RSLP AS Follow-on PWS 11 Jan 12 v2.docx

DOCX document 232 KB Posted

Attached to
Aging Surveillance Federal contract opportunity
Solicitation number
FA8818-12-R-0025
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

Performance Work Statement (PWS)

View the file

Other files for this federal contract opportunity

Other files attached to Aging Surveillance, newest first.
File Type Posted
FA8818-12-R-0025_0003_Portfolio_w_Atchs.pdf PDF
FA8818-12-R-0025 0002 portfolio.pdf PDF
FA8818-12-R-0025 0001 signed.pdf PDF
FA8818-12-R-0025 10 Sep 12.pdf PDF
AS Follow-on Overview.pptx PPTX presentation
FA8818-12-R-0025 RSLP AS DRAFT RFP v4.pdf PDF
NOCA PreSolic.doc DOC document
FA8818-12-R-0025 RSLP AS DRAFT RFP v3.pdf PDF
FA8818-12-R-0025 RSLP AS DRAFT RFP v2.pdf PDF
FA8818-12-R-0025 RSLP AS RFP.pdf PDF
Atch 6 AS Followon Section M 30 Mar 12.docx DOCX document
Attch 7 OCI Mitigation Plan Checklist.doc DOC document
Exhibit A Aging Surveillance Disposal CDRLs 30 Mar 12.docx DOCX document
Atch 5 AS Follow-on Sections L 30 Mar 12.docx DOCX document
Atch 4 DD Form 254 12-R-0025.pdf PDF
Atch 2 AS VSPT 30 Mar 2012.docx DOCX document
Atch 1 Aging Surveillance Follow-on PWS 30 Mar 12.docx DOCX document
Atch 3 Draft GFP List.doc DOC document
12R0025 DRAFT EDA 17978 no atch.doc DOC document
AS Follow-on Sections L 13 Jan 12.docx DOCX document
AS Followon Section M 13 Jan 12.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE-BASED WORK STATEMENT (PWS)

for

Rocket Systems Launch Program (RSLP) Aging Surveillance (AS) and Disposal

Solicitation/Contract Number:

FA8818-12-R-0025

11 January 2012

TABLE OF CONTENTS

1INTRODUCTION2
1.1 Scope2
2APPLICABLE DOCUMENTS2
2.1 Reference Documents2
2.2 Compliance Documents2
3REQUIREMENTS3
3.1 General Requirements3
3.2 AS Requirements3
3.3 Motor Disposition/Disposal Requirements6
3.4 Special Studies Requirements6
3.5 Special Requirements/Anomaly Investigations6
3.6 Materials and Test Equipment (TE) Support6
3.7 Program Management (PM) Requirements7
4General Considerations7
4.1 Five year Plan7
4.2 Services Summary7
4.3 Quality Assurance8
5DELIVERABLES9
6contract security requirements10
7GOVERNMENT FURNISHED EQUIPMENT/PROPERTY10
8Acronyms10

ANNEXES:

1. RSLP TEST MATRIX

2. RSLP 5 YEAR PLAN

3. GFP LIST

INTRODUCTION

Minuteman (MM) motor and component Aging Surveillance (AS) has been provided by the Rocket Systems Launch Program (RSLP) since 1993 by the original motor manufacturers ATK Launch Systems and Aerojet Corp; Peacekeeper (PK) motor and component AS has been provided for the RSLP since 2006 by ATK Launch Systems; MM and PK motor disposal was previously included in AS contracts and applied mainly to motors and components that had been used in AS processes.

Scope This Performance Work Statement (PWS) delineates the contractor tasks required to perform AS and motor disposal in support of the RSLP on MM and PK rocket motors and related components. These tasks provide motor and component life extension and identify aging trends in the motors which may be a significant indication of motor degradation. Additionally, this new contract will incorporate disassembly and disposal of unusable motors and some components. Required tasks to support AS and motor disposal of these assets include AS analysis, engineering and laboratory tests, motor preparation and static fire/support, support equipment maintenance, disposal, transportation, disassembly and disposition reporting.

APPLICABLE DOCUMENTS

Reference Documents The following documents are to be considered as reference material for the purpose of interpreting the requirements of this PWS but are not contractual documents.

Document No.Title
TO 2K-SR118-3TECHNICAL MANUAL OVERHAUL AND REPAIR INSTRUCTIONS WITH ILLUSTRATED PARTS BREAKDOWN DEPOT PEACEKEEPER STAGE I MIDEL SR-118, P/N 54576 SERIES THIOKOL CORPORATION FO4704-83-C-0001
FO4704-88-C-0015

TO 21-LG118A-26-1 OPR AND MAINT (DEPOT) -- HANDLING AND RADIOGRAPHIC PREPARATION INSTR FOR PEACEKEEPER SOLID STAGE ROCKET MOTORS AND COMPONENTS, STAGE I, II AND III, PN 54576, 1175641 AND 10529 SERIES (HERCULES INC) LGM118A

AFMAN 91201 EXPLOSIVE SAFETY STANDARDS

12 JAN 11

TO 21-LG118A-2-26CL-1 DEPOT-MISSILE SOLID STAGES TRANSPORTATION AND HANDLING- HILL AFB AND HILL AFB RANGE, UT Compliance Documents The contractor shall comply with the following documents of the exact issue shown to the extent specified in the column entitled "Tailored Application."

Document No.TitleTailored Application
MILSTD882BSystem Safety ProgramAs specified in the following:
30 Mar 84RequirementsAll requirements of paragraph 4 and
Notice Itasks 100 and 106 are applicable.

I Jul 87

TO1 IA147Department of DefenseAll
5 Jan 98Explosives Hazard
Classification Procedures

REQUIREMENTS

General Requirements Applicable Document Compliance The contractor shall comply with the applicable documents listed in Section 2.0 in performing PWS tasks. The contractor shall use the referenced documents to determine how to accomplish the tasks. The nature of A&AS services designed to facilitate government management and oversight of weapon system activities, however, also requires the contractor to adapt to changing direction, guidance, standards, policies and practices while performing the tasks within this PWS. To ensure both the Government and contractor remain synchronized relative to applicable guidance and documents, the contractor shall perform the PWS using the most current approved version of the applicable documents in section 2.0.

Environmental Compliance The contractor shall perform environmental compliance activities in accordance with federal, state, and local laws and regulations in order to comply with the requirements of this contract. Environmental activities may include one or more of the following: handling of any hazardous materials used or generated in performance of this effort; environmental analysis to demonstrate compliance with applicable federal, state, or local regulations, laws, or other specifications in accordance with this PWS; and preparation/submittal of environmental documentation to proper organizations. These environmental activities will only be in support of tasks covered by this PWS.

AS Requirements The contractor shall provide AS for Safety of Storage (SoS) and Reliability of Flight (RoF) of former MM and PK rocket motors and components. The contractor shall conduct motor and component tests and analyses that result in service life extension and identify aging trends that may affect performance. SoS testing and analysis validates the motors/components are safe to handle and store. RoF testing and analysis validates the motors/components perform to the original specifications. The contractor shall analyze test results and provide a recommendation for continued application/use of the assets. Specific requirements by motor/component are located in Annex 1.

Motor Static Fire Tests The contractor shall provide support for static fire tests of MM and PK rocket motors conducted at the Utah Test and Training Range (UTTR) and conduct/support motor static fire tests at the contractor’s proposed facility.

UTTR Static Fire Tests The contractor shall provide data analysis, including post-fire analysis and post-fire inspections. Ballistics analysis will be conducted by the contractor. The contractor shall provide a report on the post-fire analyses and inspections data. Results of these tests and inspections shall be provided for inclusion in the annual report. (CDRL A001, CDRL A002, CDRL A003) Contractor Facility Static Fire Tests The contractor shall provide static fire capability including but not limited to planning, preparation, execution and data analysis, including post-fire analysis and post-fire inspections. Ballistics analysis will be conducted by the contractor. The contractor shall provide a report on the post-fire analysis and inspections. The contractor shall maintain the static fire capability, regardless of static fire schedule. Results of these tests and inspections shall be included in an annual report. (CDRL A001, CDRL A002, CDRL A003) Component Static Fire Tests The contractor shall provide static fire tests of igniters and Gas Generators (GG) conducted at the contractor’s proposed facility, which may include Government range facilities.

Igniter Static Fire Tests The contractor shall plan, prepare, and execute the static fire tests of igniters, and data analysis. Pre-test environments (temperature cycling/transport and handling) shall be imposed by the Government. The contractor shall perform all necessary planning to delineate pre-test inspections and instrumentation requirements. The contractor shall prepare a final report for each test to include but not limited to data resulting from pre-fire testing, post-fire inspections and comparison to historical data. (CDRL A001, CDRL A002, CDRL A003) GG Static Fire Tests The contractor shall plan, prepare, execute of Thrust Vector Actuated (TVA), Extendable Nozzle Exit Cone (ENEC), Deployment Actuation System (DAS) GG and analyze the data. Pre-test environments (temperature cycling/transportation and handling) will be imposed by the Government. The contractor shall prepare a test plan (TP) detailing test conditions, pre-test inspections, and instrumentation. The contractor shall prepare a final report for each test to include but not limited to data resulting from pre-fire inspections, post-fire inspections, ballistics, and comparison to historical data. (CDRL A001, CDRL A002, CDRL A003) Nozzle Inspections and Tests Nozzle inspection and Static Fire tests are performed to determine effects of aging and provide service life extension of MM and PK nozzles. The contractor shall support the planning, preparation, execution, and data analysis of the testing of flexseal, TVA, and nozzles to identify aging trends. The contractor shall prepare a test plan detailing test conditions and instrumentation. The contractor shall prepare a final report for each test to include but not limited to data resulting from the testing, and comparison to historical data. (CDRL A001, CDRL A002, CDRL A003) Propellant Tests These tests are performed to determine effects of aging on motor and component propellant. The contractor shall perform/support the testing and analysis. Quantity and location of samples and test conditions shall be commensurate with previous test programs.

The contractor may assess the effects of changes in mechanical properties on structural margins of safety.

Loaded Motor Propellant Material Properties Test & Analysis The contractor shall plan, prepare, execute and provide data analysis to identify any age related trends and provide a recommendation for continued application/use of the assets. The contractor shall prepare a final report for each test to include but not limited to data resulting from the testing, and comparison to historical data. (CDRL A001, CDRL A002, CDRL A003) Motor Dissection The contractor shall conduct motor dissection periodically to ensure samples for conducting propellant material properties test. The timing and test required shall be approved by the Government according to the approved TP. The contractor shall support this planning and provide analysis of the propellant and bondline mechanical property data to support the trend analysis and useful life estimates. (CDRL A001, CDRL A002, CDRL A003) Loaded Motor Plugging/Excise Sampling The intent of this test series is to provide insight and assess the condition of the liner and propellant along the longitudinal axis of the case. The contractor shall plug and remove excise samples from the loaded motor case. This effort includes motor plugging, and test and analysis of samples. Quantities and locations of samples and testing conditions shall be consistent with previous test programs. (CDRL A001, CDRL A002, CDRL A003) Propellant Hazards Sensitivity Tests The contractor shall conduct propellant hazards sensitivity tests on motor propellants. These are primarily follow-on tests to the previous operational AS programs. The contractor shall support test planning and provide analysis of the propellant to support the trend analysis and useful life estimates with comparison to historical data base. (CDRL A001, CDRL A002, CDRL A003) Component Laboratory Tests Loaded Igniter Dissection The contractor shall dissect propellant loaded and unloaded igniters. Tests and inspections shall be comparable to previous test programs. This effort includes igniter dissection, analysis, test, storage and disposal. (CDRL A001, CDRL A002, CDRL A003) GG Dissection The contractor shall dissect Roll Control (RC), TVA and Nozzle GGs to obtain propellant chemical and mechanical properties. Tests and inspections shall be comparable to previous test programs. This effort includes GG dissection, storage, propellant testing and analysis. (CDRL A001, CDRL A002, CDRL A003) Ordnance Tests

3.2.5.1 Interstage Ordnance

The contractor shall provide IO Functional Testing, including RSLP unique items and legacy hardware. A test report (TR) will be issued to document the test results from functional tests as well as all the plots of the various environmental testing. Tests and inspections shall be comparable to previous test programs. (CDRL A001, CDRL A002, CDRL A003)

3.2.5.2 Ordnance Initiation Set

The contractor shall evaluate the hardware used to initiate igniters, gas generators and separation ordnance. This hardware consists of the through bulk-head initiator (TBI), and the type I and III ordnance transfer assemblies (OTA). The contractor shall prepare a test plan detailing test conditions and instrumentation. The contractor shall prepare a final report for each test to include results of the testing, and comparison to the historical database. (CDRL A001, CDRL A002, CDRL A003)

0. Ordnance/Range Certification Test Requirements The Government will provide Flight Termination (FTS) and Ordnance test per Range Commanders Council (RCC) 319-07 using Government Range personnel and test facilities to the maximum extent possible. The contractor shall support FTS and ordnance test as requested by the Government.

Motor Disposition/Disposal Requirements The contractor shall be responsible for the disposal of motors/components and related assets as necessary to support RSLP requirements.

AS Related Disposal The contractor shall disposition and dispose of residual material resulting from AS for assets tested/consumed at the contractor’s facility. This shall include, but is not be limited to, residual propellant from dissections/plugging operations, and motor/component static fire. Motors subject to the Strategic Arms Reduction Treaty (START) will be disposed per treaty requirements.

Excess Motor/Component Disposal The contractors shall disassemble and dispose of unusable motors/components per Government plan, through proven and effective methods, including but not limited to, wash out, motor/component fire or detonation. The contractor will provide a final report of motor disposition. (CDRL A005) Storage of Assets The contractor shall store selected assets required for AS and disposal to ensure availability when needed or as directed by the Government. Tasks required for this storage shall include the monitoring of the temperature to ensure proper environmental control.

Special Studies Requirements The contractor shall conduct special studies, which may be required due to changing AS or motor disposal requirements. The contractor shall provide engineering, technical and analysis support for system engineering and safety related issues of the motors/components. The contractor shall perform AS and disposal testing and analyses related to transportation, maintenance, safety, processing, test, long term storage and use. Special studies may result in either a recommendation or solution to an identified need, and/or procure support equipment as requested by the Government. (CDRL A001, CDRL A002, CDRL A003, CDRL A004) Special Requirements/Anomaly Investigations The contractor shall conduct special requirements studies/investigations related to motors/ components and disposal requirements, as directed by the Government. This includes activities such as failure investigations, anomaly investigations, and modification or development of tooling to support unique program requirements. The contractor shall also conduct other special requirements studies related to requirements in this PWS when, due to the uncertain nature of the effort involved, it is not practical to establish a firm fixed price. Special Requirements/Anomaly Investigations could result in recommendations or solutions to an identified need. (CDRL A001, CDRL A002, CDRL A003, CDRL A004) Materials and Test Equipment (TE) Support The offeror shall provide motor/component unique materials necessary for the refurbishment, testing, and maintenance as required by the Government to support RSLP.

Materials Provide materials including chemicals, soft goods, lubricants, hardware, ordnance, and other components as requested by the Government.

Electrical TE Maintenance Provide periodic maintenance of electrical TE to include minor repairs and labor.

Pressure Transducer Calibration Provide calibration of pressure transducers as requested by the Government. (CDRL A001, CDRL A002) Program Management (PM) Requirements PM & Engineering Support The contractor shall manage the overall schedule and annual report. The contractor shall provide an annual report that summarizes all contract activities, testing and recommendations. The contractor shall develop, maintain, and deliver to the Government an electronic monthly program schedule which details required activities, progress achieved, and required dates for Government Furnished Property (GFP) delivery. The contractor shall provide a monthly Contract Funds Status Report (CFSR) report that identifies actual and projected commitments, expenditures, billings, and Government invoices for all CLINs on this contract. The CFSR shall be submitted by the 10th day of each month, with data accurate to the previous month. (CDRL A002, CDRL A007, CDRL A008) Meetings The contractor shall support four Technical Interchange/Technical Direction (TI/TD) meetings per year for AS support and two Technical Interchange meetings (TIM) for disposal to be conducted in or near the contractor’s facility. At the Government’s discretion, these meetings can support other mission integration activities. One of these meetings may be held at Kirtland AFB. (CDRL A006) Data The contractor will provide a copy of all TPs and TRs to the Government for motor and component testing and motor/component disposition provided under this contract. (CDRL A001, CDRL A002, CDRL A003)

GENERAL CONSIDERATIONS

Five year Plan The Government has developed a 5 year plan, located at Annex 2, forecasting requirements for AS and disposal activities anticipated for this contract.

Services Summary

SS #
Performance Category
PWS Paragraph
Performance Threshold
1
Motor Static Fire Tests
1.1.1
Contractor support to motor static fire tests shall be capable of inclusion into Annual AS Reports with less than two (2) recommendations/solutions per year requiring significant change for reasons within contractor control.
2
Component Static Fire Tests
1.1.2
Contractor support to component static fire tests shall be capable of inclusion into Annual AS Reports with less than two (2) recommendations/solutions per year requiring significant change for reasons within contractor control.
3
Propellant Tests
1.1.3
Contractor support to propellant tests shall be capable of inclusion into Annual AS Reports with less than two (2) recommendations/ solutions per year requiring significant change for reasons within contractor control.
4
Component Laboratory Tests
1.1.4
Contractor support to component laboratory tests shall be capable of inclusion into Annual AS Reports with less than two (2) recommendations/solutions per year requiring significant change for reasons within contractor control.
5
Ordnance Tests
1.1.5
Contractor support to Ordnance tests shall be capable of inclusion into Annual AS Reports with less than two (2) recommendations/ solutions per year requiring significant change for reasons within contractor control.
6
Excess Motor/ Component Disposal
1.2.2
Contractor motor and component disposal shall conform to all AFCANs guidelines with less than two (2) disposal actions per year requiring Government action for reasons within contractor control.
7
Materials & TE Support
1.5
Contractor support for materials and TE support shall conform to Government stated needs with less than two (2) per year impacting baseline schedules for reasons within contractor control.
8
PM & Engineering Support
1.6.1
Program schedules and reports are accurate and provided on time with less than 3 schedules/reports per year requiring significant change for reasons within contractor control.
9
Data
1.6.2
Test and Disposition Reports will be accurate and complete with less than 2 significant changes required per document for reasons within contractor control.

Quality Assurance In compliance with Federal Acquisition Regulation (FAR) 52.246-4 “Inspection of Services—Fixed Price” the Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all places and times during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

If any of the services performed do not conform with the contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase to contract price or for no additional fee. When the defects in services cannot be corrected by re-performance, the Government may --

· Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

· Reduce the contract price or any fee payable under the contract to reflect the reduced value of the services performed.

If the Contractor fails to promptly perform the services again or take the action necessary to ensure future performance in conformity with contract requirements, the Government may --

· By contract or otherwise, charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or

· Terminate the contract for default.

Government Inspection The Government will evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan. Government methods of inspection other than those listed in the PWS (such as provided for by the Inspection of Services clause) may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the Contracting Officer (CO) as a result of inspections will be according to the terms of this contract.

Contracting Officer’s Representative (COR) CORs are representatives of the contracting officer and will participate in the administration of this contract. Subsequent to contract award, the contractor will be provided with a letter identifying CORs and setting forth their duties and authorities.

Scope Changes Any matter concerning a change to the scope, prices, terms or conditions of this contract shall be referred to the CO.

Administrative Records All records, documents, and associated papers provided by the Government and generated during the period of this contract become Government property and will remain in place upon contract termination or completion. During the period of the contract, records, documents, and associated papers shall be available for review.

DELIVERABLES

Contract Deliverables Requirements List (CDRL):

CDRL#
TITLE: SUB-TITLE
DID
A001
TEST/INSPECTION REPORT: INDIVIDUAL TEST REPORT
DI-NDTI-80809B
A002
TEST/INSPECTION REPORT: ANNUAL SUMMARY REPORT
DI-NDTI-80809B
A003
TEST PLAN
DI-NDTI-80566A
A004
TECHNICAL REPORT-STUDY/SERVICES: SPECIAL STUDIES
DI-MISC-80508B
A005
HAZARDOUS WASTE (HW) REPORT: MOTOR DISPOSAL CERTIFICATE
DI-NDTI-80899
A006
REPORT, RECORD OF MEETING/MINUTES
DI-ADMN-81505
A007
INTEGRATED MASTER SCHEDULE (IMS)
DI-MGMT-81650
A008
CONTRACT FUNDS STATUS REPORT (CFSR)
DI-MGMT-81468

CONTRACT SECURITY REQUIREMENTS

This contract will follow the DoD 5200.22M, National Industrial Security Operating Manual (NISPOM). To accomplish this work the contractor will require access to For Official Use Only (FOUO) Information and the Government Local Area Network. Additionally the contractor will receive and generate classified material at the SECRET level, be authorized to use the services of Defense Technical Information Center (DTIC) or other secondary distribution center, have TEMPEST and Operations Security (OPSEC) requirements, and have access to DoD Space System Protection Guide Information. Contract security requirements are defined in the contract DD 254, Contract Security Classification Specification.

GOVERNMENT FURNISHED EQUIPMENT/PROPERTY

The Contractor shall be responsible and accountable for all Government property provided under this contract and shall comply with FAR Subpart 45.5 Records of Government property. The Contractor shall create and maintain records of all Government property accountable to the contract, including Government-furnished and Contractor-acquired property. GFP available for this contract are included in Annex 3.

ACRONYMS

AS
Aging Surveillance
CDRL
Contrat Deliverables Requirements Document

CFSR

CO

Contract Funds Status Report Contracting Officer

COR
Contracting Officer’s Representative
DAS
Deployment Actuation System
ENEC
Extendable Nozzle Exit Cone
ETS
Electrical Test Set
FAR
Federal Acquisition Regulation
FTS
Flight Termination System
GFP
Government Furnished Property
GG
Gas Generator
IMS
Integrated Master Schedule
IO
Interstage Ordnance
LEA
Linear Explosive Assemblies
LSC
Linear Shaped Charge
MM
Minuteman
PK
Peacekeeper
PWS
Performance Work Statement
RCC
Range Commander’s Council
RSLP
Rocket Systems Launch Program
START
STrategic Arms Reduction Treaty
TI/TD
Technical Interchange/Technical Direction
TIM
Technical Integration Meeting
TO
Technical Order
TP
Test Plan
TVA
Thrust Vector Actuated
UTTR
Utah Test and Training Range

RSLP AS AND DISPOSAL PWS

ANNEX 1: RSLP TEST MATRIX

Test Type
System/Component
Peacekeeper
Minuteman
SR118
SR119
SR120
M55
SR19
M57
Peformance Test (Static Fire)
Motor
X
X
X
G1
G1
G1
Igniter
X
X
X
X
X
X
TVA Gas Generator
X
X
X

X

RC Gas Generator

X

Nozzle Gas Generator

X
X
Dissect/Plugging & Material Testing
Igniter
X
X
X
X
X
X
TVA Gas Generator
X
X

X

RC Gas Generator

X

Nozzle Gas Generator

X

Motor

X
X
X
X
Propellant Properties
X
X
X
X
X
X
Propellant Hazards
X
X
X
X
X
X
Other Testing (Non-ordance)
Nozzle Flexseal
X
X
X

X

TVA Test
X
X
X

Unfired Nozzle Test

X
X
X

Fire Nozzle Test

X
X
X
Flight Termination System and Other Ordnance
LSC Testing
X
X
X
Interstage Ordnance Test
X
X
X
X
X
X
Ordnance Initiation
X
X
X

Safe and Arm (1)

Arm/Disarm Switch (1)

TT Port Frangible Sector

G2

TVA Gas Generator Igniter

G2

Sounding Rocket Destruct System

G2
G2

Mechanical Modular Ordnance System (1)

Materials
Adhesives

X

Greases

X

O-rings

X
X

Gaskets (Metal)

X

Liner Kits

X

Notes:

(1) - Common for all MM applications; tested at Gov facility X - Tested at contractor facility G1 - Testing performed at government facility. Contractor responsible for post-test disassembly/ inspections G2 - For information only. Testing performed at Government facility. No contractor involvement currently required.

RSLP AS AND DISPOSAL PWS

ANNEX 2: GOVERNMENT 5 YEAR PLAN

Minuteman M55A1

Calendar Year

Activity Name
2012
2013
2014
2015
2016
2017

Static Fire Test

Fired Nozzle
1
1
1
1
1
1
Insulation Erosion
1
1
1
1
1
1

Loaded Motor Plugging

1
1
1
1
1

Prop. & Bondline Testing

1
1
1
1
1
Unfired Nozzle Test
1
1
1
1
1
1

Igniters

Static Test with Environments

Dissection/Propellant Testing

Motor Disposal
12
12
*
*
*
*

Minuteman SR19-AJ-1

Calendar Year

Activity Name
2012
2013
2014
2015
2016
2017

Static Fire Test

Post Fire Inspections
1
1
1
1
1
1
Insulation Erosion
1
1
1
1
1
1

Loaded Motor Plugging

1
1
1
1
1

Prop. & Bondline Testing

1
1
1
1
1
Unfired Nozzle Inspections
1
1
1
1
1
1

Igniters

Static Test with Environments
1

Dissection/Propellant Testing

RC Gas Generator

Static Test with Environments
2

Dissection/Propellant Testing

TVA Gas Generator

Static Test with Environments

Dissection/Propellant Testing

Flexseal

Full-Scale Unit

Flexseal Removal From Full-Scale Motor

Motor Disposal
2
4
*
*
*
*

Minuteman M57A1

Calander Year

Activity Name
2012
2013
2014
2015
2016
2017

Static Fire Test

Post Fire Nozzle Inspections
2
2
2
2
2
2

Loaded Motor Plugging

1
1
1
1
1

Prop. & Bondline Testing

1
1
1
1
1
Unfired Nozzle Inspections
2
2
2
2
2
2

Igniters

Static Test with Environments
2

Dissection/Propellant Testing

Post Fire Burst Test

Motor Disposal
30
34
*
*
*
*
* 0 unless directed otherwise by the Government;
No component disposal is planned

Peacekeeper SR118

Calendar Year

Activity Name
2012
2013
2014
2015
2016
2017

Static Fire Test

Fired Nozzle

Insulation Erosion

Prop. & Bondline Testing Analysis

Propellant Hazards Testing

Dissection/Propellant Testing

Igniters

Static Test with Environments

Dissection/Propellant Testing

TVA Gas Generator

Static Test

Dissection/Propellant Testing

TVA System

Flexseal

Full-Scale Unit

Flexseal Removal From Full-Scale Motor

Motor Disposal
*
*
*
*
*
*

Peacekeeper SR119

Calendar Year

Activity Name
2012
2013
2014
2015
2016
2017

Static Fire Test

Post Fire Inspections

Insulation Erosion

Prop. & Bondline Testing Analysis

Propellant Hazards Testing

Nozzles

Unfired Nozzle Inspections
1

Igniters

Static Test with Environments
2

Dissection/Propellant Testing

ENEC Gas Generator

Static Test with Environments
2

Dissection/Propellant Testing

TVA Gas Generator

Static Test with Environments
2

Dissection/Propellant Testing

Flexseal

Full-Scale Unit

Flexseal Removal From Full-Scale Motor

Motor Disposal
*
*
*
*
*
*
* 0 unless directed otherwise by the Government;
No component disposal is planned

Peacekeeper SR120

Calendar Year

Activity Name
2012
2013
2014
2015
2016
2017

Static Fire Test

Post Fire Inspections

Insulation Erosion

Loaded Case

Dissection

Prop. & Bondline Testing and Analysis

1
1
1
1
1

Propellant Hazards Testing

Igniters

Static Test with Environments

Dissection/Propellant Testing

DAS Gas Generator

Static Test with Environments

TVA Gas Generator

Static Test with Environments

TVA System

1
1
1
1
1

Flexseal

Full-Scale Unit

Flexseal Removal From Full-Scale Motor

Motor Disposal
*
*
*
*
*
*
* 0 unless directed otherwise by the Government;
No component disposal is planned

ORDNANCE

Calendar Year

Activity Name
2012
2013
2014
2015
2016
2017

PK FTOS LSCA (Range Safety)

SR118/SR119

SR120

PK Ordnance Initiation Set

Thru-Bulk Head Initiator

Type I OTA

Type III OTA

PK Interstage

ASE/SR118

SR118/SR119

SR119/SR120

MM Interstage

Delay Booster (1 sec)
10
Delay Booster (16 sec)
10

Explosive Assembly (Longitudnal)

Exploosive (H) Booster

Mechanical S/A

Pellet Assembly

Page of 3

RSLP AS AND DISPOSAL PWS

ANNEX 3: GOVERNMENT FURNISHED PROPERTY

PART NUMBER
DESCRIPTION
QTY
UOM
COST
EXT. COST
1103136-3
SPACER, SKIRT
2
EA
$29.94
$59.88
1103136-3
SPACER, SKIRT
2
EA
$29.94
$59.88
1103138-1
GASKET
1
EA
$0.60
$0.60
1103138-1
GASKET
1
EA
$0.60
$0.60
1103138-1
GASKET
2
EA
$0.60
$1.20
1103138-1
GASKET
2
EA
$0.60
$1.20
1103138-1
GASKET
2
EA
$0.60
$1.20
1103138-1
GASKET
1
EA
$0.60
$0.60
1103370-5
INSERT, CLAMP
6
EA
$8.14
$48.84
1103370-7
INSERT
10
EA
$8.14
$81.40
1105320-1
BRACKET, RELIEF VALVE
1
EA
$64.14
$64.14
1105354-1
BRACKET, RELIEF VALVE
1
EA
$52.99
$52.99
1105354-1
BRACKET, RELIEF VALVE
1
EA
$52.99
$52.99
1105354-1
BRACKET, RELIEF VALVE
1
EA
$52.99
$52.99
1105354-1
BRACKET, RELIEF VALVE
1
EA
$52.99
$52.99
1105354-1
BRACKET, RELIEF VALVE
1
EA
$52.99
$52.99
1105354-1
BRACKET, RELIEF VALVE
1
EA
$52.99
$52.99
1105354-1
BRACKET, RELIEF VALVE
1
EA
$52.99
$52.99
1105913-1
INSULATOR
1
EA
$26.65
$26.65
1105914-1
INSULATOR
1
EA
$26.65
$26.65
383728-9
CLIP
2
EA
$34.16
$68.32
383728-9
CLIP
2
EA
$34.16
$68.32
383728-9
CLIP
2
EA
$34.16
$68.32
383728-9
CLIP
2
EA
$34.16
$68.32
383905-1
GROMMET
1
EA
$5.69
$5.69
383905-1
GROMMET
1
EA
$5.69
$5.69
383905-1
GROMMET
1
EA
$5.69
$5.69
383905-1
GROMMET
1
EA
$5.69
$5.69
383905-1
GROMMET
1
EA
$5.69
$5.69
383905-1
GROMMET
1
EA
$5.69
$5.69
383914-1
GROMMET
1
EA
$7.42
$7.42
384020-1
GROMMET
2
EA
$5.26
$10.52
384020-1
GROMMET
2
EA
$5.26
$10.52
384020-1
GROMMET
2
EA
$5.26
$10.52
384020-1
GROMMET
2
EA
$5.26
$10.52
384020-1
GROMMET
2
EA
$5.26
$10.52
384020-1
GROMMET
1
EA
$5.26
$5.26
384020-1
GROMMET
3
EA
$5.26
$15.78
384020-1
GROMMET
2
EA
$5.26
$10.52
384020-1
GROMMET
2
EA
$5.26
$10.52
384020-1
GROMMET
2
EA
$5.26
$10.52
PART NUMBER
DESCRIPTION
QTY
UOM
COST
EXT. COST
384020-1
GROMMET
2
EA
$5.26
$10.52
384020-1
GROMMET
2
EA
$5.26
$10.52
384020-3
GROMMET
2
EA
$5.32
$10.64
384020-3
GROMMET
2
EA
$5.32
$10.64
384020-3
GROMMET
1
EA
$5.32
$5.32
384020-3
GROMMET
1
EA
$5.32
$5.32
384020-3
GROMMET
2
EA
$5.32
$10.64
384020-3
GROMMET
2
EA
$5.32
$10.64
384020-3
GROMMET
2
EA
$5.32
$10.64
369884-49-FRD
CHAMBER MINUTEMAN (FIRED)
1
EA
$500,000.00
$500,000.00
369884-49-FRD
CHAMBER MINUTEMAN (FIRED)
1
EA
$500,000.00
$500,000.00
383617-409-REP
IGNITER, ROCKET MOTOR
2
EA
$500.00
$1,000.00
1216845-9-FRD
LITVC SYSTEM, FIRED
1
EA
$3,000.00
$3,000.00
GEN-1024
NOZZLE, FIRED, DISSECT
1
EA
$80,000.00
$80,000.00
1213706-98553
EXIT CONE ASSY, TRUNCATED
1
EA
$7,000.00
$7,000.00
367950-1
BOLT
3
EA
$0.92
$2.76
1153803-1
WEATHERSEAL
1
EA
$23.92
$23.92
384744-9-AGING
ROCKET MOTOR, AGING
1
EA
$500,000.00
$500,000.00
384023-9-REP
NOZZLE ASSEMBLY
1
EA
$80,000.00
$80,000.00
1208682-59
MOTOR ASSEMBLY
1
EA
$20,000.00
$20,000.00
382100-FRM-903
ROCKET MOTOR DISASSEMBLED
1
EA
$500,000.00
$500,000.00
384744-9-AGING
ROCKET MOTOR, AGING
1
EA
$500,000.00
$500,000.00
384744-9-AGING
ROCKET MOTOR, AGING
1
EA
$500,000.00
$500,000.00
NAS1057T6-012
SPACER (WASHER)
4
EA
$2.60
$10.40
1369925
IGNITER GAS GEN
1
EA
$1,300.00
$1,300.00
1369925
IGNITER GAS GEN
1
EA
$1,300.00
$1,300.00
1369925
IGNITER GAS GEN
1
EA
$1,300.00
$1,300.00
1369925
IGNITER GAS GEN
1
EA
$1,300.00
$1,300.00
1369925
IGNITER GAS GEN
1
EA
$1,300.00
$1,300.00
1369925
IGNITER GAS GEN
1
EA
$1,300.00
$1,300.00
1369925
IGNITER GAS GEN
1
EA
$1,300.00
$1,300.00
7300-11
SWITCH, ARM/DISARM
1
EA
$1,217.60
$1,217.60
7300-11
SWITCH, ARM/DISARM
1
EA
$1,217.60
$1,217.60
7300-11
SWITCH, ARM/DISARM
1
EA
$1,217.60
$1,217.60
1106909
GAS GENERATOR PRESSURE
1
EA
$900.00
$900.00
1106909
GAS GENERATOR PRESSURE
1
EA
$900.00
$900.00
1106909
GAS GENERATOR PRESSURE
1
EA
$900.00
$900.00
1106909
GAS GENERATOR PRESSURE
1
EA
$900.00
$900.00
1106909
GAS GENERATOR PRESSURE
1
EA
$900.00
$900.00
1106909
GAS GENERATOR PRESSURE
1
EA
$900.00
$900.00
383618-17213
IGNITER, AGING
1
EA
$6,240.00
$6,240.00
383618-209
IGNITER, REHABED
1
EA
$6,240.00
$6,240.00
1106909
GAS GENERATOR PRESSURE
1
EA
$900.00
$900.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$900.00
$900.00
PART NUMBER
DESCRIPTION
QTY
UOM
COST
EXT. COST
1107216
GAS GENERATOR, AGED TVC
1
EA
$900.00
$900.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$900.00
$900.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$900.00
$900.00
1106909
GAS GENERATOR PRESSURE
1
EA
$21,550.00
$21,550.00
383618-209
IGNITER, REHABED
1
EA
$6,240.00
$6,240.00
383618-209-REP
IGNITER M/M FIELD RETURN
1
EA
$3,200.00
$3,200.00
383618-209-REP
IGNITER M/M FIELD RETURN
1
EA
$3,200.00
$3,200.00
1209682-9
ORDNANCE SUBASSEMBLY
1
EA
$5,000.00
$5,000.00
1106909
GAS GENERATOR PRESSURE
1
EA
$900.00
$900.00
1106909
GAS GENERATOR PRESSURE
1
EA
$900.00
$900.00
1106909
GAS GENERATOR PRESSURE
1
EA
$900.00
$900.00
383618-209-REP
IGNITER M/M FIELD RETURN
1
EA
$3,200.00
$3,200.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$900.00
$900.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$900.00
$900.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$900.00
$900.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$900.00
$900.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$900.00
$900.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$900.00
$900.00
1106909
GAS GENERATOR PRESSURE
1
EA
$900.00
$900.00
1106909
GAS GENERATOR PRESSURE
1
EA
$900.00
$900.00
1106909
GAS GENERATOR PRESSURE
1
EA
$900.00
$900.00
1106909-REP
GAS GEN ROLL CONTROL
1
EA
$25,863.00
$25,863.00
1107216-REP
GAS GENERATOR
1
EA
$20,185.00
$20,185.00
1106909-REP
GAS GEN ROLL CONTROL
1
EA
$25,863.00
$25,863.00
1107216-REP
GAS GENERATOR
1
EA
$20,185.00
$20,185.00
1106909
GAS GENERATOR PRESSURE
1
EA
$21,550.00
$21,550.00
1106909-REP
GAS GEN ROLL CONTROL
1
EA
$25,863.00
$25,863.00
1107216-REP
GAS GENERATOR
1
EA
$20,185.00
$20,185.00
383617-99/112
IGNITER, M/M, AGED
1
EA
$600.00
$600.00
383617-99/112
IGNITER, M/M, AGED
1
EA
$600.00
$600.00
383617-99/112
IGNITER, M/M, AGED
1
EA
$600.00
$600.00
383617-99/112
IGNITER, M/M, AGED
1
EA
$600.00
$600.00
383617-99/112
IGNITER, M/M, AGED
1
EA
$600.00
$600.00
383617-99/112
IGNITER, M/M, AGED
1
EA
$600.00
$600.00
383617-99/112
IGNITER, M/M, AGED
1
EA
$600.00
$600.00
383617-99/112
IGNITER, M/M, AGED
1
EA
$600.00
$600.00
1178400-1
ADAPTER FIRING
1
EA
$500.00
$500.00
LUM383617-99
IGNITER AGING W/O S AND A
1
EA
$600.00
$600.00
LUM383617-99
IGNITER AGING W/O S AND A
1
EA
$900.00
$900.00
LUM383617-99
IGNITER AGING W/O S AND A
1
EA
$900.00
$900.00
LUM383617-99
IGNITER AGING W/O S AND A
1
EA
$600.00
$600.00
LUM383617-99
IGNITER AGING W/O S AND A
1
EA
$900.00
$900.00
LUM383617-99
IGNITER AGING W/O S AND A
1
EA
$600.00
$600.00
1106909-REP
GAS GEN ROLL CONTROL
1
EA
$25,863.00
$25,863.00
PART NUMBER
DESCRIPTION
QTY
UOM
COST
EXT. COST
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1107216-REP
GAS GENERATOR
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1106909-REP
GAS GEN ROLL CONTROL
1
EA
$25,863.00
$25,863.00
1106909-REP
GAS GEN ROLL CONTROL
1
EA
$25,863.00
$25,863.00
1107216-REP
GAS GENERATOR
1
EA
$20,185.00
$20,185.00
1107216-REP
GAS GENERATOR
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1107216
GAS GENERATOR, AGED TVC
1
EA
$20,185.00
$20,185.00
1106909
GAS GENERATOR PRESSURE
1
EA
$25,863.00
$25,863.00
1106909
GAS GENERATOR PRESSURE
1
EA
$25,865.00
$25,865.00
1106909
GAS GENERATOR PRESSURE
1
EA
$25,863.00
$25,863.00
1106909
GAS GENERATOR PRESSURE
1
EA
$25,863.00
$25,863.00
1106909
GAS GENERATOR PRESSURE
1
EA
$25,863.00
$25,863.00
1106909
GAS GENERATOR PRESSURE
1
EA
$25,863.00
$25,863.00
383617-17214
IGNITER, AGING
1
EA
$6,000.00
$6,000.00
384517-29-REP
EXTENSION ASSY EXIT
1
EA
$7,756.00
$7,756.00
1208693-9
NOZZLE ASSEMBLY, MODIFIED
1
EA
$80,000.00
$80,000.00
1110067-1-REP
TUBE ASSY EXHAUST RH TVC
1
EA
$4,000.00
$4,000.00
1110067-1-REP
TUBE ASSY EXHAUST RH TVC
1
EA
$4,000.00
$4,000.00
1110067-3-REP
TUBE ASSEMBLY, RIGHT HAND
1
EA
$4,000.00
$4,000.00
384023-9-REP
NOZZLE ASSEMBLY
1
EA
$80,000.00
$80,000.00
383767-9-REP
SHIELD, BASE HEAT
1
EA
$7,600.00
$7,600.00
383767-9-REP
SHIELD, BASE HEAT
1
EA
$7,600.00
$7,600.00
384517-29-REP
EXTENSION ASSY EXIT
1
EA
$7,756.00
$7,756.00
1110067-1
TUBE ASSY EXHAUST R/H TVC
1
EA
$3,500.00
$3,500.00
1110067-1
TUBE ASSY EXHAUST R/H TVC
1
EA
$1,200.00
$1,200.00
1110067-1
TUBE ASSY EXHAUST R/H TVC
1
EA
$1,200.00
$1,200.00
1110067-1-REP
TUBE ASSY EXHAUST RH TVC
1
EA
$4,000.00
$4,000.00
1110067-1-REP
TUBE ASSY EXHAUST RH TVC
1
EA
$4,000.00
$4,000.00
1208693-9
NOZZLE ASSEMBLY, MODIFIED
1
EA
$80,000.00
$80,000.00
384023-9-REP
NOZZLE ASSEMBLY
1
EA
$80,000.00
$80,000.00
384517-29-REP
EXTENSION ASSY EXIT
1
EA
$7,756.00
$7,756.00
384517-29-REP
EXTENSION ASSY EXIT
1
EA
$7,756.00
$7,756.00
PART NUMBER
DESCRIPTION
QTY
UOM
COST
EXT. COST
1109992-5-REP
MANIFOLD GAS GEN TVC
1
EA
$4,000.00
$4,000.00
1110067-1-REP
TUBE ASSY EXHAUST RH TVC
1
EA
$4,000.00
$4,000.00
384517-29-REP
EXTENSION ASSY EXIT
1
EA
$7,756.00
$7,756.00
1213706-19
EXIT CONE ASSY, TRUNCATED
1
EA
$1.00
$1.00
1213706-39
EXIT CONE ASSY, TRUNCATED
1
EA
$1.50
$1.50
384023-9-REP
NOZZLE ASSEMBLY
1
EA
$80,000.00
$80,000.00
384023-9-REP
NOZZLE ASSEMBLY
1
EA
$80,000.00
$80,000.00
384517-29
EXTENSION ASSY EXIT CONE
1
EA
$6,000.00
$6,000.00
384517-29-REP
EXTENSION ASSY EXIT
1
EA
$7,756.00
$7,756.00
1111915-1
SPACER
1
EA
$13.25
$13.25
383725-9
CLIP
1
EA
$58.56
$58.56
1149638-1
COVER
2
EA
$56.56
$113.12
384024-5-REP
COVER, PROTECTIVE
1
EA
$10.00
$10.00
384024-5-REP
COVER, PROTECTIVE
1
EA
$10.00
$10.00
1111915-1
SPACER
1
EA
$13.25
$13.25
383725-9
CLIP
1
EA
$58.56
$58.56
1149625-19-REP
J-BOX HARD VALVE M/M
1
EA
$500.00
$500.00
1149625-9-REP
J-B0X SOFT VALVE M/M
1
EA
$500.00
$500.00
384024-5-REP
COVER, PROTECTIVE
1
EA
$10.00
$10.00
1208694-1
BRACKET, ACTUATOR
1
EA
$210.00
$210.00
383725-49
CLIP, MOUNTING
2
EA
$23.71
$47.42
384024-5
COVER, PROTECTIVE
1
EA
$10.00
$10.00
384024-5
COVER, PROTECTIVE
1
EA
$10.00
$10.00
367950-1
BOLT
108
EA
$0.92
$99.36
4075KF
CLAMP, PRESSURE VESSLE
1
EA
$245.00
$245.00
1107536-1
SLEEVE
8
EA
$78.50
$628.00
1107537-1
INSULATOR
16
EA
$373.00
$5,968.00
367950-1
BOLT
220
EA
$0.92
$202.40
1107055-1
SUPPORT
2
EA
$30.00
$60.00
1209678-1
PLATE
1
EA
$45.00
$45.00
1107055-1
SUPPORT
6
EA
$30.00
$180.00
1110544-5
INSULATOR
6
EA
$100.00
$600.00
1148350-9
SUPPORT
1
EA
$64.00
$64.00
NAS1351-6-32P
SCREW, SOCKET HEAD CAP
13
EA
$9.00
$117.00
TSR1AB04B
SPLICE, TINEL LOCK
79
EA
$23.00
$1,817.00
384024-5-REP
COVER, PROTECTIVE
1
EA
$10.00
$10.00
383725-49
CLIP, MOUNTING
2
EA
$23.71
$47.42
383725-49
CLIP, MOUNTING
2
EA
$23.71
$47.42
384024-5-REP
COVER, PROTECTIVE
1
EA
$10.00
$10.00
TMS-3/4-1.5-9
MARKING, MIL-I-81531
40
EA
$1.52
$60.80
TMS-3/8-1.5-9
MARKING, MIL-I-81531
40
EA
$0.81
$32.40
383725-49
CLIP, MOUNTING
4
EA
$25.00
$100.00
1149625-9-REP
J-B0X SOFT VALVE M/M
1
EA
$500.00
$500.00
1149638-1
COVER
2
EA
$56.56
$113.12
384024-5-REP
COVER, PROTECTIVE
1
EA
$10.00
$10.00
PART NUMBER
DESCRIPTION
QTY
UOM
COST
EXT. COST
384024-5-REP
COVER, PROTECTIVE
1
EA
$10.00
$10.00
1109965-1
SUPPORT
1
EA
$31.00
$31.00
NAS1352N3-10
SCREW
29
EA
$4.00
$116.00
1110470-3
INSERT
1
EA
$300.00
$300.00
NAS1595-12
O-RING
1
EA
$2.60
$2.60
1149625-19
JUNCTION BOX
1
EA
$500.00
$500.00
1149638-1
COVER
2
EA
$56.56
$113.12
383905-1
GROMMET
1
EA
$5.69
$5.69
AS7014A04A06
BOLT
55
EA
$83.99
$4,619.45
AS7014A04A06
BOLT
21
EA
$83.99
$1,763.79
1178952-2
GASKET, FLEXITALLIC
2
EA
$28.73
$57.46
AS7014A05A06
BOLT, TENSION, HIGH TEMP
3
EA
$342.00
$1,026.00
AS7014A05A06
BOLT, TENSION, HIGH TEMP
98
EA
$83.99
$8,231.02
AS7014A05A07
BOLT
100
EA
$83.99
$8,399.00
SPC-S7025A1B66A
CLAMP
1
EA
$6.50
$6.50
384024-5-REP
COVER, PROTECTIVE
1
EA
$10.00
$10.00
1149638-1
COVER
2
EA
$56.00
$112.00
384024-5-REP
COVER, PROTECTIVE
1
EA
$10.00
$10.00
14E00652517
ADAPTER OFR MOTOR SE
1
$6,184.00
$6,184.00
01E00804
HARNESS, FWD STAND
1
$1,500.00
$1,500.00
01E00994
STAND AFT
1
$1,500.00
$1,500.00
01E00800
CRADLE SECTION
1
$1,765.00
$1,765.00
01E00800
CRADLE SECTION
1
$1,765.00
$1,765.00
01E00804
HARNESS, FWD STAND
1
$1,500.00
$1,500.00
01E00800
CRADLE SECTION
1
$1,765.00
$1,765.00
01E00800
CRADLE SECTION
1
$1,764.00
$1,764.00
01E00800
CRADLE SECTION
1
$1,764.00
$1,764.00
01E00800
CRADLE SECTION
1
$1,764.00
$1,764.00
01E00877
FIXTURE, HYDRO-TEST
1
$505.00
$505.00
12E00116
DOLLY, MM RSLP MOTOR
1
$15,999.00
$15,999.00
12E00920
CLOSURE, MINUTEMAN N
1
$115.00
$115.00
12E00920
CLOSURE, MINUTEMAN N
1
$115.00
$115.00
12E00920
CLOSURE, MINUTEMAN N
1
$114.00
$114.00
12E00920
CLOSURE, MINUTEMAN N
1
$114.00
$114.00
83008J01994
FIXTURE HYDROSTATIC
1
$4,710.00
$4,710.00
6625BU
STAND, FSU DISPLAY
1
$745.00
$745.00
01E00804
HARNESS, FWD STAND
1
$1,500.00
$1,500.00
01E00624
ADAPTER FORK LIFT SH
1
$1,563.00
$1,563.00
M57 MOTOR TEST
PLASMA CAP SIGNAL CO
1
$1,975.00
$1,975.00
M57 MOTOR TEST
PLASMA CAP SIGNAL CO
1
$1,975.00
$1,975.00
83008J02159
FIXTURE, NOZZLE LEAK
1
$4,370.00
$4,370.00
83008J02172
SHROUD, PLUGGING
1
$3,875.00
$3,875.00
83008J02175
CAM, HARD STOP
1
$1,000.00
$1,000.00
83008J02176
END MILL, CASE CUTTI
1
$1,000.00
$1,000.00
83008J02177
PLATE, SLIP
1
$500.00
$500.00
PART NUMBER
DESCRIPTION
QTY
UOM
COST
EXT. COST
83008J02179
TRAP ARM, PLUGGING
1
$900.00
$900.00
83008J02180
EXCISING TOOL, AUTOM
1
$8,305.00
$8,305.00
83008J02229
CHOCK, HARNESSED MOT
1
$6,275.00
$6,275.00
83008J02230
FIXTURE, TRANSPORTAT
1
$14,395.17
$14,395.17
83008J02304
EXCISION TOOL, PROPE
1
$29,350.00
$29,350.00
83008J02306
CHOCK, TRANSPORTATIO
1
$7,455.00
$7,455.00
83008S02263
PROPELLANT EXCISE TE
1
$2,163.00
$2,163.00
83008J02533
LIFTING FIXTURE
1
$39,982.24
$39,982.24
2U141710-01
ADAPTER DIFFUSER
1
$1,006.39
$1,006.39
2U141711-01
ADAPTER LOAD TEST
1
$335.24
$335.24
2U141712-01
CHOCK MOTOR
1
$11,517.11
$11,517.11
T17062-1
PLATE ADAPTER
1
$1,779.00
$1,779.00
T17062-1
PLATE ADAPTER
1
$1,779.00
$1,779.00
NONE
PLATES ADAPTER
1
$30,000.00
$30,000.00
T17063-1
BRACKETS L
1
$129.60
$129.60
T17063-1
BRACKETS L
1
$129.60
$129.60
T17063-1
BRACKETS L
1
$129.60
$129.60
T17063-1
BRACKETS L
1
$129.60
$129.60
T17063-1
BRACKETS L
1
$129.60
$129.60
T17063-1
BRACKETS L
1
$129.60
$129.60
T17063-1
BRACKETS L
1
$129.60
$129.60
T17063-1
BRACKETS L
1
$129.60
$129.60
T17063-1
BRACKETS L
1
$129.60
$129.60
T17064-1
BRACKET MOUNTING
1
$204.00
$204.00
T17064-1
BRACKET MOUNTING
1
$204.00
$204.00
T17064-1
BRACKET MOUNTING
1
$204.00
$204.00
1045-4909-001
MANIFOLD DETONATING
1
$420.00
$420.00
1045-4909-001
MANIFOLD DETONATING
1
$420.00
$420.00
T17059-1
PLATE VIBRATION
1
$5,527.20
$5,527.20
T17059-2
PLATE VIBRATION
1
$2,874.00
$2,874.00
T17059-3
PLATE VIBRATION
1
$1,095.30
$1,095.30
2U141716-01
REMOVAL TOOL
1
$37,520.27
$37,520.27
2U141723-01
PLUG HOUSING
1
$6,891.36
$6,891.36
2U141726-01
PUNCH TAPE
1
$6,099.80
$6,099.80
2U104909-201
BEAM LIFTING
1
$12,123.19
$12,123.19
4U130144
BOX, STORAGE
1
$4,500.00
$4,500.00
4U120759
PROTECTOR, POLAR BOSS
1
$4,800.00
$4,800.00
NONE
ASSEMBLY THTVA
1
$250,000.00
$250,000.00
NA
ASSEMBLY THTVA
1
$250,000.00
$250,000.00
3268962-100
FIXTURE ASSEMBLY
1
$934.00
$934.00
3268962-100
FIXTURE ASSEMBLY
1
$3,000.00
$3,000.00
3268962-103
FIXTURE ASSEMBLY
1
$934.00
$934.00
3235310
HOIST RIG SUPPORT
1
$5,304.00
$5,304.00
3235310
HOIST RIG SUPPORT
1
$2,184.00
$2,184.00
3268962-101-103
CART ASSEMBLY
1
$1,897.00
$1,897.00
PART NUMBER
DESCRIPTION
QTY
UOM
COST
EXT. COST
3268962-101-103
CART ASSEMBLY
1
$3,844.00
$3,844.00
3268962-101
CART ASSEMBLY
1
$3,844.00
$3,844.00
3268962-101
BRACKETS LH
1
$278.00
$278.00
3268962-101
BRACKETS LH
1
$278.00
$278.00
3268962-101
BRACKETS RH
1
$325.00
$325.00
3268962-101
BRACKETS RH
1
$325.00
$325.00
2U141599-01
RING HANDLING
1
$74,532.68
$74,532.68
2U141600-01
SPACER / ADAPTER
1
$48,192.67
$48,192.67
2U141633-01
DELUGE WATER
1
$7,931.07
$7,931.07
3268892
MONITOR OVERSPEED
1
$289.00
$289.00
3268892
SPEED PICKUP
1
$1,415.40
$1,415.40
3262962
FIXTURE CALIBRATION LVDT
1
$2,483.00
$2,483.00
NONE
ANALYZER PARTICLE SIZE
1
$2,141.40
$2,141.40
3235310
PANE HYDRAULIC SUPPLY
1
$5,958.00
$5,958.00
3268962
ECE TURBO HYDRAULIC
1
$18,776.00
$18,776.00
3275534-4
STAND ENEC G/B
1
$48,476.00
$48,476.00
3549440
STAND ENEC TURB
1
$227.00
$227.00
NONE
VACUUM TC GA
1
$1,000.00
$1,000.00
NONE
VACUUM TC GA
1
$1,000.00
$1,000.00
3268698-1
ASSEMBLY TEST PANEL
1
$51,521.00
$51,521.00
3268962
STAND TVA TEST 2ND
1
$64,268.00
$64,268.00
3268962
EQUIPMENT TEST
1
$55,167.00
$55,167.00
NONE
PUMP HASKEL
1
$1,575.00
$1,575.00
3268962
TANKS HELIUM BOTTLES
1
$1,000.00
$1,000.00
3268962
ACTUATOR SERVO SUPPLY
1
$800.00
$800.00
3268962
ACTUATOR SERVO RETURN
1
$800.00
$800.00
TOOL NUMBER
DESCRIPTION
QTY
UOM
COST
EXT. COST
T2000014-001
RECOVERY SYSTEM, FREON
1
$5,230.00
$5,230.00
T2001966-001
MOLD COMPRESSION
1
$2,875.00
$2,875.00
T2001967-001
MOLD COMPRESSION
1
$2,650.00
$2,650.00
T2000015-001
SUPPORT STAND, VERTICAL, TORIDAL TANK DRAIN
1
$4,987.00
$4,987.00
T416502-16-001
FLANGE, ASSY NOZZLE
1
$1,300.00
$1,300.00
T416431-301-023
HANDLING RING AFT
1
$1,746.00
$1,746.00
T430231-201-001
ANTI-FLIGHT, HOWRE
1
$525.00
$525.00
T1042124-002
TEMPERATURE CONDITIONING CAR
1
$13,845.00
$13,845.00

image1.png image2.png

File details come from the government source that posted it. Updated .