R
P L
P
L
P L P
L
P
L
P
L
"B" LINE
C
SCALE: 1"=40'
PLAN
LEGEND:
REMOVE CONCRETE
35.87' Lt "B" 104+35.40
38.94' Lt "B" 104+55.58
35.87' Lt "B" 104+85.41
38.90' Lt "B" 105+05.63
35.80' Lt "B" 105+40.68
35.80' Lt "B" 105+70.96
29 (17 SQYD)
36.35' Lt "B" 106+52.46
44.98' Lt "B" 107+55.38
35.66' Lt "B" 107+61.97
29 (18 SQYD)
29 (72 SQYD)
30 (412 SQYD)
34.77' Rt "B" 105+21.38
38.86' Rt "B" 105+39.99
35.97' Rt "B" 105+62.29
38.96' Rt "B" 105+80.49
37.35' Rt "B" 106+66.31
37.71' Rt "B" 106+83.08
36.12' Rt "B" 106+06.41
38.93' Rt "B" 106+25.00
AND HMA OVERLAY
COLD PLANE AC PAVEMENT
C
ROADWAY EXCAVATION
REMOVE TREE
CONSTRUCTION NOTESNOTES:
REMOVE PRECAST WHEELSTOP.
ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD).
REMOVE PAINTED PAVEMENT MARKING.
SALVAGE BILLBOARD PANEL.
REMOVE TREE, NON-PAY ITEM. INCLUDED IN CLEARING AND GRUBBING.
ROADWAY EXCAVATION.
PROTECT-IN-PLACE PYLON SIGN.
REMOVE PAINTED TRAFFIC STRIPE (LF).
REMOVE TREE STUMPS AND VEGETATION, NON-PAY ITEM. INCLUDED IN CLEARING AND GRUBBING.
REMOVE BOLLARD.
REMOVE BRIDGE, SEE BRIDGE PLANS.
FOR ADDITIONAL INFORMATION, SEE SECTION 14 OF THE SPECIAL PROVISIONS.REMOVE GUARDRAIL.
REMOVE ASPHALT CONCRETE PAVEMENT (SQYD).
REMOVE CONCRETE (SQYD).
REMOVE CONCRETE CURB (LF).
PROTECT-IN-PLACE LIGHTING FEATURE.
SALVAGE MOBIL PYLON SIGN.
ASPHALT (TYPE A) TO PROVIDE A SMOOTH, UNIFORM FINISH THROUGHOUT ROADWAY LIMITS.
FINAL LIFT SHALL BE 0.20' HOT MIX MIX ASPHALT (TYPE A). SEE TYPICAL SECTIONS SHEET.
COLD PLANE ASPHALT CONCRETE PAVEMENT DEPTH VARIES (0.20' MIN.) AND PLACE 0.20' MIN HOT
FOR DISPOSITION OF ROADSIDE SIGNS, SEE SIGNING AND STRIPING PLANS.2.
FOR UTILITY DISPOSITION, SEE UTILITY PLANS.1.
BEGIN
END
BEGIN
END
BEGIN
END 28
BEGIN
BEGIN
END
END
BEGIN
END
BEGIN
END
BEGIN
END
BEGIN
15.39' Rt "B" 110+23.54
31END
BEGIN
END
BEGIN
END 34
BEGIN
BEGIN
END
BEGIN
END
BEGIN
BEGIN
END
BEGIN
END
BEGIN
END
END
C
P
L
P L
P
L
TCE
TCE TCE
TCE TCE
EASEMENT
EASEMENT
DETAIL SHEETS
SEE CONSTRUCTION
STA 106+73.25,
DRIVEWAY 3
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 108+42.16,
DRIVEWAY 4
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 109+92.16,
DRIVEWAY 5
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 104+73.07,
DRIVEWAY 1
CL
END
END
39.48' Lt "B" 108+32.32
(AERIALLY DEPOSITED LEAD)
ROADWAY EXCAVATION (TYPE COM)
30 (568 SQYD)
29 (111 SQYD)
30 (274 SQYD)
30 (167 SQYD)
30 (250 SQYD)
11.78' Rt "B" 103+58.13
5AP
38.50' Lt "B" 103+58.13
52BEGIN
38.50' Lt "B" 110+34.33
52END
38.50' Rt "B" 109+57.33
52END
37 (487 LF)
37 (164 LF)
37 (246 LF)
29 (378 SQYD)
REMOVE PAINTED TRAFFIC STRIPE
END
39.73' Lt "B" 103+58.24
28BEGIN
39.85' Lt "B" 103+61.20
34 4 STUMPS
34 3 STUMPS
31BEGIN
20.21' Rt "B" 109+89.49
WOODEN BILLBOARD
PROTECT-IN-PLACE
33 4 EA
34 3 STUMPS
42 ROYAL HAWAIIAN
REMOVE ASPHALT CONCRETE PAVEMENT
FOR POWER POLE DISPOSITION, SEE NOTE 1.
38.50' Rt "B" 103+58.13
BEGIN 52
36.50' Lt "B" 103+58.13
5BEGIN
5END
13.50' Lt "B" 106+85.50
5 AP
10.86' Rt "B" 106+85.50
REMOVE CONCRETE SLAB TO LIMITS OF CONTROL JOINTS
83 (59 CY)
83 (136 CY)
67 (34 SQFT)
67 (17 SQFT)
86 (2 EA)
TCE
BILLBOARD PANEL
AND
MOBIL PYLON SIGNS
FOR SALVAGED
DESIGNATED LOCATIONDETAIL SHEETS
SEE CONSTRUCTION
STA 106+50.54
DRIVEWAY 2
CL
DEPARTMENT OF PUBLIC WORKS
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
DN DN LK
AHEAD
STOP
JP
M
P
P
P
S S
JP
CIVIL
S T
A
TE OF CALIF
O R
N
IA
R E
G
IS
T E
R E
D
P
ROFESSION
A
L E
N G
IN
E E
R
CIVIL
DATELINDSAY KATT, PROJECT ENGINEER
C A
L L
B
EFORE YOU
D I
G
110 BLUE RAVINE ROAD SUITE 200, FOLSOM CA. 916-858-0642
DEPARTMENT OF PUBLIC WORKS
W.O. NO.
1SHEET OF
ROAD NO.
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
APPR DATEMARK REVISIONSPREPARED BY:VERTICAL DATUM:
TWO WORKING DAYS BEFORE YOU DIG
1-800-227-2600
Underground Service Alert
Call: TOLL FREE
F I L
E N
O
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
F I L
E N
O
BAKER BOULEVARD
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
150500-010
STAMPED ELEVATION IS NGVD29.
I-15 AND BAKER BOULEVARD.
RAILROAD BRIDGE LOCATED BETWEEN
ABANDONED TONOPAH AND TIDEWATER
THE NORTHERN ABUTMENT OF THE
X162 1933" LOCATED IN THE TOP OF
923.83 FEET ABOVE MEAN SEA LEVEL
GEODETIC SURVEY BENCHMARK ELEV.
2" DISC STAMPED "U.S. COAST &
NAVD 88, BM PID FT0057 EL = 925.66'
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
REMOVAL PLAN
H14278DN DN LK
KATT
LINDSAY
No.
Exp.
68432
9-30-27
3/13/26
115 120113 114 116 117 118 119 121 122
S
E
M A
T
RV-2
"B" LINE
BAKER BOULEVARD
R/W
R/W
2588.81'
N51°19'12"E
R/W
R/W
R
W
R
W
FL
BOW
FL
BOW
R O
U T E
D E
A
L L
O
A D
M O J
A
V E
R
P L
P L
C/F
PLAN
SCALE: 1"=40'
29 (664 SQYD)
29 (655 SQYD)
LEGEND:
AND HMA OVERLAY
COLD PLANE AC PAVEMENT
REMOVE CONCRETE
C
C
ROADWAY EXCAVATION
CALTRANS PLANNED IMPROVEMENT
CONSTRUCTION NOTES
ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD).
REMOVE CHAIN LINK FENCE.
REMOVE TREE, NON-PAY ITEM. INCLUDED IN CLEARING AND GRUBBING.
ROADWAY EXCAVATION.
PROTECT-IN-PLACE EXIST RIPRAP.
REMOVE GROUTED ROCK.
REMOVE BRIDGE, SEE BRIDGE PLANS.
SECTION 14 OF THE SPECIAL PROVISIONS.
FOR ADDITIONAL INFORMATION, SEE REMOVE GUARDRAIL.
REMOVE ASPHALT CONCRETE PAVEMENT (SQFT).
REMOVE CONCRETE (SQYD).
REMOVE CONCRETE CURB (LF).
UNIFORM FINISH THROUGHOUT ROADWAY LIMITS.
HOT MIX ASPHALT (TYPE A) TO PROVIDE A SMOOTH,
FINAL LIFT SHALL BE 0.20' SEE TYPICAL SECTIONS SHEET.
(0.20' MIN.) AND PLACE 0.20' MIN HOT MIX ASPHALT (TYPE A).
COLD PLANE ASPHALT CONCRETE PAVEMENT DEPTH VARIES
REMOVE TREE 83
12.36' Lt "B" 114+81.92
31BEGIN
18.78' Lt "B" 115+61.61
31END
NOTES:
FOR DISPOSITION OF ROADSIDE SIGNS, SEE SIGNING AND STRIPING PLANS.2.
FOR UTILITY DISPOSITION, SEE UTILITY PLANS.1.
EASEMENT
TCE
TCE
TCE
TCE
C A L T
R A
W
P L
DETAIL SHEETS
SEE CONSTRUCTION
STA 119+19.86,
DRIVEWAY 12
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 115+40.43,
DRIVEWAY 6
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 116+90.43,
DRIVEWAY 8
CL
REMOVE ASPHALT CONCRETE PAVEMENT
30 (105 SQYD)
30 (51 SQYD)
30 (520 SQYD)
TCE
30.43' Rt "B" 114+44.67
28BEGIN
28BEGIN
25.63' Rt "B" 114+47.49
31.42' Rt "B" 117+88.32
END
36.95' Rt "B" 117+88.63
END
REMOVE GROUTED ROCK
35 (203 SQFT)
52END
38.50' Lt "B" 117+91.50
5BEGIN
52END
38.53' Rt "B" 117+91.50
5BEGIN
5END
38.32' Rt "B" 119+59.67
END 5
28.67' Lt "B" 119+59.67
BEGIN 52
38.50' Lt "B" 114+99.33
38.50' Rt "B" 114+22.33
BEGIN
C A
L T
R A
N S
R /W
R
/W WORK TO BE DONE BY OTHERS
DETAIL SHEETS
SEE CONSTRUCTION
STA 117+95.47,
DRIVEWAY 10
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 118+95.38,
DRIVEWAY 11
CL
29 (18 SQYD)
5 AP
20.03' Rt "B" 117+91.50
5 AP
5.92' Lt "B" 117+91.50
5 AP
19.98' Lt "B" 119+10.26
5 AP
5.81' Lt "B" 119+10.79
30 (23 SQYD)
51.44' Lt "B" 116+28.27
BEGIN 80
50.00' Lt "B" 118+32.54
END 80
(AERIALLY DEPOSITED LEAD)
ROADWAY EXCAVATION (TYPE COM)
SEE NOTE 1.
DISPOSITION,
FOR POWER POLE
SEE NOTE 2.
FOR SIGN DISPOSITION,
83 (376 CY)
(178 CY) 83
DETAIL SHEETS
SEE CONSTRUCTION
STA 117+43.77,
DRIVEWAY 9
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 115+65.77,
DRIVEWAY 7
CL
DEPARTMENT OF PUBLIC WORKS
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
DN DN LK
GGGG
GG
P
T
P
EPB
P
P
P
JP
CIVIL
S T
A
TE OF CALIF
O R
N
IA
R E
G
IS
T E
R E
D
P
ROFESSION
A
L E
N G
IN
E E
R
CIVIL
DATELINDSAY KATT, PROJECT ENGINEER
C A
L L
B
EFORE YOU
D I
G
110 BLUE RAVINE ROAD SUITE 200, FOLSOM CA. 916-858-0642
DEPARTMENT OF PUBLIC WORKS
W.O. NO.
PLAN & PROFILE
1SHEET OF
ROAD NO.
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
APPR DATEMARK REVISIONSPREPARED BY:VERTICAL DATUM:
TWO WORKING DAYS BEFORE YOU DIG
1-800-227-2600
Underground Service Alert
Call: TOLL FREE
F I L
E N
O
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
F I L
E N
O
BAKER BOULEVARD
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
150500-010
STAMPED ELEVATION IS NGVD29.
I-15 AND BAKER BOULEVARD.
RAILROAD BRIDGE LOCATED BETWEEN
ABANDONED TONOPAH AND TIDEWATER
THE NORTHERN ABUTMENT OF THE
X162 1933" LOCATED IN THE TOP OF
923.83 FEET ABOVE MEAN SEA LEVEL
GEODETIC SURVEY BENCHMARK ELEV.
2" DISC STAMPED "U.S. COAST &
NAVD 88, BM PID FT0057 EL = 925.66'
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
PROFILE
VERT 1"=4'
SCALE: HORIZ 1"=40'
H14278DN DN LK
KATT
LINDSAY
No.
Exp.
68432
9-30-27
3/13/26
105 110103 104 106 107 108 109 111
.5
P
R C
E le v
.7
.5
V
P I
E le v
.8
0.02%
.8
B
B
E le v
.8
C O
N F
O R
M
E le v
.8
.5
B
V C
B E
G
IN
C O
N S
T U
C T
IO
N
E le v
.9
.1
A P
P R
O A
C H
S L
A B
E le v
.4
.8
200.00' VC
MATCH EXIST GRADE
S
E
M A
T
103+00 105+00104+00 106+00 107+00 108+00 109+00 110+00 111+00
L-1
BAKER BOULEVARD
R/W
R/W R/W
R/W
2588.81'
N51°19'12"E
S
E
M A
T
FL
BOW
FL
BOW
M O J
A V E
R
IV
E R
PG
OG
P L
P
L
P L
P L
P
L
P
L
"B" LINE
40.50' Lt "B" 103+58.13
F
SCALE: 1"=40'
PLAN
.0
SEE BRIDGE PLANS
BAKER BLVD BRIDGE,
BB
"B" 110+25.83
38.50' Lt "B" 103+58.13
10.86' Rt "B" 106+85.50
13.50' Lt "B" 106+85.50
COLD PLANE OVERLAY (HMA)
C
F
2BEGIN
1BEGIN
5END
5END
SEE BRIDGE PLANS
APPROACH SLAB
SEE BRIDGE PLANS
BAKER BLVD BRIDGE
40.50' Rt "B" 106+73.54
3END
2BEGIN
40.50' Rt "B" 106+27.54
END 2
BEGIN 3
BEGIN 61
E:7134986.079
N:2287367.528
BEGIN CONSTRUCTION
"B" 103+58.13
DETAIL SHEETS
SEE CONSTRUCTION
CUT OFF WALL,
HMA RAMP AND
BEGIN 2
40.50' Rt "B" 103+70.13
BEGIN 3
END 2
40.50' Rt "B" 104+50.00
BEGIN 2
END 3
40.50' Rt "B" 104+96.00
DETAIL SHEETS
SEE CONSTRUCTION
STA 106+50.54,
DRIVEWAY 2
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 106+73.25,
DRIVEWAY 3
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 108+42.16,
DRIVEWAY 4
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 109+92.16,
DRIVEWAY 5
CL
BEGIN 3
END 2
40.50' Lt "B" 106+55.24
40.50' Lt "B" 106+91.24
END
BEGIN
BEGIN 3
END 2
40.50' Lt "B" 108+24.16
40.50' Lt "B" 108+60.16
3END
2BEGIN
BEGIN 3
END 2
40.50' Lt "B" 109+74.16
40.50' Lt "B" 110+10.16
3END
2BEGIN
DETAIL SHEETS
SEE CONSTRUCTION
STA 104+73.00,
DRIVEWAY 1
CL
TCE
P L
TCE
TCE
P L
TCE
TCE
EASEMENT
EASEMENT
38.50' Rt "B" 103+58.13
1BEGIN
40.50' Rt "B" 109+57.33
2END
END
END 2
40.50' Lt "B" 110+34.33
6BEGIN
40.50' Rt "B" 103+58.13
6END
38.5'
38.5'
SEE DRAINAGE PLANS
STORM DRAIN SYSTEM,
SEE BRIDGE PLANS
ROCK SLOPE PROTECTION
50.00' Lt "B" 109+64.00
END 8
END 1
"B" 109+95.83
END 62
47.00' Rt "B" 109+57.33
BEGIN 62
END 62
46.00' Lt "B" 110+41.89
PROPOSED CHANNEL GRADING
SEE BRIDGE PLANS
ABUTMENT,
END 9
50.00' Rt "B" 104+50.00
BEGIN 9
50.00' Rt "B" 104+96.00
END 9
50.00' Rt "B" 106+27.54
BEGIN 8
50.00' Rt "B" 106+73.54
END 25
49.50' Lt "B" 106+55.24
BEGIN 8
50.00' Lt "B" 106+91.24
END 8
50.00' Lt "B" 108+24.16
END 62
50.00' Lt "B" 109+74.16
BEGIN 8
50.00' Lt "B" 108+60.16
BEGIN 62
50.00' Lt "B" 110+10.16
LOT STRIPING DETAILS
SHEETS FOR PARKING
SEE CONSTRUCTION DETAIL
BEGIN 25
49.50' Lt "B" 103+58.13
LOT STRIPING DETAILS
SHEETS FOR PARKING
SEE CONSTRUCTION DETAIL
5BEGIN
11.78' Rt "B" 103+58.13
36.50' Lt "B" 103+58.13
5BEGIN
62 AP
50.00' Rt "B" 109+37.33
CUT AND FILL
AND HMA OVERLAY
COLD PLANE AC PAVEMENT
P/L
TCE
DRAINAGE EASEMENT
SEE CONSTRUCTION NOTE 1
ROADWAY PAVEMENT SECTION,
R/W
LEGEND:
BEGIN 69
147.17' Rt "B" 108+50.26
TEMPORARY HIGH-VISIBILITY FENCE
R/W
PLACE TEMPORARY HIGH-VISIBILITY FENCE.
SEE CONSTRUCTION DETAIL SHEETS.
PLACE RETAINING CURB WITH STEEL PICKET RAILING,
STD PLAN NO. 115, OVER 1.00' CLASS 2 AGGREGATE BASE.
PLACE 8" CURB AND GUTTER, MINOR CONCRETE (CURB AND GUTTER), SEE SBC
KEY, SEE CONSTRUCTION DETAIL SHEETS.
REDUCED RETAINING CURB WITH OVEREXCAVATE 1' COMPACT TO 95%, PLACE
SEE CONSTRUCTION DETAIL SHEETS.
RETAINING CURB WITH KEY,OVEREXCAVATE 1' COMPACT TO 95%, PLACE
SEE CONSTRUCTION DETAIL SHEETS.
RETAINING CURB,OVEREXCAVATE 1' COMPACT TO 95%, PLACE
STD PLAN NO. 115.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 8" CURB AND GUTTER, PER SBC
A SMOOTH, UNIFORM FINISH THROUGHOUT ROADWAY LIMITS.
FINAL LIFT SHALL BE 0.20' HOT MIX ASPHALT (TYPE A) TO PROVIDE SHEET.
SEE TYPICAL SECTIONS AND PLACE 0.20' MIN HOT MIX ASPHALT (TYPE A).
COLD PLANE ASPHALT CONCRETE PAVEMENT DEPTH VARIES (0.20' MIN.)
DETAIL SHEETS.
(DRIVEWAY). SEE SBC STD PLAN 129A, MODIFIED PER CONSTRUCTION
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 0.50' MINOR CONCRETE
(SIDEWALK). SEE SBC STD PLAN 109, MODIFIED PER PLANS.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 0.33' MINOR CONCRETE
FINISH THROUGHOUT ROADWAY LIMITS.
SHALL BE 0.20' HOT MIX ASPHALT (TYPE A) TO PROVIDE A SMOOTH, UNIFORM
FINAL LIFT AGGREGATE BASE WITH 2 LAYERS OF TACK COAT IN BETWEEN.
PLACE 0.80' HOT MIXED ASPHALT TYPE A IN 3 LIFTS OVER 0.70' CLASS 2
CONSTRUCTION NOTES
TCE
BEGIN 9
50.00' Rt "B" 103+58.13
BEGIN
END
50.00' Rt "B" 109+20.00
BEGIN
147.17' Rt "B" 110+84.53
1.89
DEPARTMENT OF PUBLIC WORKS
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
DN DN LK
AHEAD
STOP
JP
M
P
P
JP
CIVIL
S T
A
TE OF CALIF
O R
N
IA
R E
G
IS
T E
R E
D
P
ROFESSION
A
L E
N G
IN
E E
R
CIVIL
DATELINDSAY KATT, PROJECT ENGINEER
C A
L L
B
EFORE YOU
D I
G
110 BLUE RAVINE ROAD SUITE 200, FOLSOM CA. 916-858-0642
DEPARTMENT OF PUBLIC WORKS
W.O. NO.
PLAN & PROFILE
1SHEET OF
ROAD NO.
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
APPR DATEMARK REVISIONSPREPARED BY:VERTICAL DATUM:
TWO WORKING DAYS BEFORE YOU DIG
1-800-227-2600
Underground Service Alert
Call: TOLL FREE
F I L
E N
O
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
F I L
E N
O
BAKER BOULEVARD
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
150500-010
STAMPED ELEVATION IS NGVD29.
I-15 AND BAKER BOULEVARD.
RAILROAD BRIDGE LOCATED BETWEEN
ABANDONED TONOPAH AND TIDEWATER
THE NORTHERN ABUTMENT OF THE
X162 1933" LOCATED IN THE TOP OF
923.83 FEET ABOVE MEAN SEA LEVEL
GEODETIC SURVEY BENCHMARK ELEV.
2" DISC STAMPED "U.S. COAST &
NAVD 88, BM PID FT0057 EL = 925.66'
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
PROFILE
VERT 1"=4'
SCALE: HORIZ 1"=40'
H14278DN DN LK
KATT
LINDSAY
No.
Exp.
68432
9-30-27
3/13/26
115 120112 113 114 116 117 118 119
.5
P
R C
E le v
.2
.5
E
V C
C O
N F
O R
M
E le v
.5
.0
V
P I
E le v
.3
.0
V
P I
E le v
.1
-1.38% 1.58%
-1.38%
.8
E
B
E le v
.8
595.00' VC
.8
A P
P R
O A
C H
S L
A B
E le v
.5
311.00' VC
MATCH EXIST GRADE
E N
D C
O N
S T
U C
T
IO
N
E le v
.7
.6
S
E
M A
T
115+00114+00 116+00 117+00 118+00 119+00 120+00
L-2
"B" LINEBAKER BOULEVARD
R/W
R/W
2588.81'
N51°19'12"E
S
E
M A
T
R/W
R
W
FL
BOW
FL
BOW
R O
U T
E
D E
A T
H V
A L
L E
Y R
O A
D
M O J
A V E
R
IV
E R
113+00
PG
OG
P L
P L
PLAN
SCALE: 1"=40'
SEE BRIDGE PLANS
BAKER BLVD BRIDGE,
EB
"B" 114+30.83
C
38.46' Rt "B" 117+91.50
38.50' Rt "B" 119+59.67
CONSTRUCTION NOTES
SEE BRIDGE PLANS
APPROACH SLAB,
5END
E:2288379.459
N:7136236.211
END CONSTRUCTION
"B" 119+59.67
DETAIL SHEETS
SEE CONSTRUCTION
STA 115+40.43,
DRIVEWAY 6
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 119+19.86,
DRIVEWAY 12
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 116+90.43,
DRIVEWAY 8
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 117+43.77,
DRIVEWAY 9
CL
DETAIL SHEETS
SEE CONSTRUCTION
STA 115+65.77,
DRIVEWAY 7
CL
C A L T
R A
W
BEGIN 2
END 3
40.50' Rt "B" 115+63.43
BEGIN 3
END 2
40.50' Rt "B" 116+67.43
BEGIN 2
END 3
40.50' Rt "B" 117+13.43
BEGIN 3
END 2
40.50' Lt "B" 115+47.77
BEGIN 2
END 3
40.50' Lt "B" 115+83.77
BEGIN 3
END 2
40.50' Lt "B" 117+25.77
BEGIN 2
END 3
40.50' Lt "B" 117+61.77
BEGIN 3
END 2
30.67' Lt "B" 119+01.86
BEGIN 2
END 3
30.67' Lt "B" 119+37.86
C A
L T
R A
N S
R /W
P L
CUT AND FILL
AND HMA OVERLAY
COLD PLANE AC PAVEMENT
R/W
P/L
TCE
DRAINAGE EASEMENT
LEGEND:
C/F
C TCE TCE
TCE
TCE
T C E
EASEMENT
C
BEGIN 61
BEGIN 2
40.50' Lt "B" 114+99.33
BEGIN 6
BEGIN 2
40.50' Rt "B" 114+22.33
END 61
END 2
30.67' Lt "B" 119+59.67
38.5'
38.5'
SEE DRAINAGE PLANS
STORM DRAIN SYSTEM,
20.13' Lt "B" 117+91.50
26.09' Lt "B" 119+59.67
END 5
PLACE DOUBLE DRIVE GATE, SEE SBC STD PLAN NO. 403.
PLACE FENCE, SEE SBC STD PLAN NO. 403.
PLACE TEMPORARY HIGH-VISIBILITY FENCE.
CONSTRUCTION DETAIL SHEETS.
PLACE RETAINING CURB WITH STEEL PICKET RAILING, SEE
SEE SBC STD PLAN NO. 115, OVER 1.00' CLASS 2 AGGREGATE BASE.
PLACE 8" CURB AND GUTTER, MINOR CONCRETE (CURB & GUTTER),
WITH KEY, SEE CONSTRUCTION DETAIL SHEETS.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE RETAINING CURB
SEE CONSTRUCTION DETAIL SHEETS.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE RETAINING CURB,
PER SBC STD PLAN NO. 115.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 8" CURB AND GUTTER,
ROADWAY LIMITS.
ASPHALT (TYPE A) TO PROVIDE A SMOOTH, UNIFORM FINISH THROUGHOUT
TYPICAL SECTIONS SHEET. FINAL LIFT SHALL BE 0.20' HOT MIX
(0.20' MIN.) AND PLACE 0.20' MIN HOT MIX ASPHALT (TYPE A). SEE
COLD PLANE ASPHALT CONCRETE PAVEMENT DEPTH VARIES
DETAIL SHEETS.
(DRIVEWAY). SEE SBC STD PLAN 129A, MODIFIED PER CONSTRUCTION
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 0.50' MINOR CONCRETE
(SIDEWALK). SEE SBC STD PLAN 109, MODIFIED PER PLANS.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 0.33' MINOR CONCRETE
SMOOTH, UNIFORM FINISH THROUGHOUT ROADWAY LIMITS.
FINAL LIFT SHALL BE 0.20' HOT MIX ASPHALT (TYPE A) TO PROVIDE A
CLASS 2 AGGREGATE BASE WITH 2 LAYERS OF TACK COAT IN BETWEEN.
PLACE 0.80' HOT MIXED ASPHALT TYPE A IN 3 LIFTS OVER 0.70'
BEGIN 5
AP5
5.81' Lt "B" 119+10.79
5 AP
19.98' Lt "B" 119+10.26
5 AP
5.92' Lt "B" 117+91.50
5 AP
20.03' Rt "B" 117+91.50
SEE BRIDGE PLANS
ROCK SLOPE PROTECTION
595.00' VC
SEE CONSTRUCTION NOTE 1
ROADWAY PAVEMENT SECTION,
BEGIN 1
"B" 114+60.83
DETAIL SHEETS
CONSTRUCTIONSEE
CURVE DATA TABLE
BEGIN 62
47.00' Rt "B" 114+21.33
BEGIN 8
END 62
50.00' Rt "B" 114+70.00
PROPOSED CHANNEL GRADING
SEE BRIDGE PLANS
ABUTMENT,
SEE DRAINAGE PLANS
STORM DRAIN SYSTEM,
DETAIL SHEETS
SEE CONSTRUCTION
STEEL PLATE COVER,
PARKWAY CULVERT WITH
BEGIN 3
END 2
40.50' Rt "B" 115+17.43
END 8
50.00' Rt "B" 115+17.43
BEGIN 8
50.00' Rt "B" 115+63.43
END 8
50.00' Rt "B" 116+67.43
BEGIN 9
50.00' Rt "B" 117+13.43
BEGIN 5
38.50' Rt "B" 117+91.50
BEGIN 2
END 3
40.50' Rt "B" 119+12.38
BEGIN 3
END 2
40.50' Rt "B" 118+72.38
BEGIN 3
END 2
40.50' Rt "B" 117+72.47
DETAIL SHEETS
SEE CONSTRUCTION
STA 118+95.38,
DRIVEWAY 11
CL
BEGIN 2
END 3
40.50' Rt "B" 118+18.47
DETAIL SHEETS
SEE CONSTRUCTION
STA 117+95.47,
DRIVEWAY 10
CL
40.50' Rt "B" 119+59.67
END 6
END 2
END 9
50.00' Rt "B" 117+72.47
END 1
"B" 119+59.67
END 8
50.00' Lt "B" 117+25.77
BEGIN 9
50.00' Lt "B" 117+61.77
END 9
39.67' Lt "B" 119+01.86
BOW
DETAIL SHEETS
SEE CONSTRUCTION
SIDEWALK AND CURB,
DONE BY OTHERS
WORK TO BE
R/W
FENCE
58.50' Lt "B" 117+25.27
BEGIN 79
END 78
50.50' Lt "B" 116+25.61
BEGIN 78
50.00' Lt "B" 118+32.77
END 78
BEGIN 78
END 79
58.50' Lt "B" 117+60.77
50.50' Lt "B" 117+25.27
78 AP
50.50' Lt "B" 117+60.77
78 AP
TEMPORARY HIGH-VISIBILITY FENCE
112+00
147.17' Lt "B" 115+72.81
END 69
END 69
74.32' Rt "B" 113+77.78
147.17' Rt "B" 113+22.77
69 AP
C
C
BEGIN 8
50.00' Lt "B" 115+83.77
SEE BRIDGE PLANS
BAKER BLVD BRIDGE
1.89
DEPARTMENT OF PUBLIC WORKS
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
DN DN LK
T
A
TE OF CALIF
O R
N
IA
R E
G
IS
T E
R E
D
P
ROFESSION
A
L E
N G
IN
E E
R
CIVIL
DATELINDSAY KATT, PROJECT ENGINEER
C A
L L
B
EFORE YOU
D I
G
110 BLUE RAVINE ROAD SUITE 200, FOLSOM CA. 916-858-0642
DEPARTMENT OF PUBLIC WORKS
W.O. NO.
1SHEET OF
ROAD NO.
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
APPR DATEMARK REVISIONSPREPARED BY:VERTICAL DATUM:
TWO WORKING DAYS BEFORE YOU DIG
1-800-227-2600
Underground Service Alert
Call: TOLL FREE
F I L
E N
O
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
F I L
E N
O
BAKER BOULEVARD
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
150500-010
STAMPED ELEVATION IS NGVD29.
I-15 AND BAKER BOULEVARD.
RAILROAD BRIDGE LOCATED BETWEEN
ABANDONED TONOPAH AND TIDEWATER
THE NORTHERN ABUTMENT OF THE
X162 1933" LOCATED IN THE TOP OF
923.83 FEET ABOVE MEAN SEA LEVEL
GEODETIC SURVEY BENCHMARK ELEV.
2" DISC STAMPED "U.S. COAST &
NAVD 88, BM PID FT0057 EL = 925.66'
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
CONSTRUCTION DETAILS
H14278DN DN LK
KATT
LINDSAY
No.
Exp.
68432
9-30-27
3/13/26
SCALE: 1"=5'
HMA RAMP
TOC 927.23'
40.00' Rt "B" 103+70.13
TOC ± 926.50'
MATCH EXIST
40.00' Rt "B" 103+58.13
MAX
7.5 %
.5
A A
SECTION A-A
NO SCALE
BOW 927.36'
49.00' Rt "B" 103+70.13
.5
HMA RAMP
12'
GB GB
MINOR CONCRETE (SIDEWALK)
FG
OG
C-1
R/W
TCE
R/W
LIP
FLTOC
BOC
BOW
BEGIN CURVE
39.83' Lt "B" 118+57.80
118+50 119
"B" LINE
BAKER BLVD
40' TO TOC
30.17' TO TOC
R/W R/W
SCALE: 1"=5'
BEGIN CURVE
32.50' Lt "B" 118+82.87
END CURVE
37.33' Lt "B" 118+70.81
END CURVE
30.00' Lt "B" 118+95.87
NO. R À T L#
35.00'
35.00'
21°48'05" 13.32'6.74'
6.74'-21°48'05" 13.32'
CURVE DATA
MINOR CONCRETE (SIDEWALK)
MINOR CONCRETE (SIDEWALK)
FOR ADDITIONAL CONSTRUCTION DETAILS SEE SAN BERNARDINO COUNTY STANDARD PLAN NO. 129A
CONSTRUCTION NOTES
7 PLACE 0.33' HOT MIX ASPHALT (TYPE A).
FG
8.0'
ABUTMENT STEM
2.0'
SLOPE PROTECTION
SMALL-ROCK
SECTION DETAIL #1
ROCK SLOPE PROTECTION
NO SCALE
PLAN DETAIL #1
ROCK SLOPE PROTECTION
NO SCALE
24" RCP
PIPE CL
ABUTMENT STEM
8.0'
ABUTMENT STEM
2.0'
FG
ABUTMENT STEM
24" RCP
PIPE CL
BOW
CURB
RETAINING
BACK OF
CURB TO CUT OFF WALL
END TRANSITION OF 8"
FL 926.56'
39.83' Rt "B" 103+70.13
CURB TO CUT OFF WALL
BEGIN TRANSITION OF 8"
FL ± 926.50'
MATCH EXIST
39.83' Rt "B" 103+58.13
Elev 928.86'
TOP OF RETAINING CURB
50.00' Rt "B" 103+70.13
HMA RAMP
8"
CUT OFF WALL SIDE VIEW
NO SCALE
FRONT VIEWS
WALL SIDE AND
SEE CUT OFF
CUT OFF WALL SECTION B-B
NO SCALE
8.5' HMA RAMP
FL
BOC
TOC
LIP
TRANSITION OF 8" CURB TO CUT OFF WALL
NO SCALE
HMA RAMP
LIP
FL
BOC
TOC
SECTION DETAIL #2
ROCK SLOPE PROTECTION
NO SCALE
PLAN DETAIL #2
ROCK SLOPE PROTECTION
NO SCALE
SLOPE PROTECTION
SMALL-ROCK
(150 LB, CLASS III, METHOD B)
ROCK SLOPE PROTECTION
(150 LB, CLASS III, METHOD B)
ROCK SLOPE PROTECTION
8.0'
10.0'
5.0'
3'
8'
9.
7'
B
B
CUT OFF WALL
4"
CUT OFF WALL
SIDEWALK SHIFT
NOT SHOWN
RETAINING CURB
NOTE:
SHEETS
SEE CONSTRUCTION DETAIL
OVEREXCAVATE,
(150 LB, CLASS III, METHOD B)
ROCK SLOPE PROTECTION
(150 LB, CLASS III, METHOD B)
ROCK SLOPE PROTECTION
7" 7"
RSP ROCK GRADATION
SEE SPECIFICATION SECTION 72-2 FOR THE COMPLETE TABLE AND REQUIREMENTS.
NOTE: THE RSP ROCK GRADATION TABLE IS FOR REFERENCE ONLY.
DIAMETER
BY MEDIAN PARTICLE
NOMINAL RSP CLASS
CLASS
(INCH)
DIAMETER
W50
WEIGHT
PARTICLE
MEDIAN
NOMINAL
MIN MAX MIN MAX MAX METHOD
D15 (INCH) D50 (INCH)
(INCH)
D100
PLACEMENT
I 6 20 LB 3.7 5.2 5.7 6.9 12.0 B
II 9 60 LB 5.5 7.8 8.5 10.5 18.0 B
III 12 150 LB 7.3 10.5 11.5 14.0 24.0 B
BOW ± 926.46'
MATCH EXIST
49.00' Rt "B" 103+58.13
MAX
7.5 %
Elev ± 926.96'
TOP OF RETAINING CURB
50.00' Rt "B" 103+58.13
DEPARTMENT OF PUBLIC WORKS
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
DN DN LK
T
A
TE OF CALIF
O R
N
IA
R E
G
IS
T E
R E
D
P
ROFESSION
A
L E
N G
IN
E E
R
CIVIL
DATELINDSAY KATT, PROJECT ENGINEER
C A
L L
B
EFORE YOU
D I
G
110 BLUE RAVINE ROAD SUITE 200, FOLSOM CA. 916-858-0642
DEPARTMENT OF PUBLIC WORKS
W.O. NO.
1SHEET OF
ROAD NO.
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
APPR DATEMARK REVISIONSPREPARED BY:VERTICAL DATUM:
TWO WORKING DAYS BEFORE YOU DIG
1-800-227-2600
Underground Service Alert
Call: TOLL FREE
F I L
E N
O
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
F I L
E N
O
BAKER BOULEVARD
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
150500-010
STAMPED ELEVATION IS NGVD29.
I-15 AND BAKER BOULEVARD.
RAILROAD BRIDGE LOCATED BETWEEN
ABANDONED TONOPAH AND TIDEWATER
THE NORTHERN ABUTMENT OF THE
X162 1933" LOCATED IN THE TOP OF
923.83 FEET ABOVE MEAN SEA LEVEL
GEODETIC SURVEY BENCHMARK ELEV.
2" DISC STAMPED "U.S. COAST &
NAVD 88, BM PID FT0057 EL = 925.66'
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
CONSTRUCTION DETAILS
H14278DN DN LK
KATT
LINDSAY
No.
Exp.
68432
9-30-27
3/13/26
"B" LINE 105+00
SCALE: 1"=5'
DRIVEWAY No. 1
C-2
BAKER BOULEVARD
R/W
NOTES:
1" LIP 926.43
FL 926.35
39.83' Rt "B" 104+56.00
Elev 926.72
42.50' Rt "B" 104+56.00
1" LIP 926.47
FL 926.39
39.83' Rt "B" 104+90.00
Elev 926.76
42.50' Rt "B" 104+90.00
BOC 926.54
40.50' Rt "B" 104+90.00
Elev 926.83
50.00' Rt "B" 104+56.00
Elev 926.88
50.00' Rt "B" 104+90.00
Elev ± 926.91
MATCH Exist
56.50' Rt "B" 104+56.00
A
R/W
TCE
104+50
3.
2.
1.
FOR DISPOSITION OF EXISTING FEATURES, SEE REMOVAL PLAN.
FOR UTILITY DISPOSITION, SEE UTILITY PLANS.
FOR ADDITIONAL DRIVEWAY CONSTRUCTION DETAILS SEE SAN BERNARDINO COUNTY STANDARD PLAN NO. 129A
CONSTRUCTION NOTES
6.
4.
3.
2.
STD PLAN NO. 115.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 8" CURB AND GUTTER, PER SEE SBC
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 0.50' HOT MIX ASPHALT (TYPE A).
SEE SBC STD PLAN 129A, MODIFIED PER CONSTRUCTION DETAIL SHEETS.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 0.50' MINOR CONCRETE (DRIVEWAY).
SEE SBC STD PLAN 109, MODIFIED PER PLANS.
OVEREXCAVATE 1' COMPACT TO 95%, PLACE 0.33' MINOR CONCRETE (SIDEWALK).
TCE
NO SCALE
SECTION A-A
5 10 15
GRAPHIC SCALE 1"=5'
0.12%
.1
.3
.1
5.23% 5.48%
CL "B" 104+73.00
BOW
CURB
RETAINING
BACK OF
BOW
CURB
RETAINING
BACK OF
X
CONFORM
4:1 OR FLATTER
GROUND SURFACE
EXISTING
RETAINING CURB
SIDEWALK
DRIVEWAY
NO SCALE
(PRIMARY ISOMETRIC VIEW)
DRIVEWAY CONFORM
X
CONFORM
4:1 OR FLATTER
RETAINING CURB
GROUND SURFACE
EXISTING
DRIVEWAY
SIDEWALK
DRIVEWAY CONFORM
NO SCALE
(ALTERNATIVE ISOMETRIC VIEW)
DRIVEWAY CONFORM
DRIVEWAY CONFORM
2%
1" LIP
OG
0.67'
FL
3 4
±0.12%1.5% 11%
6.5'
GB GB
7.5'2'
GB
MATCH EXIST
BOC
MATCH DRIVEWAY CONFORM MATERIAL.
BLEND SLOPES UNIFORMLY WITH NO ABRUPT BREAKS.
BETWEEN A 4:1 SLOPE AND 8% GRADE.
GRADE TO PROVIDE A SMOOTH TRANSITION
MATCH DRIVEWAY CONFORM MATERIAL.
BLEND SLOPES UNIFORMLY WITH NO ABRUPT BREAKS.
BETWEEN A 4:1 SLOPE AND 8% GRADE.
GRADE TO PROVIDE A SMOOTH TRANSITION
Elev ± 926.73
MATCH Exist
56.50' Rt "B" 104+90.00
BOC 926.50
40.50' Rt "B" 104+56.00
A
34'
DEPARTMENT OF PUBLIC WORKS
CHECKED BY:DRAWN BY:
DATEDATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
DATE
SUPERVISING ENGINEER
SAN BERNARDINO COUNTY
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
SUPERVISING ENGINEER
ENGINEERING MANAGER
WILFRIED NIEMANN, P.E., T.E.
DN DN LK
T
A
TE OF CALIF
O R
N
IA
R E
G
IS
T E
R E
D
P
ROFESSION
A
L E
N G
IN
E E
R
CIVIL
DATELIND…