4. AF Form 3052 Government Price Schedule Summary.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Sustain Pad 5, Phase III Federal contract opportunity
Solicitation number
FA9401-12-R-0019
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 4

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

INSTRUCTIONS FOR COMPLETING AF FORM 3052

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square
feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be
funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will
be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows.
FOR OFFICIAL USE ONLY
BASE BID
TOTAL DIRECT COSTS$0.00

OH, P & NMGRT % $

SUBTOTAL BASE BID $ 0.00

OPTION BID ITEM #1
TOTAL DIRECT COSTS$0.00

OH, P & NMGRT % $

SUBTOTAL OPTION BID $ 0.00

TOTAL BASE AND OPTION PRICE $ 0.00

DATE : FIRM NAME :

TITLE :BY :
(Signature)

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3(e) and 3-807.4)
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection
with any negotiations prior to contract award.

(Reverse of AF Form 3052., AUG 93)

BASE BID RECAP

FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.1OF2
CONTRACTORADDRESS
KAFB
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR NE BOUNDARY FENCE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
MHMV120091A
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANHOURSAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BASE BID
1SWPPPLS$0.00$0.00$0.00$0.00
2MOBILIZELS$0.00$0.00$0.00$0.00
3SITE CLEAR & GRUBSY$0.00$0.00$0.00$0.00
4EXCAVATE/DISPOSAL/DEMOCY$0.00$0.00$0.00$0.00
5REMOVE/SALVAGE FENCELF$0.00$0.00$0.00$0.00
6REMOVE/SALVAGE AIRCRAFT CABLELF$0.00$0.00$0.00$0.00
7SURVEYINGHR$0.00$0.00$0.00$0.00
8
9
10
11
12
13
14
15
16
17
18
19
20TOTAL$0.00$0.00$0.00$0.00
(AF Form 3052., AUG 93)

OPTION BID ITEM RECAP

FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.2OF2
CONTRACTORADDRESS
KAFB
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR & CONSTRUCT NE BOUNDARY FENCE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
MHMV120091B
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANHOURSAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
OPTION BID ITEM
1SWPPPLS$0.00$0.00$0.00$0.00
2MOBILIZELS$0.00$0.00$0.00$0.00
3SITE CLEAR & GRUBSY$0.00$0.00$0.00$0.00
4EXCAVATE/DISPOSAL/DEMOCY$0.00$0.00$0.00$0.00
5INSTALL SAVALGED MATERIALS FOR NEW FENCELF$0.00$0.00$0.00$0.00
6REMOVE/SALVAGE FENCELF$0.00$0.00$0.00$0.00
7REMOVE/SALVAGE AIRCRAFT CABLELF$0.00$0.00$0.00$0.00
8SURVEYINGHR$0.00$0.00$0.00$0.00
9
10
11
12
13
14
15
16
17
18
19
20
21TOTAL$0.00$0.00$0.00$0.00
(AF Form 3052., AUG 93)