Attach12_Price_Matrix.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- TH-1H Heliocopter DLM Federal contract opportunity
- Solicitation number
- FA8552-18-R-0004
About this file
This document includes a price matrix attachment and solicitation notice for a TH-1H helicopter depot level maintenance contract. The price matrix attachment contains unpriced contract line items for preparation and induction, tear down and inspection, maintenance and repair labor, maintenance and repair material, and preparation and delivery of aircraft, with quantities and units provided. These CLINs are repeated for the base year and four option years. The solicitation notice seeks proposals for a contract with five annual options for TH-1H helicopter depot level maintenance, to include tear down, inspection, maintenance and repair, travel, contractor field team support, unscheduled depot level maintenance, engineering support, contractor acquired property, long lead material, over and above labor and material, and reporting requirements. The period of performance is estimated from May 2019 to May 2024. The NAICS code is 336411 and foreign contractors are not permitted to participate. Performance must occur within 600 miles of Fort Rucker, Alabama.
Pricing Matrix
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Matrix
| TH-1H PDM Price Matrix |
| Attachment 12 |
| OFFEROR: |
| CLIN | Type | DESCRIPTION | *QTY | Units | Unit Price | Extended Price |
| Basic | ||||||
| 0001 | FFP | Preparation and Induction of Aircraft | 2 | EA | $ - 0 | |
| 0002 | FFP | Tear Down and Inspect Aircraft | 3 | EA | $ - 0 | |
| 0003 | FFP | Program Depot Maintenance and Repair Labor | 4 | EA | $ - 0 | |
| 0004 | FFP | Program Depot Maintenance and Repair Material | 3 | EA | $ - 0 | |
| 0005 | FFP | Preparation and Delivery of Aircraft | 4 | EA | $ - 0 | |
| TOTAL | $ - 0 | |||||
| Option I | ||||||
| 1001 | FFP | Preparation and Induction of Aircraft | 2 | EA | $ - 0 | |
| 1002 | FFP | Tear Down and Inspect Aircraft | 3 | EA | $ - 0 | |
| 1003 | FFP | Program Depot Maintenance and Repair Labor | 4 | EA | $ - 0 | |
| 1004 | FFP | Program Depot Maintenance and Repair Material | 3 | EA | $ - 0 | |
| 1005 | FFP | Preparation and Delivery of Aircraft | 4 | EA | $ - 0 | |
| TOTAL | $ - 0 | |||||
| Option II | ||||||
| 2001 | FFP | Preparation and Induction of Aircraft | 2 | EA | $ - 0 | |
| 2002 | FFP | Tear Down and Inspect Aircraft | 3 | EA | $ - 0 | |
| 2003 | FFP | Program Depot Maintenance and Repair Labor | 4 | EA | $ - 0 | |
| 2004 | FFP | Program Depot Maintenance and Repair Material | 3 | EA | $ - 0 | |
| 2005 | FFP | Preparation and Delivery of Aircraft | 4 | EA | $ - 0 | |
| TOTAL | $ - 0 | |||||
| Option III | ||||||
| 3001 | FFP | Preparation and Induction of Aircraft | 2 | EA | $ - 0 | |
| 3002 | FFP | Tear Down and Inspect Aircraft | 3 | EA | $ - 0 | |
| 3003 | FFP | Program Depot Maintenance and Repair Labor | 4 | EA | $ - 0 | |
| 3004 | FFP | Program Depot Maintenance and Repair Material | 3 | EA | $ - 0 | |
| 3005 | FFP | Preparation and Delivery of Aircraft | 4 | EA | $ - 0 | |
| TOTAL | $ - 0 | |||||
| Option IV | ||||||
| 4001 | FFP | Preparation and Induction of Aircraft | 2 | EA | $ - 0 | |
| 4002 | FFP | Tear Down and Inspect Aircraft | 3 | EA | $ - 0 | |
| 4003 | FFP | Program Depot Maintenance and Repair Labor | 4 | EA | $ - 0 | |
| 400 | FFP | Program Depot Maintenance and Repair Material | 3 | EA | $ - 0 | |
| 4005 | FFP | Preparation and Delivery of Aircraft | 4 | EA | $ - 0 | |
| TOTAL | $ - 0 | |||||
| Option V | ||||||
| 5001 | FFP | Preparation and Induction of Aircraft | 2 | EA | $ - 0 | |
| 5002 | FFP | Tear Down and Inspect Aircraft | 3 | EA | $ - 0 | |
| 5003 | FFP | Program Depot Maintenance and Repair Labor | 4 | EA | $ - 0 | |
| 5004 | FFP | Program Depot Maintenance and Repair Material | 3 | EA | $ - 0 | |
| 5005 | FFP | Preparation and Delivery of Aircraft | 4 | EA | $ - 0 | |
| TOTAL | $ - 0 | |||||
| GRAND TOTAL | $ - 0 |
* Number of aircraft per year
File details come from the government source that posted it. Updated .