9. AF Form 66 Schedule of Material Submittals.pdf
PDF 21 KB Posted
- Attached to
- Sustain Pad 5, Phase III Federal contract opportunity
- Solicitation number
- FA9401-12-R-0019
About this file
Attachment 9
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum 1 FA9401-12-R-0019.pdf | ||
| FA9401-12-R-0019 Amendment 1.pdf | ||
| Response to Pad 5 Questions.pdf | ||
| 4a. Corrected AF Form 3052 Contractor Proposal Form.xlsx | XLSX spreadsheet | |
| FA9401-12-R-0019 Site Visit Sign In.pdf | ||
| FA9401-12-R-0019.pdf | ||
| 14. AF Form 3064 Progress Schedule.xls | XLS spreadsheet | |
| 12. Past Performance Information Form.docx | DOCX document | |
| 2. Drawings 070054B-C1-Layout1.pdf | ||
| 5. AF 3065 Progress Report.pdf | ||
| 4. AF Form 3052 Government Price Schedule Summary.xlsx | XLSX spreadsheet | |
| 1. Statement of Work | — | |
| 7. AIR FORCE FORM 103 - Base Civil Engineering Work Clearance Request - Dig Permit.pdf | ||
| 3. Sustain Pad 5 Phase III Specs.pdf | ||
| 13. KAFB Map for Site Visit Location | — | |
| 8. AF Form 3000 Material Aprroval Submittal.pdf | ||
| 6. Permit Requirements Memo.pdf | ||
| 10. Wage Determination- NM120013- NM13-Heavy.pdf | ||
| 11. Wage Determination- NM120047- NM47- Highway.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 20
CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT APP: MATERIAL APPROVAL COMPUTER GENERATED AF 66, OCT 891]
SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER: PROJECT TITLE: SOLICITATION/CONTRACT NO.
CONTRACTOR TO SEE SPECIFICATIONS FOR
ADDITONAL REQUIREMENTS
LI
N
E N
O
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL (Note: Specification sections contain detailed requirements for submittals.
Contractor Responsible for all submittal requirements listed on this form, as well as all requirements described in specification sections.)
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
- M
FR
. S
PE
C S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
, C H
A R
TS
M A
N U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
C A
TA
LO
G / P
R O
D U
C T
D A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
TE
ST
D A
TA
R
EF
ER
EN
C
ES
PL
A
N , S
C H
ED
U
LE
, L
IS
T
A S-
B U
IL
T
D R
A W
IN
G
S
O
TH
ER
R
EQ
U
IR
ED
S
U B
M
IS
SI
O
N D
A
TE
D A
TE
R
EC
EI
VE
D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
SU
B
M
IT
TA
L
N O
C O
N
TR
A C
TO
R
R
ES
U B
M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
R
EM
A R
K S
D=DAYS APPROVED DISAPROVED
1 PERMITS 3 NTP+ 10 D
2 SAFETY PLAN 3 NTP+ 10 D
3 QUALITY CONTROL PLAN 3 NTP+ 10 D
LETTER OF SUPERINTENDENT,
PROJECT MANAGER 3 NTP+ 10 D
5 AF 3064 PROGRESS SCHEDULE 3 NTP+ 10 D
6 COST LOADED AF 1354 3 NTP+ 10 D
7 SOLID WASTE MGMT PLAN 4 NTP+ 10 D
8 FENCE 4 4 NTP+ 14 D
9 GROUNDING RODS 4 NTP+ 14 D
10 SECURITY WARNING SIGNS 4 NTP+ 14 D
11 ASBUILTS 2
14 D PRIOR TO
FINAL
ACCEPTANCE
12 WARRANTY LETTER 2
14 D PRIOR TO
FINAL
ACCEPTANCE
13 O & M MANUALS 2
14 D PRIOR TO
FINAL
ACCEPTANCE
DD 1354, TRANSFER & ACCEPTANCE
OF MILITARY REAL PROPERTY 2
14 D PRIOR TO
FINAL
ACCEPTANCE
PROJECT CLOSE OUT
REPAIR & CONSTRUCT NE
BOUNDARY FENCE, KAFB, PHASE I
& II
MHMV120091A&B
PROJECT START UP
TECHNICAL
D A
TE
C
O N
TR
A
C
TO
R N
O
TI
FI
ED
NUMBER OF COPIES REQUIRED (# CP)
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
Sheet1
File details come from the government source that posted it. Updated .