7_11_24 SEC_FLOYD Gas Line ESPC_ 7_11_24.pdf
PDF 15 MB Posted
- Attached to
- Floyd Street Gas Pipeline Replacement
- Solicitation number
- PE-70750-NONST-2025-000000031
- Issued by
- Newton County, Georgia
About this file
The document is a solicitation for the CITY OF COVINGTON, GEORGIA related to the FLOYD STREET REPLACEMENT - NATURAL GAS PIPELINE SYSTEM project. The scope of work involves the installation of approximately 9,000 feet of 2-inch polyethylene gas main, fourteen tie-ins to existing 2 and 4 steel gas main, and associated service tie-overs along Floyd Street in Covington, Georgia. A mandatory pre-bid meeting will be held on August 9, 2024 at 10:00 A.M. at the Covington City Hall. Sealed proposals will be received until August 22, 2024 at 10:00 A.M., and proposals will be publicly opened and read aloud at 10:15 A.M. The contract will be awarded to the successful bidder.
The solicitation does not provide details on pricing terms, set asides, incumbent contractors, funding requirements or sources, or other financial information. The document focuses on the technical scope of work, response deadlines, and bid submission logistics.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised Bid Sheet_ Floyd_Street_Pipeline_Repl.pdf | ||
| FLOYD STREET GAS LINE REPLACEMENT DESIGN 7_11.pdf | ||
| FloydStReplacement_BID_DocumentPackage.pdf | ||
| Floyd_Street_Pipeline_Replacement_Bid_Sheet.xlsx | XLSX spreadsheet | |
| Addendum _ 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEARING
ST. SE.
LAT N33°35'48"
LONG W83°51'30"
LAT N33°36'01"
LONG W83°50'12"
SEDIMENT & EROSION CONTROL
COVER
EC10.10REVISIONS
APPROVED BY: XXX
DRAWN BY: XXX
DWG. NO.:
NO. DESCRIPTION DATE
Southeastern Gas Engineering www.southeasterngasengineering.com
P.O. Box 20191 Atlanta, Georgia 30325
CITY OF COVINGTON
2194 EMORY STREET N.W.
COVINGTON, GEORGIA 30014
No. 19035
PROFESSIONAL
R E G I S T E R E D
E N G I N E E R
G
E O R G I A
EDW A R D G . C O NDER
LOCATION MAP
PRIMARY PERMITTEE (OWNER):
PROJECT
SITE
MR. MICHAEL WILLIS
2194 EMORY STREET N.W.
COVINGTON, GA 30014
(770) 385-2000
CITY OF COVINGTON
CITY OF COVINGTON GEORGIA
24-HOUR CONTACT:
CITY OF COVINGTON
MR. ROBERT BAKER
CITY OF COVINGTON
WATER / SEWER MANAGER
(678) 414-1434
DATE: 6-12-2024
Ju ly
1, H
:\P ro je ct
F ile s\
C ity o f C ov in gt on
G A
\P ro je ct s\
.0
- F lo yd -N ew to n W
M R
\3
D es ig n\
P re lim in ar y
D ra w in gs \0
C iv il
D em o\
Fl oy d\
-D w gs \S
E C
-F
LO
Y D
G A
S E
C C
O V
E R
A N
D D
E
TA
IL
S
.d w g
Ds1
Ds3
Ds4
Ss
Sb
Tac
Ds1
Ds3
Ds4
Sb
Tac
Ds2 Ds2
Du Du
Ss
Cs
Bf
Cs
Fl-Co Fl-Co
Bf
GEORGIA
FOR SOIL EROSION AND SEDIMENT CONTROL PRACTICES
UNIFORM CODING SYSTEM
GEORGIA SOIL AND WATER CONSERVATION COMMISSION
STRUCTURAL PRACTICES
Ch
Co
Cr Cr
Dc
Di
Dn1 Dn1
Dn2 Dn2
Fr
Ga
Gr
Lv
Rd
Re Re
Rt
Sd1
Sd2
Sd3
Rt
Sk
Sd4
Gr
Co
Sd3
Sk
Sr
St St
Su
Tc
Wt
Tr
Tp
Tc
Tp
Sr
CODE PRACTICE DETAIL DESCRIPTION CODE PRACTICE DETAIL DESCRIPTIONMAP
SYMBOL
MAP
SYMBOL
STRUCTURAL PRACTICES
CODE PRACTICE DETAIL DESCRIPTIONMAP
SYMBOL
VEGETATIVE PRACTICES
Su
Spb Spb
Cd
No. 19035
PROFESSIONAL
R E G I S T E R E D
E N G I N E E R
G
E O R G I A
EDW A R D G . C O NDER
EROSION, SEDIMENTATION & POLLUTION CONTROL PLAN CHECKLIST
INFRASTRUCTURE CONSTRUCTION PROJECTS
Project Name:______________________________________ Local Issuing Authority: LIA-107-01
Floyd Street Gas Main Replacement
Page #
EC10.10
EC10.11
Included Y/N
Y
Y
Y Y Y Y
Y Y Y Y
Y
Y
Y
Y
Y
Y Y
Y
Y
Y
Y
Y
SWCD:_________________________________________________________
Floyd Street, Covington, GA 30014
Upper Ocmulgee River SWCD Address:____________________________________________
7/10/2024Date on Plans:_______________________________________ Name & Email of person filling out checklist: Edward G. Conder / econder@segasengineering.com Plan TO BE SHOWN ON ES&PC PLAN
1 The applicable Erosion, Sedimentation and Pollution Control Plan Checklist established by the Commission as of January 1 of the year in which the land-disturbing activity was permitted.
(The completed Checklist must be submitted with the ES&PC Plan or the Plan will not be reviewed)
2 Level II certification number issued by the Commission, signature and seal of the certified design professional.
(Signature, seal and Level II number must be on each sheet pertaining to ES&PC Plan or the Plan will not be reviewed)
3 The name and phone number of the 24-hour contact responsible for erosion, sedimentation and pollution controls.
4 Provide the name, address, email address, and phone number of primary permittee.
5 Note total and disturbed acreages of the project or phase under construction.
6 Provide the GPS locations of the beginning and end of the Infrastructure project. Give the Latitude and Longitude in decimal degrees.
7 Initial date of the Plan and the dates of any revisions made to the Plan including the entity who requested the revisions.
8 Descriptions of the nature of construction activity and existing site conditions.
9 Provide vicinity map showing site’s relation to surrounding areas. Include designation of specific phase, if necessary.
10 Identify the project receiving waters and describe all sensitive adjacent areas including streams, lakes, residential areas, wetlands, marshlands, etc. which may be affected.
11 Design professional's certification statement and signature that the site was visited prior to development of the ES&PC Plan as stated on Part IV page 21 of the permit.
12 Design professional's certification statement and signature that the permittee’s ES&PC Plan provides for an appropriate and comprehensive system of BMPs and sampling to meet permit requirements as stated on Part IV page 20 of the permit. *
13 Design professional certification statement and signature that the permittee's ES&PC Plan provides for representative sampling as stated on Part IV.D.6.c.(3) page 37 of the permit as applicable. *
14 Clearly note the statement that "The design professional who prepared the ES&PC Plan is to inspect the installation of the initial sediment storage requirements, perimeter control BMPs, and sediment basins within 7 days after installation."
in accordance with Part IV.A.5 page 26 of the permit. *
15 Clearly note the statement that "Non-exempt activities shall not be conducted within the 25 or 50-foot undisturbed stream buffers as measured from the point of wrested vegetation or within 25-feet of the coastal marshland buffer as measured from the Jurisdictional Determination Line without first acquiring the necessary variances and permits."
16 Provide a description of any buffer encroachments and indicate whether a buffer variance is required.
17 Clearly note the statement that "Amendments/revisions to the ES&PC Plan which have a significant effect on BMPs with a hydraulic component must be certified by the design professional." *
18 Clearly note the statement that "Waste materials shall not be discharged to waters of the State, except as authorized by a Section 404 permit." *
19 Clearly note statement that "The escape of sediment from the site shall be prevented by the installation of erosion and sediment control measures and practices prior to land disturbing activities."
20 Clearly note statement that "Erosion control measures will be maintained at all times. If full implementation of the approved Plan does not provide for effective erosion control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source."
21 Clearly note the statement "Any disturbed area left exposed for a period greater than 14 days shall be stabilized with mulch or temporary seeding."
22 Any construction activity which discharges storm water into an Impaired Stream Segment, or within 1 linear mile upstream of and within the same watershed as, any portion of a Biota Impaired Stream Segment must comply with Part III. C. of the permit. Include the completed Appendix 1 listing all the BMPs that will be used for those areas of the site which discharge to the Impaired Stream Segment. *
N/A
N/A
N/A N/A
N
Y
Y Y
Y
Y Y
Y
Y
Y
N
N N
Y
23 If a TMDL Implementation Plan for sediment has been finalized for the Impaired Stream Segment (identified in item 22 above) at least six months prior to submittal of NOI, the ES&PC Plan must address any site-specific conditions or requirements included in the TMDL Implementation Plan. *
24 BMPs for concrete washdown of tools, concrete mixer chutes, hoppers and the rear of the vehicles. Washout of the drum at the construction site is prohibited. *
25 Provide BMPs for the remediation of all petroleum spills and leaks.
26 Description of the measures that will be installed during the construction process to control pollutants in storm water that will occur after construction operations have been completed. *
27 Description of practices to provide cover for building materials and building products on site. *
28 Description of the practices that will be used to reduce the pollutants in storm water discharges. *
29 Description and chart or timeline of the intended sequence of major activities which disturb soils for the major portions of the site (i.e., initial perimeter and sediment storage BMPs, clearing and grubbing activities, excavation activities, utility activities, temporary and final stabilization).
30 Provide complete requirements of Inspections and record keeping by the primary permittee. *
31 Provide complete requirements of Sampling Frequency and Reporting of sampling results. *
32 Provide complete details for Retention of Records as per Part IV.F. of the permit. *
33 Description of analytical methods to be used to collect and analyze the samples from each location. *
34 Appendix B rationale for NTU values at all outfall sampling points where applicable. *
35 Delineate all sampling locations, perennial and intermittent streams and other water bodies into which storm water is discharged also provide a summary chart of the justification and analysis for the representative sampling as applicable. *
36 A description of appropriate controls and measures that will be implemented at the construction site including: (1) initial sediment storage requirements and perimeter control BMPs, (2) intermediate grading and drainage BMPs, and (3) final BMPs. For construction sites where there will be no mass grading and the initial perimeter control BMPs, intermediate grading and drainage BMPs, and final BMPs are the same, the Plan may combine all of the BMPs into a single phase. *
EC10.12-16
N/A
N/A
N/A
N/A N/A
N/A
N/A
Y Y
N
N
N
N N Y Y
N
Y Y N
37 Graphic scale and North arrow.
38 Existing and proposed contour lines with contour lines drawn at an interval in accordance with the following:
Existing Contours Proposed Contours
USGS 1": 2000' Topographical Sheets 1" : 400' Centerline Profile
39 Use of alternative BMPs whose performance has been documented to be equivalent to or superior to conventional BMPs as certified by a Design Professional (unless disapproved by GAEPD or the Georgia Soil and Water Conservation Commission). Please refer to the Alternative BMP Guidance Document found at www.gaswcc.georgia.gov.
40 Use of alternative BMP for application to the Equivalent BMP List. Please refer to Appendix A-2 of the Manual for Erosion & Sediment Control in Georgia 2016 Edition. *
41 Delineation of the applicable 25-foot or 50-foot undisturbed buffers adjacent to State waters and any additional buffers required by the Local Issuing Authority. Clearly note and delineate all areas of impact.
42 Delineation of on-site wetlands and all State waters located on and within 200 feet of the project site.
43 Delineation and acreage of contributing drainage basins on the project site.
44 Delineate on-site drainage and off-site watersheds using USGS 1" :2000' topographical sheets.
45 An estimate of the runoff coefficient or peak discharge flow of the site prior to and after construction activities are completed.
46 Storm-drain pipe and weir velocities with appropriate outlet protection to accommodate discharges without erosion.
Identify/Delineate all storm water discharge points.
47 Soil series for the project site and their delineation.
48 The limits of disturbance for each phase of construction.
49 Provide a minimum of 67 cubic yards of sediment storage per acre drained using a temporary sediment basin, retrofitted detention pond, and/or excavated inlet sediment traps for each common drainage location. Sediment storage volume must be in place prior to and during all land disturbance activities until final stabilization of the site has been achieved. A written justification explaining the decision to use equivalent controls when a sediment basin is not attainable must be included in the Plan for each common drainage location in which a sediment basin is not provided. A written justification as to why 67 cubic yards of storage is not attainable must also be given. Worksheets from the Manual must be included for structural BMPs and all calculations used by the design professional to obtain the required sediment storage when using equivalent controls. When discharging from sediment basins and impoundments, permittees are required to utilize outlet structures that withdraw water from the surface, unless infeasible. If outlet structures that withdraw water from the surface are not feasible, a written justification explaining this decision must be included in the Plan.
EC10.17
Y
Y
Y
50 Location of Best Management Practices that are consistent with and no less stringent than the Manual for Erosion and Sediment Control in Georgia. Use uniform coding symbols from the Manual, Chapter 6, with legend.
51 Provide detailed drawings for all structural practices. Specifications must, at a minimum, meet the guidelines set forth in the Manual for Erosion and Sediment Control in Georgia.
52 Provide vegetative plan, noting all temporary and permanent vegetative practices. Include species, planting dates and seeding, fertilizer, lime and mulching rates. Vegetative plan shall be site specific for appropriate time of year that seeding will take place and for the appropriate geographic region of Georgia.
* If using this checklist for a project that is less than 1 acre and not part of a common development but within 200 ft of a perennial stream, the * checklist items would be N/A.
Effective January 1, 2024
EC10.10
EC10.10
EC10.10
EC10.10
EC10.10
EC10.10
EC10.10
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.11
EC10.12-16
EC10.18
EC10.11
EC10.11-18
EC10.12-16
EC10.17
EC10.11-16
SEDIMENT & EROSION CONTROL
NOTES
EC10.11REVISIONS
APPROVED BY: XXX
DRAWN BY: XXX
DWG. NO.:
NO. DESCRIPTION DATE
Southeastern Gas Engineering www.southeasterngasengineering.com
P.O. Box 20191 Atlanta, Georgia 30325
CITY OF COVINGTON
2194 EMORY STREET N.W.
COVINGTON, GEORGIA 30014
No. 19035
PROFESSIONAL
R E G I S T E R E D
E N G I N E E R
G
E O R G I A
EDW A R D G . C O NDER
DATE: 6-12-2024
Ju ly
1, H
:\P ro je ct
F ile s\
C ity o f C ov in gt on
G A
\P ro je ct s\
.0
- F lo yd -N ew to n W
M R
\3
D es ig n\
P re lim in ar y
D ra w in gs \0
C iv il
D em o\
Fl oy d\
-D w gs \S
E C
-F
LO
Y D
G A
S E
C C
O V
E R
A N
D D
E
TA
IL
S
.d w g
24-HOUR CONTACT:
(770)385-2000
SOIL SYMBOL SOIL NAME SLOPES K FACTOR T FACTOR
CCA CARTECAY AND CHEWACLA 0-2% .17 5
CfC2 CECIL SANDY CLAY LOAM 6-10% .15 5 CuC CECIL-URBAN LAND COMPLEX 2-10% .20 5
CONSTRUCTION SCHEDULE
IF PERMANENT VEGETATION FALL IN A PERIOD OF TIME WHEN PERMANENT GRASSING IS NOT ALLOWED, THE SITE
SHALL BE PERMANENTLY GRASSED AT THE BEGINNING OF THE NEXT GRASSING SEASON.
TEMPORARY EROSION CONTROL STRUCTURES SHALL BE REMOVED AFTER PERMANENT GRASS OR PAVING HAS BEEN ESTABLISHED.
END CONSTRUCTION
BEGIN CONSTRUCTION
ACTIVITY
MONTH
INSTALLATION OF
PERIMETER BMPs
INSTALLATION OF
INFRASTRUCTURE
MAINTENANCE OF EROSION
CONTROL MEASURES
REMOVE TEMPORARY
STRUCTURES **
MONTH
MONTH
MONTH
MONTH
MONTH
MONTH
MONTH
MONTH
MONTH
MONTH
MONTH
TEMPORARY GRASSING OR
ASPHALT PATCHING
FINAL GRASSING* OR
ASPHALT PATCHING
INSTALL TREE PROTECTION
(IF REQUIRED)
1. CERTIFICATION STATEMENT
I CERTIFY THAT THIS EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN (ES&PC
PLAN) HAS BEEN PREPARED IN ACCORDANCE WITH PART IV GAR 100002.
I CERTIFY THAT THE PERMITTEE'S EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN
PROVIDES FOR AN APPROPRIATE AND COMPREHENSIVE SYSTEM OF BEST MANAGEMENT
PRACTICES REQUIRED BY THE GEORGIA WATER QUALITY CONTROL ACT AND THE DOCUMENT
"MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA" (MANUAL) PUBLISHED BY
THE GEORGIA SOIL AND WATER CONSERVATION COMMISSION AS OF JANUARY 1 OF THE
YEAR IN WHICH THE LAND-DISTURBING ACTIVITY WAS PERMITTED, PROVIDES FOR THE
SAMPLING OF THE RECEIVING WATER(S) OR THE SAMPLING OF THE STORMWATER OUTFALLS
AND THAT THE DESIGNED SYSTEM OF BEST MANAGEMENT PRACTICES AND SAMPLING
METHODS IS EXPECTED TO MEET THE REQUIREMENTS CONTAINED IN THE GENERAL NPDES
PERMIT NO. GAR100002.
I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS PREPARED AFTER A SITE VISIT TO
THE LOCATIONS DESCRIBED HEREIN BY MYSELF OR MY AUTHORIZED AGENT, UNDER MY
SUPERVISION.
EDWARD G. CONDER
GSWCC NO. 0000045545
EXPIRES 09/19/2025
2. DESCRIPTION
3. ES&PC PLAN GENERAL NOTES
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF
EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND-DISTURBING
ACTIVITIES.
EROSION AND SEDIMENTATION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF
FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE
CONTROL, ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE
IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
MAINTENANCE OF ALL SOIL, EROSION, AND SEDIMENT CONTROL MEASURES AND PRACTICES,
WHETHER TEMPORARY OR PERMANENT, SHALL BE AT ALL TIMES THE RESPONSIBILITY OF THE
CONTRACTOR.
ALL FILL SLOPES SHALL HAVE SILT FENCE PLACED AT THE SLOPE'S TOE.
CONCENTRATED FLOW AREAS AND ALL SLOPES STEEPER THAN 2.5:1 WITH A HEIGHT OF TEN
FEET OR GREATER SHALL BE STABILIZED WITH APPROPRIATE EROSION CONTROL MATTING OR
BLANKET.
THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC PLAN IS TO INSPECT THE
INSTALLATION OF THE INITIAL SEDIMENT STORAGE REQUIREMENTS, PERIMETER CONTROL
BMPs, AND SEDIMENT BASINS WITHIN 7 DAYS AFTER INSTALLATION IN ACCORDANCE WITH
PART IV.A.5. PAGE 26 OF THE PERMIT. AN ALTERNATIVE DESIGN PROFESSIONAL APPROVED
BY EPD IN WRITING MAY PERFORM THE INSPECTION.
THERE ARE NO DELINEATED WETLANDS ON THIS PROJECT SITE. WETLANDS WILL NOT BE
DISTURBED BY THIS PROJECT.
SEDIMENT STORAGE INDICATORS MUST BE INSTALLED IN SEDIMENT STORAGE STRUCTURES,
INDICATING 1/3 FULL VOLUME.
ALL STORMWATER MANAGEMENT UTILITIES TO BE INSPECTED BY DEPARTMENT OF WATER
RESOURCES.
4. PLAN ALTERATIONS
THIS ES&PC PLAN IS PROVIDED BY THE ENGINEER. IT ADDRESSES THE STAGED CONSTRUCTION
OF THE PROJECT ON THE BASIS OF COMMON CONSTRUCTION METHODS AND TECHNIQUES.
IF THE CONTRACTOR ELECTS TO ALTER THE STAGED CONSTRUCTION FROM THAT SHOWN ON
THE PLANS OR UTILIZE CONSTRUCTION TECHNIQUES THAT RENDER THIS PLAN INEFFECTIVE,
AND THE ENGINEER APPROVES THE REQUEST, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
THE REVISION OF THE ES&PC PLAN TO REFLECT THE REVISED CONSTRUCTION. THIS WILL
ALSO INCLUDE ANY REVISIONS TO THE EROSION AND SEDIMENTATION CONTROL ITEM
QUANTITIES.
THE CONTRACTOR AND THE CERTIFIED DESIGN PROFESSIONAL SHALL CAREFULLY EVALUATE
THIS PLAN PRIOR TO COMMENCING LAND-DISTURBING ACTIVITIES.
AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON
BMPs WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.
A REVISION TO THE EROSION CONTROL PLAN IS REQUIRED WHENEVER THERE IS A CHANGE IN
DESIGN, CONSTRUCTION, OPERATION, OR MAINTENANCE, THAT WILL HAVE A SIGNIFICANT
EFFECT ON BMPs WITH A HYDRAULIC COMPONENT, OR IF THE PLAN PROVES TO BE
INEFFECTIVE IN ELIMINATING POLLUTANT DISCHARGE.
5. TEMPORARY MULCHING
EXCEPT AS PROVIDED IN EPD GENERAL PERMIT GAR 100002, STABILIZATION MEASURES
SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE
CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE
MORE THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE
HAS TEMPORARILY OR PERMANENTLY CEASED.
ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE
STABILIZED WITH MULCH OR TEMPORARY SEEDING. HOWEVER, IN SPECIAL CASES THE
PROJECT ENGINEER MAY REQUIRE THE CONTRACTOR TO PERFORM STABILIZATION MORE
OFTEN THAN 14 DAYS.
6. VEGETATION AND PLANTING SCHEDULE
ALL TEMPORARY AND PERMANENT VEGETATIVE PRACTICES INCLUDING PLANT SPECIES,
PLANTING DATES, SEEDING, FERTILIZING, LIMING, AND MULCHING FOR THIS PROJECT CAN BE
FOUND IN THE ES&PC PLAN.
7. SEQUENCE OF MAJOR ACTIVITIES
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF CONSTRUCTION
SEQUENCING AND PHASING. THE PERIMETER BMP'S AND INLET PROTECTION DEVICES MUST
BE IN PLACE AS SHOWN ON THE PLANS PRIOR TO TO ANY LAND DISTURBING ACTIVITIES.
ADDITIONAL BMPs SHALL BE INSTALLED AND MAINTAINED DURING CONSTRUCTION AS
SHOWN OR AS OTHERWISE REQUIRED. PERMANENT BMP'S AND FINAL STABILIZATION SHALL
BE COMPLETED AS SHOWN ON THE PLAN OR AS OTHERWISE REQUIRED.
8. PETROLEUM STORAGE, SPILLS, AND LEAKS
THESE PLANS EXPRESSLY DELEGATE THE RESPONSIBILITY OF PROPER ON-SITE HAZARDOUS
MATERIAL MANAGEMENT TO THE CONTRACTOR. THE CONTRACTOR SHALL AT A MINIMUM
PROVIDE AN ACTION PLAN AND KEEP THE NECESSARY MATERIALS ON SITE FOR THE CAPTURE,
CLEAN UP, AND DISPOSAL OF ANY PETROLEUM PRODUCT, OR OTHER HAZARDOUS MATERIAL,
LEAKS OR SPILLS ASSOCIATED WITH THE SERVICING, REFUELING OR OPERATION OF ANY
EQUIPMENT UTILIZED AT THE SITE. A COPY OF THE ACTION PLAN SHALL BE MAINTAINED ON
THE PROJECT SITE. ALL PERSONNEL OPERATING OR SERVICING EQUIPMENT SHALL BE
FAMILIAR WITH THE ACTION PLAN. THE CONTRACTOR SHALL NOT PARK, REFUEL, OR
MAINTAIN EQUIPMENT WITHIN STREAMS.
9. SPILL CLEANUP AND CONTROL PRACTICES
· LOCAL, STATE AND MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP
WILL BE CLEARLY POSTED AND PROCEDURES WILL BE MADE AVAILABLE TO SITE
PERSONNEL.
· MATERIAL AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT IN THE
MATERIAL STORAGE AREAS. TYPICAL MATERIALS AND EQUIPMENT INCLUDES, BUT IS
NOT LIMITED TO, BROOMS, DUSTPANS, MOPS, RAGS, GLOVES, GOGGLES, CAT LITTER,
SAND, SAWDUST AND PROPERLY LABELED PLASTIC AND METAL WASTE CONTAINERS.
· SPILL PREVENTION PRACTICES AND PROCEDURES WILL BE REVIEWED AFTER A SPILL
AND ADJUSTED AS NECESSARY TO PREVENT FUTURE SPILLS.
· ALL SPILLS WILL BE CLEANED UP IMMEDIATELY UPON DISCOVER. ALL SPILLS WILL BE
REPORTED AS REQUIRED BY LOCAL, STATE, AND FEDERAL REGULATIONS.
· FOR SPILLS THAT IMPACT SURFACE WATER (LEAVE A SHEEN ON SURFACE WATER), THE
NATIONAL RESPONSE CENTER (NRC) WILL BE CONTACTED WITHIN 24 HOURS AT
1-800-426-2675.
· FOR SPILLS OF AN UNKNOWN AMOUNT, THE NATIONAL RESPONSE CENTER (NRC) WILL
BE CONTACTED WITHIN 24 HOURS AT 1-800-426-2675.
· FOR SPILLS GREATER THAN 25 GALLONS AND NO SURFACE WATER IMPACTS OCCUR,
THE GEORGIA E.P.D. WILL BE CONTACTED WITHIN 24 HOURS.
· FOR SPILLS LESS THAN 25 GALLONS AND NO SURFACE WATER IMPACTS OCCUR, THE
SPILL WILL BE CLEANED UP AND LOCAL AGENCIES WILL BE CONTACTED AS REQUIRED.
THE CONTRACTOR SHALL NOTIFY THE LICENSED PROFESSIONAL WHO PREPARED THIS PLAN IF
MORE THAN 1,320 GALLONS OF PETROLEUM IS STORED ONSITE (THIS INCLUDES CAPACITIES
OF EQUIPMENT) OR IF ANY ONE PIECE OF EQUIPMENT HAS A CAPACITY GREATER THAN 660
GALLONS. THE CONTRACTOR WILL NEED A SPILL PREVENTION CONTAINMENT AND
COUNTERMEASURES PLAN PREPARED BY THAT LICENSED PROFESSIONAL.
IF THE CONTRACTOR ELECTS TO STORE PETROLEUM PRODUCTS ON SITE, THE CONTRACTOR
SHALL PREPARE AN ES&PC PLAN ADDENDUM THAT ADDRESSES THE ADDITIONAL BMPS
NEEDED FOR ONSITE STORAGE AND SPILL PREVENTION FOR PETROLEUM PRODUCTS. THIS
PLAN SHALL BE PREPARED BY A CERTIFIED DESIGN PROFESSIONAL AS REQUIRED BY GAR
100002 FOR INCLUSION WITH THESE PLANS.
10. SOIL SERIES INFORMATION
A PROJECT-SPECIFIC SOIL SURVEY AND GEOTECHNICAL INVESTIGATION WAS NOT
PERFORMED FOR THIS PROJECT. SOIL SERIES INFORMATION OBTAINED FROM THE NRCS IS
SHOWN ON THE PLAN SHEETS AND SUMMARIZED IN THE CHART CONTAINED HEREIN. THE
NRCS SOIL SURVEY AND SOIL SERIES MAPS FOR THE PROJECT AREA ARE ALSO AVAILABLE
ONLINE AT HTTP:\\WEBSOILSURVEY.NRCS.USDA.GOV\ AND LIST THE SOIL TYPES.
A SUMMARY OF THE SOILS THAT ARE EXPECTED TO BE FOUND ON THE PROJECT SITE IS
SHOWN IN THE TABLE BELOW.
11. POSTCONSTRUCTION BMPs FOR STORMWATER
MANAGEMENT
ALL PERMANENT POST-CONSTRUCTION BMP'S ARE SHOWN IN THE CONSTRUCTION PLANS
AND IN THE ES&PC PLAN. THE POST-CONSTRUCTION BMPs FOR THIS PROJECT CONSIST OF VEGETATION. THE POST-CONSTRUCTION BMPs WILL PROVIDE PERMANENT STABILIZATION OF
THE SITE AND PREVENT ABNORMAL TRANSPORTATION OF SEDIMENT AND POLLUTANTS INTO
RECEIVING WATERS.
12. SILT FENCE INSTALLATIONS WITH J HOOKS AND SPURS
SILT FENCE SHOULD NEVER BE RUN CONTINUOUSLY. THE SILT FENCE SHOULD TURN BACK
INTO THE FILL OR SLOPE TO CREATE SMALL POCKETS THAT TRAP SILT AND FORCE
STORMWATER TO FLOW THROUGH THE SILT FENCE. THIS TECHNIQUE IS CALLED USING J
HOOKS (OR SPURS). THE J HOOKS SHALL BE UTILIZED ON ALL SILT FENCES THAT ARE LOCATED
AROUND THE PERIMETER OF THE PROJECT AND ALONG THE TOE OF EMBANKMENTS OR
SLOPES. THE J HOOKS SHALL BE SPACED IN ACCORDANCE WITH THE TYPICAL LOCATION
DETAILS FOR SILT FENCES / BALED STRAW. THE MAXIMUM J HOOK SPACING IS REACHED
WHEN THE TOP OF THE J HOOK IS AT THE SAME ELEVATION AS THE BOTTOM OF THE
IMMEDIATELY UPGRADIENT J HOOK.
13. SITE STABILIZATION AND BMP MAINTENANCE MEASURES
ALL SEDIMENT CONTROL DEVICES, OTHER THAN SEDIMENT BASINS, SHALL BE CLEANED OF
SEDIMENT WHEN ONE-HALF THE CAPACITY, BY HEIGHT, DEPTH, OR VOLUME HAS BEEN
REACHED. SEDIMENT BASINS SHALL BE CLEANED OF SEDIMENT WHEN ONE-THIRD THE
CAPACITY, BY VOLUME, HAS BEEN REACHED. REFER TO BMP DETAILS INCLUDED HEREIN FOR
FURTHER MAINTENANCE INFORMATION.
14. WASTE DISPOSAL
WHERE ATTAINABLE, LOCATE WASTE COLLECTION AREAS, DUMPSTERS, TRASH CANS AND
PORTABLE TOILETS AWAY FROM STREETS, GUTTERS, WATERCOURSES AND STORM DRAINS.
SECONDARY CONTAINMENT SHALL BE PROVIDED AROUND LIQUID WASTE COLLECTION
AREAS TO MINIMIZE THE LIKELIHOOD OF CONTAMINATED DISCHARGES. THE CONTRACTOR
SHALL COMPLY WITH APPLICABLE STATE AND LOCAL WASTE STORAGE AND DISPOSAL
REGULATIONS AND OBTAIN ALL NECESSARY PERMITS.
WASTE MATERIALS, INCLUDING BUILDING MATERIALS, SHALL NOT BE DISCHARGED TO
WATERS OF THE STATE, UNLESS AUTHORIZED BY A SECTION 404 PERMIT.
15. INSPECTIONS
DAY AND SHALL
IDENTIFY ALL INCIDENTS OF BEST MANAGEMENT PRACTICES THAT HAVE NOT BEEN
PROPERLY INSTALLED AND/OR MAINTAINED AS DESCRIBED IN THE PLAN. WHERE THE
REPORT DOES NOT IDENTIFY ANY INCIDENTS, THE INSPECTION REPORT SHALL CONTAIN
A STATEMENT THAT THE BEST MANAGEMENT PRACTICES ARE IN COMPLIANCE WITH THE
EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN. THE REPORT SHALL BE
SIGNED IN ACCORDANCE WITH PART V.G.2. OF THIS PERMIT.
16. NON-STORM WATER DISCHARGES
NON-STORM WATER DISCHARGES DEFINED IN PART III.A.2 AND IN COMPLIANCE WITH PART
IV.D.7 OF THE NPDES PERMIT MAY BE DISCHARGED, INCLUDING: WATER LINE FLUSHING,
IRRIGATION DRAINAGE, UNCONTAMINATED GROUND WATER. ADDITIONAL NON-STORM
WATER DISCHARGES MAY BE IDENTIFIED AFTER CONSTRUCTION HAS COMMENCED. THESE
DISCHARGES SHALL BE SUBJECT TO THE SAME REQUIREMENTS AS STORM WATER
DISCHARGES REQUIRED BY THE GEORGIA EROSION AND SEDIMENTATION CONTROL ACT, THE
NPDES PERMIT, THE CLEAN WATER ACT, THE MANUAL FOR EROSION AND SEDIMENT
CONTROL IN GEORGIA, DEPARTMENT STANDARDS, AND OTHER CONTRACT DOCUMENTS. THE
NPDES DOES NOT AUTHORIZE THE DISCHARGE OF SOAPS OR SOLVENTS USED IN VEHICLE
AND EQUIPMENT WASHING OR THE DISCHARGE OF WASTEWATER CONTAINING STUCCO,
PAINT, OILS, CURING COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS.
17. STORM WATER DISCHARGES
POLLUTANTS SHALL BE
MINIMIZED IN THE STORM WATER DISCHARGES BY MAINTAINING GOOD HOUSEKEEPING
AND UTILIZING PROPER CARE, HANDLING OF, AND/OR DISPOSAL OF CONSTRUCTION
MATERIALS, SOLVENTS, PETROLEUM PRODUCTS, AND CONSTRUCTION WASTE. STRUCTURAL
AND VEGETATIVE BMPs SHALL BE UTILIZED AS DESCRIBED AND DEPICTED IN THE ES&PC PLAN.
18. PRODUCT SPECIFIC PRACTICES
PETROLEUM BASED PRODUCTS - CONTAINERS FOR PRODUCTS SUCH AS FUELS, LUBRICANTS,
AND TARS WILL BE INSPECTED DAILY FOR LEAKS AND SPILLS. THIS INCLUDES ONSITE VEHICLES
AND MACHINERY DAILY INSPECTIONS AND REGULAR PREVENTATIVE MAINTENANCE OF SUCH
EQUIPMENT. EQUIPMENT MAINTENANCE AREAS WILL BE LOCATED AWAY FROM STATE
WATERS, NATURAL DRAINS, AND STORM WATER DRAINAGE INLETS. IN ADDITION,
TEMPORARY FUELING TANKS SHALL HAVE A SECONDARY CONTAINMENT LINER TO
PREVENT/MINIMIZE SITE CONTAMINATION. DISCHARGE OF OILS, FUELS, AND LUBRICANTS IS
PROHIBITED. PROPER DISPOSAL METHODS WILL INCLUDE COLLECTION IN A SUITABLE
CONTAINER AND DISPOSAL AS REQUIRED BY LOCAL AND STATE REGULATIONS.
PAINTS/FINISHES/SOLVENTS - ALL PRODUCTS WILL BE STORED IN TIGHTLY SEALED ORIGINAL
CONTAINERS WHEN NOT IN USE. EXCESS PRODUCT WILL NOT BE DISCHARGED TO THE STORM
WATER COLLECTION SYSTEM. EXCESS PRODUCT, MATERIALS USED WITH THESE PRODUCTS,
AND PRODUCT CONTAINERS WILL BE DISPOSED OF ACCORDING TO MANUFACTURER'S
SPECIFICATIONS AND RECOMMENDATIONS.
CONCRETE TRUCK WASHING - NO CONCRETE TRUCKS WILL BE ALLOWED TO WASH OUT OR
DISCHARGE SURPLUS CONCRETE OR DRUM WASH WATER ONSITE.
FERTILIZER/HERBICIDES - THESE PRODUCTS WILL BE APPLIED AT RATES THAT DO NOT EXCEED
THE MANUFACTURER'S SPECIFICATIONS OR ABOVE THE GUIDELINES SET FORTH IN THE CROP
ESTABLISHMENT OR IN THE GSWCC MANUAL FOR EROSION AND SEDIMENT CONTROL IN
GEORGIA. ANY STORAGE OF THESE MATERIALS WILL BE UNDER ROOF IN SEALED
CONTAINERS.
BUILDING MATERIALS - NO BUILDING OR CONSTRUCTION MATERIALS WILL BE BURIED OR
DISPOSED OF ONSITE. ALL SUCH MATERIAL WILL BE DISPOSED OF IN PROPER WASTE
DISPOSAL PROCEDURES.
19. DEWATERING AND PUMPING ACTIVITIES
ANY PUMPED DISCHARGE FROM AN EXCAVATION OR DISTURBED AREA SHALL BE ROUTED
THROUGH AN APPROPRIATELY SIZED SEDIMENT BASIN, SILT FILTER BAG, OR SHALL BE
TREATED EQUIVALENTLY WITH SUITABLE BMP'S.
20. OTHER CONTROLS
THE CONTRACTOR SHALL FOLLOW THIS ES&PC PLAN AND ENSURE AND DEMONSTRATE
COMPLIANCE WITH ALL APPLICABLE STATE AND/OR LOCAL REGULATIONS FOR WASTE
DISPOSAL, SANITARY SEWER AND SEPTIC SYSTEMS, AND PETROLEUM STORAGE.
THE CONTRACTOR SHALL CONTROL DUST FROM THE SITE TO THE MAXIMUM EXTENT
PRACTICAL.
21. RETENTION OF RECORDS
A. THE PRIMARY PERMITTEE SHALL RETAIN THE FOLLOWING RECORDS AT THE
CONSTRUCTION SITE OR THE RECORDS SHALL BE READILY AVAILABLE AT A DESIGNATED
ALTERNATE LOCATION FROM COMMENCEMENT OF CONSTRUCTION UNTIL SUCH TIME
AS A NOT IS SUBMITTED IN ACCORDANCE WITH PART VI OF THE PERMIT:
a. A COPY OF ALL NOTICES OF INTENT SUBMITTED TO EPD;
b. A COPY OF THE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN REQUIRED
BY THE PERMIT;
c. THE DESIGN PROFESSIONAL'S REPORT OF THE RESULTS OF THE INSPECTION CONDUCTED
IN ACCORDANCE WITH PART IVA5. OF THE PERMIT;
d. A COPY OF ALL SAMPLING INFORMATION, RESULTS, AND REPORTS REQUIRED BY THE
PERMIT;
e. A COPY OF ALL INSPECTION REPORTS GENERATED IN ACCORDANCE WITH PART IV.D.4.a.
OF THE PERMIT;
f. A COPY OF ALL VIOLATION SUMMARIES AND VIOLATION SUMMARY REPORTS
GENERATED IN ACCORDANCE WITH PART III.D.2. OF THE PERMIT; AND
g. DAILY RAINFALL INFORMATION COLLECTED IN ACCORDANCE WITH PART IV.D.4.a.(2). OF
THE PERMIT.
B. COPIES OF ALL NOTICES OF INTENT, NOTICES OF TERMINATION, INSPECTION REPORTS,
SAMPLING REPORTS (INCLUDING ALL CALIBRATION AND MAINTENANCE RECORDS AND
ALL ORIGINAL STRIP CHART RECORDINGS FOR CONTINUOUS MONITORING
INSTRUMENTATION) OR OTHER REPORTS REQUESTED BY THE EPD, EROSION,
SEDIMENTATION AND POLLUTION CONTROL PLANS, RECORDS OF ALL DATA USED TO
COMPLETE THE NOTICE OF INTENT TO BE COVERED BY THIS PERMIT AND ALL OTHER
RECORDS REQUIRED BY THIS PERMIT SHALL BE RETAINED BY THE PERMITTEE WHO
EITHER PRODUCED OR USED IT FOR A PERIOD OF AT LEAST THREE YEARS FROM THE DATE
THAT THE NOT IS SUBMITTED IN ACCORDANCE WITH PART VI. OF THIS PERMIT. THESE
RECORDS MUST BE MAINTAINED AT THE PERMITTEE'S PRIMARY PLACE OF BUSINESS OR
AT A DESIGNATED ALTERNATIVE LOCATION ONCE THE CONSTRUCTION ACTIVITY HAS
CEASED AT THE PERMITTED SITE. THIS PERIOD MAY BE EXTENDED BY REQUEST OF THE
EPD AT ANY TIME UPON WRITTEN NOTIFICATION TO THE PERMITTEE.
22. SEDIMENT STORAGE
THE SITE HAS A TOTAL DISTURBED AREA OF 1.10 ACRES. AT A RATE OF 67 CY/AC, THE
REQUIRED MINIMUM SEDIMENT STORAGE IS 74 CY. THE NATURE OF THIS LINEAR
CONSTRUCTION, ALONG A NARROW CORRIDOR, DOES NOT ALLOW FOR CENTRAL SEDIMENT
STORAGE BMPs. SILT FENCE SHALL BE THE PRIMARY MEANS OF SEDIMENT STORAGE.
ALL STORED BUILDING PRODUCTS, CONSTRUCTION WASTES, TRASH, LANDSCAPE MATERIALS,
FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS, SANITARY WASTE, AND OTHER
MATERIALS SHALL BE COVERED WITH PLASTIC SHEETING.
23. DISCHARGES INTO OR WITHIN ONE LINEAR MILE UPSTREAM
OF AND WITHIN THE SAME WATERSHED AS ANY BIOTA
IMPAIRED STREAM SEGMENT
PROJECT OUTFALLS ARE LOCATED WITHIN 1 LINEAR MILE UPSTREAM OF THE ALCOVY RIVER.
THIS WATERSHED IS NOT AN IMPAIRED STREAM SEGMENT AND HAS NOT BEEN LISTED FOR
CRITERIA VIOLATED. THEREFORE, A TMDL IMPLEMENTATION PLAN FOR SEDIMENT IS NOT
NECESSARY.
24. STREAM ENCROACHMENTS
STREAMS, AS DEFINED BY O.C.G.A. 12-7-1, ARE NOT IMPACTED BY THIS PROJECT.
NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN 25 OR 50-FOOT UNDISTURBED
STREAMS AS MEASURED FROM THE POINT OF WRESTED VEGETATION OR WITHIN 25-FEET OF
THE COASTAL MARSHLAND BUFFER AS MEASURED FROM THE JURISDICTIONAL
DETERMINATION LINE WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES AND
PERMITS.
THIS PROJECT DOES NOT INCLUDE ANY BUFFER ENCROACHMENTS.
25. READY MIX CHUTE WASH-DOWN
THE WASHING OF READY-MIX CONCRETE DRUMS AND DUMP TRUCK BODIES USED IN THE
DELIVERY OF PORTLAND CEMENT CONCRETE IS PROHIBITED ON THIS SITE. ONLY THE
DISCHARGE "CHUTE" UTILIZED IN PORTLAND CEMENT CONCRETE DELIVERY MAY BE RINSED
FREE OF FRESH CONCRETE REMAINS. NEVER DISPOSE OF WASH-DOWN WATER DOWN A
STORM DRAIN.
THE PROJECT SITED DOES NOT PROVIDE ACCESS TO A LOCATION WHICH ALLOWS FOR A
WASH-DOWN PIT. THE CONTRACTOR SHALL WASH-DOWN INTO A WHEELBARROW, STEEL
DRUM, OR OTHER CONTAINER FOR TRANSPORT TO A PROPER DISPOSAL SITE. FOR
ADDITIONAL INFORMATION, REFER TO THE GEORGIA SMALL BUSINESS ENVIRONMENTAL
ASSISTANCE PROGRAM'S "A GUIDE FOR READY MIX CHUTE/HOPPER WASH-DOWN".
26. STORMWATER MANAGEMENT STATEMENT
WORK IS LOCATED WITHIN PUBLIC RIGHT-OF-WAY OR
EASEMENT ACQUIRED FOR THIS PROJECT. THE SITE WILL BE RESTORED, AND THERE WILL BE
NO CHANGES TO ELEVATION, DRAINAGE PATTERNS, OR IMPERVIOUS AREA.
THERE WILL BE NO INCREASE IN IMPERVIOUS AREA ASSOCIATED WITH THE PROPOSED
CONSTRUCTION AND ALL DISTURBED AREAS SHALL BE RESTORED TO PRE-CONSTRUCTION
CONDITIONS. SOILS THROUGHOUT THE SITE ARE PREDOMINANTLY GROUP B. USING THIS
DATA, THE ESTIMATED PRE- AND POST-CONSTRUCTION SCS RUNOFF CURVE NUMBER (CN)
FOR THE PROJECT AREA IS APPROXIMATELY 70. TOTAL PROJECT DISTURBED AREAS EQUAL
1.15 ACRES.
THE LOCATIONS OF STORMWATER OUTFALLS AND MONITORING POINTS ARE NOT REQUIRED
FOR THIS PROJECT.
STORMWATER MANAGEMENT FOR THIS PROJECT IS PROVIDED ON-SITE.
STORMWATER MANAGEMENT ON THIS PROJECT CONSISTS OF THE TEMPORARY AND
PERMANENT EROSION AND SEDIMENT CONTROLS.
PRIMARY PERMITTEE ENGINEER
No. 19035
PROFESSIONAL
R E G I S T E R E D
E N G I N E E R
G
E O R G I A
EDW A R D G . C O NDER
STM
STM
STM
STMSTM
STM
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SANGA S
GAS
GA
S
GA
S
GA
S
GA
S
GA
S
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS
GAS
GAS
GA
S GA
S
GA
S
TEL
TEL
TEL
TE
L
TEL
TE
L
TEL
TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL
TEL
TEL TEL TEL TEL TEL TEL TEL TEL TEL
W M
WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM
W M
W M
W M
WM
GV
GV
TBX
OHP
O H
P O
H P
O H
P O
H P
O H
P
O H
P
OHP
OHP
OHP
OHP
O
HP
O H
P
O H
P
OHP
OHP
OHP
O H
P
OHP OHP
OHP
O H
P
O H
P O
H P
OHP
OH
P
OHP OHP OHP OHP
OHP
OHP
OHP
OHP
EL
M
S
TR
EE
T
EA
ST
S
TR
EE
T
LY
D
A
SU
E
LA
N E
' A
LL
EY
EA
ST
S
TR
EE
T
#4RBF#4RBF #4RBF
CONCRETE SIDEWALK
CONC. S/W
& STAIRS
W/ RAIL
CONCRETE
SIDEWALK
XXXXXX
WROUGHT IRON FENCE
CONC.
DRIVEWAY
CONC.
DRIVEWAY
PICKETT FENCEGATE GATE GATE
BRICK
COLUMNS
W/ WROUGHT
IRON FENCE
CONC. S/W
W/ CONC.
WALL
STREET
SIGN
CONC. S/W
W/ CONC.
WALL
BRICK
S/W
ONE WAY
SIGN
35MPH
SIGN
BRICK
S/WCONC. S/W
& STAIRS
W/ RAIL
CONCRETE SIDEWALK
CWSPTSHH
T
RAMP
RAMP
BIKE LANE
SIGN
CONC. S/W
NO WRONG
WAY PARKING
SIGN
XXXXXXXXXXXXXX CONCRETE SIDEWALK
WROUGHT
IRON FENCE
GATE
CONC. S/W
35MPH
SIGN MARKER
BIKE LANE
SIGN
WROUGHT IRON FENCE GATE
CONC. S/W
& STEP
W/ CONC.
BLOCK
CONCRETE SIDEWALK
CROSSWALK
AHEAD SIGN
BLOCK WALL
CONC. STAIRS
W/ RAILBRICK
COLUMN
(TYPICAL)
MARKER
FACE OF
PORCH
CONC. WALL
& STEPS
COLUMN,
BRICK WALL
& WROUGHT
IRON FENCE
PAVER
STAIRS
CONC.
S/W
CONC.
S/W
COMMON
CONC.
DRIVEWAY
C
CONC.
S/W
CONC.
S/W
SAN
SA
N
STOP
SIGN
STOP
SIGN
CROSSWALK
SIGN
RAMP
RAMP
GASLINE BY GIS
GAS
GAS
GA
S
GASLINE BY GIS
GASLINE BY GIS
GAS
GASLINE BY GIS
GASLINE BY GIS
CONCRETE BLOCK WALL
GA
S
GA
S
GASLINE BY GIS
FLOYD STREET FLOYD STREET
2'L-BACK C&G
CONCRETE
CONCRETE
24"L-BACK C&G
2'L-BACK C&G 2'L-BACK C&G
CONCRETE WALL
SA
N
SAN
(A )(B)
(C
(D)
(B)
(C
(D)
RAMP
741.1 74 2 74
4 74
751.1750.6 751.3
8 74
4 74
S S
O
HW
O
HW
O
HW
O
HW
O
HW
O
HW
O
HW
O
HW
O
HW
O
HW
OHW OHW OHW OHW OHW OHW OHW OHW OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O
HW
O
HW
O
HW
O
HW
(A )(B)
(C
(D)
(B)
(C
(D)
STM STM
STM
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS
XX
XX
XX
XX
XX
XX
0+ 00 1+00 2+00 3+00 4+00 5+00 6+00
7+00 8+00
ST
M
STM
STM
STM
STM
STM
STM
STM
ST
M
STM
STMSTM
ST
M
ST
M
STM
STM
STM
STM
GAS
GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GA
S
GA
S
TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL
TEL
TEL
TEL
TEL
TEL
TEL
TEL
TEL
TEL
WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM
WM
WM WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
GV
ICV
ICV
TBX
TBX
WM
WM
WM
WM
WM
WM WM
WM
WM
WV
WV
WV
WV
O H
P
O H
P
O
HP
OHP
OHP
OHP
O
HP
OH
P
O H
P
OHP OHP OHP
O
H P
O H
P
O
HP
O
HP
O H
P
OHP
OHP
O H
P O
H P
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
O H
P
O H
P O
H P
O H
P
EA
ST
S
TR
EE
T
AN
D
ER
SO
N S
TR
EE
T
EA
ST
S
TR
EE
T
1"OTF #4RBF
X
X X
C
SANSANSANSANSANSANSANSANSANSANSANSAN
SA
N
SAN SAN SAN SAN SAN SAN SAN SAN SAN
STOP
SIGN
CROSSWALK
SIGN
CROSSWALK
SIGN
CONC. S/W
W/ STEPS
CONC. S/W
W/ STEPS
CONCRETE SIDEWALK
MARKER
X
5' CHAINLINK
FENCE
STOP
SIGN
DRIVEWAY
APRON
CONC. S/W
BRICK
SIDEWALK
BIKE LANE
SIGN
SA
N
RAMP
RAMP
RAMP
RAMP
RAMP
CROSSWALK
SIGN
MARKER
DECO
POLE
BRICK S/W
W/ STEPS
CONCRETE
STEPS
BRICK PAVERSCONCRETE
SIDEWALK
CONCRETE SIDEWALK
BRICK WALL,
BRICK COLUMNS
& WROUGHT
IRON FENCE BRICK WALL,
BRICK COLUMNS
& WROUGHT
IRON FENCE
CONC.
DRIVEWAY
BRICK
S/W
BIKE LANE
SIGN
CONCRETE SIDEWALK CONCRETE SIDEWALK
CONC.
DRIVEWAY
RAMP
CONC.
S/W
CONCRETE SIDEWALK
MARKER
ASPHALT
DRIVEWAY
YARD INLET
4"
CPP
CONCRETE SIDEWALK
#4RBF
CONC.
DRIVEWAY
CONC.
STAIRS
W/ RAIL
ROCK WALL
ROCK WALL
BRICK
S/W
BRICK WALL
BRICK WALL
COLUMN
(TYPICAL)
CONC.
S/W
CONC.
STEPS
COLUMN
(TYPICAL) CONC.
DRIVEWAY
4"
CPP
GATE
BRICK
WALL &
COLUMN
(TYPICAL)
ASPHALT
DRIVEWAY
5' CHAIN
LINK
FENCE
BIKE LANE
SIGN
CROSSWALK
AHEAD SIGN
X
X
X
X
X
X
BIKE LANE
SIGN
X
HANDRAIL
TOP OF
CREEK
BANK
BOTTOM OF
CREEK BANK
CENTERLINE
OF CREEK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
WROUGHT IRON
ROCK WALL
SERVES AS
TOP OF BANK
INV=717.46'
18"RCP
ROCK HW
#4RBF
DIST.
#4RBF
WROUGHT IRON FENCE
CONC.
DRIVEWAY
ROCK HW
W/ WING
WALLS
SA
N
SA
N
SA
N
SA
N
SAN
SAN
SA
N
SAN
SAN
GA
S
GA
S
GAS
GASLINE
BY GIS
GA
S
GA
S
GASLINE
BY GIS
GAS
GASLINE
BY GIS
GA
S
GASLINE
BY GIS
GA
S
GASLINE
BY GIS
SEWERLINE
BY GIS
SEWERLINE
BY GIS
MH BY GIS
FLOYD STREET
FLOYD STREET
24"L-BACK C&G
24"L-BACK C&G
24"L-BACK C&G
24"L-BACK C&G
SAN
CI
TOP=729.67
C/L BOX INV=720.47*
(24"RCP RECESSED)
15"RCP INV(A)=725.97
INV=721.20'
36"RCP
ROCK WALL
SERVES AS
TOP OF BANK CI
TOP=729.70
24"RCP INV(A)=722.56
24"RCP INV(B)=720.75*
(RECESSED)
12"RCP INV(C)=722.79
48"RCP INV(D)=720.15
(A)
(A)
(B
(C)
(D
CI
TOP=734.20
12"RCP INV(A)=729.75
(A)
SANITARY MH
TOP= 730.78
12"DIP INV(A)=723.08
12"DIP INV(B)=724.43
18"CLAY INV(C)=723.03
SANITARY MH
TOP= 729.90
8"DIP INV(A)=724.60
8"CLAY INV(B)=724.70
12"CLAY INV(C)=724.53
(B)(C)
(A
(B)
(C
(B)
(A
CROSSWALK
SIGN
MH
TOP=740.90
8"CLAY INV(B)=735.40
8"CLAY INV(C)=735.71
8"CLAY INV(D)=735.30(B)
(C
(D)
RAMP
(A)
(B
DI
TOP=740.38
12"DIP INV(A)=738.99
12"RCP INV(B)=738.53
CI
TOP=739.12
*SILTED IN
(A)
(A)
(B) (B)
MH
TOP=742.34
12"DIP INV(A)=733.80
12"DIP INV(B)=734.27
12"DIP INV(C)=733.40
#4RBF
(A)
(B
(C)
CI
TOP=739.94
C/L BOX
INV=736.22
SANITARY MH
TOP= 727.03
18"CLAY INV(A)=721.73
18"CLAY INV(B)=721.68
SAN
(A
(B)
INV=716.37' 18"RCP
INV=716.50' 18"RCP
740.7 741.4 740.6
730.6
730.2
100-YEAR FLOOD
PLAIN. ELEV.
=731.0'
100-YEAR FLOOD
PLAIN. ELEV.
=731.0'
APPROXIMATE MH
PAVED OVER
S
S
S
S
S
S
S
S
S
S
GAS
GAS
GAS
GA
S
GA
S
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GA
S
GA
S
GAS
GA
S
GAS
GAS
GAS
GASGAS
GAS
GAS
GAS
O
HW
O
HW
O
HW
O
HW
O
HW
OHW OHW OHW OHW
O
HW
O
HW
O
HW
O
HW
O
HW
O
HW
O
HW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O
HW
O
HW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OH
W
OH
W
OHW
OHW
OHW
O
HW
O
HW
O
HW
O
HW
O
HW
OH
W
OH
WW
M W
M
4"
CPP
4"
CPP
MH BY GIS
(A)
(A)
(B
(C)
(D
(A)
SANITARY MH
TOP= 730.78
12"DIP INV(A)=723.08
12"DIP INV(B)=724.43
18"CLAY INV(C)=723.03
SANITARY MH
TOP= 729.90
8"DIP INV(A)=724.60
8"CLAY INV(B)=724.70
12"CLAY INV(C)=724.53
(B)(C)
(A
(B)
(C
(B)
(A
MH
TOP=740.90
8"CLAY INV(B)=735.40
8"CLAY INV(C)=735.71
8"CLAY INV(D)=735.30(B)
(C
(D)
(A)
(B
(A)
(A)
(B) (B)
MH
TOP=742.34
12"DIP INV(A)=733.80
12"DIP INV(B)=734.27
12"DIP INV(C)=733.40
(A)
(B
(C)
SANITARY MH
TOP= 727.03
18"CLAY INV(A)=721.73
18"CLAY INV(B)=721.68
(A
(B)
APPROXIMATE MH
PAVED OVER
INV=717.46'18"RCP
ROCK HW
ROCK HWW/ WINGWALLS
CI
TOP=729.67C/L BOX INV=720.47*(24"RCP RECESSED)15"RCP INV(A)=725.97
CI
TOP=729.7024"RCP INV(A)=722.5624"RCP INV(B)=720.75*(RECESSED)12"RCP INV(C)=722.7948"RCP INV(D)=720.15
CI
TOP=734.20
12"RCP INV(A)=729.75
12"DIP INV(A)=739.47 DI
TOP=740.38
12"DIP INV(A)=738.99
12"RCP INV(B)=738.53
CI
TOP=739.12
*SILTED IN
TOP=740.67
12"RCP INV(A)=738.67
DI
TOP=740.60
12"RCP INV(A)=738.40
12"RCP INV(B)=738.36
CI
TOP=739.71
12"RCP INV(A)=737.76
12"RCP INV(B)=737.61
CI
TOP=739.94
C/L BOX
INV=736.22
INV=716.37' 18"RCP
INV=716.50' 18"RCP
STM STM
STM
STM STM STM
GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GA
S
GA
S
8+00 9+00 10+00 11+00 12+00
13+00
14+00
15+00
16+00
SCALE: FEET
PLAN
FLOYD ST. NE
M
AT
CH
LI
N E
SH
EE
T
EC
.1
SH
EE
T
EC
.1
ST
AT
IO
N
+0
EL
M
S T.
N E
EL
M
S T.
S E
SEDIMENT & EROSION CONTROL
PLAN (1 OF 5)
EC10.12REVISIONS
APPROVED BY: XXX
DRAWN BY: XXX
DWG. NO.:
NO. DESCRIPTION DATE
Southeastern Gas Engineering www.southeasterngasengineering.com
P.O. Box 20191 Atlanta, Georgia 30325
CITY OF COVINGTON
2194 EMORY STREET N.W.
COVINGTON, GEORGIA 30014
No. 19035
PROFESSIONAL
R E G I S T E R E D
E N G I N E E R
G
E O R G I A
EDW A R D G . C O NDER
DATE: 6-12-2024
Know what'sbelow.
before you dig.Call
R
Ju ly
1, H
:\P ro je ct
F ile s\
C ity o f C ov in gt on
G A
\P ro je ct s\
.0
- F lo yd -N ew to n W
M R
\3
D es ig n\
P re lim in ar y
D ra w in gs \0
C iv il
D em o\
Fl oy d\
-D w gs \S
E C
-F
LO
Y D
G as
L in e.
dw g
Sd2-P
Ds2 Ds3Du
TYP - ALL DISTURBED
PERVIOUS AREAS
Sd2-P
Sd2-P
FLOYD ST. NE
M
AT
CH
LI
N E
SH
EE
T
EC
.1
SH
EE
T
EC
.1
ST
AT
IO
N
+0
SCALE: FEET
PLAN
EA
S T
S T.
N E
EA
S T
S T.
FLOYD ST. NE
A N
D
ER
S O
N A
V E.
N E
M
AT
CH
LI
N E
SH
EE
T
EC
.1
SH
EE
T
EC
.1
ST
AT
IO
N
6+
W M
W M
6'
FR
O
M E
O R
Sd2-P
Sd2-P
Sd2-P
Sd2-P
Sd2-P
Ds2 Ds3Du
TYP - ALL DISTURBED
PERVIOUS AREAS
Sd2-P
Sd2-P
Sd2-P
No. 19035
PROFESSIONAL
R E G I S T E R E D
E N G I N E E R
G
E O R G I A
EDW A R D G . C O NDER
NOTE:
1. LIMITS OF DISTURBANCE IS RESTRICTED TO A
6-FOOT-WIDE AREA SURROUNDING THE GAS
MAIN INSTALLATION.
STM STM STM STM STM STM STM
ST
M
STM
STM
STM
STM
STM
STM
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM STM STM STM STM STM STM STM STM STM STM STM STM
STMSTMSTMSTMSTMSTM
ST
M
STM
STM
STM STM STM STM STM STM STM
SAN
GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GAS GA
S
GAS
GA
S
GA
S
TEL
TEL
TEL
TEL
TEL
TEL
TEL
TEL
TEL
TEL
WM
WM
WM
WM
WM
WM
WM
WM WM
WM
WM
WM
WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM
W M
W M
GV
OH
P
O H
P
O
HP
O H
P
OHP
OHP
OHP OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
O
HP
O H
P O
H P
OHP OHP OHP
O
HP
O
HP
OHP
OHP
OHP
OHP OHP
OHP
OHP OHP
O H
P O
H P
O H
P
OHP
OHP
OHP OHP OHP
O H
P
OHP
OHP
OHP
OHP
O H
P
O
HPOHP
OHP
OHP
OHP
OHP
OHP
O H
P O
H P
OHP
OHP
OHPO
HP
O
HP
O
HP
OHP
OHP
O H
P
O H
P
OHP
OHP
O H
P
O H
P
BU
TL
ER
AV
EN
U
E
SO
C
KW
EL
L
AV
EN
U
E
M
IL
L
ST
R
EE
T
C
C
X
X X
X
BIKE LANE
SIGN
X
BOTTOM OF
CREEK BANK
CENTERLINE
OF CREEK
#4RBF BENT
COLUMN
& CONC.
WALL
CONCRETE SIDEWALK
WROUGHT IRON
ROCK WALL
SERVES AS
TOP OF BANK
CONCRETE SIDEWALK
CONC.
DRIVEWAY
CONC.
DRIVEWAY
BRICK
S/W
W M
CONCRETE SIDEWALK
ASPHALT
DRIVEWAY ASPHALT
DRIVEWAY
#4RBF
#4RBF
1"OTPF
UNDER WALL
AL
LE
Y
FUNERAL
HOME SIGN
CONCRETE SIDEWALK
CONC.
S/W ASPHALT
DRIVEWAY
ASPHALT
DRIVEWAY
1"OTPF
BENT
1"ROD
FOUND
TRAFFIC
POLE
CONCRETE SIDEWALK
CONCRETE SIDEWALK
NO PARKING
SIGN
1"OTPF
AXLE
ROD
FOUND
COBBLESTONE
S/W
CRICKET
FROGTRAIL
NO PARKING
SIGN
CONCRETE SIDEWALK
STONE WALLSTONE WALL
CONC.
STAIRS
BRICK WALL
BRICK WALL
BRICK
STAIRS
COLUMN
(TYPICAL)
CONC.
DRIVEWAY
BRICK
WALL
ROCK
WALL
CONC.
DRIVEWAY
BRICK &
STONE WALL
BRICK &
STONE WALL
CONC.
STAIRS
COBBLESTONE
S/W
MARKER
CONCRETE SIDEWALK
CONC.
DRIVEWAY
ROCK WALL
ROCK WALL
ROCK
STAIRS
W/ RAIL
1"
ROD
FOUND
BENT
STOP
SIGN
90'
SA
N
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
GA
S
GASLINE
BY GIS
GA
S
GASLINE
BY GIS
GA
S
GASLINE
BY GIS
GA
S
GA
S
GASLINE
BY GIS
TRAFFIC
POLE SIGN
CONCRETE
DRIVEWAY
CONCRETE
SIDEWALK
1"OTPF
35MPH
SIGN
CONCRETE SIDEWALK
CONCRETE
SIDEWALK
BRICK
SIDEWALK
BIKE
LANE
SIGN
STOP
SIGNRAMP
#4RBF
RAMP
STOP
SIGN
CONCRETE SIDEWALK
CONCRETE
DRIVEWAY
MARKER
#4RBF
HOSPITAL
SIGN
FLOYD STREET
24"L-BACK C&G
24"L-BACK C&G
CONC. APRON
24"L-BACK C&G
CONC. APRON CONC. APRON
24"L-BACK C&G
24"L-BACK C&G
24"L-BACK C&G
24"L-BACK C&G
GAS
GASLINE
BY GIS
GASLINE
BY GIS
24"L-BACK C&G
SAN
ROCK WALL
SERVES AS
TOP OF BANK
SAN
SAN
RAMP
WATER METER
INSIDE SEWER
CLEANOUT
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
FLOYD STREET
730.2
731.173
746 74
8 75 0 752 75
4751.5 753.3
100-YEAR FLOOD
PLAIN. ELEV.
=731.0'
100-YEAR FLOOD
PLAIN. ELEV.
=731.0'
S
S
S
S
S
S
O
HW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW OHW
OHW
OHW
O
HW
O
HW
O
HW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O
HW
O
HW
OH
W
O
HW
O
HW
O
HW
O
HW
O
HW
O
HW
O
HW
OHW
OHW
O
HW
O
HW
O
HW
OHW
OHW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O
HW
O
HW
OHW
OHW
O
HW
O
HW
O
HW
SANITARY MH
TOP= 730.42
*MH IS PLUGGED
SANITARY MH
TOP= 744.97
6" DIP INV(A)=738.94
6" DIP INV(B)=737.03
(A)
(B)
SANITARY MH
TOP= 742.48
6" DIP INV(A)=735.28
6" DIP INV(B)=735.10
(A)(B)
(A)
(B) (C)
SANITARY MH
TOP= 729.91
8"DIP INV(A)=724.81
8"DIP INV(B)=724.41
(B)
(A
SANITARY MH
TOP= 755.24
6" DIP INV(A)=750.36
6" DIP INV(B)=749.93
SANITARY MH
TOP= 730.85
6"CLAY INV(A)=726.98
6"CLAY INV(B)=726.96
*CONNECTIVITY
HARD TO DETERMINE.
(A) (B)
SP
W M
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GA
S
GA
S
16+00
17+00
18+00
19+00 20+00 21+00 22+00
23+00 24+00
STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTM
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
STM
STM STM STM STM STM STM STM STM STM STM STM
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS
GA
S GA
S
GAS
GA
S
GA
S
GAS
GA
SWM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM
W M
GV
GV
GV
ICV
ICV
WM WM WM
WM WM
WM
WM WM
WM
WM
WM
WM
WV
WV
WV
WV
WV
WV
WV
WV
WV
OHP OHP
OHP
O
HPOHP
OHP OHP OHP OHP
OHP
OHP
OHP
O H
P
OHP OHP OHP
O
HP
OHP OHP
O H
P O
H P
OHP
OHP
O H
P O
H P
OHP OHP OHP OHPOHP OHP OHPOHP OHP OHP
OHP
OHP
OHP
OHP
O H
P
O
HP
O
HP
OHP
OHP
OHP
OHP
OHP
O
HP
O H
P
OHP
OHP
OHP
OHP
OHP
OHP
M
IL
L
ST
R
EE
T
M
IL
L
ST
R
EE
T
M
ID
D
LE
BR
O
O
KS
ST
R
EE
T
EL
IZ
AB
ET
H
ST
R
EE
T
N O
R
TH
EL
IZ
AB
ET
H
ST
R
EE
T
C C
CONCRETE SIDEWALK
CONCRETE
SIDEWALK
BRICK
SIDEWALK
BIKE
LANE
SIGN
STOP
SIGN
HOSPITAL
SIGN
RAMP
ROCK WALL ROCK WALL
ROCK
STEPS
CONC.
PAD
WM
EDGE OF
LANDSCAPING
CONC.
STEPS
W/ BRICK
WALL
PAVER
S/W
CONCRETE SIDEWALK CONCRETE SIDEWALK
BRICK
S/W
BRICK STEPS,
PAVER S/W &
BLOCK WALLS
STOP
SIGN
RAMP
#4RBF
NAIL
FOUND
#4RBF
1" ROD
FOUND
CONCRETE
DRIVEWAY
MARKER
HOSPITAL
SIGN
STOP
SIGN
BIKE
LANE
SIGN
ROCK WALL ROCK WALL
BRICK
COLUMN
(TYPICAL)
CONC.
STEPS CMF
CONCRETE SIDEWALK
BRICK
S/W
CONC.
STEPS
CONCRETE
DRIVEWAY
BRICK WALL
CONCRETE
DRIVEWAY
W/ BRICK
BAND
BRICK WALL
STONE WALL
W/ CONC. STAIRS
CONC. S/W
W/ STEPS
1" ROD
FOUND
BENT
BRICK
COLUMNS
RAMP RAMP
STOP
SIGN
BRICK WALL BRICK WALL
BRICK
STEPS #4RBF
GRAVEL
DRIVEWAY
STOP
SIGN
#4RBF
BLOCK
WALL
SLOW CHILDREN
AT PLAY SIGN
GRAVEL
DRIVEWAY #4RBF
#4RBF
35MPH
SIGN
BRICK
COLUMNS
HOSPITAL
SIGN
CONC. STAIRS
CONCRETE SIDEWALK
CONCRETE
DRIVEWAY
BRICK STAIRS
1"OTPF
24"L-BACK C&G
24"L-BACK C&G
24"L-BACK C&G
24"L-BACK C&G 24"L-BACK C&G
24"L-BACK C&G
GA
S
GASLINE
BY GIS
GA
S
GASLINE
BY GIS
GA
S
GASLINE
BY GIS
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
GA
S
GASLINE
BY GIS
GA
S
GASLINE
BY GIS
FLOYD STREET
SANITARY MH
TOP= 755.24
6" DIP INV(A)=750.36
6" DIP INV(B)=749.93
INV=756.30
12"RCP
(A)(B)
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
WM
WM
CI
TOP=755.93
C/L BOX INV=750.83
(*APPEARS TO BE
15"RCP, RECESSED)
SANITARY MH
TOP= 757.56
4" DIP INV(A)=754.64
4" DIP INV(B)=754.62
(B
(A
CI
TOP=755.42
18"RCP INV(A)=749.12
18"RCP INV(B)=749.22
(A)(B)
CI
TOP=763.79
C/L BOX INV=757.39
(*PIPES RECESSED)
SANITARY MH
TOP= 768.29
C/L BOX INV=762.51
(*UNABLE TO DETERMINE
PIPE CONNECTIVITY)
CI
TOP=769.99
C/L BOX INV=762.19
(*PIPES RECESSED)
SANITARY MH
TOP=768.76
CONCRETE SIDEWALK
SANITARY MH
TOP=773.04
(*FULL OF SILT)
JB BY GIS
(*NOT VISIBLE
IN FIELD)
CI
TOP=774.35
12"RCP INV(A)=772.65
DI
TOP=774.95
12"RCP INV(A)=773.45
(A)
(B
CI
TOP=774.00
12"RCP INV(A)=770.49
15"RCP INV(B)=769.60
(A
(A)
CI
TOP=775.24
15"RCP INV(A)=771.04
18"RCP INV(B)=770.74
(A)(B)
SANITARY MH
TOP=776.91
8"CLAY INV(A)=771.01
8"CLAY INV(B)=770.91
(A)(B)
6 768
0 77
SANITARY MH
TOP=776.09
C/L BOX INV=773.34
(4"VCP)
S
S
S
S
S S
S
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GA
S
GA
S
GA
S
GA
S
GA
S
GAS
GAS
GAS
GA
S
GA
S
GASGASGASGASGAS
GAS
GA
S
O
HW
O
HW
OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW
OHW
OHW
O
HW
O
HW
O
HW
OH
W
OH
W O
HW
O
HW
O
HW
O
HW
OHW
OHW
OHW
OHW
OHW
O
HW
O
HW
O
HW
O
HW
OH
W
OH
W
OHW
OHW
OHW
W M
SANITARY MH
TOP= 755.24
6" DIP INV(A)=750.36
6" DIP INV(B)=749.93
(A)(B)
SANITARY MH
TOP= 757.56
4" DIP INV(A)=754.64
4" DIP INV(B)=754.62
(B
(A
(A)(B)
SANITARY MH
TOP= 768.29
C/L BOX INV=762.51
(*UNABLE TO DETERMINE
PIPE CONNECTIVITY)
SANITARY MH
TOP=768.76
SANITARY MH
TOP=773.04
(*FULL OF SILT)
(A)
(B
(A
(A)
(A)(B)
SANITARY MH
TOP=776.91
8"CLAY INV(A)=771.01
8"CLAY INV(B)=770.91
(A)(B)
SANITARY MH
TOP=776.09
C/L BOX INV=773.34
(4"VCP)
INV=756.30
12"RCP
CI
TOP=755.93
C/L BOX INV=750.83
(*APPEARS TO BE
15"RCP, RECESSED)
CI
TOP=755.42
18"RCP INV(A)=749.12
18"RCP INV(B)=749.22
CI
TOP=763.79
C/L BOX INV=757.39
(*PIPES RECESSED)
CI
TOP=769.99
C/L BOX INV=762.19
(*PIPES RECESSED)
JB BY GIS
(*NOT VISIBLE
IN FIELD)
CI
TOP=774.35
12"RCP INV(A)=772.65
DI
TOP=774.95
12"RCP INV(A)=773.45
CI
TOP=774.00
12"RCP INV(A)=770.49
15"RCP INV(B)=769.60
CI
TOP=775.24
15"RCP INV(A)=771.04
18"RCP INV(B)=770.74
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
24+00
25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00
FLOYD ST. NE
M
AT
CH
LI
N E
SH
EE
T
EC
.1
SH
EE
T
EC
.1
ST
AT
IO
N
6+
SCALE: FEET
PLAN
FLOYD ST. NE
S O
C K W
EL
L
A V E.
S E
M
ATC
HLIN
E
SH
EE
T E C1
0.
SH
EE
T E C1
0.
ST
ATIO
N 24 +0
B U
TL
ER
A V E.
S E
CENTERLINE OF CREEK
EC10.13REVISIONS
APPROVED BY: XXX
DRAWN BY: XXX
DWG. NO.:
NO. DESCRIPTION DATE
Southeastern Gas Engineering www.southeasterngasengineering.com
P.O. Box 20191 Atlanta, Georgia 30325
CITY OF COVINGTON
2194 EMORY STREET N.W.
COVINGTON, GEORGIA 30014
No. 19035
PROFESSIONAL
R E G I S T E R E D
E N G I N E E R
G
E O R G I A
EDW A R D G . C O NDER
DATE: 6-12-2024
Know what'sbelow.
before you dig.Call
R
Ju ly
1, H
:\P ro je ct
F ile s\
C ity o f C ov in gt on
G A
\P ro je ct s\
.0
- F lo yd -N ew to n W
M R
\3
D es ig n\
P re lim in ar y
D ra w in gs \0
C iv il
D em o\
Fl oy d\
-D w gs \S
E C
-F
LO
Y D
G as
L in e.
dw g
SEDIMENT & EROSION CONTROL
PLAN (2 OF 5)
Sd2-P Sd2-P
Sd2-P
Sd2-P
Sd2-P
Ds2 Ds3Du
TYP - ALL DISTURBED
PERVIOUS AREAS
Sd2-P
Sd2-P Sd2-P
FLOYD ST. NE
M
AT
CH
LIN
E
SH
EE
T E C1
0.
SH
EE
T E C1
0.
ST
AT
IO
N 24
+0
SCALE: FEET
PLAN
FLOYD ST. NE
M
ID
D
LE
B R O
O K S S
T.
N
E
M
AT
CH
LI
N E
SH
EE
T
EC
.1
SH
EE
T
EC
.1
ST
AT
IO
N
2+
EL
IZ
A B
ET
H S
T.
S
E
EL
IZ
A B
ET
H S
T.
N
E
M
IL
L S T.
N E
M
IL
L S T.
S E
2'
FR
O
M E
O R
Ds2 Ds3Du
TYP - ALL DISTURBED
PERVIOUS AREAS
Sd2-P
Sd2-P
Sd2-P
Sd2-P
Sd2-P
Sd2-P
Sd2-P
Sd2-P
No. 19035
PROFESSIONAL
R E G I S T E R E D E N G I N E E R
G
E O R G I A
EDW A R D G . C O NDER
NOTE:
1. LIMITS OF DISTURBANCE IS RESTRICTED TO A
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
STM STM
GAS
X
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GAS
GA
S
GAS
WM
WM
WM WM WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM WM WM WM WM WM WM WM WM WM WM WM WM
W M
GV
GV
GV
OHP OHP OHP OHP
OHP
OHP
O H
P O
H P
OHP
OHP
O H
P
OHP OHP OHP OHP
O H
P O
H P
O H
P
O H
P
O H
P O
H P
O H
P
O
HP
O
HP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
O H
P O
H P
OHP
OHP
OHP
OHP
O H
P
OHP
OHP
OHP
OHP
OHP
OHP
N . D
EA
R
IN
G
ST
R
EE
T
S. D
EA
R
IN
G
ST
R
EE
T
#4RBF PAVER
S/W GRAVEL
DRIVEWAY CONCRETE
DRIVEWAY
2" ROD
FOUND
#4RBF
C
35MPH
SIGN
ASPHALT
DRIVEWAY
4X4 WOOD EDGE
1"CTPF
CONCRETE
DRIVEWAY
C
HOME
SIGN
STOP
SIGN
OHP
BIKE LANE
SIGN
CONCRETE
DRIVEWAY
BRICK STAIRS CONC. STAIRS
CONCRETE
DRIVEWAY
CONCRETE SIDEWALK
CONCRETE
STEPS & S/W
BRICK S/W
#4RBF
1"OTPF
RAMP
BIKE LANE
SIGN
CONCRETE SIDEWALK
CONCRETE
DRIVEWAY
AXLE IN
TREE
CONCRETE
DRIVEWAY
CONCRETE
SIDEWALK
#4RBF
BENT
CONCRETE SIDEWALK
CONCRETE
DRIVEWAY
CONCRETE
SIDEWALK
GRAVEL
DRIVEWAY
#4RBF
AXLE
FOUND
BRICK WALL
BRICK
COLUMN
CONCRETE SIDEWALK
BROKEN
ASPHALT
DRIVEWAY
CONCRETE
DRIVEWAY
CONCRETE
S/W
BRICK
STEPS
BRICK
COLUMN
(TYPICAL)
BRICK WALL
CONCRETE
DRIVEAY
WROUGHT IRON FENCE
BRICK
S/W &
STEPS
#4RBF
BRICK WALL
24"L-BACK C&G
24"L-BACK C&G
24"L-BACK C&G
24"L-BACK C&G
CONC.
APRON
24"L-BACK C&G
24"L-BACK C&G
CONC.
APRON 24"L-BACK C&G
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANGA
S
GASLINE
BY GIS
GAS
GASLINE
BY GIS
SAN SAN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .