H14278 Baker Blvd Bridge - Addendum No. 2.pdf
PDF 12 MB Posted
- Solicitation number
- PWG127-LANDD-6482
- Issued by
- San Bernardino County, San Francisco City, California
About this file
This is an Addendum No. 2 to a contract opportunity issued by the San Bernardino County Department of Public Works for the Baker Boulevard over Mojave River Bridge Replacement project (Work Order H14278, Federal No. 5954(193)). The addendum, issued September 10, 2026, modifies contract documents for the sealed bid solicitation with bid opening scheduled for September 17, 2026 at 10:00 a.m. via electronic submission through the ePro System. The project involves demolition of an existing timber bridge and construction of a new four-lane reinforced concrete structure with approach slabs, curbing, sidewalks, lighting, and erosion control work. Key modifications include: requiring CARB In-Use Off-Road Diesel-Fueled Fleets Certification of Compliance from subcontractors within 24 hours of bid opening; revising proposal pages P-4 through P-8 to include 118 bid line items with fixed and deletable items; adding settlement period requirements for bridge approach embankments; specifying concrete surface texture and stain treatments for concrete barriers with detailed architectural requirements including timber beam texture simulation; and replacing plan sheets and attachment pages. Bid items 47 through 52 are designated as deletable items for water utility work (water valves, hydrants, backflow preventers, and irrigation systems) that the Baker Community Services District is expected to perform within specified work windows; if not completed, the County Engineer may direct the contractor to perform these items or delete them per Section 9-1.06.
The addendum addresses bidder questions regarding estimates (not provided until after award), the definition of "D" (deletable items), and clarification that the County is the generator of treated wood waste from the existing bridge structure. Prevailing wage determinations are included for multiple crafts including Boilermaker-Blacksmith, Iron Worker, Electrical Utility Lineman, Telecommunications Technician, Metal Roofing Systems Installer, Tree Trimmer, Stator Rewinder, and Driver classifications across various California localities and areas, with rates effective through mid-2027. The concrete barrier texture and stain specifications require submitted manufacturer data, test panels at least 60 days before production work, and strict adherence to specified colors from AMS-STD-595 (base color 33690 with accent colors 33446, 30372, 36555, 30219, and 37769). Bidders must acknowledge receipt and understanding of Addendum No. 2 with a signed Bidder's Certification submitted with the proposal; proposals without this certification will not be accepted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
BAKER BOULEVARD OVER MOJAVE RIVER BRIDGE REPLACEMENT
September 10, 2026
ADDENDUM NO. 2
BAKER BOULEVARD OVER MOJAVE RIVER BRIDGE REPLACEMENT
WORK ORDER: H14278
FEDERAL NO.: 5954(193)
AREA: Baker
ROAD NO.: 150500-010
BIDS OPEN 10:00 A.M., THURSDAY, SEPTEMBER 17, 2026
By Email via ePro System
The bid opening will be publicly viewable via goto.com. Details are available in the Notice to Bidders pages of the Project Special Provisions and through the project posting in ePro.
Amend the Contract Documents as follows:
1. NOTICE TO BIDDERS
a. “CARB In-Use Off-Road Diesel-Fueled Fleets Certification of Compliance” for sub-contractors shall be submitted within 24 hours of the bid opening.
2. PROPOSAL PAGES
a. Delete Proposal Pages P-4 to P-8 and replace with Revised Addendum No. 2 Proposal Pages P-4 to P-8 (Attachment #1).
3. DIVISION I - GENERAL PROVISIONS
a. On SP-2, add the following to the “Add to Bid Item List Abbreviations Table” within Section 1-1.06:
Abbreviation Meaning
D Deletable
4. DIVISION III - EARTHWORK AND LANDSCAPE
a. On SP-89, add the following after 19-6.03A:
Add to section 19-6.03D:
Settlement periods are required for bridge approach embankments as shown in the following table:
Abutment number Surcharge height (feet)
Settlement period (days) a Abutment 1 & 11 0 28 a At this location, construct embankment by extending the grading plane (GP) in the elevation view of the bridge embankment surcharge detail of standard plan A62B horizontally to the centerline of the abutment.
5. DIVISION VI - STRUCTURES
a. On SP-99, add the following after 51-1.03F(5)(b)(i):
Add to the end of section 51-1.03G(1):
Provide concrete surface textures at the locations shown. The Engineer determines the acceptability of the surface textures. Architectural treatments must consist of:
1. Formed timber beam architectural treatment
Prepare and stain all textured concrete surfaces under section 78-4.
September 10, 2026
Submit manufacturer product data, form liner specifications, and sample shop drawings showing liner layout, grain orientation, and joint details at least 30 days before constructing the test panel.
The timber beam texture must simulate horizontally oriented rough-sawn wood grain with random shadow patterns and relief. Tool surfaces between imprints that do not exhibit the timber beam texture to match the adjacent grain pattern.
Construct a test panel at least 60 days before starting textured concrete work. The test panel must:
1. Be at least 4 feet wide by 4 feet high and constructed at a location approved by the Engineer
2. Demonstrate the form liner jointing, tie-hole patching, and surface tooling methods proposed for production work
3. Be prepared and stained under section 78-4 using the proposed concrete stain, color, and application technique
Do not place textured concrete or apply stain on production work until the Engineer approves the test panel.
The approved test panel establishes the visual standard for grain alignment, texture relief, form release residue removal, tooling, and color uniformity. Maintain the approved test panel on-site until all architectural surface work is complete and accepted. After acceptance of the production work, demolish and dispose of the test panel.
b. On SP-105, add the following after 78-2.01:
Add to the end of section 78-4.04B(2)(a):
The stain must be an acid stain.
The stain system for the formed timber beam texture must consist of 1 base color and 5 accent colors from the same manufacturer. The base color must match color no. 33690 of AMS-STD-595 and the accent colors must match color nos. 33446, 30372, 36555, 30219, and 37769 of AMS-STD-595.
6. ATTACHMENT A – BLUE PAGES
c. Delete Attachment A, Blue Pages, in its entirety and replace it with Revised Attachment A, Blue Pages, (Attachment #3) attached to this Addendum.
7. PROJECT PLANS
a. Delete and replace the following plan sheets with the corresponding Revised Addendum No. 2 plan sheets (Attachment #2), including:
Sheet 94, Add Alternate 1 Concrete Barrier (Type 85SW)
Questions and Answers:
Q: Is an estimate available?
A: The County does not provide the Engineer's Estimate to the prospective bidders. The Engineer’s Estimate is available after the award of the contract.
Q: Please clarify what the "D" stands for on the fourth column of the Item Sheet. Where it states (F) or (D).
A: (D) is defined in Special Provision 9-1.06 on page SP-52. Definition added to 1-1.06, see Addendum No. 2.
Q: Referencing Bid Items 47-52, and Section 5-1.36C(3) Pages SP-23 and SP-24 of the Special Provisions, are these bid items performed by Baker CSD? If not; * Bid Item 47, what type of material is the existing pipe? * Bid Item 48, is this hydrant run off an existing tee and please provide details on the connection. * Bid Item 49, what size is the backflow
September 10, 2026 and confirm the material connection. * Bid Item 50, please confirm the reuse of the existing material and extend the line with poly pipe and couplings. * Bid Item 51, please confirm the existing hydrants are reused.
A: Bid Items 47–52 are deletable items and must be priced by the bidder. Baker CSD is expected to perform the work within the specified work windows. If Baker CSD does not complete the work within those windows, the Engineer may direct the Contractor to perform the applicable bid items. Items not directed will be deleted under section 9-1.06. Refer to Attachment D (Green Pages) in particular Special Districts Department County of San Bernardino Standard Drawings. Existing size and material type is identified on the utility plans, connection details for valves and hydrants are unknown and to be verified in the field. Existing hydrants are to be reused as indicated on utility plans.
Q: Referencing the bridge removal item, please confirm if the lumber is considered "Treated Wood Waste" and if so, confirm that the contractor is not the generator. The "As-Builts reference "Heart Redwood".
A: The County is the generator of treated wood waste removed from the existing County-owned bridge. The Contractor is not the generator solely by reason of removing and handling the treated wood waste onsite. The Contractor must manage, accumulate, label, transport, and dispose of treated wood waste under section 14-11.14 and applicable law.
The County will provide the generator information required for the disposal records. Various members of the original existing bridge have been previously replaced with materials containing Treated Wood Waste. Requirements for Treated Wood Waste in Special Provisions 14-11.14 apply only to members determined to be Treated Wood Waste.
Q: Please confirm if there is a settlement period required for the new bridge abutments.
A: A settlement period is required at abutments, see Addendum No. 2.
Q: Please allow 24 hours from bid opening to submit the CARB certificates for subcontractors and not due at time of opening.
A: This is acceptable, see Addendum No. 2.
Q: Referencing Item #118. “118 839820A 925 LF Concrete Barrier (Type 85SW) (With Texture and Stain). The Contract Specifications nor the Plans provide any information as to the types of “Texture” or “Stain”. Please clarify.
A: See Addendum No. 2 for Special Provisions and Bid Items added to address the barrier texture and stain.
Attachments
Attachment #1: Revised Addendum No. 2 Proposal Pages
Attachment #2: Revised Addendum No. 2 Plan Sheets
Attachment #3: Revised Attachment A, Blue Pages
The addition of these requirements must be considered with the existing contract documents in preparing bids. THE BIDDER’S CERTIFICATION FOR THIS ADDENDUM NO. 2 MUST BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND MUST BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER’S CERTIFICATION acknowledging receipt of this Addendum No. 2 will NOT be accepted.
Noel Castillo, Director Department of Public Works
Andy Silao, P.E., Chief, Contracts Division
BIDDER’S CERTIFICATION:
By my signature below, I acknowledge receipt of Addendum No. 2 and fully understand its intent and detail, which I have considered in preparing the attached proposal.
Bidder’s Signature Date
Note: The page containing the executed BIDDER’S CERTIFICATION (just this page) must be included with the proposal.
Attachment #1:
Addendum No. 2
Revised Proposal Pages
Bidder:
Project: BAKER BOULEVARD OVER MOJAVE RIVER BRIDGE
REPLACEMENT
W.O.#:
H14278
Federal. No.
5954(193)
Limits: FROM EAST OF MILL ROAD TO WEST OF ROUTE 127
Item No.
Caltrans Bid Item #
Approx.
Quant.
(F) or (D)
Meas.
Unit
Item Description Unit Price Total
Addendum No. 2 P - 4
1 070030 1 LS Lead Compliance Plan $ $
2 040010A 200,000
FA
Supplemental Work at Force Account (Unforeseen Differing Site Conditions)
$ 1.00 $200,000
3 060010A 1 LS Quality Control Program $ $
4 070010A 1 LS Fire Prevention Plan $ $
5 130010A 1 LS Dewatering Plan $ $
LS
Progress Schedule (Critical Path)
7 090100 355 WDAY Time Related Overhead (WDAY) $ $
8 100100 1 LS Develop Water Supply $ $
9 120090 1 LS Construction Area Signs $ $
10 120100
LS Traffic Control System
11 120120
EA Type III Barricade
12 120149
SQFT
Temporary Pavement Marking (Paint)
13 120159 9,900 LF Temporary Traffic Stripe (Paint) $ $
14 120165 520 EA Channelizer (Surface Mounted) $ $
15 120207
LS
Portable Radar Speed Feedback Sign System
16 128651
EA
Portable Changeable Message Sign (EA)
17 129000 3,080 LF Temporary Railing (Type K) $ $
18 129105 11 EA Temporary Crash Cushion TL-2 $ $
19 129150 3,080 LF Temporary Traffic Screen $ $
20 129152
LS
Temporary Radar Speed Feedback Sign System
21 130005A 1 LS Water Pollution Control Work $ $
22 130100 1 LS Job Site Management $ $
23 130301
LS
Storm Water Pollution Prevention Plan
24 130321
LS
Storm Water Sampling and Analysis
25 130331 3 EA Stormwater Annual Report $ $
26 131104
EA Water Quality Monitoring Report
27 131105 3 EA Water Quality Annual Report $ $
28 141110 1 LS Work Area Monitoring $ $
29 141120 1 LS Treated Wood Waste $ $
200,000
FA
$ 1.00 $200,000
REPLACEMENT
W.O.#:
H14278
Federal. No.
5954(193)
Limits: FROM EAST OF MILL ROAD TO WEST OF ROUTE 127
Item No.
Caltrans Bid Item #
Approx.
Quant.
(F) or (D)
Meas.
Addendum No. 2 P - 5
30 146007 1 LS Invasive Species Control $ $
31 153123 2,050 SY Remove Concrete (SQYD) $ $
32 153123A 210 SQFT Remove Grouted Rock $ $
33 153123B 4 EA Remove Bollard $ $
34 153123C 10 EA Remove Object Marker $ $
35 153123D
D LF
Remove Abandoned Sprint Conduit
36 153123E 2 EA Remove Precast Wheelstop $ $
37 160101A 1 LS Resident Engineer's Field Office $ $
38 160110 1,100 LF Temporary High-Visibility Fence $ $
39 170103 1 LS Clearing and Grubbing (LS) $ $
40 190101 8,000 F CY Roadway Excavation $ $
41 190159
CY
Roadway Excavation (Type Com)(Aerially Deposited Lead)
42 192020 4,050 F CY Structure Excavation (Type D) $ $
43 192032 1,570
F CY
Structure Excavation (Rock Slope Protection)
44 193003 3,720 F CY Structure Backfill (Bridge) $ $
45 193017 1,520
F CY Structure Backfill (Channel)
46 198010 150 CY Imported Borrow $ $
47 2 D EA Install Water Valve $ $
48 1 D EA Remove Water Valve $ $
49 202026
D EA
Relocate Backflow Preventer Assembly
50 202027 4 D EA Relocate Water Meter $ $
51 2 D EA Relocate Hydrant $ $
D EA
Relocate Irrigation System (Sprinkler Valve Assembly)
53 260203 1,900 CY Class 2 Aggregate Base (CY) $ $
54 390135 4,800 TON Hot Mix Asphalt (Type A) $ $
55 397005 4 TON Tack Coat $ $
56 398000
CY
Remove Asphalt Concrete Pavement (CY)
57 398001 2,370
SQYD
Remove Asphalt Concrete Pavement (SQYD)
58 398200 1,900
SQYD
Cold Plane Asphalt Concrete Pavement
59 490603 1,820
LF
24" Cast-In-Drilled Hole Concrete Piling
2,370
F
REPLACEMENT
W.O.#:
H14278
Federal. No.
5954(193)
Limits: FROM EAST OF MILL ROAD TO WEST OF ROUTE 127
Item No.
Caltrans Bid Item #
Approx.
Quant.
(F) or (D)
Meas.
Addendum No. 2 P - 6
60 490605 5,940
LF
36" Cast-In-Drilled Hole Concrete Piling
61 510051
F CY
Structural Concrete, Bridge Footing
62 510053 700 F CY Structural Concrete, Bridge $ $
63 510054 2,445
F CY
Structural Concrete, Bridge (Polymer Fiber)
64 510054A
LS
Concrete Surface Smoothness Testing
65 510086
F CY
Structural Concrete, Approach Slab (Type N)
66 510502 1 F CY Minor Concrete (Minor Structure) $ $
67 511106 390 LF Drill and Bond Dowel $ $
68 518008 2,600 F LB Hinge Transverse Shear Key $ $
69 520001A 1 LS Welding Quality Control Plan $ $
70 520102 1,550,000 F LB Bar Reinforcing Steel (Bridge) $ $
71 520115A 22,600 F LB Bar Reinforcing Steel (Stainless) $ $
72 520120 252 F EA Headed Bar Reinforcement $ $
73 568051A 2 D EA Salvage Mobil Pylon Sign $ $
74 568051B 1 D EA Salvage Billboard Panel $ $
75 600097 1 LS Bridge Removal $ $
76 650014 200 LF 18" Reinforced Concrete Pipe $ $
77 650018 260 LF 24" Reinforced Concrete Pipe $ $
78 519081 266 LF Joint Seal (MR = 1/2") $ $
79 519100 133 LF Joint Seal (MR = 2") $ $
80 2 EA Storm Drain Cleanout $ $
81 4 EA Type "A" Catch Basin $ $
82 720110 7 CY Small-Rock Slope Protection $ $
83 723070
CY
Rock Slope Protection (150lb, Class III, Method B)
84 729011 1,270
SY
Rock Slope Protection Fabric (Class 8)
85 11 CY Portland Cement Concrete $ $
86 730020 190 CY Minor Concrete (Curb) (CY) $ $
87 731504
CY
Minor Concrete (Curb and Gutter)
88 731516
CY Minor Concrete (Driveway) $ $
89 731521
CY Minor Concrete (Sidewalk) $ $
REPLACEMENT
W.O.#:
H14278
Federal. No.
5954(193)
Limits: FROM EAST OF MILL ROAD TO WEST OF ROUTE 127
Item No.
Caltrans Bid Item #
Approx.
Quant.
(F) or (D)
Meas.
Addendum No. 2 P - 7
90 731710 990 LF Remove Concrete Curb (LF) $ $
91 750500A
F SQFT
Checkered Steel Plate (0.249" Thick)(Galvanized)
92 770091A 1 LS Luminaires (Standard) $ $
93 780001A
EA
General Temporary Traffic Handling Sign
94 780500 19 EA Place Precast Wheelstop $ $
95 800360 190 LF Chain Link Fence (Type Cl-6) $ $
96 803050 210 LF Remove Chain Link Fence $ $
97 802670 1 EA 24' Chain Link Gate (Type Cl-6) $ $
98 810230
EA
Pavement Marker (Retroreflective)
99 820134 4 EA Object Marker (Type P) $ $
100 820230 3 EA Remove Sign $ $
101 820380 3 EA Remove Sign Post $ $
102 820590
EA
Relocate Roadside Sign - One Post
103 820840 7 EA Roadside Sign - One Post $ $
104 833085A 140 LF Steel Picket Railing $ $
105 839719 931 LF Concrete Barrier Type 732SW $ $
106 839752 120 LF Remove Guardrail $ $
EA Remove Trees
108 840502
LF
Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility)
109 840516
SQFT
Thermoplastic Pavement Marking (Enhanced Wet Night Visibility)
110 840656 9,600 LF Paint Traffic Stripe (2-Coat) $ $
111 840666
SQFT
Paint Pavement Marking (2- Coat)
112 846020 9,650 LF Remove Painted Traffic Stripe
113 846025
SQFT
Remove Painted Pavement Marking
114 847196 3150 LF Contrast Stripe Paint (2-Coat) $ $
114A 999999 1 LS Mobilization $ $
Base Bid Subtotal:
114A
REPLACEMENT
W.O.#:
H14278
Federal No.
5954(193)
Limits: FROM EAST OF MILL ROAD TO WEST OF ROUTE 127
Item No.
Caltrans Bid Item #
Approx.
Quant.
(F) or (D)
Meas.
Addendum No. 2 P - 8
ADD ALTERNATE 1 – CONCRETE BARRIER (TYPE 85SW)
510054 26 F CY
Structural Concrete, Bridge (Polymer Fiber)
510086 4 F CY
Structural Concrete, Approach Slab (Type N)
116A 511055 3720 F SQFT Concrete Surface Texture $ $
117 520102 13,400 F LB Bar Reinforcing Steel (Bridge) $ $
117A 780440 3720 SQFT Prepare and Stain Concrete $ $
118 839820A 933 LF Concrete Barrier (Type 85SW) $ $
Add Alternate 1 Bid Subtotal: $
ADD ALTERNATE 2 – ALTERNATE LUMINAIRE
119 770091A 1 LS Luminaires (Decorative) $ $
Add Alternate 2 Bid Subtotal: $
Base Bid + Add Alternate 1 + Add Alternate 2 $
Attachment #2:
Revised Plan Sheets
L E
GA
NTT
ON YME
R E J
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
M A
R K
D A
T E
A P
P R
R
E V
IS
IO
N S
W.O. NO. SHT. NO.PLAN SCALE
DATENO CHANGES RESIDENT ENGINEER
MARK CHANGES
FIELD CHANGES
110 BLUE RAVINE ROAD SUITE 200, FOLSOM CA. 916-858-0642
DATEJEREMY NOTTNAGEL, PROJECT ENGINEER
PREPARED BY:
J.L. REF. W.O. NO. SHT. NO. TOT. SHT'S.PLAN SCALE
AS NOTED
BRIDGE REPLACEMENT
OVER MOJAVE RIVER
BAKER BOULEVARD
3/13/26
DEPARTMENT OF PUBLIC WORKS
CHECKED BY:DRAWN BY:
DATE
APPROVED BY:
DEPUTY DIRECTOR
DESIGNED BY:
DATE
SUPERVISING ENGINEER
DATE
SAN BERNARDINO COUNTY
TRANSPORTATION DESIGN ENGINEERING
ENGINEERING MANAGER
CHRIS NGUYEN, P.E.
MERVAT MIKHAIL, P.E.DATE
DATE
ENGINEERING MANAGER
WILFRIED P. NIEMANN, P.E., T.E.
EP/JN EF
CIVIL
S T
A
TE OF CALIF
O R
N
IA
R E
G
IS
T E
R E
D
P
ROFESSION
A
L E
N G
IN
E E
R
No. 93270
CIVIL
RECOMMENDED BY:
H14278XXX
LH
BARRIER
2'-0"
A
96'-0"
48'-0"
BARRIER
2'-0"
SW
6'-0"
LANE
12'-0"
MEDIAN
12'-0"
LANE
12'-0"
SW
6'-0"
-2%
PG
-2%
A
TYPICAL SECTION
⅛" = 1'-0"
ALTERNATIVE 1 LEGEND:
Concrete Barrier Type 85SWA
UTILITIES LEGEND:
2" BRIDGE LIGHTING CONDUIT
2-4" Á FUTURE
6-6" Á TYPE 1 CONDUITS (SCE)
3-2"Á TYPE 1 CONDUITS (SPRINT)
2-4" Á AT&T
48'-0"
SLAB OVER WINGWALL
SECTION AT APPROACH
½" = 1'-0"
1.
Barnwood #1203, or equivalent.
5. Timber Beam Texture to be Spec Formliner
4. For Luminaire, See "ADD ALTERNATE 2" sheet.
See "PIER LAYOUT" sheets.
3. For PC/PS Concrete Pile Extensions, See Standard Plan B11-83.
2. Concrete Barrier Type 85SW, for location of "SECTION B-B".
See "ABUTMENT DETAILS No. 1" sheet
A
WINGWALL (MOD)
SLAB OVERB9-5
X-1
B9-1
TYPE N (30)
APPROACH
STRUCTURE
1'-6"
OVERHANG
ALTERNATE
DETAILS No. 1"
SEE "ABUTMENT
REINFORCEMENT,
TYPICAL WINGWALL
1'-0"
SLAB REINFORCEMENT
TYPICAL APPROACH
BETWEEN UTILITY BRACKETS
ALTERNATE OVERHANG
1" = 1'-0"
1'-0"
DECK Elev
Typ SLAB Reinf
#5 Cont Tot 3
#5 @ 12
A
REINFORCEMENT
TRANSVERSE
BUNDLE WITH TYPICAL
#10 Cont, Tot 2
Typ
20" CIP CONCRETE COLUMN,
WWLOL
3'-6"
NOTES:
STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER)
BAR REINFORCING STEEL (BRIDGE)
CONCRETE BARRIER (TYPE 85SW)
ITEM TOTAL UNIT
CY
LB
LF
ALTERNATE 1 QUANTITIES
13,400
Bridge (Polymer Fiber) Pay Limits for Structural Concrete, Approach Slab Pay Limits for Structural Concrete, STRUCTURAL CONCRETE, APPROACH SLAB CY4
ALTERNATE 1 CONCRETE PAY LIMITS
LANE
12'-0"
SHOULDER
10'-0"
SHOULDER
10'-0"
LANE
12'-0"
CONCRETE BARRIER (TYPE 85SW)
ADD ALTERNATE 1
5 5
Typ
36" CIDH CONCRETE PILING,
JOINT
CONSTRUCTION
DECK
B0-5
5-2
ADDENDUM #2: ADDED CONCRETE SURFACE TREATMENT REQUIREMENTS 9/10/26
CONCRETE SURFACE TREATMENT
CONCRETE BARRIER (TYPE 85SW)
NO SCALE
CONCRETE SURFACE TEXTURE 3720 SQFT
SQFT3720PREPARE AND STAIN CONCRETE
EOD
TOP AND SIDES OF BEAM
TIMBER BEAM TEXTURE ON
BEAM TEXTURE
ALL SIDES OF TIMBER
PREPARE AND STAIN
SECTION VIEW
INTERIOR ELEVATION
BEAM TEXTURE
ALL SIDES OF TIMBER
PREPARE AND STAIN
EXTERIOR ELEVATION
AND SIDES OF BEAM
TEXTURE ON TOP
TIMBER BEAM
AND SIDES OF BEAM
TEXTURE ON TOP
TIMBER BEAM
Timber Beam Texture
Prepare and Stain Concrete
Exclude stain and texture on inside faces of joint posts
Attachment #3:
Revised Attachment A
Blue Pages
Attachment A General Prevailing Wage Rates
(Blue Pages) inserted here
REVISED
Index 2026-2 general prevailing wage journeyman determinations
General prevailing wage determinations made by the director of industrial relations
Pursuant to California Labor Code part 7, chapter 1, article 2, sections 1770, 1773, and 1773.1
The effective date of each determination is ten (10) days after the issue date. (8 CCR § 16000). The general determinations are issued twice a year (February 22nd and August 22nd) and go into effect ten days thereafter (March 3rd in a leap year and March 4th in a non-leap year for determinations issued on February 22nd, and September 1st for determinations issued on August
22nd).
To locate a particular journeyman craft or classification's prevailing wage determination, holiday, advisory scope of work, or travel and subsistence provision, please follow the six steps in the table below:
Step one Statewide First examine if your craft's determination is among the basic trades that apply to most counties in California.
Step two (A) Northern California If you have not found your craft in step one, check this area to see if your craft's determination is one of Northern California's basic trades.
Step two (B) Southern California If you have not found your craft in step one, check this area to see if your craft's determination is one of Southern California's basic trades.
https://www.dir.ca.gov/oprl/2026-2/PWD/Statewide.html https://www.dir.ca.gov/oprl/2026-2/PWD/Northern.html https://www.dir.ca.gov/oprl/2026-2/PWD/Southern.html
Step three San Diego After following steps one and two (B), examine this area if your project is in San Diego County.
Step four County Determinations (subtrades)
If you have not found your craft in steps 1, 2, or 3, choose the county where work is being performed to examine the subtrades.
Step five County Determinations (Shift)
(subtrades) Shift differential pay
Examine the county (if shown) where work is being performed to see if your classification has a shift differential pay determination.
Step six Important notices Check the important notices to see if any corrections, interims, or modifications have been issued that may apply to your determination.
Return to main menu
To ensure that you are able to view all current prevailing wage determinations, predetermined increases, and current holiday, scope of work, travel and subsistence and shift provisions, you must have a copy of Adobe Acrobat and a copy of Microsoft Excel 2003. If you do not have the programs necessary to open these files, you can obtain the free Reader and Viewer programs below:
Click on this icon to download a copy of the Adobe Acrobat Reader program.
If you cannot find a job classification needed to execute a contract in the Director's general prevailing wage determinations, please contact the Office of the Director - Research Unit, P.O. Box
420603, San Francisco, CA 94142, (415) 703-4774. Because it may necessitate a wage survey, you should allow 45 days prior to the bid advertisement date for such request. Include in your request the project name or bid number, the classifications needed, job description if available, the bid advertisement date, and location of the project(s).
https://www.dir.ca.gov/oprl/2026-2/PWD/SanDiego.html https://www.dir.ca.gov/oprl/2026-2/PWD/Determinations/Subtrades/jrnylist.html https://www.dir.ca.gov/oprl/2026-2/PWD/Determinations/Subtrades/Shift/shiftlist.html https://www.dir.ca.gov/oprl/2026-2/PWD/Determinations/Subtrades/Shift/shiftlist.html https://www.dir.ca.gov/oprl/2026-2/NoticeIndex.htm https://www.dir.ca.gov/oprl/main.htm http://www.adobe.com/products/acrobat/readstep2.html http://www.adobe.com/products/acrobat/readstep2.html
GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
Craft: Boilermaker-Blacksmith #
Determination:
C-14-X-2-2026-1
Issue Date:
February 22, 2026
Expiration date of determination:
September 30, 2026* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director – Research Unit (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.
Localities:
All localities within the State of California
Wages and Employer Payments:
Classification (Journeyperson)
Basic Hourly Rate
Health and
Welfare
Pensiona Vacation and
Holiday
Training Other Hours Total Hourly Rate
Daily Overtime
Hourly Rate
(1 ½ X)
Saturday Overtime
Hourly Rate
(1 ½ X)
Sunday/ Holiday
Overtime Hourly Rate (2 X)
Boilermaker-Blacksmith (Area 1)b $57.98 $8.57 $20.64c $9.00c $3.90 $1.34 8.0 $101.43 $145.24d $145.24d $189.05
Boilermaker-Blacksmith (Area 2)b $64.18 $8.57 $23.49c $6.00c $4.40 $1.34 8.0 $107.98 $154.815d $154.815d $201.65
Boilermaker-Blacksmith (Area 3)b $59.24 $8.57 $21.63c $5.50c $4.40 $1.34 8.0 $100.68 $143.865d $143.865d $187.05
Determination: C-14-X-2-2026-1
Determination:
C-14-X-2-2026-1
Issue Date:
February 22, 2026
Expiration date of determination:
September 30, 2026* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director – Research Unit at (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.
Localities:
All localities within the State of California
Wages and Employer Payments:
Classification (Journeyperson)
Basic Hourly Rate
Health and
Welfare
Pensiona Vacation and
Holiday
Training Other Hours Total Hourly Rate
Daily Overtime
Hourly Rate
(1 ½ X)
Saturday Overtime
Hourly Rate
(1 ½ X)
Sunday/ Holiday
Overtime Hourly Rate (2 X)
Boilermaker-Blacksmith Helpere (Area 1)b $31.89 f $0.76c $0.00 $3.90 $1.34 8.0 $37.89 $54.215d $54.215d $70.54
Boilermaker-Blacksmith Helpere (Area 2)b $35.30 f $0.76c $0.00 $4.40 $1.34 8.0 $41.80 $59.83d $59.83d $77.86
Boilermaker-Blacksmith Helpere (Area 3)b $32.58 f $0.76c $0.00 $4.40 $1.34 8.0 $39.08 $55.75d $55.75d $72.42
Recognized holidays:
Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
Travel and/or subsistence payment:
In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm
Determination: C-14-X-2-2026-1
Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
a Includes amount for Annuity Trust Fund.
b Area 1: Imperial, Inyo, Kern, Los Angeles, Orange, Riverside, San Bernardino, San Diego, Santa Barbara, San Luis Obispo (only that portion that is within a 25-mile radius of the city of Santa Maria), and Ventura Counties.
Area 2: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano and Sonoma Counties.
Area 3: All other remaining counties.
c Contribution is factored at the applicable overtime multiplier for each overtime hour worked.
d Rate applies to the first 2 daily overtime hours and the first 10 hours worked on Saturday. All other overtime is paid at the Sunday/Holiday rate.
e One Helper shall be employed on each job of 5 to 10 employees.
f Helpers will be eligible for Health & Welfare benefits after completing 2000 hours.
https://www.dir.ca.gov/oprl/pwappwage/PWAppWageStart.asp
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
Craft: Iron Worker #
Determination:
C-20-X-1-2026-2 Issue Date:
August 22, 2026 Expiration date of determination:
December 31, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.
Localities:
Area 1: San Francisco, Santa Clara and San Mateo Counties Area 2: Alameda and Contra Costa Counties Area 3: California Port of Long Beach and City of Los Angeles including cities of Baldwin Hills, Beverly Hills, Burbank, Culver City, El Segundo, Gardena, Hawthorne, Hermosa Beach, Inglewood, Lawndale, Lennox, Lomita, Manhattan Beach, Marina Del Rey, Rancho Palos Verdes, Redondo Beach, Rolling Hills Estates, San Fernando, Santa Monica, Torrance, Universal City, West Hollywood, and Westwood Veterans Affairs Area 4: City of Long Beach, Orange and San Diego Counties Area 5: Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Imperial, Inyo, Kern, Kings, Lake, Lassen, Los Angeles (portions not covered in Zones 3 and 4), Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Mono, Monterey, Napa, Nevada, Placer, Plumas, Riverside, Sacramento, San Benito, San Bernardino, San Joaquin, San Luis Obispo, Santa Barbara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Tulare, Trinity, Tuolumne, Ventura, Yolo and Yuba Counties
Wages and Employer Payments:
Classification (Journeyperson)
Basic Hourly Rate
Health and
Welfare
Pension Vacation and
Holidaya
Training Other Hours Total Hourly Rate
Daily Overtime
Hourly Rate
(1 ½ X)b
Saturday Overtime
Hourly Rate
(1 ½ X)b
Sunday/ Holiday
Overtime Hourly Rate (2 X)
Iron Worker (Ornamental, Reinforcing, Structural) (Area 1)
$58.44 $15.30 $9.32 $6.40 $0.72 $7.380 8.0 $97.560 $126.780 $126.780 $156.000
Determination: C-20-X-1-2026-2
Classification (Journeyperson)
Basic Hourly Rate
Health and
Welfare
Pension Vacation and
Holidaya
Training Other Hours Total Hourly Rate
Daily Overtime
Hourly Rate
(1 ½ X)b
Saturday Overtime
Hourly Rate
(1 ½ X)b
Sunday/ Holiday
Overtime Hourly Rate (2 X)
Iron Worker (Ornamental, Reinforcing, Structural) (Area 2)
$57.93 $15.30 $9.32 $6.40 $0.72 $7.380 8.0 $97.050 $126.015 $126.015 $154.980
Iron Worker (Ornamental, Reinforcing, Structural) (Area 3)
$55.59 $15.30 $9.32 $6.40 $0.72 $7.380 8.0 $94.710 $122.505 $122.505 $150.300
Iron Worker (Ornamental, Reinforcing, Structural) (Area 4)
$53.35 $15.30 $9.32 $6.40 $0.72 $7.380 8.0 $92.470 $119.145 $119.145 $145.820
Iron Worker (Ornamental, Reinforcing, Structural) (Area 5)
$51.85 $15.30 $9.32 $6.40 $0.72 $7.380 8.0 $90.970 $116.895 $116.895 $142.820
Fence Erector (All Areas) $46.50 $11.00 $6.50 $5.00 $0.51 $5.440 8.0 $74.950 $98.200 $98.200 $121.450 Recognized holidays:
Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
Travel and/or subsistence payment:
In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
a Includes supplemental dues.
b Rate applies to the first 2 daily overtime hours and the first 8 hours on Saturday. All other overtime is at the Sunday/Holiday rate.
https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm
PREDETERMINED INCREASE
CRAFTS/CLASSIFICATIONS:
Iron Worker
DETERMINATION:
C-20-X-1-2026-2
LOCALITIES:
All localities within California.
These predetermined increases for the above named crafts apply only to the current determinations for work being performed on public works projects with bid advertisement dates on or after September 1, 2026, until the determination(s) is/are superseded by a new determination(s) or a predetermined increase modification notice becomes effective.
When referencing our prevailing wage determinations, please note that if the prevailing wage rate determination which was in effect on the bid advertisement date of a project, has a single asterisk (*) after the expiration date, the rate will be good for the life of the project. However, if a prevailing wage rate determination has double asterisks (**) after the expiration date, the rate must be updated on the following date to reflect the predetermined rate change(s).
The above determination is currently in effect and will expire on December 31, 2026**.
IRON WORKER (AREA 1)
Effective January 1, 2027, there will be an increase of $2.95 to be allocated to wages and/or employer payments.
There are no further increases applicable to this determination.
IRON WORKER (AREA 2)
Effective January 1, 2027, there will be an increase of $2.96 to be allocated to wages and/or employer payments.
There are no further increases applicable to this determination.
IRON WORKER (AREA 3)
Effective January 1, 2027, there will be an increase of $4.29 to be allocated to wages and/or employer payments.
There are no further increases applicable to this determination.
IRON WORKER (AREA 4)
Effective January 1, 2027, there will be an increase of $3.40 to be allocated to wages and/or employer payments.
There are no further increases applicable to this determination.
IRON WORKER (AREA 5)
Effective January 1, 2027, there will be an increase of $3.15 to be allocated to wages and/or employer payments.
There are no further increases applicable to this determination.
FENCE ERECTOR (ALL AREAS)
No Predetermined Increases
Issued 8/22/2026, Effective 9/1/2026 until superseded.
This page will be updated when wage rate breakdown becomes available.
Last Updated: September 1, 2026
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
Craft: Electrical Utility Lineman #
Determination:
C-61-X-3-2026-1
Issue Date:
August 22, 2026
Expiration date of determination:
May 31, 2027* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director – Research Unit (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.
Localities:
All localities within the State of California, except Del Norte, Modoc, and Siskiyou Counties. (For Del Norte, Modoc, and Siskiyou - see determination C-61-X-8)
Wages and Employer Payments:
Classification
(Journeyperson)
Basic Hourly Rate
Health and
Welfare
Pensiona Trainingb Otherc Hours Total Hourly Rate
Daily Overtime
Hourly Rate (2 X)
Saturday Overtime
Hourly Rate (2 X)
Sunday/ Holiday
Overtime Hourly Rate (2 X)
Lineman, Cable Splicer # $74.43 $8.90 $14.08 $0.74 $0.81 8.0 $101.19 $179.40 $179.40 $179.40
Powderman $62.16 $8.90 $11.34 $0.62 $0.68 8.0 $85.56 $150.88 $150.88 $150.88
Groundman $42.51 $8.90 $11.30 $0.43 $0.46 8.0 $64.88 $109.54 $109.54 $109.54
Determinations: C-61-X-3-2026-1 and C-61-X-4-2025-1
Determination:
C-61-X-4-2025-1
Issue Date:
February 22, 2025
Expiration date of determination:
December 31, 2025* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director – Research Unit (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.
Localities:
All localities within the State of California, except Del Norte, Imperial, Inyo, Kern, Kings, Los Angeles, Modoc, Mono, Orange, Riverside, San Bernardino, San Diego, San Luis Obispo, Santa Barbara, Siskiyou, Tulare, and Ventura Counties. (For Del Norte, Modoc, and Siskiyou – see determination C-61-X-8. For Imperial, Inyo, Kern, Kings, Los Angeles, Mono, Orange, Riverside, San Bernardino, San Diego, San Luis Obispo, Santa Barbara, Tulare, and Ventura Counties– see determination C-61-X-5)
Wages and Employer Payments:
Classification
(Journeyperson)
Basic Hourly Rate
Health and
Welfared
Pensiona Vacation and
Holiday
Hours Total Hourly Rate
Daily Overtime Hourly Rate
(1 ½ X)
Saturday Overtime
Hourly Rate (1 ½ X)e
Sunday/ Holiday Overtime
Hourly Rate (1 ½ X)
Pole Restoration Journeyman
$36.95 $7.75 $2.50 $1.54 8.0 $49.85 $68.88 $68.88 $68.88
After 1 year $36.95 $7.75 $2.50 $2.25 8.0 $50.66 $69.59 $69.59 $69.59
After 3 years $36.95 $7.75 $2.50 $2.96 8.0 $51.27 $70.30 $70.30 $70.30
After 6 years $36.95 $7.75 $2.50 $3.68 8.0 $51.99 $71.02 $71.02 $71.02
Senior Technicianf $23.84 $7.75 $2.10 $1.00 8.0 $35.41 $47.68 $47.68 $47.68
After 1 year $23.84 $7.75 $2.10 $1.46 8.0 $35.87 $48.14 $48.14 $48.14
After 3 years $23.84 $7.75 $2.10 $1.92 8.0 $36.33 $48.60 $48.60 $48.60
Basic Hourly Rate
Health and
Welfared
Pensiona Vacation and
Holiday
Hours Total Hourly Rate
Daily Overtime Hourly Rate
(1 ½ X)
Saturday Overtime
Hourly Rate (1 ½ X)e
Sunday/ Holiday Overtime
Hourly Rate (1 ½ X)
After 6 years $23.84 $7.75 $2.10 $2.38 8.0 $36.79 $49.06 $49.06 $49.06
Pole Treatment Journeyman
$33.01 $7.75 $2.50 $1.39 8.0 $45.64 $62.64 $62.64 $62.64
After 1 year $32.05 $7.75 $2.50 $2.02 8.0 $46.27 $63.27 $63.27 $63.27
After 3 years $32.05 $7.75 $2.50 $2.66 8.0 $46.91 $63.91 $63.91 $63.91
After 6 years $32.05 $7.75 $2.50 $3.30 8.0 $47.55 $64.55 $64.55 $64.55
Pole Restoration and Treatmentf
Technician $21.50 $7.75 $1.60 $0.90 8.0 $32.40 $43.47 $43.47 $43.47
After 1 year $20.82 $7.75 $1.60 $1.31 8.0 $32.81 $43.88 $43.88 $43.88
After 3 years $20.82 $7.75 $1.60 $1.72 8.0 $33.22 $44.29 $44.29 $44.29
After 6 years $20.82 $7.75 $1.60 $2.14 8.0 $33.64 $44.71 $44.71 $44.71
Recognized holidays:
Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
Travel and/or subsistence payment:
In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm
# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations a In addition, an amount equal to 3% of the Basic Hourly Rate is added to the Total Hourly Rate and overtime hourly rates for the National Employees Benefit Board b This amount is factored at the applicable overtime rate.
c Includes $0.01 to LMCC; the remaining amount is factored at the applicable overtime rate.
d Includes an amount for Health Reimbursements Accounts.
e Saturdays may be scheduled as a make-up day at the regular straight time rate.
f The Ratio of Technicians to Journeymen may not exceed 4 to 1. However, if the Journeyman is assisted by a maximum of two Senior Technicians, three additional Technicians may be added per Senior Technician
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
Craft: Electrical Utility Lineman
Determination:
C-61-X-5-2023-1
Issue Date:
February 22, 2023
Expiration date of determination:
December 31, 2023* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director – Research Unit (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.
Localities:
All localities within Imperial, Inyo, Kern, Kings, Los Angeles, Mono, Orange, Riverside, San Bernardino, San Diego, San Luis Obispo, Santa Barbara, Tulare, and Ventura Counties.
Wages and Employer Payments:
Classification (Journeyperson)
Basic Hourly Rate
Health and
Welfared
Pension Vacation and
Holiday
Hours Total Hourly Rate
Daily Overtime
Hourly Rate (1 ½ X)
Saturday Overtime
Hourly Rate (1 ½ X)
Sunday/ Holiday
Overtime Hourly Rate
(1 ½ X) Pole Restoration Journeyman $34.74 $7.50 $2.00a $0.00 8.0 $45.28 $63.17 $63.17b $63.17 After 6 months $34.74 $7.50 $2.00a $1.77 8.0 $47.05 $64.94 $64.94b $64.94 After 3 years $34.74 $7.50 $2.00a $2.63 8.0 $47.91 $65.80 $65.80b $65.80 After 6 years $34.74 $7.50 $2.00a $3.10 8.0 $48.38 $66.27 $66.27b $66.27 After 10 years $34.74 $7.50 $2.00a $3.50 8.0 $48.78 $66.67 $66.67b $66.67 Senior Technician c $22.42 $7.50 $1.60a $0.00 8.0 $32.19 $43.74 $43.74b $43.74 After 6 months $22.42 $7.50 $1.60a $1.14 8.0 $33.33 $44.88 $44.88b $44.88 After 3 years $22.42 $7.50 $1.60a $1.70 8.0 $33.89 $45.43 $45.43b $45.43 After 6 years $22.42 $7.50 $1.60a $2.00 8.0 $34.19 $45.73 $45.73b $45.73 After 10 years $22.42 $7.50 $1.60a $2.26 8.0 $34.45 $45.99 $45.99b $45.99 Pole Treatment Journeyman $31.04 $7.50 $2.00a $0.00 8.0 $41.47 $57.46 $57.46b $57.46 After 6 months $31.04 $7.50 $2.00a $1.58 8.0 $43.05 $59.04 $59.04b $59.04 After 3 years $31.04 $7.50 $2.00a $2.35 8.0 $43.82 $59.81 $59.81b $59.81 After 6 years $31.04 $7.50 $2.00a $2.77 8.0 $44.24 $60.22 $60.22b $60.22 After 10 years $31.04 $7.50 $2.00a $3.13 8.0 $44.60 $60.58 $60.58b $60.58
Determination: C-61-X-5-2023-1
Basic Hourly Rate
Health and
Welfared
Pension Vacation and
Holiday
Hours Total Hourly Rate
Daily Overtime
Hourly Rate (1 ½ X)
Saturday Overtime
Hourly Rate (1 ½ X)
Sunday/ Holiday
Overtime Hourly Rate
(1 ½ X) Pole Restoration and Treatment c Technician (First 6 months)
$19.16
$7.50
$1.10a
$0.00
8.0
$28.33
$38.20
$38.20b
$38.20
Technician (After 6 months)
$0.98
$29.31
$39.17
$39.17b
$39.17
Technician (After 3 years)
$1.45
$29.78
$39.65
$39.65b
$39.65
Technician (After 6 years)
$1.71
$30.04
$39.90
$39.90b
$39.90
Technician (After 10 years)
$1.93
$30.26
$40.13
$40.13b
$40.13
Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
Travel and/or subsistence payment:
In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
a In addition, an amount equal to 3% of the Basic Hourly Rate is added to the Total Hourly Rate and overtime hourly rates for the National Employees Benefit Board.
b Saturdays may be scheduled as a make-up day at the regular straight time rate.
c The Ratio of Technicians to Journeymen may not exceed 4 to 1. However, if the Journeyman is assisted by a maximum of two Senior Technicians, three additional Technicians may be added per Senior Technician.
d Health and Welfare includes $0.50 for Health Reimbursement Account.
https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
Craft: Electrical Utility Lineman #
Determination:
C-61-X-8-2026-1
Issue Date:
February 22, 2026
Expiration date of determination:
January 31, 2027** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director – Research Unit for specific rates at
(415) 703-4774.
Localities:
All localities within Del Norte, Modoc and Siskiyou counties.
Wages and Employer Payments:
Classification (Journeyperson)
Basic Hourly Rate
Health and
Welfare
Pensiona Trainingb Otherc Hours Total Hourly Rate
Daily Overtime
Hourly Rate (2X)
Saturday Overtime
Hourly Rate (2X)
Sunday/ Holiday
Overtime Hourly Rate (2X)
Lineman, Heavy Line Equipment man, Certified Lineman Welder, Pole Sprayer
$70.75 $8.70 $18.12 $1.06
$0.19 8.0 $98.82 $172.930 $172.930 $172.930
Cable Splicer $79.24 $8.70 $18.38 $1.19 $0.21 8.0 $107.72 $190.730 $190.730 $190.730 Line Equipment Operator $60.85 $8.70 $14.63 $0.91 $0.16 8.0 $85.25 $148.990 $148.990 $148.990 Powderman $53.06 $8.60 $10.49 $0.80 $0.14 8.0 $73.09 $128.670 $128.670 $128.670 Groundman First 1040 Hours $28.30 $8.60 $9.75 $0.42 $0.08 8.0 $47.15 $76.790 $76.790 $76.790 Groundman 1041-2080 Hours $35.38 $8.60 $9.96 $0.53 $0.10 8.0 $54.57 $91.630 $91.630 $91.630 Groundman 2081+ Hours $42.45 $8.60 $10.17 $0.64 $0.12 8.0 $61.98 $106.450 $106.450 $106.450 Pole Sprayer Trainee First six months $60.63 $8.60 $10.72 $0.91 $0.16 8.0 $81.02 $144.530 $144.530 $144.530
Pole Sprayer Trainee Second six months $63.53 $8.60 $10.81 $0.95 $0.17 8.0 $84.06 $150.610 $150.610 $150.610
Pole Sprayer Trainee Third six months $65.66 $8.60 $10.87 $0.98 $0.17 8.0 $86.28 $155.050 $155.050 $155.050
Determination: C-61-X-8-2026-1
Recognized holidays:
Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
Travel and/or subsistence payment:
In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations a Includes an amount equal to 3% of the Basic Hourly Rate for the National Employees Benefit Board. This amount is factored at the applicable overtime rate. Pursuant to Labor Code Sections 1773.1 and 1773.8, the amount paid for this employer payment may vary resulting in a lower taxable basic hourly wage rate, but the total hourly rates for straight time and overtime may not be less than the general prevailing rate of per diem wages.
b This amount is factored at the applicable overtime rate.
c This amount is for the Administrative Maintenance Fund (AMF) and is factored at the applicable overtime rate.
https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm
CRAFT:
Electrical Utility Lineman
DETERMINATION:
C-61-X-8-2026-1
LOCALITIES:
All localities within Del Norte, Modoc, and Siskiyou counties.
This predetermined increase for the above named craft applies only to the current determination for work being performed on public works projects with bid advertisement dates on or after March 4, 2026, until this determination is superseded by a new determination or a predetermined increase modification notice becomes effective.
When referencing our prevailing wage determinations, please note that if the prevailing wage rate determination which was in effect on the bid advertisement date of a project, has a single asterisk (*) after the expiration date, the rate will be good for the life of the project. However, if a prevailing wage rate determination has double asterisks (**) after the expiration date, the rate must be updated on the following date to reflect the predetermined rate change(s).
ELECTRICAL UTILITY LINEMAN
Determination C-61-X-8-2026-1 is currently in effect and expires on January 31, 2027**.
LINEMAN, HEAVY LINE EQUIPMENT MAN, CERTIFIED LINEMAN WELDER, POLE
SPRAYER
Effective February 1, 2027, there will be an increase of $6.42 to be allocated as follows:
$4.60 to Basic Hourly Rate, $0.10 to Health and Welfare, $1.64 to Pension, $0.07 to Training, and $0.01 to Other.
Effective February 1, 2028, there will be an increase of $6.88 to be allocated as follows:
$4.90 to Basic Hourly Rate, $0.10 to Health and Welfare, $1.80 to Pension, $0.07 to…