Attach12REv1.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- TH-1H Heliocopter DLM Federal contract opportunity
- Solicitation number
- FA8552-18-R-0004
About this file
This document contains a price matrix and notice of proposed contract action for depot level maintenance of TH-1H helicopters. The price matrix includes CLINs for preparation and induction, tear down and inspection, program depot maintenance and repair labor and material, and preparation and delivery of aircraft across five annual options. The notice states that the Department of the Air Force Materiel Command Lifecycle Management Center intends to award a contract providing depot level maintenance support for the TH-1H helicopter fleet, including CLINs for tear down, inspection, maintenance, repair, travel, contractor field team support, unscheduled depot level maintenance, engineering support, contractor-acquired property, long lead material, over and above labor and material, and reporting requirements. The period of performance is estimated to be from May 30, 2019 to May 29, 2024. The NAICS code is 336411 and participation of foreign contractors is not permitted. Performance must be within 600 miles of Fort Rucker, Alabama.
Attach12_Price Matrix Rev 1
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Matrix
| TH-1H PDM Price Matrix |
| Attachment 12 |
| OFFEROR: |
| CLIN | Type | DESCRIPTION | *QTY | Units | Unit Price | Extended Price |
| Basic | ||||||
| 0001 | FFP | Preparation and Induction of Aircraft | 2 | EA | $ - 0 | |
| 0002 | FFP | Tear Down and Inspect Aircraft | 2 | EA | $ - 0 | |
| 0003 | FFP | Program Depot Maintenance and Repair Labor | 2 | EA | $ - 0 | |
| 0004 | FFP | Program Depot Maintenance and Repair Material | 2 | EA | $ - 0 | |
| 0005 | FFP | Preparation and Delivery of Aircraft | 2 | EA | $ - 0 | |
| TOTAL | $ - 0 | |||||
| Option I | ||||||
| 1001 | FFP | Preparation and Induction of Aircraft | 3 | EA | $ - 0 | |
| 1002 | FFP | Tear Down and Inspect Aircraft | 3 | EA | $ - 0 | |
| 1003 | FFP | Program Depot Maintenance and Repair Labor | 3 | EA | $ - 0 | |
| 1004 | FFP | Program Depot Maintenance and Repair Material | 3 | EA | $ - 0 | |
| 1005 | FFP | Preparation and Delivery of Aircraft | 3 | EA | $ - 0 | |
| TOTAL | $ - 0 | |||||
| Option II | ||||||
| 2001 | FFP | Preparation and Induction of Aircraft | 4 | EA | $ - 0 | |
| 2002 | FFP | Tear Down and Inspect Aircraft | 4 | EA | $ - 0 | |
| 2003 | FFP | Program Depot Maintenance and Repair Labor | 4 | EA | $ - 0 | |
| 2004 | FFP | Program Depot Maintenance and Repair Material | 4 | EA | $ - 0 | |
| 2005 | FFP | Preparation and Delivery of Aircraft | 4 | EA | $ - 0 | |
| TOTAL | $ - 0 | |||||
| Option III | ||||||
| 3001 | FFP | Preparation and Induction of Aircraft | 3 | EA | $ - 0 | |
| 3002 | FFP | Tear Down and Inspect Aircraft | 3 | EA | $ - 0 | |
| 3003 | FFP | Program Depot Maintenance and Repair Labor | 3 | EA | $ - 0 | |
| 3004 | FFP | Program Depot Maintenance and Repair Material | 3 | EA | $ - 0 | |
| 3005 | FFP | Preparation and Delivery of Aircraft | 3 | EA | $ - 0 | |
| TOTAL | $ - 0 | |||||
| Option IV | ||||||
| 4001 | FFP | Preparation and Induction of Aircraft | 4 | EA | $ - 0 | |
| 4002 | FFP | Tear Down and Inspect Aircraft | 4 | EA | $ - 0 | |
| 4003 | FFP | Program Depot Maintenance and Repair Labor | 4 | EA | $ - 0 | |
| 400 | FFP | Program Depot Maintenance and Repair Material | 4 | EA | $ - 0 | |
| 4005 | FFP | Preparation and Delivery of Aircraft | 4 | EA | $ - 0 | |
| TOTAL | $ - 0 | |||||
| GRAND TOTAL | $ - 0 |
* Number of aircraft per year
File details come from the government source that posted it. Updated .