Q&A.docx

DOCX document 18 KB Posted

Attached to
TH-1H Heliocopter DLM Federal contract opportunity
Solicitation number
FA8552-18-R-0004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document contains questions and answers regarding a solicitation for TH-1H helicopter depot level maintenance services. The solicitation will include CLINs for tear down, inspection, maintenance and repair, travel, contractor field team support, unscheduled depot level maintenance, engineering support, contractor acquired property, long lead material, over and above labor and material, and reporting requirements. The estimated period of performance is from May 2019 to May 2024. The solicitation will be issued by the Air Force Materiel Command Lifecycle Management Center to support the TH-1H helicopter fleet. Any questions may be directed to the listed contracting officer or contract specialist. Performance must occur within 600 miles of Fort Rucker, Alabama.

View the file

Other files for this federal contract opportunity

Other files attached to TH-1H Heliocopter DLM, newest first.
File Type Posted
Attach06.pdf PDF
FA855218R0004_______0004.pdf PDF
FA855218R0004_______0003.pdf PDF
Attach06.pdf PDF
RFP_Attachments.xls XLS spreadsheet
FA855218R0004_______0002.pdf PDF
Attach02.pdf PDF
Attach12REv1.xlsx XLSX spreadsheet
ppi_tool.accdb MDB file
Attach06SectionLM.pdf PDF
FA855218R0004_______0001.pdf PDF
WorkSpec.pdf PDF
Attach12_Price_Matrix.xlsx XLSX spreadsheet
Attach06_Section_LM_Provision.pdf PDF
Attach15_Fully_Burden_Labor_Rates.xlsx XLSX spreadsheet
FA855218R0004.pdf PDF
Attach08_Past_Performance_Information_Tool_Instructions.pdf PDF
Attach10_Subcontractor_Consent_Form.pdf PDF
Attach04_Contract_Data_Requirement_List.pdf PDF
Attach16_Packaging_Requirement.pdf PDF
RFP_Attachments.xls XLS spreadsheet
Attach17_Transportation_Requirement.pdf PDF
Attach19_Past_Performance_Questionnaire.pdf PDF
Attach14_Labor_Categories_Description.xlsx XLSX spreadsheet
Attach07_Engineering_Subfactor_Scenarios.pdf PDF
Attach18_GFP_Attachment.pdf PDF
Attach02_PDM_Work_Spec.pdf PDF
Attach03_Performance_Work_Statement.pdf PDF
Attach13_CRNF_Matl_Add-on_Factors.xlsx XLSX spreadsheet
Attach09_Relevancy_Table.pdf PDF
Attach11_Cross_Reference_Matrix.pdf PDF
Attach01_Security_Classification_Specification.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

1) L.II.A.1- The Government states that each volume shall be marked with the RFP number, Offeror’s name and address, and the volume number. The Government has not specified how the proposal shall be bound for submission.

Question:

a) Does the Government want each copy of each volume in written form to be bound in a separate 3-ring binder?

b) Is all of this information required on each page of the submission, or only on the cover page for each bound volume?

Answer:

a) Yes and Section L page 2 para II A. has been revised to reflect the change below. Proposals shall be submitted to the Government in five (5) separate volumes each volume in written form to be bound in a separate 3-ring binder.

b) Only on the cover page.

2) L.II.A.2- The Government specifies that print shall be Times New Roman no smaller than 12 point.

Question:

a) Will the Government allow a smaller font size to be used for charts, graphs, drawings, diagrams, supporting illustrations, spreadsheets, and tables?

b) Will the Government allow Arial or Arial Narrow font to be used for charts, graphs, drawings, diagrams, supporting illustrations, spreadsheets, and tables?

Answer:

a) No, Section L pg. 3 para 2 states print shall be font size 12.

b) No, Section L pg. 3 para 2 states font shall be in Times New Roman.

3) L.II.A.3- The Government states that the cover page is included in page count, and there is no requirement for each proposal volume to be bound.

Question:

a) Does the Government want each copy of each volume in written form to be bound in a separate 3-ring binder?

b) If the proposal is to be bound in a 3-ring binder, does the cover page on the front of the binder of the written form count toward page count?

c) Would the Government please consider removing this requirement and not have the cover page count in the page count?

Answer:

a) Yes and Section L page 2 para II A has been revised to reflect the change below. Proposals shall be submitted to the Government in five (5) separate volumes each volume in written form to be bound in a separate 3-ring binder.

b) Yes

c) No

4) Is our response to the sample tasks included in the Technical Proposal page count?

a) Yes

5) Page 5 of Section L provision. Paragraph L.II.C.2.b. Will the USG provide a copy of TO 1H-1(T)H-2-1 that is referenced in paragraph 4.16.4 and Work Specification TH-1H-13-070-001?

a) Yes, a set of documents, referred to as the Bidder’s Library will be made available to each offeror. This library will include the TH-1H helicopter Technical Orders that may assist the offeror’s understanding of the requirement. The instructions will be posted on FedBizOpps under solicitation.

File details come from the government source that posted it. Updated .