FM-11-18 Contractor Deliverables.docx
DOCX document 15 KB Posted
- Attached to
- Addendum - Added Questions and Answers*** State and local contract opportunity
- Solicitation number
- RFP 751 190000002992 2
- Issued by
- Allegan County, Michigan
About this file
This document outlines contractor deliverables for a section retracement survey project managed by the Michigan Department of Natural Resources (MDNR) Gaylord Field Office, with deliverables to be submitted to Carl Kiiskila (989-732-3541 ext. 5463). The contractor must provide a working AutoCAD drawing five business days before final staking that documents conflicting ground evidence, historical versus modern measurements, and multiple monumentation. Final deliverables include two signed and stamped copies of the final map (one on 4-mil mylar), an AutoCAD file, a least squares adjustment report at 95% confidence with error ellipses on all control points and boundary monuments, and field notes. Monumentation work requires installation of stamped 2-inch aluminum caps on 5/8-inch by 34-inch iron rebars at all LCRC-recorded boundary points using standard BLM corner marking per the 2009 manual of instructions, with the MDNR reserving the right to adjust the number of 1/16 corners set and recorded as needed.
Additional deliverables include copies of recorded LCRC records for all state boundary corners, witness trees blazed and painted on state land, and documentation of wood lath or post locations on state boundary lines. Blue composite posts will be placed at one-foot offsets on state land at all state boundary corners, with offset documentation recorded if corners fall in traveled roadways. The contractor must provide state plane coordinate files and latitude-longitude coordinate files in CSV format containing point names, coordinates, elevation or height, and descriptions, along with printed coordinate files. All survey caps and composite posts will be supplied by the Department of Natural Resources.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| FM-23-18 plat map.docx | DOCX document | |
| FM-22-18 plat map.docx | DOCX document | |
| FM-36-18 Contractor Deliverables.docx | DOCX document | |
| FM-11-18 plat map.docx | DOCX document | |
| research FM-23-18.pdf | ||
| FM-36-18 plat map.docx | DOCX document | |
| Corner recordsFM-36-18.pdf | ||
| FM-15-18 plat map.docx | DOCX document | |
| Corner records FM-15-18.pdf | ||
| research FM-11-18.pdf | ||
| FM-23-18 Contractor Deliverables.docx | DOCX document | |
| FM-22-18 Contractor Deliverables.docx | DOCX document | |
| RFP 190000002992 questions and answers.xlsx | XLSX spreadsheet | |
| schedule_b_pricing.docx | DOCX document | |
| corner recordsFM-22-18.pdf | ||
| schedule_a_prof_services-outline_format.docx | DOCX document | |
| FM-15-18 Contractor Deliverables.docx | DOCX document | |
| proposal-instructions-confidential-treatment-vendor-questions-worksheet.docx | DOCX document | |
| standard_contract_terms.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FM-11-18 Contractor Deliverables to the MDNR Gaylord Field Office Attention Carl Kiiskila PS Phone # 989-732-3541 ex 5463 e-mail kiiskilac@Michigan.gov
1. Working AutoCAD Drawing will be provided Five (5) business days before final staking. Drawing shall indicate any conflicting evidence on the ground, a comparison of the historical record dimensions vs. modern measurements and any evidence of multiple monumentation. This information will be included on final drawing.
1. Final Drawing:
1. Large format drawing for section retracement of existing DNR lands Contractor will provide Two (2) signed & stamped copies of the Final map.
1. One of the final maps will be on 4 mil mylar
1. AutoCAD file of final drawings.
1. Least squares adjustment report at 95% confidence error ellipses on all control points, government corners and boundary monuments. A minimum of 1 redundancy on all adjustment points from an independent control point.
1. Copy of field notes.
1. Minimum monumentation will be a stamped 2” Aluminum Cap on a 5/8” x 34” long iron rebar at all LCRC recorded boundary points. Stamping to included standard BLM corner marking per 2009 manual of instructions. The Michigan DNR reserves the right too adjust the number of 1/16 corners set and recorded as needed.
1. Copies of the recorded LCRC’s on all State Boundary Corners in the project area. Corners to be recorded are remonumented and/or rewitnessed government corners and all 1/16 corners used as control or as angle points in the boundary survey. All other corners of control shall have a minimum of two witnesses and shown on the final drawing. Blue Composite Posts will be added at a 1’ foot offset on the state land at all State Boundary corners. If the corner falls in a traveled roadway the Composite Posts will be offset at an appropriate distance and recorded in the corner record. Survey caps and Composite Posts will be supplied by the Department of Natural Resources. All witness trees on State land will blazed and painted.
1. Locations of wood lath or posts placed on State Boundary lines if required.
1. State plane Coordinate file CSV format – With Point name, Northing, Easting, Elev, Description.
1. Lat long coordinate file in CSV format – With Point name, Latitude, Longitude, Height, Description.
1. Printed coordinate file.
File details come from the government source that posted it. Updated .