FM-15-18 Contractor Deliverables.docx

DOCX document 15 KB Posted

Attached to
Addendum - Added Questions and Answers*** State and local contract opportunity
Solicitation number
RFP 751 190000002992 2
Issued by
Allegan County, Michigan

About this file

This is a contractor deliverables document from the Michigan Department of Natural Resources (MDNR) Gaylord Field Office for project FM-15-18, a section retracement survey of existing DNR lands. The primary contact is Carl Kiiskila at the Gaylord Field Office (989-732-3541 ext. 5463). The contractor must deliver a working AutoCAD drawing five business days before final staking that documents conflicting evidence, historical versus modern measurements, and any multiple monumentation found. Final deliverables include two signed and stamped copies of the final map (one on 4 mil mylar), AutoCAD files, a least squares adjustment report at 95% confidence error ellipses with minimum redundancy from independent control points, and copies of field notes. All boundary monuments must be monumented with stamped 2-inch aluminum caps on 5/8-inch by 34-inch iron rebars marked according to 2009 BLM standards, with blue composite posts placed at 1-foot offsets on state land. The contractor must record all remonumented and rewitnessed government corners and 1/16 corners used as control with the LCRC, blaze and paint witness trees on state land, and locate any wood lath or posts on state boundary lines.

The deliverables also require state plane coordinate files and latitude-longitude coordinate files in CSV format with point names, coordinates, elevation or height, and descriptions, along with printed coordinate files. The MDNR reserves the right to adjust the number of 1/16 corners set and recorded as needed. Survey caps and composite posts are to be supplied by the Department of Natural Resources. No pricing terms, funding amounts, or contract term information is provided in this deliverables document.

View the file

Other files for this state and local contract opportunity

Other files attached to Addendum - Added Questions and Answers***, newest first.
File Type Posted
schedule_a_prof_services-outline_format.docx DOCX document
proposal-instructions-confidential-treatment-vendor-questions-worksheet.docx DOCX document
standard_contract_terms.docx DOCX document
RFP 190000002992 questions and answers.xlsx XLSX spreadsheet
schedule_b_pricing.docx DOCX document
corner recordsFM-22-18.pdf PDF
FM-23-18 plat map.docx DOCX document
FM-22-18 plat map.docx DOCX document
FM-36-18 Contractor Deliverables.docx DOCX document
FM-11-18 plat map.docx DOCX document
research FM-23-18.pdf PDF
FM-36-18 plat map.docx DOCX document
Corner recordsFM-36-18.pdf PDF
FM-15-18 plat map.docx DOCX document
Corner records FM-15-18.pdf PDF
research FM-11-18.pdf PDF
FM-11-18 Contractor Deliverables.docx DOCX document
FM-23-18 Contractor Deliverables.docx DOCX document
FM-22-18 Contractor Deliverables.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FM-15-18 Contractor Deliverables to the MDNR Gaylord Field Office Attention Carl Kiiskila PS Phone # 989-732-3541 ex 5463 e-mail kiiskilac@Michigan.gov

1. Working AutoCAD Drawing will be provided Five (5) business days before final staking. Drawing shall indicate any conflicting evidence on the ground, a comparison of the historical record dimensions vs. modern measurements and any evidence of multiple monumentation. This information will be included on final drawing.

1. Final Drawing:

1. Large format drawing for section retracement of existing DNR lands Contractor will provide Two (2) signed & stamped copies of the Final map.

1. One of the final maps will be on 4 mil mylar

1. AutoCAD file of final drawings.

1. Least squares adjustment report at 95% confidence error ellipses on all control points, government corners and boundary monuments. A minimum of 1 redundancy on all adjustment points from an independent control point.

1. Copy of field notes.

1. Minimum monumentation will be a stamped 2” Aluminum Cap on a 5/8” x 34” long iron rebar at all LCRC recorded boundary points. Stamping to included standard BLM corner marking per 2009 manual of instructions. The Michigan DNR reserves the right too adjust the number of 1/16 corners set and recorded as needed.

1. Copies of the recorded LCRC’s on all State Boundary Corners in the project area. Corners to be recorded are remonumented and/or rewitnessed government corners and all 1/16 corners used as control or as angle points in the boundary survey. All other corners of control shall have a minimum of two witnesses and shown on the final drawing. Blue Composite Posts will be added at a 1’ foot offset on the state land at all State Boundary corners. If the corner falls in a traveled roadway the Composite Posts will be offset at an appropriate distance and recorded in the corner record. Survey caps and Composite Posts will be supplied by the Department of Natural Resources. All witness trees on State land will blazed and painted.

1. Locations of wood lath or posts placed on State Boundary lines if required.

1. State plane Coordinate file CSV format – With Point name, Northing, Easting, Elev, Description.

1. Lat long coordinate file in CSV format – With Point name, Latitude, Longitude, Height, Description.

1. Printed coordinate file.