Floyd_Street_Pipeline_Replacement_Bid_Sheet.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Floyd Street Gas Pipeline Replacement
Solicitation number
PE-70750-NONST-2025-000000031
Issued by
Newton County, Georgia

About this file

This document is a bid sheet for the City of Covington's Floyd Street Gas Main Replacement project. The work consists of installing approximately 9,000 feet of 2-inch polyethylene gas main, fourteen tie-ins to existing 2 and 4-inch steel gas mains, and associated service tie-overs along Floyd Street in Covington, Georgia. A mandatory pre-bid meeting will be held on August 9, 2024, at 10:00 A.M. at Covington City Hall, and sealed proposals will be due by August 22, 2024, at 10:00 A.M.

The bid sheet includes unit pricing for various line items, such as polyethylene pipe, tie-ins, fabrication and installation of a 4-inch header, ball valves, service installations, mobilization, haul-off, erosion control measures, sod replacement, tree protection, and extra depth or solid rock excavation. The total estimated cost for the project is $453,950.00. The contract is for the City of Covington, which is located in Newton County, Georgia.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CITY OF COVINGTON
FLOYD STREET GAS MAIN REPLACEMENT
ITEMTYPEDESCRIPTIONQTY.UNITUNIT PRICETOTAL AMOUNT
1.M,L&E2" SDR 11 PE 2406/2708 Polyethylene Line Pipe9,000L.F.$0.00

2. M,L&E Tie in per Detail A 14 Ea $0.00

3. M,L&E Fabrication and Installation of 4" Header per Detail B (includes tie-in to existing 4" main and 4" valve w/ valve box) 1 Ea $0.00

4. M,L&E 2" Polyball Ball Valve w/ valve box 21 Ea $0.00

5. M,L&E Insert short side service (includes self tapping tee, EFV, anodeless riser and meter valve) 39 Ea $0.00

6. M,L&E Insert longside service (includes self tapping tee, EFV, anodeless riser and meter valve) 32 Ea $0.00

7. L & E Mobilzation/Demobilization between Phase 1 and 2 1 Ea $0.00

8.M,L&ESqueegie/Pad Material10,000L.F.$5.00$50,000.00
five dollars & no/100
9.L&EHard Surface Haul-off20,000Sq. Ft.$4.00$80,000.00
four dollars & no/100
10.M,L&EType C Silt Fence100L.F.$3.00$300.00
three dollars & no/100
11.M,L&ECurb Inlet Filters50Ea.$250.00$12,500.00
ten dollars & no/100
12.M,L&ESod replacement2,000Sq. Ft.$2.00$4,000.00
two dollars & no/100
13.M,L&ETree Protection and Buffer Delineation Orange Fencing50L.F.$3.00$150.00
three dollars & no/100
14.L & EPer foot of Extra Depth where required500L.F.$10.00$5,000.00
ten dollars & no/100
15.L & ESolid Rock Excavation10C.Y.$200.00$2,000.00
two hundred dollars & no/100
16.M,L&EAsphalt/concrete replacement20,000Sq. Ft.$15.00$300,000.00
fifteen dollars & no/100

Total Cost (Items 1-16) $453,950.00