G Squared Design Addendum Drawings.pdf
PDF 5 MB Posted
- Attached to
- OAAA, 2010, 082525 JFHQ CONTROLLED AREA REMODEL
- Solicitation number
- IFB1 OAAA 2027000001 3
- Issued by
- Arapahoe County, Colorado
About this file
This is a set of architectural addendum drawings for a secure area renovation project at the National Guard facility located at 6848 South Revere Parkway, Centennial, Colorado 80112. The project, designated as OAAA 2010 082525 JFHQ Controlled Area Remodel, involves a Level 2 alteration of approximately 1,110 square feet on Level 2 of the existing 43,908-square-foot building. The work includes reconfiguration of office spaces (rooms 3-238, 3-240, 3-241, 3-246, 3-245), a conference room (3-239), a man trap vestibule (3-238A), and associated corridors and stairwell areas. The project scope encompasses demolition of existing partitions, doors, and finishes; installation of new gypsum board partitions with specialized vapor barrier and aluminum sheathing for electromagnetic security requirements; new flooring, wall finishes, and ceiling systems; updated mechanical, electrical, and plumbing systems; and installation of security equipment including card readers, fire alarm systems, and communication devices. The architectural team includes OZ Architecture (architect), MartinMartin (structural and mechanical engineering), RMH Group (consulting architect and electrical engineering), and G Squared Design (contractor). The drawings were issued for permit on June 25, 2026, with the addendum dated July 22, 2026.
The project must comply with the 2021 International Building Code and related codes as adopted by Centennial, Colorado, and enforced by South Metro Fire Rescue. The controlled security area requires specialized construction with continuous vapor barrier systems, AL40 aluminum sheathing, and grounding systems to achieve STC-50 acoustic ratings and electromagnetic shielding requirements. All penetrations through fire-rated and security boundaries must be sealed and labeled, with mechanical coordination required among all trades. The contractor is responsible for maintaining existing structural and fire protection integrity, coordinating all work with the National Guard owner and design team, and ensuring no disruption to adjacent occupied areas during construction. The project maintains existing occupancy classifications and egress paths, with no changes to building square footage or occupancy loads. Deferred submittals include fire alarm design to meet NFPA 72 standards, which requires separate application to South Metro Fire Rescue.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION PLAN
6848 SOUTH REVERE PARKWAY
E ARAPAHOE RD
H
IG
H W
A Y
S
JO
R D
A N
R D
S P
O
TO
M A
C S
T
S H
A V
A N
A S
T
AIRPORT
P A
R K
ER
R
D
PROJECT DIRECTORY
ARCHITECT:
OZ ARCHITECTURE
M/P ENGINEERING:
OWNER/CLIENT:
STRUCTURAL ENGINEERING:
3003 LARIMER ST
DEVNVER, CO 80205
(303) 861-5704
CONTACT: JOE LEVI
EMAIL: JLEVI@OZARCH.COM
NATIONAL GUARD
6868 S REVERE PKWY,
CENTENNIAL, CO 80112
PHONE # (720) 584-3682
CONTACT: DUSTIN JONES
EMAIL: DUSTIN.D.JONES12.NFG@ARMY.MIL
12499 W COLFAX AVE,
LAKEWOOD, CO 80215
PHONE #: (303) 431-6100
CONTACT: MIKE GOLDSTEIN
EMAIL:
MGOLDSTEIN@MARTINMARTIN.COM
MARTINMARTIN
12600 WEST COLFAX AVENUE, SUITE A-400
LAKEWOOD, COLORADO 80215
PHONE #303.239.0909
CONTACT: PENNY JORDAN
EMAIL: PJORDAN@RMHGROUP.COM
RMH GROUP
G SQUARED DESIGN
10920 W ALAMEDA AVE #100
LAKEWOOD, CO 80026
(720) 502-4156
CONTACT: JESTIN GIECK
EMAIL: JG@G-2-DESIGN.COM
CONSULTING ARCHITECT:
ELEC ENGINEERING:
12600 WEST COLFAX AVENUE, SUITE A-400
LAKEWOOD, COLORADO 80215
PHONE #303.239.0909
CONTACT: JEREMY WHITLEY
EMAIL: JWHITLEY@RMHGROUP.COM
RMH GROUP
CHECKED BY:
DESIGNED BY:
DRAWN BY:
PROJECT #:
DATE:
10920 W. ALAMEDA AVE, SUITE 100
LAKEWOOD, COLORADO 80226
720.502.4156
TH
E O
R
IG
IN
A
L O
F T
H
IS
D R
A W
IN
G
I S
X
I F T
H
IS
C O
P Y
I S
A N
Y O
TH
E R
S
IZ
E
IT
H A
S B
E E N
R E D
U C
E D
O R
E N
LA
R
G E D
History Date
OZ ARCHITECTURE, INC
:3
:4
P M
G-000
COVER SHEET
S
O U
T H
R E V
E R E P
A R K W
A Y C
E N
T E N
N
IA
L C
O
N A
T
IO
N A
L G
U A
R D
JG
RP,JG
RP
2026.060
07.22.26
NATIONAL GUARD
SECURE AREA RENOVATION
6848 SOUTH REVERE PARKWAY, CENTENNIAL, CO 80112
S E C
U R
E A
R E A
R E N
O V
A T
IO
N
SHEET LIST
GENERAL
G-000 COVER SHEET
G-010 GENERAL NOTES
G-101 LIFE SAFETY DIAGRAM - LEVEL 1
ARCHITECTURAL
AD-101 DEMOLITION FLOOR PLAN - LEVEL 2
AD-111 DEMOLITION RCP
A-101 FLOOR PLANS - LEVEL 2
A-102 FINISH PLAN - LEVEL 2
A-110 REFLECTED CEILING PLAN
A-161 SECURITY PLAN
A-300 SECTIONS/ELEVATIONS
A-590 VAPOR BARRIER DETAILS
A-591 VAPOR BARRIER PENETRATION DETAILS
A-620 PARTITION TYPES
A-630 PARTITION TYPE SHEET J
A-631 PARTITION TYPE SHEET K
A-801 SCHEDULES AND TYPES - DOORS
MECHANICAL
M-001 MECHANICAL LEGEND
MD-102 HVAC AND PIPING DEMOLITION PLAN LEVEL 2
M-102 HVAC AND PIPING PLAN LEVEL 2Unnamed
M-601 MECHANICAL SCHEDULES AND DETAILS
ELECTRICAL
E-001 ELECTRICAL LEGEND
ED-102 ELECTRICAL DEMOLITION PLAN LEVEL 2
ED-112 LIGHTING DEMOLITION PLAN LEVEL 2
E-102 ELECTRICAL PLAN LEVEL 2
E-112 LIGHTING PLAN LEVEL 2
E-601 ELECTRICAL ONE-LINE DIAGRAM
E-602 ELECTRICAL DETAILS/SCHEDULES
ISSUED FOR PERMIT 06/25/2026
FIRE ALARM IS TO BE A DELEGATED
DESIGN TO MEET NFPA 72
DEFERRED SUBMITTALS
FIRE ALARM
LICENSED ARCHITEC
T
ST
AT
E OF COLORADO
00402915JE
ST
IN
DAVID GIECK
07/22/2026
1. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS,
THE CONTRACTOR SHALL BE RESPONSIBLE FOR SEEKING CLARIFICATION/RESOLUTION
WITH THE DESIGN INTENT FROM THE ARCHITECT
2. REVIEW THE ARCHITECTURAL DRAWINGS BEFORE THE INSTALLATION OF SYSTEMS
SHOWN IN CONSULTING DRAWINGS
3. ENGINEERS' DOCUMENTS. DISCREPANCIES BETWEEN THE ARCHITECTURAL AND
ENGINEERING DOCUMENTS SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION FOR
DIRECTION.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ALL WORK FOUND TO BE
INSTALLED IN CONFLICT WITH THE CONSTRUCTION DOCUMENTS AT NO ADDITIONAL
EXPENSE TO THE OWNER.
5. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT UPON FINDING ANY
CONFLICTS IN THE DRAWINGS AND SPECIFICATIONS.
6. DO NOT SCALE DRAWINGS. LARGE SCALE DETAILS SHALL GOVERN OVER SMALL-SCALE
DETAILS. WHEN CONFLICT OCCURS BETWEEN DRAWINGS AND SPECS, THAT WHICH
IMPLIES GREATER QUANTITY & QUALITY SHALL PREVAIL.
7. WRITTEN DIMENSIONS ALWAYS TAKE PRECEDENCE OVER-SCALED DRAWINGS. NOTIFY
THE DESIGN TEAM OF ANY DISCREPANCIES.
8. CONTRACTOR TO ISSUE A COMPLETE SET OF CONTRACT DOCUMENTS TO EACH OF THE
SUB-CONTRACTORS FOR COORDINATION OF THEIR WORK AND DESCRIPTION OF THE
SCOPE
9. NO WORK DEFICIENT OR DEFECTIVE IN QUALITY IN ANY OF THE REQUIREMENTS OF THE
CONTRACT DOCUMENT WILL BE ACCEPTABLE DESPITE THE ARCHITECT'S FAILURE TO
DISCOVER OR POINT OUT DEFECTS OR DEFICIENCIES DURING CONSTRUCTION.
DEFECTIVE WORK REVEALED WITHIN THE TIME REQUIRED BY GUARANTEES OR
WARRANTIES SHALL BE REPLACED BY WORK CONFORMING WITH THE INTENT OF THE
CONTRACT. NO PAYMENT, EITHER PARTIAL OR FINAL, SHALL BE CONSTRUED AS
ACCEPTANCE OF DEFECTIVE WORK OR IMPROPER MATERIALS
10. IT IS INTENDED THAT THE CONTRACTOR PROVIDE A COMPLETE JOB, AND ANY
OMISSIONS IN THESE NOTES OR THE OUTLINE OF WORK SHALL NOT BE CONSTRUED AS
RELIEVING THE CONTRACTOR OF SUCH RESPONSIBILITIES
11. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING CONTRACT DOCUMENTS, FIELD
CONDITIONS, AND DIMENSIONS FOR ACCURACY AND CONFIRMING THAT THE WORK IS
BUILDABLE AS SHOWN BEFORE PROCEEDING WITH CONSTRUCTION. IF THERE ARE ANY
QUESTIONS REGARDING THESE OR OTHER COORDINATION ISSUES, THE CONTRACTOR
SHALL SUBMIT THEM, IN WRITING, TO THE ARCHITECT AND IS RESPONSIBLE FOR
OBTAINING A WRITTEN CLARIFICATION FROM THE ARCHITECT BEFORE PROCEEDING
WITH THE WORK IN QUESTION OR RELATED WORK.
1. ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS SHOW WHERE DUCTWORK IS TO BE INSTALLED AT A SPECIFIC ELEVATION IN A CONTROLLED PATTERN. THE CONTRACTOR MUST RELY ON ALL OF THESE DISCIPLINES TO COMPLETE THE WORK AND SHOULD NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. THE CONTRACTOR SHALL COORDINATE THE LAYOUT, CLEARANCES, AND LOCATION OF HEAD HEIGHTS WITH THE STRUCTURE, MECHANICAL DUCTWORK, ELECTRICAL LIGHTING, DRAINAGE PIPING, AND THE ARCHITECTURAL REFLECTED CEILING PLANS.
2. THE CONTRACTOR SHALL PROVIDE AND COORDINATE THE EXACT DIMENSIONS, SIZES, AND POSITIONS OF ALL OPENINGS IN ANY FLOOR, ROOF, OR WALL CONSTRUCTION NECESSARY FOR THE INSTALLATION OF THE WORK, INCLUDING CONFIRMING THE LOCATION OF ALL SUCH OPENINGS BEFORE BEGINNING THE WORK.
3. THE ARCHITECTURAL AND STRUCTURAL DRAWINGS DESCRIBE VARIOUS FLOOR SLAB SLOPE REQUIREMENTS, RECESSES, AND EDGE CONDITIONS. THEREFORE, USE BOTH SETS OF DRAWINGS WHEN INSTALLING THE FLOOR
SLAB.
4. ALL VERTICAL AND HORIZONTAL DUCTS, PIPES, CONDUIT, ETC. IN FINISHED ROOMS SHALL BE FURRED-IN OR ENCLOSED WITH MATCHING WALL CONSTRUCTION AND FINISHED TO MATCH ADJACENT FINISHED SURFACES AND ANY REQUIRED WALL OR CEILING RATING. IN ADDITION, ALL VERTICAL SHAFT ENCLOSURES NOT CONTIGUOUS TO THE LOWEST FLOOR SLAB AND TERMINATE ABOVE THE CEILING SHALL BE CLOSED AT THE BOTTOM BY A FIRE- RATED HORIZONTAL SHAFT CONSTRUCTION WITH MATCHES THE FIRE-RATING OF THE SHAFT ASSEMBLY.
5. COORDINATE SCHEDULING PROVISIONS FOR INSTALLATION AND LOCATIONS OF ITEMS FURNISHED BY THE OWNER OR OTHERS. FACILITATE WORK WITH ALL TRADES ON THE PROJECT NOT UNDER CONTRACT TO THE CONTRACTOR (I.E., TELEPHONE, COMPUTER, ETC.). ANY CHANGES OR DELAYS ARISING FROM CONFLICTS BETWEEN SUCH TRADES AND THE CONTRACTOR SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR WITH THE RESOLUTION OF
THOSE CONFLICTS AT NO ADDITIONAL COST TO THE OWNER
6. ALL ATTACHMENTS TO AND PENETRATIONS THROUGH CONCRETE NOTED ON THE DRAWINGS TO BE
WATERPROOFED SHALL BE MADE BEFORE THE APPLICATION OF THE WATERPROOFING MATERIAL.
7. ALL OPERATING MECHANISMS IN PIPING AND DUCTWORK SHALL BE INSTALLED AT LOCATIONS THAT PROVIDE SAFE, DIRECT, AND EASY ACCESS FOR MAINTENANCE. ACCESS DOORS SHALL BE PROVIDED AT ALL WALLS AND CEILINGS
WHERE ACCESS TO SUCH MECHANISMS IS NOT OTHERWISE READILY AVAILABLE.
8. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS AND COORDINATE AND COMPLY WITH ALL REQUIREMENTS INDICATED ON THE PROJECT DOCUMENTS BEFORE PROCEEDING WITH THE WORK AND SHALL PROVIDE ALL WORK
NECESSARY TO INSTALL COMPLETE AND FULLY OPERATIONAL SYSTEMS AND COMPONENTS.
9. THE CONTRACTOR SHALL WORK WITHIN THE BOUNDARIES INDICATED IN THE PROJECT DOCUMENTS AND COMPLY WITH ALL APPLICABLE BUILDING CODES, REGULATIONS, AND ORDINANCE REQUIREMENTS. OCCUPANTS ADJACENT TO THE PROJECT AREA BOUNDARIES SHALL CONTINUE UNINTERRUPTED OCCUPANCY DURING THE CONSTRUCTION
PROJECT.
10. THE CONTRACTOR SHALL NOT INTERRUPT EXISTING UTILITIES SERVING EXISTING FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY THE OWNER AND ALL AUTHORITIES HAVING JURISDICTION AND SHALL PROVIDE TEMPORARY SERVICES DURING CONSTRUCTION ACCEPTABLE TO THE OWNER AND AUTHORITIES HAVING
JURISDICTION.
11. VERIFY IN THE FIELD THAT NO CONFLICTS EXIST, WHICH WOULD PROHIBIT THE LOCATION OF ANY AND ALL
MECHANICAL, ELECTRICAL, TELEPHONE, LIGHTING, PLUMBING, AND SPRINKLER EQUIPMENT, INCLUDING ALL REQUIRED PIPING, DUCTWORK, AND CONDUIT. CONFIRM THAT ALL REQUIRED CLEARANCES FOR INSTALLATION AND
MAINTENANCE OF THE ABOVE EQUIPMENT ARE PROVIDED.
12. ALL FLAG NOTES ARE SPECIFIC TO EACH DRAWING SHEET
13. ALL WORK SHALL BE PERFORMED BY THE GENERAL CONTRACTOR U.N.O. ALL REFERENCES TO THE "CONTRACTOR." INCLUDE THE GENERAL CONTRACTOR AND THE SUB-CONTRACTORS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE AND HAVE CONTROL OVER ALL CONSTRUCTION MEANS, TECHNIQUES, SEQUENCES, AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK REQUIRED BY THE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACTS AND OMISSIONS OF THE CONTRACTOR'S EMPLOYEES, SUB- CONTRACTORS AND THEIR AGENTS AND EMPLOYEES, AND ANY OTHER PERSONS PERFORMING ANY OF THE WORK
UNDER A CONTRACT WITH THE CONTRACTOR.
14. THOROUGHLY CLEAN ALL SURFACES OF DUST, DEBRIS, LOOSE CONSTRUCTION MATERIAL, AND EQUIPMENT 24 HOURS BEFORE OCCUPANCY OF ANY PHASE. VACUUM OR MOP AS APPROPRIATE ON ALL FLOORS, CLEAN
WINDOWS, AND GLAZING.
15. THE CONTRACT DOCUMENTS INTEND TO ALLOW FOR THE PERFORMANCE OF THE WORK. EVERY ITEM NECESSARILY
REQUIRED MAY NOT BE SPECIFICALLY MENTIONED OR SHOWN. UNLESS EXPRESSLY STATED, ALL SYSTEMS AND EQUIPMENT SHALL BE COMPLETELY AND APPROPRIATELY OPERABLE. PROVIDE ALL SPECIFIED AND APPROPRIATE ITEMS, ALL INCIDENTAL, ACCESSORY, AND OTHER ITEMS NOT SPECIFIED BUT REQUIRED FOR COMPLETE AND
FINISHED ASSEMBLY.
16. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY AND THE SUBCONTRACTORS TO REVIEW ALL DRAWINGS, PROJECT MANUAL, ADDENDA, ETC. TO ENSURE THE COORDINATION OF ALL WORK AFFECTING EACH TRADE.
FAILURE TO REVIEW AND COORDINATE ALL CONTRACT DOCUMENTS BY THE GENERAL CONTRACTOR WITH ALL THE SUBCONTRACTORS FOR APPLICABLE ITEMS SHALL NOT RELIEVE THE RESPONSIBLE PARTY FROM PERFORMING ALL
WORK SO REQUIRED AS PART OF THE CONTRACT.
17. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL OF THE SCOPE OF WORK, AFFECTING BOTH EXISTING CONDITIONS AND NEW WORK. NO CHANGE REQUESTS WILL BE CONSIDERED FOR ANY WORK THAT THE GENERAL THE CONTRACTOR SHOULD HAVE BECOME FAMILIAR WITH DURING THE SITE VISIT, FIELD REVIEW, AND SURVEY.
18. PROVIDE FOR THE PROPER SEQUENCE OF CONSTRUCTION, LOCATION, AND SIZE OF OPENINGS. COORDINATE ALL CONSTRUCTION AS INDICATED BY THE CONTRACT DOCUMENTS, INCLUDING SHOP DRAWINGS REVIEWED BY THE
ARCHITECT.
19. PROVIDE HORIZONTAL CONCEALED SOLID WOOD BLOCKING FOR ATTACHMENT OF CABINETS AND EQUIPMENT IN ALL NEW WALLS. INTERIOR K.D H.M. FRAMES IN LIGHT GAUGE WALLS TO HAVE WOOD BUCKS AS PART OF
ASSEMBLY.
20. ELECTRICAL PANELS IN THE CORRIDORS SHALL BE PAINTED TO MATCH THE ADJACENT WALL FINISH. IN ADDITION, ALL EXPOSED STEEL, IRONWORK, METAL PIPES, AND PRIMED METAL SURFACES OF MECHANICAL AND ELECTRICAL EXPOSED TO VIEW IN OCCUPIED, EGRESS STAIR, AND CIRCULATION SPACES SHALL BE PAINTED. THE PAINTING SUBCONTRACTOR SHALL PROVIDE A FIELD MOCK-UP OF PAINTED WALL(S) OF THE BASE AND ACCENT PAINT
COLORS FOR REVIEW AND APPROVAL BY THE OWNER AND ARCHITECT.
1. THE CONTRACTOR IS THE PERSON OR ENTITY IDENTIFIED AS SUCH IN THE OWNER/CONTRACTOR AGREEMENT, AND THIS MEANS THE GENERAL CONTRACTOR OR AT-RISK CONSTRUCTION MANAGER, HIS AUTHORIZED
REPRESENTATIVE, AND HIS COLLECTIVE SUB-CONTRACTORS.
2. THE TERM "ALIGN" REFERS TO LOCATING DIFFERENT COMPONENTS OF CONSTRUCTION TO PROVIDE A FLUSH, STRAIGHT, TRUE, AND PLUMB RELATION TO ADJACENT MATERIALS.
3. THE TERM "AS REQUIRED" REFERS TO COMPONENTS THAT MAY BE REQUIRED TO COMPLETE THE NOTED SYSTEM
AS INDICATED IN THE PROJECT DOCUMENTS.
4. THE TERM "HOLD" SHALL BE APPLIED TO DIMENSIONS CONSIDERED AS ABSOLUTE AND USED FOR LAYOUT AND
CONTROL UNLESS OTHERWISE DIRECTED BY THE ARCHITECT.
5. WHERE WORK OR EQUIPMENT IS INDICATED AS "N.I.C." (NOT IN CONTRACT), SUCH WORK AND EQUIPMENT SHALL BE PROVIDED BY OTHERS. THE CONTRACTOR SHALL COORDINATE AND COOPERATE TO ACCOMMODATE SUCH
INSTALLATION.
6. THE TERM "SIMILAR" REFERS TO COMPARABLE CHARACTERISTICS FOR THE ELEVATION, DETAIL NOTED, OR
SPECIFIC CONDITIONS SUCH THAT A COMPLETE SYSTEM AND COMPONENT SHALL BE PROVIDED.
7. THE TERM "TYPICAL" REFERS TO COMPARABLE CONDITIONS TO WHICH THE DETAIL, ELEVATION, NOTE, OR REQUIREMENT SHALL APPLY, WHETHER GRAPHICALLY REPRESENTED OR NOT, WHEN A DETAIL OR NOTE IS IDENTIFIED AS MIRRORED OR SHOWN IN THE OPPOSITE HAND, AND WHETHER OR NOT THE REFERENCE IS
REPEATED IN OTHER INSTANCES.
8. THE TERM "VERIFY" REFERS TO A CONDITION THAT MUST BE CONFIRMED BEFORE PROCEEDING WITH THE
ORDERING MATERIAL OR THE FABRICATION AND INSTALLATION OF A COMPONENT.
9. ABBREVIATIONS THROUGHOUT THE DOCUMENTS COMPLY WITH THE DOCUMENT ABBREVIATION LIST OR ARE
THOSE IN COMMON USE. THE ARCHITECT WILL DEFINE THE INTENT OF ANY IN QUESTION.
10. WHERE THE TERM "OR EQUAL" IS USED, THE ARCHITECT ALONE SHALL DETERMINE EQUALITY BASED UPON INFORMATION SUBMITTED BY THE CONTRACTOR. SUBSTITUTION REQUESTS WILL ONLY BE CONSIDERED DURING
THE TIME FRAME ALLOWED BY SPECIFICATIONS DIVISION 1.
1. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC
ENGINEERING DISCIPLINES (SUCH AS CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL,
ETC), ARE COMPLEMENTARY AND ARE INTENDED TO BE USED TOGETHER; ITEMS
REFERENCED IN EITHER THE DRAWINGS OR SPECIFICATIONS SHALL BE AS IF SHOWN IN
BOTH DRAWINGS AND SPECIFICATIONS. WHERE THE INTENT CAN NOT BE REASONABLY
INFERRED FROM THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR SHALL SEEK
CLARIFICATION OR INTERPRETATION FROM THE ARCHITECT.
2. ALL DRAWINGS, NOTES, SYMBOLS, ETC. WITHIN THE CONSTRUCTION DOCUMENTS ARE
INTENDED TO CONVEY THE DESIGN INTENT. THEY ARE NOT INTENDED TO BE
EXHAUSTIVE IN SCOPE OR COMPREHENSIVE IN DETAIL, NOR ARE THEY MEANT TO BE
ALL-INCLUSIVE OF THE MATERIALS/LABOR TO PRODUCE THE JOB AS INTENDED.
3. NO DRAWING, NOTE, SYMBOL, ETC. SHALL SUPERSEDE ANOTHER.
4. THE DRAWING SET INDEX INDICATES A COMPLETE LIST OF SHEETS CONTAINED IN THE
DRAWING SET, INDEXED BY DISCIPLINE, SHEET NUMBER, AND SHEET TITLE, IN
SEQUENTIAL ORDER. NOTE: ALL SEQUENTIAL SHEET NUMBERS MAY NOT BE USED IN
THE DRAWING SET.
5. DISCIPLINE IDENTIFICATION IS IN THE ORDER BOUND IN THE DRAWING SET. REFER TO
THE DRAWING SET INDEX LISTED BELOW FOR DISCIPLINES CONTAINED IN THIS
DRAWING SET
6. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR THE
CONVENIENCE OF THE ARCHITECT AND CONTRACTOR. SUCH SEPARATIONS IN NO WAY
DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND
SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO
WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE,
INTEGRATED, AND UNIFIED WHOLE
7. ALL CONTRACT DOCUMENTS ARE COMPLEMENTARY, AND WHAT IS CALLED FOR BY ONE
WILL BE AS BINDING AS IF CALLED FOR BY ALL
G – GENERAL INFORMATION
A – ARCHITECTURAL
S – STRUCTURAL
M – MECHANICAL
P – PLUMBING
FP – FIRE PROTECTION
E – ELECTRICAL
T – TECHNOLOGY/LOW VOLTAGE
1. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT CONFIGURATIONS OR DETAILS OF SPECIFIC MANUFACTURERS, TYPICALLY THE FIRST MANUFACTURER LISTED UNDER “ACCEPTABLE MANUFACTURERS” IN THE SPECIFICATIONS. THE SIZES, LOCATIONS FOR MOUNTING AND ATTACHMENTS, AND LOCATIONS OF UTILITY CONNECTIONS FOR EACH ITEM OF EQUIPMENT SHOWN ON THE DRAWINGS ARE FOR ILLUSTRATION PURPOSES
ONLY.
2. DIMENSIONS AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE INCORPORATED INTO THE WORK. ALSO, THE SIZES, LOCATIONS FOR MOUNTING AND ATTACHMENTS, AND LOCATIONS OF UTILITY CONNECTIONS CAN VARY FROM ONE MANUFACTURER TO ANOTHER AND ARE DEPENDENT ON THE EXACT MANUFACTURER’S MODEL FURNISHED. SO, THE CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK, INCLUDING PARTITION THICKNESSES FOR RECESSED OR
SEMI-RECESSED PRODUCTS. ADDITIONALLY, THE CONTRACTOR IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS, PRODUCTS OR ASSEMBLIES THAT ARE NECESSARY BECAUSE OF
THESE DIFFERENCES.
3. THE SIZES, LOCATION FOR MOUNTINGS AND ATTACHMENTS, AND LOCATIONS OF UTILITY CONNECTIONS FOR EACH ITEM OF EQUIPMENT SHOWN IN THE DRAWINGS ARE FOR ILLUSTRATION ONLY. ALL CAN VARY FROM ONE MANUFACTURER TO ANOTHER AND ARE DEPENDENT ON THE EXACT MANUFACTURER’S MODEL FURNISHED. THE CONTRACTOR SHALL PROVIDE AND COORDINATE EXACT DIMENSIONS RELATING TO THE SIZE OF EACH PIECE OF EQUIPMENT, THE LOCATIONS OF ALL MOUNTINGS AND ATTACHMENTS, AND FOR ALL UTILITY CONNECTIONS FOR EACH ITEM OF EQUIPMENT. IF THE SELECTED PRODUCT RESULTS IN STRUCTURAL CHANGES, THE CONTRACTOR
WILL BE RESPONSIBLE FOR ENGINEERING THE CHANGE AND ALL RELATED COSTS.\
1. BEFORE THE START OF WORK, THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH SITE CONDITIONS AS THEY MAY AFFECT THE CARRYING OUT OF THE WORK AS DESCRIBED IN THESE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL INVESTIGATE, VERIFY, AND BE RESPONSIBLE FOR ALL THE CONDITIONS OF THE PROJECT ON WHICH THE WORK IS PERFORMED. ALSO, FOR THE SAFETY OF ALL PERSONS AND PROPERTY, DURING THE PERFORMANCE OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY ACTUAL FIELD CONDITIONS NOT CONSISTENT WITH THE WORK INDICATED IN THE CONTRACT DOCUMENTS OR THAT REQUIRE MODIFICATION BEFORE PROCEEDING WITH THE WORK. IF WORK CAN NOT BE PERFORMED AS SHOWN, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY. WORK PERFORMED AFTER SUCH DISCOVERY, UNLESS AUTHORIZED BY THE ARCHITECT, SHALL BE DONE AT THE CONTRACTOR’S RISK.
2. BEFORE BEGINNING ANY WORK, THE CONTRACTOR SHALL THOROUGHLY INSPECT EXISTING CONDITIONS TO DETERMINE THE CONDITION OF THE WORK ALREADY IN PLACE. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING
OR REPLACING ANY EXISTING CONDITION OR EQUIPMENT THAT IS INTENDED TO REMAIN IN PLACE IF DAMAGED
DURING CONSTRUCTION.
3. THE CONTRACTOR SHALL VERIFY ALL EMBEDDED ITEMS AND MATERIALS ARE IN PLACE AND SECURELY ANCHORED
BEFORE POURING CONCRETE.
4. THE CONTRACTOR SHALL VERIFY THE DIMENSIONS AND LOCATIONS OF ALL OPENINGS, BASES, AND SPECIAL PROVISIONS REQUIRED FOR EQUIPMENT, PLUMBING FIXTURES, DUCTS, PIPING, CONDUIT, FINISH HARDWARE, ETC.
5. CUTTING, BORING, OR DRILLING THROUGH NEW OR EXISTING STRUCTURAL ELEMENTS SHALL BE ALLOWED ONLY WHEN SO DETAILED IN THE DRAWINGS OR WHEN REVIEWED AND ACCEPTED BY THE PROJECT’S STRUCTURAL
ENGINEER OF RECORD.
THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE SUBCONTRACTORS TO PROVIDE COMPLETE MECHANICAL COORDINATION DRAWINGS FOR CONSTRUCTION INDICATING THE LOCATION, RELATIONSHIP, AND ELEVATION OF ALL PLUMBING, SPRINKLER, MECHANICAL, AND ELECTRICAL WORK TO BE INSTALLED BY THE TRADES
1. THE GENERAL CONTRACTOR AND SUBCONTRACTORS ARE RESPONSIBLE FOR RESOLVING INSTALLATION CONFLICTS ON MECHANICAL COORDINATION DRAWINGS AND SUBMITTING THE DRAWINGS TO THE ARCHITECT AND ENGINEERS FOR REVIEW AND APPROVAL. CONFLICTS WITH THE FUNCTION AND APPEARANCE OF THE DESIGN WILL BE CLARIFIED BY THE ARCHITECT. INSTALLATION OF THE WORK SHALL NOT PROCEED BEFORE THE COMPLETION
OF THE MECHANICAL COORDINATION DRAWINGS.
2. WHERE RELOCATION IS REQUIRED DUE TO JOB CONDITIONS, THE PLUMBING, SPRINKLER, MECHANICAL, ELECTRICAL, OR OTHER WORK MAY BE ALTERED TO ALLOW FOR INSTALLATION WHILE MAINTAINING THE FUNCTION
AND APPEARANCE OF THE DESIGN, AS SHOWN.
3. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL FURNISH AND INSTALL ACCESS PANELS, WHETHER SHOWN OR NOT, IN WALLS AND NON-ACCESSIBLE TYPE CEILINGS WHERE SERVICE OR ADJUSTMENT TO PLUMBING, SPRINKLER, MECHANICAL, OR ELECTRICAL EQUIPMENT OR CONSTRUCTION IS REQUIRED. WHERE WALLS OR CEILINGS ARE REQUIRED TO BE FIRE-RATED ASSEMBLIES, PROVIDE ACCESS PANELS FOR FIRE-RATING EQUAL TO THE SURFACE IN WHICH THEY OCCUR. ACCESS PANEL FINISH SHALL MATCH ADJACENT FINISH. STAINLESS STEEL
ACCESS PANELS SHALL BE USED IN ALL WET LOCATIONS.
DOCUMENTS WERE PRODUCED USING THE CONSTRUCTION SPECIFICATION INSTITUTE’S UNIFORM DRAWING SYSTEM AND
THE NATIONAL CAD STANDARD AS GUIDES.
1. THE ELECTRICAL SUBCONTRACTOR SHALL COORDINATE LIGHT FIXTURE TYPES AND LOCATIONS WITH THE REFLECTED CEILING PLANS DRAWING AND ELECTRICAL DRAWINGS. THE SUBCONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR AND THE ARCHITECT OF ANY DISCREPANCIES BEFORE BID SUBMISSION AND
INSTALLATION.
2. ELECTRICAL SUBCONTRACTORS SHALL COORDINATE THE LOCATION OF ALL DEVICES WITH THE DRAWINGS. THE ELECTRICAL SUBCONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES BEFORE INSTALLING SMOKE DETECTORS, AND SPEAKERS SHALL BE INSTALLED AND LOCATED FOLLOWING THE REFLECTED CEILING
PLANS AND AT THE CENTER OF CEILING TILES.
3. THE ELECTRICAL SUBCONTRACTOR SHALL REVIEW THE ELECTRICAL DRAWINGS AND RCP IN TERMS OF ONE
ANOTHER AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES BEFORE INSTALLATION.
GENERAL NOTES
CONFLICTS
COORDINATION
EQUIPMENT
DESIGN INTENTFIRE AND ACOUSTICAL SEPARATIONSPECIFICATIONS FIRE AND VERTICAL SEPARATION
DEFINITIONS
1. PROVIDE UL-APPROVED FIRE AND DRAFT STOPS IN ALL WALLS, FURRED SPACES, CEILINGS, ETC. AS REQUIRED AND
SPECIFIED BY APPLICABLE CODES.
2. THROUGH PENETRATION FIRE STOP SYSTEM” DETAILS ARE FOR REFERENCE ONLY. PENETRATION THROUGH FIRE-RATED FLOORS AND WALLS SHALL BE PROVIDED FOLLOWING APPLICABLE CODES. SYSTEMS SHALL BE INSTALLED PER THE
MANUFACTURER’S INSTALLATION INSTRUCTIONS.
3. ALL ELECTRICAL, MECHANICAL, AND PLUMBING PENETRATIONS THROUGH ANY COMPONENT OF A FIRE-RATED ASSEMBLY, INCLUDING CONDUIT AND PIPING THROUGH FIRE-RATED WALL, FLOOR, AND CEILING ASSEMBLIES, SHALL BE TIGHTLY AND SOLIDLY SEALED WITH MATERIAL CAPABLE OF PREVENTING THE PASSAGE OF FLAMES AND HOT GASES. WHERE AN ITEM PENETRATES AN AREA SEPARATION WALL, THE SECTION PASSING THROUGH THE WALL SURFACE AND THE FIXTURE
CONNECTIONS, THERE SHALL BE ONLY OF METAL.
4. PENETRATIONS INTO AND THROUGH PARTITIONS CONTAINING SOUND INSULATION SHALL BE SEALED WITH A PERMANENT RESILIENT SEALANT SPECIFIED FOR THAT PURPOSE. ELECTRICAL DEVICES, RECESSED CABINETS, ETC. SHALL BE SEALED, LINED, INSULATED, OR OTHERWISE TREATED TO MAINTAIN THE INTEGRITY OF THE ACOUSTICAL ASSEMBLY
5. PROVIDE PROPER SLEEVING AND CAULKING TO ALL PLUMBING AND ELECTRICAL CONDUITS AND PIPES PASSING THROUGH
SLAB ON GRADE AND CONCRETE OR MASONRY WALLS.
6. WHERE MECHANICAL WORK PENETRATES ANY FIRE-RATED ASSEMBLY ASSOCIATED WITH FIRE-RATED PARTITIONS, FLOORS, SHAFTS, AND CEILINGS, PROVIDE THE APPROPRIATE COMBINATION FIRE/SMOKE DAMPERS. COMBINATION FIRE/SMOKE DAMPERS SHALL BE USED AT DUCT PENETRATIONS OF RATED CORRIDOR PARTITIONS. IF, AT THE TIME OF BIDDING, IT IS NOT CLEAR WHETHER DUCTWORK PENETRATES A PORTION OF THE RATED ASSEMBLY, OBTAIN CLARIFICATION FROM THE
ARCHITECT BEFORE SUBMISSION OF THE BID.
7. FIRE DAMPER DETAILS ARE SHOWN FOR REFERENCE ONLY. FIRE DAMPERS SHALL BE APPROVED AND LISTED BY THE STATE
FIRE MARSHAL. INSTALL STRICTLY PER THE MANUFACTURER’S PRINTED INSTRUCTIONS.
8. WHERE FIRE EXTINGUISHER CABINETS AND OTHER EQUIPMENT ARE RECESSED IN FIRE-RATED PARTITIONS, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IF IT IS DETERMINED THAT ANY PARTITION’S FIRE RATING CAN NOT BE
MAINTAINED BY THE CONSTRUCTION DETAILS INDICATED IN THE CONSTRUCTION DOCUMENTS.
9. FIRE ALARM AND FIRE SPRINKLER SYSTEM SHOP DRAWINGS MUST BE REVIEWED AND APPROVED BY THE FIRE DEPARTMENT
BEFORE INSTALLATION.
10. THE CONTRACTOR SHALL PROVIDE PROTECTION BY COMPLYING WITH THE APPLICABLE BUILDING CODE DURING ANY WELDING. FURTHER PROTECTION SHALL BE PROVIDED TO ANY OCCUPANTS AND THE PUBLIC WITH PORTABLE SOLID VISION BARRICADES AROUND LOCATIONS WHERE WELDING IS BEING PERFORMED AND WITH SIGNS WARNING AGAINST LOOKING AT
WELDING WITHOUT PROPER EYE PROTECTION.
11. ALL INTERIOR FINISHES AND INSULATION MATERIALS INSTALLED WITHIN ROOF-CEILING ASSEMBLIES, ATTICS, OR WALLS SHALL CONFORM TO THE REQUIREMENTS OF THE BUILDING CODE. ALL FINISHES AND INSULATION MATERIALS SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE DENSITY NOT TO EXCEED 450 WHEN TESTED PER ASTM E84 OR UL 723.
12. PROVIDE LABELS ON DOORS, FRAMES, AND OTHER ASSEMBLIES AT OPENING SIN FIRE-RATED CONSTRUCTION, INCLUDING DOCUMENTATION FOR SECURITY-RATED SYSTEMS. PENETRATIONS THROUGH FIRE-RATED WALLS AND FLOORS SHALL BE SEALED WITH A MATERIAL CAPABLE OF PREVENTING THE PASSAGE OF FLAMES AND HOT GASES WHEN SUBJECTED TO THE REQUIREMENTS OF THE TEST STANDARD SPECIFIC FOR FIRE STOPS ASTM E-184 AND UBC STANDARD 7-5 AND IN
COMPLIANCE WITH THE PROJECT MANUAL.
13. FIRE-RATED DOOR ASSEMBLIES SHALL BE PROVIDED WITH APPROVED GASKETING MATERIAL INSTALLED TO PROVIDE A SEAL
WHERE THE DOOR MEETS THE STOP ON BOTH SIDES AND ACROSS THE TOP.
14. MANUFACTURERS’ INSTALLATION INSTRUCTIONS SHALL BE AVAILABLE ON THE JOB SITE FOR ALL RATED OPENING
ASSEMBLIES.
15. DRAWINGS THAT SHOW LISTED CONSTRUCTION HAVE BEEN DETAILED IN COMPLIANCE WITH UNDERWRITERS’
LABORATORIES (UL), WARNOCK HERSEY, AND OTHER RECOGNIZED TESTING LABORATORY LISTING REQUIREMENTS AND WITH ICBO REPORTS FOR THE MATERIALS SPECIFIED. IF AN ALTERNATE OR SUBSTITUTE MATERIAL IS PROPOSED BY THE CONTRACTOR, THE ALTERNATE OR SUBSTITUTION SHALL CONFORM TO THE REQUIREMENTS IN SPECIFICATION SECTION
01630 AND SHALL COMPLY WITH ONE OF THE APPROVED TESTING LABORATORIES NOTED ABOVE
16. ALL WOOD USED FOR BLOCKING, NAILERS, AND FRAMING USED FOR PERMANENT CONSTRUCTION SHALL BE FIRE
RETARDANT PRESSURE TREATED AND SHALL BEAR AN APPROVED INSPECTION AGENCY LABEL
17. PENETRATIONS THROUGH FIRE-RATED WALLS AND FLOORS SHALL BE SEALED WITH A MATERIAL CAPABLE OF PREVENTING THE PASSAGE OF FLAMES AND HOT GASES WHEN SUBJECTED TO THE REQUIREMENTS OF THE TEST STANDARD SPECIFIC FOR FIRE STOPS ASTM E-184 AND UBC STANDARD 7-5 AND IN COMPLIANCE WITH THE PROJECT MANUAL.
18. THE CONTRACTOR SHALL SUBMIT SHOP DRAWING DETAILS FURNISHED BY THE MANUFACTURER OF FIRE STOP MATERIAL WHICH CONFORMS AND SHALL BE SPECIFIED FOR EACH PENETRATION WITH ALL VARIABLES DEFINED. THESE FINAL AND APPROVED DRAWINGS SHALL BE READILY AVAILABLE TO THE DISTRICT INSPECTOR AT ALL TIMES AT THE PROJECT SITE.
19. DUCT INSULATION APPLIED TO THE EXTERIOR SURFACE OF DUCTS SHALL HAVE A FLAME-SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED RATING OR NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE INSTALLATION, INCLUDING INSULATION, FACING MATERIALS, TAPES, AND ADHESIVES AS NORMALLY APPLIED.
20. THE CONTRACTOR SHALL PROVIDE PROTECTION DURING THE WELDING, COMPLYING WITH APPLICABLE CODES. FURTHER PROTECTION SHALL BE PROVIDED TO ANY OCCUPANTS AND THE PUBLIC WITH PORTABLE SOLID VISION BARRICADES AROUND THE LOCATION WHERE WELDING IS BEING PERFORMED. PROVIDE SIGNS WARNING AGAINST LOOKING AT WELDING
WITHOUT PROPER EYE PROTECTION OR EQUIVALENT.
21. PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A-10BC WITHIN A 75 FEET TRAVEL DISTANCE
TO ALL PORTIONS OF THE BUILDING ON EACH FLOOR.
22. PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 10BC FOR ELECTRICAL ROOMS, MECHANICAL
ROOMS, ELEVATOR MACHINE ROOMS, AND TRASH ROOMS.
23. PROVIDE AN APPROPRIATE NUMBER OF PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 4A-60BC FOR
PROTECTION DURING CONSTRUCTION.
24. ALL ATTACHMENTS TO AND PENETRATIONS THROUGH CONCRETE NOTED ON THE DRAWINGS TO BE WATERPROOFED SHALL
BE BEFORE THE APPLICATION OF WATERPROOF MATERIALS.
1. THE CONTRACTOR SHALL KEEP ALL EXITS READILY ACCESSIBLE AND UNOBSTRUCTED AT ALL TIMES.
2. ALL EXIT DOORS, INCLUDING EACH LEAF OF PAIR OF DOORS, SHALL ALWAYS BE OPERABLE FROM THE INSIDE BY THE SIMPLE TURN OF A LEVER OR PUSHING AN EXIT DEVICE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT AND IN COMPLIANCE WITH REGULATIONS FOR THE ACCESSIBLE (BARRIER-FREE LAWS).
MAXIMUM EFFORT TO OPERATE THE DOORS SHALL NOT EXCEED 5 POUNDS, SUCH PULL OR PUSH EFFORT BEING APPLIED AT RIGHT ANGLES TO HINGED DOORS AND AT THE CENTER PLANE OF SLIDING OR FOLDING DOORS.
COMPENSATING DEVICES OR AUTOMATIC DOOR OPERATORS MAY BE UTILIZED TO MEET THE ABOVE STANDARDS
WHEN FIRE-RATED DOORS ARE INDICATED.
3. PROVIDE A STRIP AT LEAST 2” WIDE OF CLEARLY CONTRASTING COLOR PLACED PARALLEL TO AND NOT MORE THAN 1” BACK FROM THE NOSE OF THE TOP AND BOTTOM TREAD OF ALL INTERIOR STAIR RUNS AND ON EACH
TREAD OF ALL EXTERIOR STAIR RUNS.
4. PROVIDE BARRICADES AND PROTECTIVE DEVICES SEPARATING CONSTRUCTION AREAS. PROVIDE TEMPORARY PASSAGES AS REQUIRED. BEFORE DELIVERING MATERIALS TO THE CONSTRUCTION ZONE AND REMOVAL OF WASTE FROM THE SITE, CHECK WITH THE OWNER/ARCHITECT/RESIDENT INSPECTOR FOR ACCEPTABLE ACCESS ROUTE AND TIME. UNDER NO CIRCUMSTANCES SHALL THE AREA OUTSIDE THE CONSTRUCTION ZONE BE USED
WITHOUT PRIOR CLEARANCE FROM THE OWNER/ARCHITECT/RESIDENT INSPECTOR.
5. ALL RATED DOORS SHALL BE POSITIVE LATCHING.
6. PER APPLICABLE BUILDING CODES, EXISTING BUILDINGS UNDERGOING CONSTRUCTION SHALL REMAIN UNDER THE
FOLLOWING REQUIREMENTS AT ALL TIMES:
A. WATER MAINS AND HYDRANTS SHALL BE OPERATIONAL.
B. FIRE EXTINGUISHERS SHALL REMAIN ACCESSIBLE AND OPERATIONAL. THE NUMBER AND TYPE OF
EXTINGUISHERS SHALL BE AS REQUIRED BY THE LOCAL FIRE DEPARTMENT, AND THE TYPE OF
EXTINGUISHER SHALL BE SUITABLE FOR THE TYPE OF FIRE ASSOCIATED WITH THE HAZARDS PRESENT.
C. EXITING COMPONENTS SHALL BE MAINTAINED. PROVIDE TEMPORARY 1-HOUR RATED PROTECTION
DURING CONSTRUCTION, WHERE REQUIRED.
D. COMBUSTIBLE DEBRIS, RUBBISH, AND WASTE MATERIAL SHALL BE REMOVED FROM THE CONSTRUCTION SITE DAILY. WASTE MATERIAL AND TRASH SHALL NOT BE BURNED ON-SITE UNLESS APPROVED. DO NOT STORE BUILDING MATERIALS IN CORRIDORS AT ANY TIME. COMPLY WITH REQUIREMENTS AS SPECIFIED IN
THE PROJECT MANUAL.
E. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE MAINTAINED DURING THE COURSE OF
CONSTRUCTION.
F. FIRE ASSEMBLIES (DOORS, DAMPERS, ETC.) SHALL BE PER MANUFACTURER’S STANDARDS. ANY FAILURE
SHALL BE REPLACED.
7. ALL FIRE-RATED DOOR ASSEMBLIES SHALL BE PROVIDED WITH APPROVED GASKETING MATERIALS INSTALLED TO
PROVIDE A SEAL WHERE THE DOOR MEETS THE STOP ON BOTH SIDES AND ACROSS THE TOP.
8. MANUFACTURERS’ INSTALLATION INSTRUCTIONS SHALL BE AVAILABLE ON THE JOB SITE FOR ALL RATED OPENING
ASSEMBLIES.
MEANS OF EGRESS
MECHANICAL
ELECTRICAL
DOCUMENTS WERE PRODUCED USING THE CONSTRUCTION SPECIFICATION INSTITUTE’S UNIFORM DRAWING SYSTEM AND
THE NATIONAL CAD STANDARD AS GUIDES.
GRAPHIC STANDARDS
A-100
A-100
A-100
T.O.
X' - X"
DETAIL CALLOUT
REFERENCE CALLOUT
SHEET NUMBER
DETAIL REFERENCE
A-100
BUILDING SECTION
DETAIL NUMBER
SHEET NUMBER
SECTION NUMBER
SHEET NUMBER
SET NAVIGATION ELEMENT TAGS
DOOR
NUMBER
DOOR TAG
ELEVATION TARGET SYMBOL
REFERENCE
ELEVATION HEIGHT (AFF)
CENTER LINEVIEW TITLE
TITLE
SCALE
4'2'1'0
EGRESS PATH
VIEW #
ELEVATION
NUMBER
SHEET
NUMBER
A-100
EXTERIOR ELEVATION
REVISION TAG TRAVEL DISTANCE
TD =0' - 0"
WALL SECTION
A-100
SECTION NUMBER
SHEET NUMBER
A-100
INTERIOR
ELEVATION
NUMBER
SHEET
NUMBER
INTERIOR ELEVATION
GRID HEAD
LEVEL HEAD
LEVEL
0' - 0"
NORTH ARROW
N
FLOOR FINISH TAG
T-01
ZX
B3
500 SF
WALL TYPE
T.O. WALL CONDITION
ROOM NAME
ROOM NUMBER
ADDITIONAL INFORMATION
ACOUSTICAL RATING INDICATOR
WALL TYPE
ROOM TAG
ROOM
FLOOR TRANSITION TAG
FLOOR FINISH NUMBER
FLOOR FINISH NUMBER
FLOOR TRANSITION LOCATIONT
-0
C
P T
-0
WALL AND BASE FINISH TAG
WALL FINISH TAG
BASE FINISH TAG
WALL EDGE
WB-1
P-1
A
WINDOW TAG
WINDOW LETTER
(UPPER CASE)
& AND
@ AT
A/C AIR CONDITIONER (ING)
ABV ABOVE
ACCS ACCESSORIES
ACSDR ACCESS DOOR
ACSFLR ACCESS FLOOR
ACST / ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADDL ADDITIONAL
ADDM ADDENDUM
ADJ ADJUSTABLE / ADJACENT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHR ANCHOR
AHU AIR HANDLING UNIT
AL / ALUM ALUMINUM
ALNMT ALIGNMENT
ALT ALTERNATE
ANOD ANODIZED
AP ACCESS PANEL
APPROX APPROXIMATELY
APPVD APPROVED
ARCH ARCHITECT(URAL)
ASPH ASPHALT
ASTM AMERICAN SOCIETY FOR
TESTING MATERIALS
AUTO AUTOMATIC
AVG AVERAGE
BD BOARD
BG BUMPER GUARD
BITUM BITUMINOUS
BL BLACK
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BMS BALANCE MAGNETIC SWITCH
BOS BOTTOM OF STEEL
BOT BOTTOM
BS BOTH SIDES
CAB CABINET
CAS CASEWORK
CB CATCH BASIN
CEM CEMENT
CER CERAMIC
CF CUBIC FOOT
CG CORNER GUARD
CH CEILING HEIGHT
CHAM CHAMFER
CHBD CHALKBOARD
CI CONTRACTOR INSTALLED
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CLEAN/CLEAR OUT
COL COLUMN
CONC CONCRETE
FOW FACE OF WALL
FP FIREPROOF
FPL FIREPLACE
FR FRAME
FRC FIBER REINFORCED
CONCRETE
FRGP FIBER REINFORCED
GYPSUM PLASTER
FRT FIRE RETARDANT TREATED
FS FLOOR SINK
FTG FOOTING
FURR FURRING
FUT FUTURE
GA GAUGE
GALV GALVANIZE(D)
GB GRAB BAR
GC GENERAL CONTRACTOR
GL GLASS / GLAZING
GND GROUND
GR GRADE
GRV GRAVEL
GT GLASS TILE
GYP GYPSUM
GYP BD GYPSUM BOARD
HB HOSE BIB
HC HOLLOW CORE
HCP HANDICAPPED
HD HEAVY DUTY
HD HARD
HDR HEADER
HDWR HARDWARE
HI HIGH
HM HOLLOW METAL
HMI HOLLOW METAL INSULATED
HOR / HORIZ HORIZONTAL
HP HIGH POINT
HR HANDRAIL
HR HOUR
HT HEIGHT
HVAC HEATING / VENTILATION /
AIR CONDITIONING
HW HARDWARE
HYD HYDRANT
ID INSIDE DIAMETER
IN INCH / INCHES
INCL INCLUDE(D) / INCLUDING
INSUL INSULATE / INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
KIT KITCHEN
LAB LABORATORY
LAM LAMINATE(D)
LAV LAVATORY
LB(S) POUND(S)
LF LINEAR FOOT (FEET)
LH LEFT HAND
LIB LIBRARY
LKR LOCKER
LNS LINOLEUM SHEET
LNT LINOLEUM TILE
LP LOW POINT
LT LIGHT
LVR LOUVER
LWT LIGHT WEIGHT
MACH MACHINE
MAINT MAINTENANCE
MATL MATERIAL
Q QUARTZ
QT QUARRY TILE
QTY QUANTITY
R RISER
RAD RADIUS
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
RD "ROOF DRAIN, REMOTE DOOR"
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCE(D)
RESIL RESILIENT
RESS RESILIENT SHEET
REST RESILIENT TILE
RET RETAINING
REV REVISE / REVISION
RFG ROOFING
RFL REFLECTED
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
RP REMOTE POINT
RS RUBBER SHEET FLOORING
RST RUBBER STAIR TREADS
RSTR RUBBER STAIR TREADS &
RISERS
RT RUBBER TILE
RWD REDWOOD
RWL RAIN WATER LEADER
S SOUTH
SAFB SOUND ATTENUATION
FIRE BLANKET
SC SOLID CORE
SCD SEAT COVER DISPENSER
SCHED SCHEDULE
SCN SCREEN
SCR SCREEN
SD SOAP DISPENSER /
STORM DRAIN
SDC SEALED CONCRETE
SECT SECTION
SF SQUARE FEET
SHT SHEET
SHTG SHEATHING
SHWR SHOWER
SIM SIMILAR
SND SANITARY NAPKIN DISPENSER
SNR SANITARY NAPKIN
RECEPTACLE
SOG SLAB ON GRADE
SPEC SPECIFY / SPECIFICATION
SPK SPEAKER
SQ SQUARE
SQFT SQUARE FEET
SQIN SQUARE INCH(ES)
SS STAINLESS STEEL
ST STONE
STA STATION
STC STAINED CONCRETE
STD STANDARD
STDS STUDS
STIFF STIFFENER
STL STEEL
STOR STORAGE
STRUCT STRUCTURE / STRUCTURAL
SUSP SUSPENDED
SW SWITCH
SYM SYMMETRICAL
ARCHITECTURAL ABBREVIATIONS
CONST CONSTRUCTION
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET(ED)(ING)
CT CERAMIC TILE
CTR COUNTER
DBL DOUBLE
DEFS DIRECT APPLIED EXTERIOR
FINISH SYSTEM
DEG DEGREE
DEMO DEMOLISH
DEP DEPRESSION
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DIV DIVISION
DN DOWN
DR DOOR
DS DOWNSPOUT
DWG DRAWING
E EAST
EA EACH
EF EACH FREE
EIFS EXTERIOR INSULATION
AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSED / ENCLOSURE
ENG ENGINEER
EOD EDGE OF DECK
EOS EDGE OF SLAB
EQ EQUAL(LY)
EQPT EQUIPMENT
EST ESTIMATE
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAST FASTEN(ER)
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FEC (R) "FIRE EXTINGUISHER
CABINET, RECESSED"
FEC (SR) "FIRE EXTINGUISHER CABINET,
SEMI-RECESSED"
FEW "FIRE EXTINGUISHER,
WALL MOUNTED"
FF FINISHED FLOOR
FGL FIBERGLASS
FIN FINISH(ED)
FIXT FIXTURE
FL FLOOR
FLUOR FLUORESCENT
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUDS
MAX MAXIMUM
MC MEDICINE CABINET
ME MECHANICAL EQUIPMENT
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURE(R)
MH MANHOLE
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MLD / MLDG MOULDING
MO MASONRY OPENING
MR MOISTURE RESISTANT
MTD MOUNTED
MTL METAL
MUL MULLION
N NORTH
NA OR N/A NOT AVAILABLE / APPLICABLE
NFPA NATIONAL FIRE
PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO / # NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OBS OBSCURE
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFF OFFICE
OPG / OPNG OPENING
OPP OPPOSITE
OZ OUNCE
PART PARTIAL
PAT PATTERN
PBD PARTICLE BOARD
PC / PCC PRECAST CONCRETE
PED PEDESTAL
PER PERIMETER
PERF PERFORATED
PERP PERPENDICULAR
PF PRE-FINISHED
PIP POURED-IN-PLACE
PL PROPERTY LINE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PMF PRESSED METAL FRAMES
POP POINT OF PRESENCE
PR PAIR
PRCST PRE-CAST
PREFAB PREFABRICATED
PROP PROPERTY
PRT PORCELAIN TILE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PTD PAPER TOWEL DISPENSER
PTD/WR PAPER TOWEL DISPENSER &
WASTE RECEPTACLE
PTDF PRESSURE TREATED
DOUGLAS FIR
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PVC POLYVINYL CHLORIDE
SYN SYNTHETIC
SYS SYSTEM
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TB TOWEL BAR
TBD TO BE DETERMINED
TC TOP OF CURB
TD TRAVEL DISTANCE
TEL TELEPHONE
TEMP TEMPORARY / TEMPERATURE
TER TERRAZZO
THK THICK
THRU THROUGH
TOC TOP OF CONCRETE
TOS TOP OF SLAB
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPTN TOILET PARTITION
TV TELEVISION
TYP TYPICAL
UC UNDERCUT
UG UNDERGROUND
UL UNDERWRITER'S LABORATORY
UNF / UNFIN UNFINISHED
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER
SUPPLY
UR URINAL
V VOLT
VAC VACUUM
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VENT VENTILATE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VNR VENEER
VOL VOLUME
VST VINYL STAIR TREADS
VSTR VINYL STAIR TREADS & RISERS
VT VINYL TILE
VTR VENT THRU ROOF
VWC VINYL WALLCOVERING
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WCV WALLCOVERING
WD WOOD
WF WIDE FLANGE
WG WIRE GLASS
WH WALL HOSE / HYDRANT
WI WROUGHT IRON
WIN WINDOW
WK WORK
WNSCT WAINSCOT
WP WATERPROOF(ING)
WPT WORK POINT
WR WATER RESISTANT
WRR WOOD RISER
WT WEIGHT
YD YARD
ALUMINUM
BRICK (ELEVATION)
CARPET
CMU
CEMENTITIOUS DECKS
& TOPPINGS
CONCRETE
PRECAST CONCRETE
EARTH
CRUSHED STONE
ACOUSTIC TILE CEILING
GRANITE & MARBLE
GYPSUM WALL BOARD
PARTICLE BOARD
PLYWOOD
RIGID INSULATION
STEEL
WOOD
MATERIALS DESIGNATION
BATT INSULATION
MORTAR/SETTING BED/GROUT SAND
CONCRETE BLOCK (SECTION)
MASONRY BRICK (SECTION) EIFS
PLYWOOD
CHECKED BY:
DESIGNED BY:
DRAWN BY:
PROJECT #:
DATE:
10920 W. ALAMEDA AVE, SUITE 100
LAKEWOOD, COLORADO 80226
720.502.4156
TH
E O
R
IG
IN
A
L O
F T
H
IS
D R
A W
IN
G
I S
X
I F T
H
IS
C O
P Y
I S
A N
Y O
TH
E R
S
IZ
E
IT
H A
S B
E E N
R E D
U C
E D
O R
E N
LA
R
G E D
History Date
OZ ARCHITECTURE, INC
:3
:4
P M
G-010
GENERAL NOTES
S
O U
T H
R E V
E R E P
A R K W
A Y C
E N
T E N
N
IA
L C
O
N A
T
IO
N A
L G
U A
R D
JG
RP,JG
RP
2026.060
07.22.26
S E C
U R
E A
R E A
R E N
O V
A T
IO
N
ISSUED FOR PERMIT 06/25/2026
LICENSED ARCHITEC
T
ST
AT
E OF COLORADO
00402915JE
ST
IN
S S
BBE
J J J
CR CR
DB
DBJ
CODE PLAN LEGEND
PROJECT LIMIT LINE
1-HR RATED WALL
EXIT ARROW
EXIT ACCESS ARROW
EXIT DISCHARGE ARROW
TYPE 1 FIRE EXTINGUISHER
TYPE 1
XX
XX
XX
B- OCC
A- OCC
2024 CENTENNIAL PROPERTY MAINTENANCE CODE
2023 NATIONAL ELECTRIC CODE (NEC)
2021 INTERNATIONAL BUILDING CODE (IBC)
2021 INTERNATIONAL PLUMBING CODE (IPC)
2021 INTERNATIONAL MECHANICAL CODE (IMC)
2021 INTERNATIONAL FUEL GAS CODE (IFGC)
2024 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2017 ICC A117.1 AMERICAN NATIONAL STANDARD - AS REFERENCED IN THE 2021 INTERNATIONAL BUILDING CODE 2021 INTERNATIONAL FIRE CODE (IFC) IS ENFORCED BY SOUTH METRO FIRE RESCUE. APPLICANTS MUST APPLY
SEPARATELY TO SOUTH METRO FIRE.
CODE SUMMARY
APPLICABLE CODES
EXISTING BUILDING AREA GROSS SQUARE FOOTAGE (INFORMATION PROVIDED FROM OWNER PROVIDED
DICUMENTS)
LEVEL 1: 14,974 S.F.
LEVEL 2: 14,467 S.F.
LEVEL 3: 14,467 S.F.
TOTAL: 43,908 S.F.
PROJECT AREA SQUARE FOOTAGE
AREA OF WORK 1,110 S.F.
SUMMARY OF WORK
BUILDING AREA SUMMARY
BUILDING AREA SUMMARY
Existing Building Reference Information
Use and Occupancy Classifications Group A Assembly Group A occupancy includes, among others, the use of a building or structure, or a portion thereof, for the gathering of persons for purposes such as civic, social or religious functions;
recreation, food or drink consumption or awaiting transportation.
Group B Business Group B occupancy includes, among others, the use of a building or structure, or a portion thereof, for office, professional or service-type transactions, including storage of records and accounts.
Group S-1 Storage Group S occupancy includes, among others, the use of a building or structure, or a portion thereof, for storage that is not classified as a hazardous occupancy.
Type of Construction Type II-B, provided by Owner from previous Construction Documents
Fully Sprinklered
NONE
Existing Building Code Reference Information
Change in Occupancy Classification in Scope of Work No
Compliance Method Chosen Work Area
Classification Alteration - Level 2
2021 International Existing Building Code
Section 301 Administration
301.3 Alteration, Addition or Change of Occupancy. The repair, alteration, change of occupancy, addition or relocation of all existing buildings shall comply with one of the methods listed in Section 301.1.1 through 301.1.3 as selected by the applicant.
Sections 301.1.1 through 301.1.3 shall not be applied in combination with each other.
301.3.2 Work Area Compliance Method. Alterations, additions, changes in occupancy complying with the applicable requirements of Chapter 7 through 12 of this code shall be considered in compliance with the provisions of this code.
Section 603 Alteration - Level 2
603.1 Scope. Level 2 Alterations include the reconfiguration of space, the addition or elimination of any door or window, the reconfiguration or extension of any system, or the installation of any additional equipment.
603.2 Application. Level 2 Alterations shall comply with the provisions of Chapter 7 for Level 1 Alterations as well as the rovisions of Chapter 8.
Section 602 Alteration - Level 1
602.1 Scope. Level 1 Alterations as described in Section 602 shall comply with the requirements of this chapter.
602.2 Conformance. An existing building or portion thereof shall not be altered such that the building becomes less safe than its existing condition.
Section 702 Building Elements and Materials
702.6 Materials and Methods. New work shall comply with the materials and methods requirements in the International Building Code, International Energy Conservation Code, International Mechanical Code, and International Plumbing Code, as applicable, that specify materials standards, detail of installation and connection, joints, penetrations, and continuity of any element, component, or system in the building.
Section 703 Fire Protection
703.1 General. Alterations shall be done in a manner that maintains the level of fire protection provided.
Section 704 Means of Egress
704.1 General. Alterations shall be done in a manner that maintains the level of protection provided for the means of egress.
Section 707 Energy Conservation
707.1 Minimum Requirements. Level 1 Alterations to existing buildings or structures do not require the entire building or structure to comply with the energy requirements of the International Energy Conservation Code. The alterations shall conform to the energy requirements of the International Residential Code as they relate to new construction only.
Section 801 Alteration - Level 2
801.1 Scope. Level 2 Alterations as described in Section 603 shall comply with the requirements of this chapter.
801.2 Alteration Level 1 Compliance. In addition to the requirements of this chapter, all work shall comply with the requirements of Chapter 7.
801.3 Compliance. New construction elements, components, systems, and spaces shall comply with the requirements of Chapter 7.
Section 802 Building Elements and Materials
802.1 Scope. The requirements of this section are limited to work areas in which Level 2 Alterations are being performed and shall apply beyond the work area where specified.
802.4 Interior Finish. The interior finish of walls and ceilings in exits and corridors in any work area shall comply with the requirements of the International Building Code.
THIS PROJECT IS TO REMODEL AN EXISTING OFFICE SPACE IN A BUILDING TO BE BROUGHT UP TO NEW STANDARDS.
THE PROJECT WILL HAVE UPDATES TO WALLS, DOORS, FINISHES, MECH AND ELECTRICAL IN THE WORK AREA
NO CHANGE TO BUILDING SQUARE FOOTAGE, OCCUPANCY LOADS, OR EGRESS PATHS..
312 SF
B
150 SF/OCC
3 OCC
OFFICE
208 SF
B
150 SF/OCC
2 OCC
OFFICE
168 SF
B
150 SF/OCC
1 OCC
OFFICE
210 SF
B
15 SF/OCC
14 OCC
CONF
302 SF
B
150 SF/OCC
3 OCC
OFFICE
53 SF
B
150 SF/OCC
1 OCC
VESTIBULE
179 SF
STAIRS
1429 SF
HALL
236 SF
B
150 SF/OCC
2 OCC
HALL
104 SF
B
150 SF/OCC
1 OCC
OFFICE
COMMON PATH OF TRAVEL 40'-5"
WORK AREA
OPEN TO BELOW
STAIRS
WOMENS
MENS
NOTE: EXISTING CORRIDOR SYSTEM
IS ONE-HOUR CONSTRUCTION
CHECKED BY:
DESIGNED BY:
DRAWN BY:
PROJECT #:
DATE:
10920 W. ALAMEDA AVE, SUITE 100
LAKEWOOD, COLORADO 80226
720.502.4156
TH
E O
R
IG
IN
A
L O
F T
H
IS
D R
A W
IN
G
I S
X
I F T
H
IS
C O
P Y
I S
A N
Y O
TH
E R
S
IZ
E
IT
H A
S B
E E N
R E D
U C
E D
O R
E N
LA
R
G E D
History Date
OZ ARCHITECTURE, INC
:3
:4
P M
G-101
LIFE SAFETY
DIAGRAM - LEVEL 1
S
O U
T H
R E V
E R E P
A R K W
A Y C
E N
T E N
N
IA
L C
O
N A
T
IO
N A
L G
U A
R D
JG
RP,JG
RP
2026.060
07.22.26
S E C
U R
E A
R E A
R E N
O V
A T
IO
N
N 16'8'4'0
1/8" = 1'-0"
1 LEVEL 1 CODE PLAN
1/8" = 1'-0"
2 LEVEL 2 CODE PLAN
NO CHANGES TO LEVEL 1 SHOWN FOR REF ONLY
N
16'8'4'0
ISSUED FOR PERMIT 06/25/2026
1 ADD #1 07/22/2026
LICENSED ARCHITEC
T
ST
AT
E OF COLORADO
00402915JE
ST
IN
GENERAL DEMOLITION NOTES
1. THE CONTRACTOR SHALL MAINTAIN THE EXISTING STRUCTURAL AND FIREPROOFING INTEGRITY OF THE ENTIRE BUILDING EXCEPT
WHERE OTHERWISE NOTED.
2. UPON THE DISCOVERY OF HAZARDOUS MATERIALS ENCOUNTERED DURING CONSTRUCTION, NOTIFY THE DESIGNER AND OWNER IMMEDIATELY AND AWAIT FURTHER INSTRUCTIONS, THE WORK AREA SHALL BE COMPLETELY SEALED OFF DURING ABATEMENT.
3. WORK INCLUDED IN THE CONTRACT IS ILLUSTRATED IN BOLD-DASHED LINE WORK. UNLESS NOTED OTHERWISE, BOLD-DASHED ITEMS INDICATED SUCH AS: PARTITIONS, DOORS, WINDOWS, EQUIPMENT, ETC. ARE TO BE REMOVED.
4. WHERE THE TERM "REMOVE" IS USED, THE CONTRACTOR SHALL REMOVE FROM THE SITE AND LEGALLY DISPOSE OF.
5. WHERE THE TERM "SALVAGE" IS USED, THE CONTRACTOR SHALL REMOVE FROM THIS PROJECT AND RETURN TO OWNER.
6. WHERE THE TERM "REMOVE AND REINSTALL" IS USED, THE CONTRACTOR IS TO DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED.
7. WHERE THE TERM "EXISTING TO REMAIN" IS USED, THE EXISTING ITEMS OF CONSTRUCTION ARE NOT TO BE REMOVED.
8. SEE REFLECTED CEILING DEMOLITION PLANS FOR CEILING DEMOLITION WORK.
9. SEE ENGINEERING DRAWINGS FOR THE REMOVAL OF SPECIFIC STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE ALARM
SYSTEMS.
10. REINSTALLED EQUIPMENT AND DEVICES ARE TO BE CLEANED OF FOREIGN MATERIAL.
11. WHEREVER MECHANICAL, ELECTRICAL, AND PLUMBING DEVICES ARE REMOVED, ALL PIPING AND/OR CONDUITS THAT ARE
ABANDONED SHALL BE CAPPED OFF BELOW THE FLOOR, INSIDE THE WALLS, OR ABOVE THE CEILINGS EXCEPT WHERE NOTED OTHERWISE. MECHANICAL/ELECTRICAL CONTRACTOR TO REMOVE ALL UNUSED WIRING TO PANEL BOXES. PATCH AND REPAIR FINISHES TO MATCH SURROUNDING FINISHES. BLANK COVER PLATES OVER EXISTING BOXES ARE NOT ACCEPTABLE, UNO.
12. REMOVE WALL BASE IN AREAS WHERE FLOORING IS BEING REMOVED.
13. AT FLOORS AND WALLS: WHERE WALLS OR PARTITIONS THAT ARE REMOVED EXTEND ONE FINISHED AREA INTO ANOTHER, PATCH
AND REPAIR FLOOR AND WALL SURFACES IN THE NEW SPACE TO PROVIDE AN EVEN SURFACE OF UNIFORM FINISH, COLOR, TEXTURE, AND APPEARANCE.
14. PROTECT EXPOSED CONCRETE DURING CONSTRUCTION
15. ALL FURNITURE TO BE REMOVED AND REINSTALLED BY OWNER
16. REMOVE ALL STRAPS, HANGARS AND SUPPORTS FROM CONTROLLED SPACE AREA (3-238)1
FLAGNOTES #
DEMOLITION FLOOR PLAN LEGEND
AREA NOT IN CONTRACT (NIC)
PROJECT LIMIT LINE
TEMPORARY CONSTRUCTION BARRIER
EXISTING DEMOLITION
WALLS
3-238
OFFICE
3-238A
MAN TRAP
3-239
CONFERENCE
3-240
OFFICE
3-241
OFFICE
3-246
OFFICE
3-247
CLOSET
3-245
OFFICE
HALL
HALL
STAIRS
A
7 9 99
UP
7 8
15 7
KEY PLAN
CHECKED BY:
DESIGNED BY:
DRAWN BY:
PROJECT #:
DATE:
10920 W. ALAMEDA AVE, SUITE 100
LAKEWOOD, COLORADO 80226
720.502.4156
TH
E O
R
IG
IN
A
L O
F T
H
IS
D R
A W
IN
G
I S
X
I F T
H
IS
C O
P Y
I S
A N
Y O
TH
E R
S
IZ
E
IT
H A
S B
E E N
R E D
U C
E D
O R
E N
LA
R
G E D
History Date
OZ ARCHITECTURE, INC
:3
:4
P M
AD-101
DEMOLITION FLOOR
PLAN - LEVEL 2
S
O U
T H
R E V
E R E P
A R K W
A Y C
E N
T E N
N
IA
L C
O
N A
T
IO
N A
L G
U A
R D
JG
RP,JG
RP, CF
2026.060
07.22.26
S E C
U R
E A
R E A
R E N
O V
A T
IO
N
1. REMOVE GYP PARTITION WALL.
2. REMOVE GYP FURRING. NOTIFY ARCHITECT OF ANY UTILITIES.
3. SALVAGE DOOR FRAME AND HARDWARE.
4. REMOVE DOOR FRAME AND HARDWARE.
5. ALL WALL MOUNTED ITEMS SUCH AS, BUT NOT LIMITED TO, WHITEBOARDS, PICTURES, PLAQUES, TVS, ETC TO BE REMOVED AND
REINSTALLED BY OWNER.
6. REMOVE ALL FLOORING AND BASE.
7. REMOVE GYP FURRING WALL. WALL GOES TO GRID.
8. REMOVE AND REINSTALL FIRE EXTINGUISHER CABINET IN NEW LOCATION.
9. REMOVE AND REINSTALL CARPET, SHOWN HATCHED
10. REMOVE GYP FURRING WALL. DO NOT DAMAGE CMU STAIR CORE. NOTIFY ARCHITECT OF AND HOLES OR PENETRATIONS IN CMU
WALL.
11. SALVAGE DOORBELL FOR REINSTALL. RE: ELEC
12. SALVAGE CARD READER AND RETURN TO OWNER.
13. REMOVE AND REINSTALL WALL MOUNTED TV
14. REMOVE AND REINSTALL SAFE
15. DEMO PORTION OF WALL FOR NEW SECURE PERIMETER WALL
N
6'4'2'0 1/4" = 1'-0"
1 DEMOLITION PLAN
ISSUED FOR PERMIT 06/25/2026
1 ADD #1 07/22/2026
LICENSED ARCHITEC
T
ST
AT
E OF COLORADO
00402915JE
ST
IN
DEMOLITION RCP LEGEND
AREA NOT IN CONTRACT (NIC)
PROJECT LIMIT LINE
TEMPORARY CONSTRUCTION BARRIER
2X4 LIGHT FIXTURE, RE:
ELECTRICAL
2X4 ACOUSTICAL CEILING TILE
AND SUSPENSION SYSTEM
EXHAUST, RE: MECHANICAL
SUPPLY, RE: MECHANICAL
EXISTING DEMOLITION
2X2 LIGHT FIXTURE, RE:
ELECTRICAL
2X2 ACOUSTICAL CEILING TILE
AND SUSPENSION SYSTEM
OVERHEAD OR WALL MOUNTED
EMERGENCY EXIT SIGN WITH
TRAVEL DIRECTION INDICATOR,
RE; ELECTRICAL
DEMO
AREA OF CEILING DEMO ABOVE
GENERAL DEMOLITION NOTES
1. THE CONTRACTOR SHALL MAINTAIN THE EXISTING STRUCTURAL AND FIREPROOFING INTEGRITY OF THE ENTIRE BUILDING EXCEPT
WHERE OTHERWISE NOTED.
2. UPON THE DISCOVERY OF HAZARDOUS MATERIALS ENCOUNTERED DURING CONSTRUCTION, NOTIFY THE DESIGNER AND OWNER IMMEDIATELY AND AWAIT FURTHER INSTRUCTIONS, THE WORK AREA SHALL BE COMPLETELY SEALED OFF DURING ABATEMENT.
3. WORK INCLUDED IN THE CONTRACT IS ILLUSTRATED IN BOLD-DASHED LINE WORK. UNLESS NOTED OTHERWISE, BOLD-DASHED ITEMS INDICATED SUCH AS: PARTITIONS, DOORS, WINDOWS, EQUIPMENT, ETC. ARE TO BE REMOVED.
4. WHERE THE TERM "REMOVE" IS USED, THE CONTRACTOR SHALL REMOVE FROM THE SITE AND LEGALLY DISPOSE OF.
5. WHERE THE TERM "SALVAGE" IS USED, THE CONTRACTOR SHALL REMOVE FROM THIS PROJECT AND RETURN TO OWNER.
6. WHERE THE TERM "REMOVE AND REINSTALL" IS USED, THE CONTRACTOR IS TO DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED.
7. WHERE THE TERM "EXISTING TO REMAIN" IS USED, THE EXISTING ITEMS OF CONSTRUCTION ARE NOT TO BE REMOVED.
8. SEE REFLECTED CEILING DEMOLITION PLANS FOR CEILING DEMOLITION WORK.
9. SEE ENGINEERING DRAWINGS FOR THE REMOVAL OF SPECIFIC STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE ALARM
SYSTEMS.
10. REINSTALLED EQUIPMENT AND DEVICES ARE TO BE CLEANED OF FOREIGN MATERIAL.
11. WHEREVER MECHANICAL, ELECTRICAL, AND PLUMBING DEVICES ARE REMOVED, ALL PIPING AND/OR CONDUITS THAT ARE
ABANDONED SHALL BE CAPPED OFF BELOW THE FLOOR, INSIDE THE WALLS, OR ABOVE THE CEILINGS EXCEPT WHERE NOTED OTHERWISE.
This is the start of the file's text. The full file is on GovTribe.