FN1313-10 5.doc

DOC document 86 KB Posted

Attached to
PARTICLEBOARD, PANELS, PLYWOOD, VENEER
Solicitation number
FN1313-10
Issued by

About this file

fn1313-10 amendment 5

View the file

Other files

File Type Posted
FN1313-10 cancel awards 3 and 4.doc DOC document
FN1313-10 10.doc DOC document
FN1313-10 9.doc DOC document
FN1313-10 8.doc DOC document
FN1313-10 7.doc DOC document
FN1313-10 6.doc DOC document
FN1313-10 4.doc DOC document
FN1313-10 3.doc DOC document
PNL2897M DRAWING.xls XLS spreadsheet
FN1313-10 2.doc DOC document
PNL3881M DRAWING.xls XLS spreadsheet
PNL2898M DRAWING.xls XLS spreadsheet
PNL3880M DRAWING.xls XLS spreadsheet
FN1313-10 1.doc DOC document
NCIC FORM.pdf PDF
FN1313-10 SOLICITATION PARTICLEBOARD PANELS PLYWOOD VENEER AND BOAT SHAPED TOPS.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT

tc \l1 "AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT1. CONTRACT ID CODE
PAGE OF PAGES
1
2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
AMENDMENT #5
08/17/2010
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

See Block 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, State and Zip Code)
(x)
9A. AMENDMENT OF SOLICITATION NO.

FN1313-10 PARTICLEBOARD, PANELS, PLYWOOD, VENEER, TABLE TOPS

X

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and the date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE

DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, Appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :

D. OTHER (Specify type of modification and authority)

E. IMPORTANT : Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

COMMODITY: PARTICLEBOARD, PANELS, PLYWOOD, VENEER, TABLE TOPS

SEE ATTACHED

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Tiffani Balestrini, Contract Specialist

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

BY

(Signature of the person authorized to sign)

(Signature of contracting officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105
STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR(48 CFR) 53.243

This modification hereby answers the following questions:

Q: On item 00042, VNR0050, it indicates a panel dimension of 1.34 x 4 x 8. Can you confirm the panel thickness? I suspect it wanted to read 1/32", not 1.34. Can you please confirm?

A: Yes it should read 1/32”

Q: When I look at the sample request it asks for Fire Rated, FSC, No Added Urea Formaldehyde, Moisture Resistant core. Do you want what the sample request says (which I don't know if there exists a single core with all of those attributes) or do you want something representative of the individual specified items?

A: All particleboard products on this solicitation as well as samples must meet the following M-2 Particleboard ANSI A 208.1-1999 specifications.

Length and Width Tolerance: +/- 0.080 inch Thickness Tolerance Panel Avg. from specified: +/- 0.008 inch Thickness Tolerance Variance from Panel Avg.: +/- 0.004 inch Modulus of Rupture 2103 psi Modulus of Elasticity: 326,300 psi Internal Bond: 65 psi Hardness: 500 pounds Screw Holding Face: 225 poundsScrew Holding Edge: 202 pounds Linear Expansion: 0.35 percent Flammability: ASTM E 84 - Flame Spread Index Shall Not Exceed 25 Green Spec listed - Green Seal Recommended - Forest Stewardship Council Certified (SW -COC-l. 40) 100% Recycled Woods Formaldehyde Free Emissions Mold and Mildew Resistant Water Resistant Q: On all particleboard you ask for ANSI A208.1-1999 M-2 specifications. For part numbers PRB0026 and PRB0100 you are asking for screw holding of 300 lbs face, 250 lb edge, and M.O.R. 2103 PSI all of which exceed ANSI A208.1 for M-2 particleboard.

A: Please see above specifications for all particleboard specification to meet M-2 Particleboard ANSI A208.1-1999

Q: Should we bid per the ANSI A208.1-1999, M-2 Industrial spec on all items?

We have suppliers that exceed the ANSI specs but do not meet the above specs.

A: Please submit your proposal in accordance with the specifications for M-2 Particleboard ANSI A208.1-1999

Q: Award 2 sample calls for PRB0026, could we submit a sample of that for Award 1 as well?

A: No, PRB0026 is 1 1/8” thick board. Award 1 specifies four (4) samples of ¾”x12”x12”

Since these are different thicknesses, you can not submit PRB0026 as the sample for Award 1.

This solicitation deadline for offer submission and samples is hereby extended until 2:00 pm EST on Wednesday August 25, 2010.

Except as provided herein, all other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .