FBO_Q_and_A_updated.docx

DOCX document 20 KB Posted

Attached to
Safety and Environment Management (SEM) Program Survey
Solicitation number
GS-11-P-17-NW-D-0002
Issued by

About this file

Q & A Document

View the file

Other files

File Type Posted
SEM_Line_Items.xlsx XLSX spreadsheet
Statement_of_Work_IAO-Radon-Water--FY-2015_Budget.docx DOCX document
Solicitation_Amendment_GS-11-P-17-NW-D-0002_0001_4-24-17.pdf PDF
P100_2016.pdf PDF
Child_Care_Center_designguidesmall.pdf PDF
GS-11-P-17-NW-D-0002_Generated_PDF_with_TOC.pdf PDF
Attachment_U_GSA527-15b.pdf PDF
Attachment_S_Safety_and_Health_Survey.pdf PDF
Attachment_M_OSH_Survey_Locations.pdf PDF
Attachment_L_Child_Devleopment_Center_Report.pdf PDF
Request_for_Proposals.pdf PDF
Attachment_C_2017_GSA_NCR_Facility_Owned_and_Leased.xlsx XLSX spreadsheet
Attachment_P_Checklist_Monthly_Fire_and_Safety_Inspection__Office.pdf PDF
Attachment_G_Injury_Illness_and_OSHA_Form.pdf PDF
Attachment_J_Abatement_Report_Example_and_Sample_Findings.pdf PDF
Attachment_Q_Environment_Survey.pdf PDF
Attachment_I_Prelease_Survey.pdf PDF
Attachment_N_Child_Development_Center_Locations.pdf PDF
Attachment_O_GSA_Playground_Inspection_Form.pdf PDF
Attachment_T_Wage_Determination.pdf PDF
Attachment_E__Minor_Survey_Finding_Report___Instructions_for_Use.pdf PDF
Attachment_D_Risk_Assessment_Methodology.pdf PDF
Attachment_R_Fire_Protection_Survey.pdf PDF
Attachment_H_GSA_Notice_of_Unsafe_Unhealthful_Working_Conditions.pdf PDF
Attachment_K_Sample_Complete_SEM_Report.pdf PDF
Attachment_F_Building_Profiles.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Question: Is the solicitation 8(a) competitive or open small business?

Answer: This is a competitive small business set-aside.

2. Question: Is there an 8(a) set aside?

Answer: This is a competitive small business set-aside.

3. Question: How many firms will be selected for award?

Answer: The Government anticipates awarding a Multiple Award IDIQ Contract to three (3) selected Offerors.

4. Question: Who are the incumbent companies?

Answer: The incumbent companies are listed in question 11.

5. Question: Will more information be released before the solicitation?

Answer: The questions and answers posted in this amendment is the last planned release of information for this solicitation.

6. Question: The level of effort for completing an SEM survey for a leased building and a federal building are not the same. The federal building requires completing the spreadsheets and the lease buildings do not. From experience, completing the spreadsheets take a lot more time than one would think. There would be a significant savings to GSA if GSA solicited different prices for completing SEM of federal buildings and leased buildings because the leased building could be completed with less expense. Otherwise, bidders will charge the same unit price for a federal building and a leased building, which is not advantageous to GSA.

Answer: Even though our Central Office only requires the consolidated risk survey spreadsheet to be completed for federal owned facilities we are anticipating that requirement will eventually be extended to leased facilities and we would like the vendor to complete the spreadsheet for both leased and federally owned facilities.

7. Question: Also, water samples have never been done as part of the occupational safety and health (OSH) survey because the surveys are limited in scope. Does GSA really want water samples taken as part of the OSH survey.

Answer: We will not require the vendor to take water samples for the OSH portion of the survey.

8. Question: Could you please let me know if the 8(a) designation for this Solicitation is the only group that can apply & secondly, if that is the case, will there be an additional solicitation for other groups to bid on performing the NCR’s SEM surveys?

Answer: Initially, the synopsis erroneously stated that this would be a competitive 8(a) set aside. The synopsis was amended to state that this is a competitive small business set aside.

9. Question: Would you please define “Child Development Surveys” and provide the requirements of this particular type of survey.

Answer: I have attached the SOW for 2016 Child Care Development Center Surveys

10. Question: The above referenced solicitation indicates that pricing is to be prepared on the attachment to the SF 1449 for line items however, it does not appear that either SF 1449 or the attachment to SF 1449 is included in the solicitation package. Could you please provide the location for the form SF 1449 and its attachments to be used to provide pricing?

Answer: The 1449 was attached in an amendment to the solicitation. The line items are attached to this amendment.

11. Question: I was wondering if the below listed contracts are incumbent contracts for this effort. If yes, have they been extended and would you be able to provide current expiration date of the contracts or did they expire in September 2016? If not, is there an incumbent contract for this requirement?

Aerosol Monitoring & Analysis, Inc.; Contract #GS-11P-11-YA-C-0019AERO Atrium Environmental Health & Safety Services, Inc.; Contract #GS-11P-11-YA-C-0019ATR HCC & Associates, Inc.; Contract #GS-11P-11-YA-C-0019HCC Neilson Associates, Inc.; Contract #GS-11P-11-YA-C-0019NEIL Inspection Experts, Inc.; Contract #GS-11P-11-YA-C-0019IET Answer: Yes, those are the incumbent contracts. Currently, our office has task orders that expire June 30, 2017.

12. Question: Attachments A & B are not posted on the FBO website. They contain the SF1449 and Pricing Schedule. When will they be available?

Answer: The solicitation has been amended to include the 1449. A document containing the line items is attached to this amendment.

13. Question: On RFP Page 103, E, Factor 2 - Building Assessment Experience, #2 states that “The offeror’s will be evaluated on the quality of the survey documentation. The offer shall submit copies of past survey reports and experiences is uploading those reports into various database.” .To evaluate survey report quality, should offerors submit 1 example survey report for each Project provided in Technical/ Factor 2, or will one report demonstrating our overall approach be sufficient? In addition, will GSA accept reports that have been redacted to protect client information?

Answer: GSA is looking for 3 reports that were completed in the last 5 years that show experience with conducting Safety and occupational health, environment and fire protection surveys. Protection of client information is very important and GSA will accept reports with sensitive information removed or blacked out.

14. Queston: CLIN 0014 - Description notes "facilities with estimated 2,260,000 sq foot space to be surveyed." Did the Government mean to say, "facilities with estimated 50,001 - 150,000 sq foot of space to be surveyed during the pre-lease portion of the survey. 2,260,000 is the estimated areas..."

Answer: The figure 2,260,000 is the total square footage of facilities that fall with in the 50,001 - 150,000 sq foot area.

15. Question: The Government has not provided a CLIN for OSH Program Review scope area. Could the Government provide clarification on how this service will be procure?

Answer: Attached is the SOW for the last OSH Survey task order that we did.

16. Question: Can the Government specify whether any of the water samples have specific turn-around times less than 5 days?

Answer: GSA would not require water sample results less than 5 days.

17. Question: CLIN 0020 - Could the Government explain the type of analysis required by the direct reading instrumentation category 1? Our pricing may vary based on the type of analysis, length of sampling, sensitivity, medium, etc.

Answer: Direct read instrumentation for collecting near instantaneous results. Instrumentation such as TSI Q-Trak (or similar equipment) for atmospheric monitoring and Rae systems PID (or similar equipment) for VOC screening

18. Question: For the Technical Volume, Factor 1 (Past Performance), the Government has requested references for 4 projects. In Factor 2, the number of projects required is a minimum of 3. Can GSA please clarify whether the Government expects a different number of projects to be represented in each section?

Answer: GSA will accept 3 references.

19. Question: Line items 0009, 1009, 2009, 3009 and 4009 states “Water samples for the SEM portion of the survey …” however, what the water samples are to be analyzed for is not stated. Could you please detail what contaminants are to be analyzed for these five line items?

Answer: Water samples for SEM surveys will be tested for lead.

20. Question: Alpha Track Radon test kits are for radon in air longer term testing however, items 0017, 1017, 2017, 3017 and 4017 calls for using Alpha Track samples for Child Development Center surveys and that water samples analyzed for radon content are to be performed. Is GSA asking for longer term Alpha Track radon sampling and radon in water sampling which are two different types of sampling? If this is the case, could you please state how many samples of each type of radon sampling is to be priced?

Answer: Water samples for Radon and long term samples are not required by our policies. Just air samples for radon will be required.

21. Question: Line items 0020, 1020, 2020, 3020 and 4020 state “Direct Reading Instrumentation Category 1 (with recorder less than $4,000). Section III, Scope of Work, paragraph L describes that the contractor shall furnish direct reading instrumentation for temperature, relative humidity, air flow, CO2, CO, and TVOC’s. Are these tests for temperature, relative humidity, air flow, CO2, CO and TVOCs considered all of the Category 1 requirements for the direct reading instrumentation and if not, what are all of the required tests in Category 1?

Answer: Yes that is considered category 1.

22. Question: Line items 0020, 1020, 2020, 3020 and 4020 state “Direct Reading Instrumentation Category 1 (with recorder less than $4,000). Is a physical tape from the direct reading instrumentation recorder to be supplied in the report for all of the Child Development Center surveys? Is a physical tape from the direct reading instrumentation recorder to be supplied in any of the other reports – OSH, Pre‐Lease, SEM, etc.?

Answer: Field logs/notes for direct read sampling is sufficient for all surveys.

23. Question: Section C, III Scope of Work, paragraph E, 1, a indicates that the GSA's Child Development Center Design Guide, PBS‐P100 (March 2003) can be found at http://www.gsa.gov/gsa/cm_attachments/GSA_DOCUMENT/de sign_guide_R2FD38_0Z5RDZ‐134K‐pR.pdf however, this link address produces an error and the design guide is not able to be obtained. Please supply a copy of this design guide or a working URL where the design guide can be obtained.

Answer: The current copies of PBS-P100 (2016 version) and child development design guide are attached.

24. Question: Will a No Show Cost Recovery (per occurrence) line item cost be provided to contractors for reimbursement on surveys for which written survey appointments were secured but building management and or agency personnel are not able to provide required survey access and support at the agreed upon survey date/time?

Answer: Yes when I make the task order, I will add a line item for each facility for No Show Cost.

25. Question: There are no instructions for proposal format other than the number of volumes. Is there a particular style, size, page limitations?

Answer: Any format that adheres to the requirement listed in the RFP is acceptable.

26. Question: Please confirm as to whether the proposal should be delivered by hard copy, email or both. Question is based on the following: Each offeror must deliver proposals by e-mail to william.fawcett@gsa.gov. In contrast, it further states to Enter original signatures on all documents to be signed. Be sure that all information is correct and accurate. Protruding tabs should be used to separate each section/form.

Answer: Please submit your proposals electronically to william.fawcett@gsa.gov. Hard copies are not required.

27. Question: Is it correct to say that submission of the Past Performance includes only the name of the Reference POC and their contact information, Title of Project, scope and complexity? Is additional information required for this section? Any particular format?

Answer: Any format that adheres to the requirement listed in the RFP is acceptable. The contractor shall provide Past Performance References/Examples for four [4] projects performed within the last [4] years by the business unit that will perform this effort. These four projects [4] must be similar in size, scope and complexity to the requirements identified in the statement of work. The contractor should ensure that all of the points of contact are aware that they will be contacted. In addition to references, the Government will review data available in the Contractor Performance Assessment Reporting System (CPARS). In the case of a contractor without a record of relevant past performance, the contractor will be evaluated neither favorably nor unfavorably on past performance.

28. Question: Please confirm that a technical response for the task areas in addition to Factor 1,2 and 3 should be addressed in the technical proposal?

Answer: Yes, confirmed factor 1, 2 and 3 should be addressed.

29. Question: Which labor categories are considered key?

Answer: Not sure of the answer here.

30. Question: Will a company be in compliant when providing all past performances and experiences including verifying information, but information has not been entered in CPARS? Can the experience of a subcontractor be used? If so will their CPARS be checked and evaluated as well?

Answer: They must provide all past performances and experience, GSA will not check CPARS. Subcontractor experience counts.

31. Question: Will the government accept Representation and Certification from SAM’s rather than completing the section in the proposal?

Answer: The proposal section must be completed.