T-6A_ADS-B_Out_Program_WBS_Dictionary_final_7_Dec_15.docx

DOCX document 74 KB Posted

Attached to
Joint Primary Aircraft Trainer System (JPATS) T-6A ADS-B (Out) Program Federal contract opportunity
Solicitation number
FA8617-16-R-6207
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

JPATS T-6A ADS-B (Out) Draft Preliminary Work Breakdown Structure Dictionary

View the file

Other files for this federal contract opportunity

Other files attached to Joint Primary Aircraft Trainer System (JPATS) T-6A ADS-B (Out) Program, newest first.
File Type Posted
4._T-6A_ADS_B_Out_Section_M_Final_1_Jul_16.docx DOCX document
3._T-6A_ADS_B_Out_Section_L_Final_1_Jul_16.doc DOC document
Responses_to_Industry_Questions_on_the_Draft_RFP.pdf PDF
ppi_tool.accdb —
T-6A_ADS-B_Out_Program_WBS_final_7_Dec_15.docx DOCX document
T-6A_ADS_B_Out_Section_L_Final_Draft_8_Dec_15.doc DOC document
SGFP_Data_Input_Spreadsheet_(XLSX).xlsx XLSX spreadsheet
T-6A_ADS_B_Out_Section_M_Final_Draft_8_Dec_15.docx DOCX document
Past_Performance_Matrix_v2.xlsx XLSX spreadsheet
SGFP_Data_Input_Spreadsheet_(PDF).pdf PDF
T-6A_ADS_B_Out_SRD_Final_Draft_2_Nov_15.docx DOCX document
FA8617-16-R-6207_Model_Contract.pdf PDF
T-6A_ADS_B_Out_CDRL_Package_Final_Draft_2_Nov_15.docx DOCX document
T-6A_ADS_B_Out_Draft_RFP_Cover_Letter_Final_Draft_2_Nov_15.docx DOCX document
T-6A_ADS_B_Out_Pricing_Matrix_Final_Draft_2_Nov_15.xlsx XLSX spreadsheet
T-6A_ADS_B_Out_Section_L_Past_Perf_Q_Final_Draft_18_Nov_15.docx DOCX document
T-6A_ADS_B_Out_SOW_Final_Draft_5_Nov_15.docx DOCX document
T-6A_ADS_B_Out_Base_Support_Agreement_Final_Draft_1_Dec_15.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

JOINT PRIMARY AIRCRAFT TRAINING SYSTEMS (JPATS)

NATIONAL AIRSPACE COMPLIANCE (NAC)

AUTOMATIC DEPENDENT SURVEILLANCE–BROADCAST (ADS-B) OUT

PROGRAM WORK BREAKDOWN

STRUCTURE (WBS) DICTIONARY

FOR THE T-6A AIRCRAFT &

AIRCREW TRAINING DEVICES (ATD)

Prepared by:

T-6A Integrated Product Team JPATS Program Office Wright-Patterson AFB, OH

October 2015

Document Information

Edition Information:

Type of Document:

Process

Status of Document:
DRAFT
Document File Name:
JPATS NAC ADS-B Out Program WBS Dictionary.docx

Document File Location:

Document Version:

TBD

Version 1

Document Control:

Title of Document:

JPATS NAC ADS-B (Out) Program WBS Dictionary

Program Name:
JPATS NAC ADS-B (Out)
Originator:
Mark Ragland

Contact Information:

Primary Contact:

Mark Ragland Program Manager, Avionics IPT Lead JPATS (T-6) Branch, Training Aircraft Division 1970 Monahan Way, Bldg 11A, Room 202.6

WPAFB, OH 45433-7211

Phone:
937-904-4182
E mail Address:
mark.ragland@us.af.mil

Record of Review and Change

Date
Version
Description of Change
28 October 2015
1.0
Document Created
7 December 2015
1.0
Removed WBS (put in separate document)

Table of Contents

1INTRODUCTION3
1.1JPATS NAC ADS-B (Out) Program Overview3
2JPATS NAC ADS-B (Out) Program Dictionary4

INTRODUCTION

This Program Work breakdown (WBS) Dictionary identifies and defines the element structure required to design, develop, integrate, test, certify, and install the Automatic Dependent Surveillance–Broadcast (ADSB) (Out) capability into the T-6A aircraft and the T-6A Aircrew Training Devices (ATD). It has been developed using MIL-STD-881C, Appendices A and L.

JPATS NAC ADS-B (Out) Program Overview

ADS-B (Out) is a requirement mandated by the Federal Aviation Administration (FAA) for aircraft operating within the National Airspace System as specified by Title 14 Code of Federal Regulations Part 91.225. This mandate directs a nationwide transition to ADS-B (Out) technology by 2020. ADS-B (Out) is a system by which aircraft repeatedly broadcast current position, altitude, airspeed, identification, and other information over a common data link.

JPATS NAC ADS-B (Out) Program Dictionary Table 2 contains JPATS NAC ADS-B (Out) program definitions for those elements that may apply to the EMD and/or Production effort.

Table 2. Program WBS Dictionary

WBS Element Number
WBS Description
WBS Definition
1.0
JPATS NAC ADS-B (Out)
The complex of equipment (hardware/software), data, services, and facilities required to develop, produce, and support the T-6A aircraft and Aircrew Training Devices (ATD).
1.1
Air Vehicle
The design, development, and production of complete ADS-B (Out) for the T-6A aircraft and ATD.
1.1.1
Airframe
N/A
1.1.2
Propulsion
N/A
1.1.3
Vehicle Subsystems
N/A
1.1.4
Avionics
ADS-B (Out) equipment on the T-6A and ATD, which is primarily electronic in nature.
1.1.4.1
Avionics Integration, Assembly, Test & Checkout
This element includes all effort of technical & functional activities associated with the design, development, and production of the hardware configuration required for assembling & testing the ADS-B (Out) system on the T-6A aircraft and ATD.
1.1.4.2
Communication/Identification
N/A
1.1.4.3
Navigation/Guidance
This element contains the equipment (hardware) installed on the T-6A and ATD to perform the ADS-B (Out) function.
1.1.4.4
Mission Computer/Processing
N/A
1.1.4.5
Fire Control
N/A
1.1.4.6
Data Display and Controls
N/A
1.1.4.7
Survivability
N/A
1.1.4.8
Reconnaissance
N/A
1.1.4.9
Automatic Flight Control
N/A
1.1.4.10
Health Monitoring System
N/A
1.1.4.11
Stores Management
N/A
1.1.4.12
Avionics Software Release 1..n
N/A
1.1.4.13
Other Avionics Subsystems 1..n
N/A
1.1.5
Armament/Weapons Delivery
N/A
1.1.6
Auxiliary Equipment
N/A
1.1.7
Furnishings and Equipment
N/A
1.1.8
Air Vehicle Software Release 1..n
N/A
1.1.9
Air Vehicle Integration, Assembly, Test & Checkout
N/A
1.2
Systems Engineering
The technical and management efforts of directing and controlling a totally integrated engineering effort for the T-6A and ATD.
1.3
Program Management
The business and administrative planning, organizing, directing, coordinating, controlling, and approval actions designated to accomplish overall program objectives, which are not associated with specific hardware elements and are not included in systems engineering.
1.4
System Test and Evaluation
The use of pilot, prototype, production, or specifically fabricated hardware/ software to obtain or validate engineering data on the performance of the system during the developmental phase of the program. It also includes all effort associated with the development of any specialized tools or data in support of the system level test program.
1.4.1
Development Test and Evaluation
This effort is planned, conducted and monitored by the developing agency of the DoD component. It includes test and evaluation conducted to:

a. Demonstrate that the engineering design and development process is complete

b. Demonstrate that the design risks have been minimized

c. Demonstrate that the system will meet specifications

d. Estimate the system's military utility when introduced

e. Determine whether the engineering design is supportable (practical, maintainable, safe, etc.) For operational use

f. Provide test data with which to examine and evaluate trade-offs against specification requirements, life cycle cost, and schedule

g. Perform the logistics testing efforts to evaluate the achievement of supportability goals, the adequacy of the support package for the system, (e.g., deliverable maintenance tools, test equipment, technical publications, maintenance instructions, and personnel skills and training requirements, etc.)

1.4.2
Operational Test and Evaluation
The test and evaluation conducted by agencies other than the developing command to assess the prospective system's military utility, operational effectiveness, operational suitability, logistics supportability (including compatibility, inter-operability, reliability, maintainability, logistic requirements, etc.), cost of ownership, and need for any modifications.
1.4.3
Mock-Ups / System Integration Labs (SILs)
The design engineering and production of system or subsystem mock-ups that have special contractual or engineering significance or that are not required solely for the conduct of one of the above elements of testing. SILs are often used in lieu of (or in addition to) mock-ups. SILs are risk reduction facilities where software and hardware can be developed, integrated, tested and evaluated for both standalone functionality and/or interoperability prior to being fielded.
1.4.4
Test and Evaluation Support
The support elements necessary to operate and maintain, during test and evaluation, systems and subsystems, which are not consumed during the testing phase and are not allocated to a specific phase of testing.
1.4.5
Test Facilities
The special test facilities required for performance of the various developmental tests necessary to prove the design and reliability of the system or subsystem.
1.5
Training
Deliverable training services, devices, accessories, aids, equipment, and parts used to facilitate instruction through which personnel will learn to operate and maintain the ADS-B (Out) system with maximum efficiency.
1.5.1
Equipment
Distinctive deliverable end items of training equipment, assigned by either a contractor or military service, required to meet specific training objectives.
1.5.2
Services
Deliverable training services, accessories, and aids necessary to accomplish the objectives of training.
1.5.3
Facilities
N/A
1.6
Data
The deliverable data required to be listed on a contract data requirements list, DD Form 1423.
1.6.1
Technical Publications
Technical data, providing instructions for installation, operation, maintenance, training, and support, formatted into a technical manual. Data may be presented in any form regardless of the form or method of recording. Technical orders that meet the criteria of this definition may also be classified as technical manuals.
1.6.2
Engineering Data
Recorded scientific or technical information (regardless of the form or method of recording) including computer software documentation. Engineering data defines and documents an engineering design or product configuration (sufficient to allow duplication of the original items) and is used to support production, engineering and logistics activities.
1.6.3
Management Data
The data items necessary for configuration management, cost, schedule, contractual data management, program management, etc., required by the Government.
1.6.4
Support Data
The data items designed to document support planning in accordance with functional categories.
1.6.5
Data Depository
N/A
1.7
Peculiar Support Equipment
The design, development, and production of those deliverable items and associated software required to support and maintain the ADS-B (Out) system or portions of the system while the system is not directly engaged in the performance of its mission, and which are not common support equipment.
1.7.1
Test and Measurement Equipment
The peculiar or unique testing and measurement equipment that allows an operator or maintenance function to evaluate operational conditions of a system or equipment by performing specific diagnostics, screening or quality assurance effort at an organizational, intermediate, or depot level of equipment support.
1.7.2
Support and Handling Equipment
The deliverable tools and handling equipment used for support of the mission system.
1.8
Common Support Equipment
The items required to support and maintain the ADS-B (Out) system or portions of the system while not directly engaged in the performance of its mission, and which are presently in the DoD inventory for support of other systems.
1.8.1
Test and Measurement Equipment
The common testing and measurement equipment that allows an operator or maintenance function to evaluate operational conditions of a system or equipment by performing specific diagnostics, screening or quality assurance effort at an organizational, intermediate, or depot level of equipment support.
1.8.2
Support and Handling Equipment
The deliverable tools and handling equipment used for support of the mission system.
1.9
Operational/Site Activation
The real estate, construction, conversion, utilities, and equipment to provide all facilities required to house, service, and launch prime mission equipment at the organizational and intermediate level.
1.9.1
System Assembly, Installation & Checkout on Site
The materials and services involved in the assembly of the ADS-B (Out) equipment at the site.
1.9.2
Contractor Technical Support
The materials and services provided by the contractor related to activation.
1.9.3
Site Construction
N/A
1.9.4
Site/Ship/Vehicle Conversion
N/A
1.9.5
Sustainment/Interim Contractor Support
N/A
1.10
Industrial Facilities
N/A
1.10.1
Construction/Conversion/Expansion
N/A
1.10.2
Equipment Acquisition or Modernization
N/A
1.10.3
Maintenance (Industrial Facilities)
N/A
1.11
Initial Spares and Repair Parts
The deliverable spare components, assemblies and subassemblies used for initial replacement purposes in the ADS-B (Out) system equipment end item.

File details come from the government source that posted it. Updated .