Attachment 1 - Miller Dynasty Welder Specification Amend1.pdf

PDF 102 KB Posted

Attached to
Model Shop Welders Federal contract opportunity
Solicitation number
FA910123QB044
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This document outlines specifications for a Dynasty 400 welding machine to be provided under the Department of the Air Force Materiel Command Test Center solicitation for Model Shop Welders. The specifications require supplying a new fully functional welding machine with an input of 208-575V 3- or 1-Phase power, rated output of 300A at 32V and 60% duty cycle, and weighing 134 pounds. The machine must support stick, TIG, pulsed TIG, and air carbon arc welding processes and include coolant systems, a runner cart, torch kit and accessories. It must operate on the AEDC power system of 480V 3PH 60Hz and be warranted for defects for 24 months. The supplier must be capable of on-site repairs within 36 hours and part delivery within 48 hours, and provide packaging for safe delivery, initial instruction, and a cart for the machine. Installation and testing will occur at Arnold AFB upon delivery.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications for Dynasty 400 Welding Machines at Arnold Air Force Base, TN;

Arnold Engineering Development Complex (AEDC)

Provide all materials, labor, and equipment necessary to provide a new fully functional welding Machine.

Refurbished or remanufactured parts are not authorized for this requirement.

• Machine capacities o Machine shall have an input of 208-575V, 3- or 1-Phase Power.

o Machine shall have a rated output of 300A at 32V, 60% Duty Cycle.

o Machine shall have a net weights of 134lb.

o Machine shall have an amperage range of 3-400A o Machine shall have the following processes: Stick (SMAW), TIG (GTAW), Pulsed TIG

(GTAW-P), Air Carbon Arc (CAC-A).

o Machine shall include Coolmate 3.5 and 4 gal coolant, runner cart with cylinder rack, Weldcraft

W-375 torch kit and accessories.

o Machine shall have TIG capabilities with fluid cooling.

o Machine shall have DC Stick capabilities.

o Machine shall have wireless foot control.

o Machine shall have 8ft Primary Cord o Machine shall have all cables, cords, and connectors for full and complete set up.

o Power supply shall come assembled with the following: End connector, Arktite 3-wire/4-pole

Heavy-Duty 60 Amp Circuit Breaking Plug With Cable Grip And Neoprene Bushing, Crouse-

Hinds p/n: APJ6485 or equiv. Wire, 4 conductor, 6 AWG stranded flexible copper, with rubber insulation, jute filler, separators as required, with neoprene jacket, 55 amp, extreme heavy-duty flexible service, nominal OD 1.0”, type W, minimum 10 ft long, or equiv.

• General o Machine shall be built to NFPA 79 and operate with AEDC power system which is 480V, 3PH, 60 HZ.

o Quote shall include work leads, gas hoses, wireless foot pedal, TIG torch, MIG spool feeder, and flow meters as needed to allow machine to be completely operational as received.

o Operating Manual, Maintenance Manual, & Schematics provided.

o Quote shall include initial instruction at delivery on controls and operation of the machine.

o Quote shall include cart/trolley for machine delivered.

• Verification o Upon delivery, Model Shop personnel will assemble & test run the machine at the site in accordance with functional tests for accuracy required by ISO/ANSI Standards.

o If there are any operational or functional issues, the Contractor shall make a site visit to diagnose

& correct the problem.

• Warranty o This machine shall be warranted against any defects in material, parts, and workmanship for 24 months after the date of installation.

• Maintenance, Parts and Service o The Contractor shall have the capability to service the equipment (labor and parts) beyond the warranty period, or the equipment shall be able to be serviced by a local qualified representative.

The Contractor or representative shall be capable of responding to a repair service call on-site within 36 hours and repair parts delivery within 48 hours after placement of order.

• Packaging/Delivery o Provide all preservation, packaging, and packing to ensure safe delivery of the machine and related components to AEDC (FOB Destination to Arnold Air Force Base, TN 37389). Deliver Machine to AEDC for off-loading by AEDC personnel.

• Installation o Installation will be at the Arnold Air Force Base, TN; Arnold Engineering Development

Complex’s Model Shop, Maintenance Shop, Building 451. Installation of the machine shall be accomplished by Model Shop personnel.