Industry_Day_-_Afternoon_Presentation.pdf

PDF 256 KB Posted

Attached to
Wind Tunnel Compressor Rotor Blades Federal contract opportunity
Solicitation number
FA9101-17-R-1000
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Afternoon Presentation Slides

View the file

Other files for this federal contract opportunity

Other files attached to Wind Tunnel Compressor Rotor Blades, newest first.
File Type Posted
Industry_Day_2_Slides_-_scan.pdf PDF
Amendment_0002_-_FBO.pdf PDF
Amendment_0001.pdf PDF
Current_Spacer_Seal_Configuration.xlsx XLSX spreadsheet
Amendment_0001_Answers_to_Industry_Questions.pdf PDF
Slides_Industry_Day_12_April_17_-_FBO.pdf PDF
Revised_Atch_2_16T_C1_Compressor_Blades_Equipment_Specification.pdf PDF
Attachment_L-8,_Cross_Reference_Matrix_for_Phase_2.xlsx XLSX spreadsheet
AEDC_Map.pdf PDF
Flying_into_Nashville_and_Driving_to_AEDC.pdf PDF
Map_to_GLC.pdf PDF
run03_r3_pressure.csv CSV file
FA9101-17-R-1000.pdf PDF
run06_r3_pressure.csv CSV file
Attachment_3_-_Section_L.pdf PDF
run04_r1_pressure.csv CSV file
run05_r2_pressure.csv CSV file
run06_r2_pressure.csv CSV file
Attachment_6__-_Section_M_Phase_2.pdf PDF
Attachment_L-5,_Subcontractor_Consent_Letter.pdf PDF
run04_r3_pressure.csv CSV file
run01_r1_pressure.csv CSV file
run05_r3_pressure.csv CSV file
Attachment_L-1_PPI_Tool.accdb —
run07_r3_pressure.csv CSV file
run05_r1_pressure.csv CSV file
run03_r2_pressure.csv CSV file
Attachment_L-1,_PPI_Tool_Instruction.pdf PDF
SKRO6199.pdf PDF
run06_r1_pressure.csv CSV file
PG108760_C_2_CALSP_stamp_stamp.pdf PDF
PG631713.01_B.stp STP file
PG209017_A_1_stamp_stamp_stamp.pdf PDF
PU630917.01_A_2_SVEPA_stamp_stamp_stamp.pdf PDF
16T_Blade_Pin_Aero_Surface.SLDPRT —
RowB_Blade_Assembly_For_Information_Only.stp STP file
RowA_Blade_Assembly_For_Information_Only.stp STP file
PG108761_C_2_CALSP_stamp_stamp.pdf PDF
PG108760_C_1_CALSP_stamp_stamp.pdf PDF
PG108761.stp STP file
Attachment_L-9,_Cost_Model.xlsx XLSX spreadsheet
C1_compressor_blade_synopsis.pdf PDF
Draft_RFP_Cover_Letter_-_signed.pdf PDF
Industry_Day_Attendee_List.pdf PDF
Industry_Day_-_Morning_Presentation.pdf PDF
PWT_16T_Comp_C1_Blades_RFI_v_04.pdf PDF
16T_C1_Blade_Design_SOW_14424-002-17.pdf PDF
3202100.6_H_0106_AROIN_stamp_stamp.pdf PDF
Transonic_C1_Compressor_Fiberglass_Blade_Construction.pdf PDF
PWT_16T_Comp_C1_Blades_RFI_Draft_v_03.pdf PDF
Show all 50

Wind Tunnel Compressor Rotor Blades has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Arnold Engineering Development Complex

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

RFI Review

Chris Gernaat Technical Lead, Structural Analyst

Ed Mickle Lead Aerospace Engineer, Business Manager

Flight Systems Combined Test Force (AEDC/TSTW)

21 Oct 2016

Distribution A – Public Release Distribution Unlimited

ITAR/Distribution C 2

Distribution A – Public Release Distribution Unlimited 3

Procurement Phases

• Design and Prototype Phase

- Design and Analysis

- Prototype Blade Manufacturing

Production ready processes and tooling 10 blades – 9 required for tunnel entry 1 blade for destructive testing

- Prototype blade acceptance testing Material testing as required Load testing – Static and possibly dynamic at temperature Blades installed in 16T Blade impact, repair, and inspectability

Manufacturing Phase

• LRIP Manufacturing – at least 3 blades may be as many as

– Testing similar to prototype blades to prove manufacturing process

– Will become production blades if acceptance testing is passed

• Manufacture 2 sets of 97 blades (each set 31 A-Row, 33 B-

Row, 33 C-Row)

• First Set will be installed an run in the compressor before the approval for the second set of blades is released

Objectives

• Deliver all blades by the end of FY22

• Redesign blade structure to handle increased compressor horsepower

• Composite material construction

• No negative aerodynamic performance impact on the compressor

- Retain existing OML

- Careful consideration given to weight, center of gravity, stiffness, natural frequencies for the operating environment.

• Easy Repairability – blade impacts are common, repair time must be similar to existing blades

Objectives - Continued

• Process for inspection and repair must be similar in time and equipment to the existing blades

• Tooling to become Government property at contract conclusion

• Data rights for blade design, tooling design, and all manufacturing processes to become Government property

RFI Table

• Interest and Capability – Does your company have interest in and capability to perform the entire scope? If not which portions? Would you team with another contractor?

• Experience – Total years of experience with this type of work

• Government Experience – Total years of experience with Government contracts

• Recommended contract type – What type of contract would you recommend for each phase of work (e.g., Cost Plus Incentive Fee (CPIF), Firm Fixed Price (FFP), etc.)

-Account for unknowns in Design process -Account for unknowns in manufacturing process -Account for unknowns in Damage tolerance

• Minimum period of performance

- To be worthwhile to your company, what is the minimum period of performance you would recommend each of the Program Phases (1 and 2)?

- Does end of FY22 (September 31, 2022) look reasonable with a projected contract award date of September 31, 2017?

ITAR/Distribution C 8

Questions for Feedback

• What outer surface finish can be obtained on composite blades of this type?

• Has your company provided composite structures for man-rated aerospace vehicles?

• Please provide any additional thoughts or recommendations you have regarding possible strategy options and contract types for the Compressor C1 Rotor Blade Program, including single awards, multiple awards, and small business set asides.

• Please describe any involvement your company may have had in contracts similar in nature to the areas in which you have expressed an interest.

• If major portions of the AEDC contract (e.g., Design and Prototype, Tooling, and / or Production) were awarded to different contractors, how would you recommend the USAF incentivize cooperation/coordination to ensure smooth execution of each program element or phase?

Questions for Feedback - Continued

• Would you participate in the acquisition with other firms as teaming members or joint ventures? What other teaming opportunities do you see for this acquisition?

• What quality assurance processes does your company employ (e.g., ISO 9000, AS 9100, or other)?

• Please identify the North American Industry Classification System (NAICS) code you think is appropriate for the areas in which you have expressed an interest.

• Will your company provide data rights for the blades, including manufacturing process procedures? If not, please explain why and suggest an alternate solution.

Distribution A – Public Release Distribution Unlimited 11

Questions for Feedback - Continued

• Reducing the costs of owning, inspecting, and / or repairing the Compressor C1 blades will likely be necessary given projected future budgets. Please provide examples of how your company successfully reduced costs for similar type blades and why that experience may be useful here.

• What topics would you like to have discussed in future Government / contractor meetings?

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11

File details come from the government source that posted it. Updated .