FM-23-18 Contractor Deliverables.docx

DOCX document 15 KB Posted

Attached to
Addendum - Added Questions and Answers*** State and local contract opportunity
Solicitation number
RFP 751 190000002992 2
Issued by
Allegan County, Michigan

About this file

This is a contractor deliverables document for the Michigan Department of Natural Resources (MDNR) Gaylord Field Office outlining requirements for survey work on existing DNR lands. The project requires delivery of a working AutoCAD drawing five business days before final staking that identifies conflicting ground evidence, compares historical and modern measurements, and documents multiple monumentation. The final deliverables include two signed and stamped copies of large format section retracement drawings (one on 4 mil mylar), AutoCAD files, a least squares adjustment report with 95% confidence error ellipses on all control and boundary monuments with minimum redundancy from independent control points, and field notes. Monumentation requirements specify stamped 2-inch aluminum caps on 5/8-inch by 34-inch iron rebars at all LCRC recorded boundary points following 2009 BLM corner marking standards. Additional deliverables include recorded LCRC copies for all state boundary corners, blue composite posts at one-foot offsets on state land, blazed and painted witness trees, locations of wood lath or posts on state boundary lines if required, and coordinate files in both state plane and latitude/longitude CSV formats with point names, coordinates, elevations, and descriptions.

The document does not specify pricing terms, set-asides, incumbency status, funding sources, or contract duration. Deliverables should be submitted to Carl Kiiskila at the MDNR Gaylord Field Office (Phone: 989-732-3541 extension 5463; email: kiiskilac@Michigan.gov). The MDNR reserves the right to adjust the number of 1/16 corners set and recorded as needed. Survey caps and composite posts will be supplied by the Department of Natural Resources.

View the file

Other files for this state and local contract opportunity

Other files attached to Addendum - Added Questions and Answers***, newest first.
File Type Posted
FM-23-18 plat map.docx DOCX document
FM-22-18 plat map.docx DOCX document
FM-36-18 Contractor Deliverables.docx DOCX document
FM-11-18 plat map.docx DOCX document
research FM-23-18.pdf PDF
schedule_a_prof_services-outline_format.docx DOCX document
FM-15-18 Contractor Deliverables.docx DOCX document
proposal-instructions-confidential-treatment-vendor-questions-worksheet.docx DOCX document
standard_contract_terms.docx DOCX document
RFP 190000002992 questions and answers.xlsx XLSX spreadsheet
schedule_b_pricing.docx DOCX document
corner recordsFM-22-18.pdf PDF
FM-36-18 plat map.docx DOCX document
Corner recordsFM-36-18.pdf PDF
FM-15-18 plat map.docx DOCX document
Corner records FM-15-18.pdf PDF
research FM-11-18.pdf PDF
FM-11-18 Contractor Deliverables.docx DOCX document
FM-22-18 Contractor Deliverables.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FM-23-18 Contractor Deliverables to the MDNR Gaylord Field Office Attention Carl Kiiskila PS Phone # 989-732-3541 ex 5463 e-mail kiiskilac@Michigan.gov

1. Working AutoCAD Drawing will be provided Five (5) business days before final staking. Drawing shall indicate any conflicting evidence on the ground, a comparison of the historical record dimensions vs. modern measurements and any evidence of multiple monumentation. This information will be included on final drawing.

1. Final Drawing:

1. Large format drawing for section retracement of existing DNR lands Contractor will provide Two (2) signed & stamped copies of the Final map.

1. One of the final maps will be on 4 mil mylar

1. AutoCAD file of final drawings.

1. Least squares adjustment report at 95% confidence error ellipses on all control points, government corners and boundary monuments. A minimum of 1 redundancy on all adjustment points from an independent control point.

1. Copy of field notes.

1. Minimum monumentation will be a stamped 2” Aluminum Cap on a 5/8” x 34” long iron rebar at all LCRC recorded boundary points. Stamping to included standard BLM corner marking per 2009 manual of instructions. The Michigan DNR reserves the right too adjust the number of 1/16 corners set and recorded as needed.

1. Copies of the recorded LCRC’s on all State Boundary Corners in the project area. Corners to be recorded are remonumented and/or rewitnessed government corners and all 1/16 corners used as control or as angle points in the boundary survey. All other corners of control shall have a minimum of two witnesses and shown on the final drawing. Blue Composite Posts will be added at a 1’ foot offset on the state land at all State Boundary corners. If the corner falls in a traveled roadway the Composite Posts will be offset at an appropriate distance and recorded in the corner record. Survey caps and Composite Posts will be supplied by the Department of Natural Resources. All witness trees on State land will blazed and painted.

1. Locations of wood lath or posts placed on State Boundary lines if required.

1. State plane Coordinate file CSV format – With Point name, Northing, Easting, Elev, Description.

1. Lat long coordinate file in CSV format – With Point name, Latitude, Longitude, Height, Description.

1. Printed coordinate file.

File details come from the government source that posted it. Updated .