This document outlines specifications for a new welding machine for the Arnold Air Force Base in Tennessee. The machine must have a rated output of 400 amps at 44 volts with a 100% duty cycle and capabilities for stick, TIG, MIG, pulsed MIG, and flux-cored welding. It must weigh less than 225 pounds for the power source and include a cooler, feeders, torch kit, foot pedal, hoses, leads, and flow meters for full operation. The machine must be built to NFPA 79 standards and operate on the base's 480-volt, 3-phase, 60-hertz power system. The supplier must provide manuals, initial training, a cart, on-site testing, warranty against defects for 24 months, and maintenance and repair services within 36 hours for on-site calls and 48 hours for parts delivery beyond the warranty period. The machine will be installed at Building 451 by base personnel, with the supplier addressing any operational or functional issues. This document provides specifications for the solicitation from the Department of the Air Force Materiel Command Test Center for a new welding machine for the Arnold Air Force Base model shop.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Miller Dynasty Welder Specification Amend1.pdf | ||
| FA9101-23-Q-B044 Combined Synopsis Solicitation Amend 1.pdf | ||
| Attachment 3 - ESAB Aristo MIG 5000i Specification Amend1.pdf | ||
| Attachment 5 - Quote Worksheet Amend 1.docx | DOCX document | |
| FA9101-23-Q-B044 Combined Synopsis Solicitation.pdf | ||
| Attachment 1 - Miller Dynasty Welder Specification.pdf | ||
| Attachment 2 - Miller Pipeworx Welder Specification.pdf | ||
| Attachment 5 - Quote Worksheet.docx | DOCX document | |
| BNO_Justification_Miller_Redacted.pdf | ||
| BNO_Justification_ESAB_Redacted.pdf | ||
| Attachment 3 - ESAB Aristo MIG 5000i Specification.pdf | ||
| Attachment 4 - Provisions and Clauses.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications for Pipeworx Welding Machines at Arnold Air Force Base, TN;
Arnold Engineering Development Complex (AEDC)
Provide all materials, labor, and equipment necessary to provide a new fully functional welding Machine.
Refurbished or remanufactured parts are not authorized for this requirement.
• Machine capacities o Machine shall have a rated output of 400A at 44VDC, 100% duty cycle.
o Machine shall have an output range as follows: Stick_40-400A, DC TIG_10-350A, MIG/Flux-cored_10-44V, 400A.
o Machine shall have Net weights as follows: Power source_225lb, Single Feeder_65lb, Dual
Feeder_90lb, Cooler_133lb.
o Machine shall have the following processes: Stick (SMAW), DC TIG (GTAW), MIG (GMAW), RMD (GMAW-S), Pulsed MIG (GMAW-P), Flux-Cored (FCAW).
o Machine shall include coolmate, runner cart, Weldcraft W-375 torch kit and accessories.
o Machine shall have MIG wire fed capabilities.
o Machine shall have TIG capabilities with fluid cooling.
o Machine shall have DC Stick capabilities.
o Machine shall have wireless foot control.
o Machine shall have all cables, cords, and connectors for full and complete set up.
o Power supply shall come assembled with the following: End connector, Arktite 3-wire/4-pole
Heavy-Duty 60 Amp Circuit Breaking Plug With Cable Grip And Neoprene Bushing, Crouse-
Hinds p/n: APJ6485 or equiv. Wire, 4 conductor, 6 AWG stranded flexible copper, with rubber insulation, jute filler, separators as required, with neoprene jacket, 55 amp, extreme heavy-duty flexible service, nominal OD 1.0”, type W, minimum 10 ft long, or equiv.
• General o Machine shall be built to NFPA 79 and operate with AEDC power system which is 480V, 3PH, 60 HZ.
o Quote shall include work leads, gas hoses, wireless foot pedal, TIG torch, MIG spool feeder, and flow meters as needed to allow machine to be completely operational as received.
o Operating Manual, Maintenance Manual, & Schematics provided.
o Quote shall include initial instruction at delivery on controls and operation of the machine.
o Quote shall include cart/trolley for machine delivered.
• Verification o Upon delivery, Model Shop personnel will assemble & test run the machine at the site in accordance with functional tests for accuracy required by ISO/ANSI Standards.
o If there are any operational or functional issues, the Contractor shall make a site visit to diagnose
& correct the problem.
• Warranty o This machine shall be warranted against any defects in material, parts, and workmanship for 24 months after the date of installation.
• Maintenance, Parts and Service o The Contractor shall have the capability to service the equipment (labor and parts) beyond the warranty period, or the equipment shall be able to be serviced by a local qualified representative.
The Contractor or representative shall be capable of responding to a repair service call on-site within 36 hours and repair parts delivery within 48 hours after placement of order.
• Packaging/Delivery o Provide all preservation, packaging, and packing to ensure safe delivery of the machine and related components to AEDC (FOB Destination to Arnold Air Force Base, TN 37389). Deliver Machine to AEDC for off-loading by AEDC personnel.
• Installation o Installation will be at the Arnold Air Force Base, TN; Arnold Engineering Development
Complex’s Model Shop, Maintenance Shop, Building 451. Installation of the machine shall be accomplished by Model Shop personnel.
File details come from the government source that posted it. Updated .