T-6A_ADS_B_Out_CDRL_Package_Final_Draft_2_Nov_15.docx

DOCX document 3 MB Posted

Attached to
Joint Primary Aircraft Trainer System (JPATS) T-6A ADS-B (Out) Program Federal contract opportunity
Solicitation number
FA8617-16-R-6207
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

JPATS T-6A ADS-B (Out) Draft CDRL Package

View the file

Other files for this federal contract opportunity

Other files attached to Joint Primary Aircraft Trainer System (JPATS) T-6A ADS-B (Out) Program, newest first.
File Type Posted
3._T-6A_ADS_B_Out_Section_L_Final_1_Jul_16.doc DOC document
4._T-6A_ADS_B_Out_Section_M_Final_1_Jul_16.docx DOCX document
Responses_to_Industry_Questions_on_the_Draft_RFP.pdf PDF
ppi_tool.accdb —
T-6A_ADS_B_Out_Base_Support_Agreement_Final_Draft_1_Dec_15.docx DOCX document
T-6A_ADS_B_Out_Section_M_Final_Draft_8_Dec_15.docx DOCX document
Past_Performance_Matrix_v2.xlsx XLSX spreadsheet
SGFP_Data_Input_Spreadsheet_(PDF).pdf PDF
T-6A_ADS_B_Out_SRD_Final_Draft_2_Nov_15.docx DOCX document
FA8617-16-R-6207_Model_Contract.pdf PDF
T-6A_ADS_B_Out_Draft_RFP_Cover_Letter_Final_Draft_2_Nov_15.docx DOCX document
T-6A_ADS_B_Out_Pricing_Matrix_Final_Draft_2_Nov_15.xlsx XLSX spreadsheet
T-6A_ADS_B_Out_Section_L_Past_Perf_Q_Final_Draft_18_Nov_15.docx DOCX document
T-6A_ADS-B_Out_Program_WBS_Dictionary_final_7_Dec_15.docx DOCX document
T-6A_ADS_B_Out_SOW_Final_Draft_5_Nov_15.docx DOCX document
T-6A_ADS-B_Out_Program_WBS_final_7_Dec_15.docx DOCX document
T-6A_ADS_B_Out_Section_L_Final_Draft_8_Dec_15.doc DOC document
SGFP_Data_Input_Spreadsheet_(XLSX).xlsx XLSX spreadsheet
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

CONTRACTOR PROGRESS STATUS AND MANAGEMENT REPORT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80227/T

5. CONTRACT REFERENCE

SOW PARA: 3.3, 3.13.8

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

MTHLY

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

Draft Final

Reg Repro

16. REMARKS

BLK 4: A. Delete paras 10.3g, 10.3h, 10.3i

B. This report shall include status of all authorized change request taskings.

BLK 11: The last day of the month.

BLK 12: First submission shall be 60 days after award of the T-6A ADS-B Out Development/Upgrade contract.

BLK 13: Submission is due the 15th day of the month after the period of performance.

BLK 14: Submission shall be electronically.

AFLCMC/WLZJ

DCMA

15. TOTAL

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland ADS B-OUT Program Manager

J. DATE

17. PRICE GROUP

18. ESTIMATED TOTAL PRICE

DD FORM 1423-1, FEB 2001

PREVIOUS EDITION MAY BE USED.

Page 1 of 1 Pages

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ILSS

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

PROPOSED SPARE PARTS LIST

3. SUBTITLE

SPARES AND SUPPORT EQUIPMENT

4. AUTHORITY (Data Acquisition Document No.)

DI-ILSS-80134A/T

5. CONTRACT REFERENCE

SOW PARA: 3.12.2, 3.12.5

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT

16. REMARKS

BLK 4: Tailor DID DI-ILSS-80134A as follows:

Include Support Equipment List with Spare Parts List.

Add to section 10.2 "shall be delivered in MS office 2010 or newer".

10.3.l Change "Production" to "Procurement".

BLK 8: The Government reserves 30 days review for approval (Initial and any revisions).

BLK 12: Due 30 days prior to Critical Design Review (CDR)

BLK 13: Revisions as required.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP TM OTHER OTHER

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

COUNTERFEIT PREVENTION PLAN

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81832

5. CONTRACT REFERENCE

SOW Para 3.2.6

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

30DAC

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

16. REMARKS

G. PREPARED BY

Brenda Coy Data Manager

H. DATE

I. APPROVED BY

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER HFAC

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

HUMAN ENGINEERING DESIGN APPROACH DOCUMENTS - OPERATOR

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-HFAC-80746C

5. CONTRACT REFERENCE

SOW PARA: 3.6.1

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

1TIME

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

16. REMARKS

BLK 4: Contractor format is acceptable.

BLK 16: Submittal due at CDR.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER HFAC

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

HUMAN ENGINEERING DESIGN APPROACH DOCUMENT - MAINTAINER

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-HFAC-80747B

5. CONTRACT REFERENCE

SOW PARA: 3.6.2

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

1TIME

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

16. REMARKS

BLK 4: Contractor format is acceptable.

BLK 12: Deliver at CDR.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

AIRWORTHINESS DIRECTIVES/SERVICE

3. SUBTITLE

BULLETINS/ADVISORY DATA

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81241/T

5. CONTRACT REFERENCE

SOW PARA: 3.2.2.1, 3.3.8

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

16. REMARKS

BLK 4:

1) Contractor shall track the status of all Service Instructions (SIs), Service Bulletins (SBs), and Service Information Letters (SILs).

2) Contractor shall submit copies of all customer advisory data to include all items listed in section

10.2 of the DID as well as component manufacturer's bulletings subsequent to CDR.

3) Contractor shall submit a complete engineering review and analysis of each service instruction, evaluating applicability to the JPATS, and providing instructions for accomplishing change.

BLKs 10, 12 & 13: As Required

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER CMAN

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

INTERFACE CONTROL DOCUMENT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-81248A

5. CONTRACT REFERENCE

BLK 16

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

16. REMARKS

SOW PARA: 3.2.1, 3.4.3, 3.4.4, 3.7, 3.12.3

BLK 4: Contractor format is acceptable.

BLK 12: First submittal shall be at the preliminary design review.

BLK 16: A full ICD update shall be submitted 3 months after the date of the first submittal and quarterly thereafter.

3) If no changes have occurred, submit a contracting letter stating such to meet submittal requirements.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

REQUIREMENTS TRACEABILITY AND VERIFICATION MATRIX

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81283/T

5. CONTRACT REFERENCE

SOW PARA: 3.2.1

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

MTHLY

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT

16. REMARKS

A. Blk 4: Contractor format is acceptable.

B. Blk 8: Approval is required for the RVTM prior to start of testing for the purpose of verifying the ADS-B Out system functionality or the the 6A/B Project engineer specifically directs. RVTM returned to the Contractor that is approved with comments shall have the comments resolved prior to release for the test. RTM approved without comments are ready for release.

C. Blk 12:

1) Submit the draft RTVM at SRR/SFR.

2) A full RVTM update shall be submitted 30 days after the date of the first submission and monthly thereafter.

3) If no changes have occurred, submit a contracting letter Stating such to meet submittal requirements.

AFLCMC/WNZJ

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A011

2. TITLE OF DATA ITEM

TEST PLAN

3. SUBTITLE

CERTIFICATION

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80566A/T

5. CONTRACT REFERENCE

SOW PARA: 3.8.2

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

BLK16

13. DATE OF SUBSEQUENT

16. REMARKS

BLK 4: Contractor format is acceptable.

BLKs 10, 12 & 13: Engineering Test Requests (ETRs) and/or subcontractor vendor Test Plans shall be submitted for each System Design Validation test.

The ETC/Test Plan shall be submitted for review and approval prior to the planned start of the test.

ETRs/Test Plans returned to the Contractor that are approved with comments shall have the comments resolved prior to release for the test. ETRs/Test Plans approved without comments are ready for release.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A012

2. TITLE OF DATA ITEM

TEST INSPECTION REPORT

3. SUBTITLE

CERTIFICATION

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B/T

5. CONTRACT REFERENCE

SOW Para: 3.8.2, 3.13.4

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

16. REMARKS

BLK 4:

A. Quick look reports shall include only the following:

10.2.1.a, b, c, d, f, g, h; 10.2.3.1; 10.2.3.2a, b, c, d, e, f and 10.2.4.

B. Quick look reports shall be submitted within 24 hours from the completion of the test.

C. When required, submit reports for ground and flight tests, demonstrations, studies and analysis.

BLKs 10, 12 & 13: All reports shall be submitted not later than 30 days after the completion of a test, demonstration, study, and analysis.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER S

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A013

2. TITLE OF DATA ITEM

INERTIA (MASS PROPERTIES) REPORT FOR AIRCRAFT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81504A

5. CONTRACT REFERENCE

SOW PARA: 3.12.7

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

1TIME

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

16. REMARKS

BLK 4: Contractor format acceptable.

BLK 12: The Report shall be submitted 30 days prior to Qualification Test Report.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ILSS

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A014

2. TITLE OF DATA ITEM

FAILURE MODE, EFFECTS AND CRITICALITY ANALYSIS REPORT

3. SUBTITLE

(FMECA)

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81495A/T

5. CONTRACT REFERENCE

SOW PARA: 3.2.4

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

90DAC

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT

16. REMARKS

BLK 4: Contractor format is acceptable, but must include, as a minimum, the following data elements: ID, Part Nomenclature, Function, Anomaly Mode, Probability, System Phase(s), Effect on Component, Effect on System, Effect on Aircraft, Category, Mitigations, and Remarks.

BLKs 10 & 13: 1) Proposed FMECA update changes to the report, as required, shall be submitted in conjunction with each Class I ECP. Negative comments are required. A revised FMECA section (LRU Section)shall be submitted upon approval of each Class I ECP. At government request, specific anomaly probabilities shall be updated to reflect data gathered via operational usage.

2) A full FMECA update shall be submitted on the anniversary date of first submission and annually thereafter.

3) If no changes have occurred, submit a Contracting letter stating such to meet submittal requirements.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER IPSC

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A015

2. TITLE OF DATA ITEM

SYSTEM/SUBSYSTEM SPECIFICATION (SSS)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81431A/T

5. CONTRACT REFERENCE

BLK 16

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT

16. REMARKS

BLK 4:

a) Contractor format acceptable.

b) Specifications shall be maintained using MIL-HDBK-61A (Configuration Management Guidance) as a guide.

c)With each ECP that effects any baseline specification, the changed pages shall be submitted. Once the ECP has been approved, as part of the contract Modification, a new revision to that specification will be provided.

d) A change history page shall be maintained for each specification to reflect change history. Change bars shall be used for each change.

e) A specification matrix, presented in a Excel spreadsheet, reflecting the items to be audited for the functional configuration audit shall be provided. This matrix shall meet the requirements in paragraph 4. of the DID.

BLK 5: SOW PARA: 3.2.1, 3.4.5.1, 3.4.5.2, 3.8.1, 3.12.3, 3.8.2.2.1

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM X OTHER

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A016

2. TITLE OF DATA ITEM

TECHNICAL MANUAL CONTRACT REQUIREMENTS

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

TMCR-86-01P/T

5. CONTRACT REFERENCE

BLK 16

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

SD

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT

16. REMARKS

BLK 5: SOW PARA: 3.4.4, 3.8.2.3, 3.12.7, 3.13.6, 3.13.9

BLK 14: Operator and Maintenance Manuals to be delivered in CD ROM format. If data cannot be electronically copied from a single CD-ROM master, then a total of 45 hard copies shall be provided.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A017

2. TITLE OF DATA ITEM

SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81024/T

5. CONTRACT REFERENCE

SOW PARA: 3.2, 3.4.2, 3.4.3; 3.4.4

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

ANNLY

12. DATE OF FIRST SUBMISSION

120 DAC

14. DISTRIBUTION

16. REMARKS

BLK 4:

1) Delete Para 10.2.2c.

2)Para 10.2.2d. Delete the first sentence and substitute with: "This section shall identify the proposed organization(s) and key personnel for each of the technical management elements, clear definition of assignments, and their standards or measures of accomplishment."

3) Para 10.2.2k. - delete in its entirety.

BLK 13: Submit change pages as changes occur. Revise entire document annually unless no changes have occurred.

If no changes have occurred, submit a Contracting letter stating such to meet submittal requirements.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A018

2. TITLE OF DATA ITEM

CONFERENCE MINUTES

3. SUBTITLE

CONFERENCE MINUTES AND AGENDAS

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81250A/T

5. CONTRACT REFERENCE

BLK16

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

16. REMARKS

BLK 4: Contractor Format acceptable.

BLK 5: SOW PARA: 3.3, 3.3.7, 3.6.3, 3.8.2.1; 3.8.2.2.1, 3.8.2.2.2, 3.8.2.3

BLK 10 & 12:

A) Formal Minutes, Action Items, and Briefing Slides shall be submitted for each meeting. These shall be submitted not later than 7 calendar days after the conclusion of each meeting.

B) The Cockpit Working Group meetings will be held twice a year.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER F

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A020

2. TITLE OF DATA ITEM

RISK MANAGEMENT PLAN

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81808/T

5. CONTRACT REFERENCE

SOW PARA: 3.3.6, 3.12.8

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

ANNLY

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT

16. REMARKS

BLK 4:

1) Contractor format is acceptable.

2) Para 2.4 change "2003-2007" to "2010 or newer".

BLK 8: The Government reserves 30 days after first submission for approval. Approval is granted upon compliance with SOW Paragraphs referenced in BLK 5.

BLK 12 & 13:

1) The first submittal shall be submitted no later than 5 business days prior to the Post Award Conference.

2) Submit change pages as changes occur. Revise entire document annually on the anniversary of the initial submittal unless no changes have occurred. If no changes have occurred, submit a Contracting letter stating such to meet submittal requirements.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER F

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A021

2. TITLE OF DATA ITEM

DMSMS HEALTH ANALYSIS REPORT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81900/T

5. CONTRACT REFERENCE

SOW PARA: 3.12.4

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

1TIME

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

16. REMARKS

BLK 4: Contractor format is acceptable.

BLK 8: The Government reserves 30 days review for approval.

BLK 12: The contractor shall provide the DMSMS Impact Assessment 60 days prior to the Material Readiness Review.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER F

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A022

2. TITLE OF DATA ITEM

INTEGRATED PROGRAM MANAGEMENT REPORT (IPMR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81861/T

5. CONTRACT REFERENCE

BLK16

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

MTHLY

12. DATE OF FIRST SUBMISSION

30 DAC

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

EOM

13. DATE OF SUBSEQUENT

EOM + 15 days

16. REMARKS

BLK 4: Tailor DID by including only Formats 5 and 6. Formats 1-4 and 7 are not applicable. EVM is not applicable.

Delete paragraph 3.7.1.3.6 (SRA). Contractor Format is Acceptable.

BLK 7: Inspection and Acceptance will be performed by the requiring office and in accordance with attachment 7, Exhibit A - Supplement 1.

BLK 8: The Government has 10 work days for review and acceptance/rejection. Contractor shall incorporate comments and changes in next monthly submittal.

BLK 9: Distribution shall be IAW Attachment 7, Exhibit A - Supplement 1, Section 2 Distribution Statement & Marking Instructions for Data Deliverables.

Administrative and Technical Data Deliverables shall not be marked Proprietary nor be marked with any other non-conforming or unjustified markings.

BLK 14: Distribution shall be in accordance with SOW Attachment 7, Exhibit A - Supplement 1, Section 3 PEGNET instructions for CDRL Data submission.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A023

2. TITLE OF DATA ITEM

CONTRACT CHANGE PROPOSAL

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81401B/T

5. CONTRACT REFERENCE

SOW PARA: 3.11.1

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT

16. REMARKS

BLK 4:

1) Amendments and/or revisions are as directed by the Procuring Contracting Officer (PCO). For amendments only, submit documentation that was modified.

2) Revisions may be requested as a result of a CCP disapproval.

3) CCP submittals shall consist of both Technical and Cost Volume, as applicable.

4) A CCP must not be used for making changes to specifications drawings or other baseline documentation.

BLKs 10, 12 & 13: Contractor shall submit CCPs as required.

BLK 14: * Immediately following electronic delivery, a hardcopy shall be submitted via regular mail. Cost and pricing data shall be submitted in hardcopy to AFLCMC/WLZJ(2 copies) with each CCP.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER CMAN

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A024

2. TITLE OF DATA ITEM

ENGINEERING CHANGE PROPOSAL

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80639C/T

5. CONTRACT REFERENCE

SOW PARA: 3.11.2

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT

16. REMARKS

BLK 4: Contractor shall submit Engineering Change Proposals (ECPs) using MIL-HDBK-61A (Configuration Management Guidance), para 6.2 and Table 6-6 as a guide.

BLKs 10, 12 & 13: 1) With each ECP that affects any baseline specification, the changed pages shall be submitted. Once the ECP has been approved, as part of the contract modification, a new revision to that specification shall be provided.

2) ECP submittals shall consist of both a Technical and Cost Volume, as applicable.

3) Revisions may be requested as a result of a ECP disapproval.

C. BLK 14: * Immediately following electronic delivery, a hardcopy shall be submitted via regular mail. Cost and pricing data shall be submitted in hardcopy to AFLCMC/WLZJ(2 copies) with each ECP.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A025

2. TITLE OF DATA ITEM

HAZARDOUS MATERIALS MANAGEMENT

3. SUBTITLE

PROGRAM (HMMP) REPORT

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81397A

5. CONTRACT REFERENCE

SOW PARA: 3.2.5

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

ANNLY

12. DATE OF FIRST SUBMISSION

120 DAC

14. DISTRIBUTION

16. REMARKS

BLK 4: Contractor format acceptable.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER CMAN

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A026

2. TITLE OF DATA ITEM

CONFIGURATION MANAGEMENT PLAN

3. SUBTITLE

(CMP)

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80858B/T

5. CONTRACT REFERENCE

SOW PARA: 3.11

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

See Blk 16

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT

16. REMARKS

BLK 4: Contractor format acceptable. Electronic format for the final CMP.

BLKS 10 and 13: Revisions as required to maintain the plan in a current status.

BLK 12: The plan provided with the proposal may be draft and final CMP shall be incorporated in the contract upon award.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER SAFT

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A027

2. TITLE OF DATA ITEM

SAFETY ASSESSMENT REPORT (SAR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80102C

5. CONTRACT REFERENCE

SOW PARA: 3.8.2.3, 3.10

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

ANNLY

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT

16. REMARKS

BLK 4: Contractor format acceptable.

BLK 12&13: Provide 45 days prior to Preliminary Design Review. Incorporate changes within 45 days after PDR. Update prior to the CDR, and incorporate changes within 45 days after CDR. Update annually thereafter.

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A028

2. TITLE OF DATA ITEM

TECHNICAL REPORT-STUDY/SERVICES

3. SUBTITLE

FAA CERTIFICATION

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B/T

5. CONTRACT REFERENCE

SOW PARA: 3.2.2.1

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

1TIME

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

16. REMARKS

BLK 4: The Contractor shall submit proof of FAA Certification to the USG. This proof shall be an official Certificate from the FAA relating to aircraft level Certification. Some methods of certification include but are not limited to a Supplemental Type Certificate or updated Type Certificate.

BLK 10, 12: The Contractor shall submit the proof to the USG within 10 days of receiving it from the FAA.

*AFLCMC/WLZJ

* DCMA

G. PREPARED BY

Donna Winkler Configuration Manager

H. DATE

I. APPROVED BY

Mark Ragland

Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

T-6A ADSB-OUT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A029

2. TITLE OF DATA ITEM

TEST PROCEDURE

3. SUBTITLE

SYSTEM TEST DESCRIPTION/PROCEDURES/TIS

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80603A/T

5. CONTRACT REFERENCE

SOW Para 3.8.3.1, 3.13.2

6. REQUIRING OFFICE

AFLCMC/WLZJ

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

14.…