Attach04_Contract_Data_Requirement_List.pdf

PDF 717 KB Posted

Attached to
TH-1H Heliocopter DLM Federal contract opportunity
Solicitation number
FA8552-18-R-0004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document outlines the requirements for a federal contract to provide depot-level maintenance for the TH-1H helicopter fleet. Key details include that the Air Force Life Cycle Management Center intends to issue a solicitation for a five-year contract with annual option periods to support teardown, inspection, maintenance, repair, travel, engineering support, long-lead material, and reporting requirements. The work must be performed within 600 miles of Fort Rucker, Alabama. The estimated period of performance is 30 May 2019 through 29 May 2024. Questions can be directed to the identified Contracting Officer and Contract Specialist.

Contract Data Requirement List

View the file

Other files for this federal contract opportunity

Other files attached to TH-1H Heliocopter DLM, newest first.
File Type Posted
FA855218R0004_______0004.pdf PDF
Attach06.pdf PDF
FA855218R0004_______0003.pdf PDF
Attach12REv1.xlsx XLSX spreadsheet
RFP_Attachments.xls XLS spreadsheet
FA855218R0004_______0002.pdf PDF
Attach02.pdf PDF
Attach06.pdf PDF
Q&A.docx DOCX document
FA855218R0004_______0001.pdf PDF
WorkSpec.pdf PDF
ppi_tool.accdb MDB file
Attach06SectionLM.pdf PDF
Attach13_CRNF_Matl_Add-on_Factors.xlsx XLSX spreadsheet
Attach09_Relevancy_Table.pdf PDF
Attach11_Cross_Reference_Matrix.pdf PDF
Attach01_Security_Classification_Specification.pdf PDF
Attach16_Packaging_Requirement.pdf PDF
RFP_Attachments.xls XLS spreadsheet
Attach17_Transportation_Requirement.pdf PDF
Attach19_Past_Performance_Questionnaire.pdf PDF
Attach14_Labor_Categories_Description.xlsx XLSX spreadsheet
Attach07_Engineering_Subfactor_Scenarios.pdf PDF
Attach18_GFP_Attachment.pdf PDF
Attach02_PDM_Work_Spec.pdf PDF
Attach03_Performance_Work_Statement.pdf PDF
Attach12_Price_Matrix.xlsx XLSX spreadsheet
Attach06_Section_LM_Provision.pdf PDF
Attach15_Fully_Burden_Labor_Rates.xlsx XLSX spreadsheet
FA855218R0004.pdf PDF
Attach08_Past_Performance_Information_Tool_Instructions.pdf PDF
Attach10_Subcontractor_Consent_Form.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 1 1 PREVIOUS EDITION MAY BE USED. Page of Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

ADMN

TDP TM OTHER

D. SYSTEM/ITEM

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Conference Agenda

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81249B

5. CONTRACT REFERENCE

PWS Para. 4.6

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

Draft

Final

Reg Repro

16. REMARKS

BLK 7: FINAL WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC

FA8552, via Wide Area Work Flow (WAWF) attention tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by Letter of Transmittals. GOVERNMENT WILL APPROVE/DISAPPROVE

WITHIN 30 BUSINESS DAYS OF RECEIPT.

BLK 8, 10-13: Draft agenda shall be submitted seven business days prior to scheduled presentation. The Government will review and approve or disapprove within five business days. Contractor shall have two business days to incorporate comments and resubmit the final agenda.

BLK 9: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational use) (27 Feb 2018). Other request for this document shall be referred to AFLCMC/WIUBC.

BLK 14: Submit a digital copy in Microsoft® Office® or Adobe® Portable Document Format (PDF).

aflcmc.wiub1.sust@ 1 1 us.af.mil tyrone.hendrix@ 1 1 us.af.mil william.grun@ 1 1 us.af.mil

15. TOTAL 3 3 0

G. PREPARED BY

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

27 Feb 2018

I. APPROVED BY

WITTER.GARY.L.106 Digitally signed by

WITTER.GARY.L.1062900020

2900020 Date: 2018.06.14 14:43:29 -04'00'

J. DATE

14 Jun 2018 mailto:tyrone.hendrix@us.af.mil mailto:william.grun@us.af.mil

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A002

Conference Minutes

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81250B

5. CONTRACT REFERENCE

PWS Para. 4.6

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

LT

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SEE BKL 16

Reg Repro

16. REMARKS

BLK 7: All interim documents will be delivered via letter of transmittal and the FINAL DOCUMENT WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC FA8552, via Wide Area Work Flow (WAWF) attention:

tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by Letter of Transmittals. GOVERNMENT WILL

APPROVE/DISAPPROVE WITHIN 30 BUSINESS DAYS OF RECEIPT.

BLKs 8, 10-13: Draft minutes shall be submitted five business days after meeting/conference. The Government will review and approve or disapprove within 15 business days. Contractor shall have five business days to incorporate comments and resubmit after notification of disapproval by Government.

(Administrative or Operational use) (27 Feb 2018). Other request for this

BLK 14: Submit a digital copy in a Microsoft® Office® or Adobe® Portable aflcmc.wiub1.sust@ 1 1 us.af.mil tyrone.hendrix@ 1 1 us.af.mil

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

27 Feb 2018

I. APPROVED BY

WITTER.GARY.L.106 Digitally signed by

WITTER.GARY.L.1062900020

2900020 Date: 2018.06.14 14:43:50 -04'00'

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A003

Presentation Material

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81373

5. CONTRACT REFERENCE

PWS Para. 4.6

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

DD

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

BLK 7: FINAL WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC

FA8552, via Wide Area Work Flow (WAWF) attention tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by

BLKs 8, 10-13: Draft presentation material shall be submitted seven working days prior to scheduled presentation. The Government will review and approve or disapprove within five business days. Contractor shall have two business days to incorporate comments and resubmit.

BLK 9: Distribution authorized to U.S. Government Agencies and their contractors (Administrative or Operational use) (5 Mar 2018) Other request for this document shall be referred to AFLCMC/WIUBC.

aflcmc.wiub1.sust@ 1 1 us.af.mil tyrone.hendrix@ 1 1 us.af.mil us.af..mil

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

5 Mar 2018

I. APPROVED BY

WITTER.GARY.L.1062 Digitally signed by

WITTER.GARY.L.1062900020

900020 Date: 2018.06.14 14:44:09 -04'00'

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

MGMT

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A004

Status Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

SEE BLK 16

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

DD

MTHLY

12. DATE OF FIRST SUBMISSION

8. APP CODE

N/A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

BLK 5: See paragraphs 4.7.1, 4.23.8, 4.23.12, 4.23.13

BLK 7: FINAL WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC

FA8552, via Wide Area Work Flow (WAWF) attention tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by

BLKs 10-13: The Contractor shall provide monthly status reports no later than the 15th of each month. The Government will reject a deliverable if one or more technical errors or two or more minor errors are found within the deliverable. The Government will review and approve or disapprove within fifteen business days.

Contractor shall have five business days to incorporate comments/corrections and resubmit.

Document Format (PDF) aflcmc.wiub1.sust@ 1 us.af.mil tyrone.hendrix@ 1 us.af.mil william.grun@ 1

15. TOTAL 0 3 0

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

5 Mar 2018

I. APPROVED BY

WITTER.GARY.L.10 Digitally signed by

WITTER.GARY.L.1062900020

62900020 Date: 2018.06.14 14:44:34 -04'00'

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

MISC

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A005

Technical Report - Study/Services

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

SEE BLK 16

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

DD

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

N/A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

BLK 5: PWS Paragraphs 4.7.4, 4.23.4, 4.23.5, 4.23.6, 4.23.7

BLK 7: FINAL WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC

FA8552, via Wide Area Work Flow (WAWF) attention tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by

BLKs 8, 10-13: The Contractor shall provide requested technical reports as required in support of the TH-1H helicopter DLM. The Contractor shall provide data deliverables five working days after completion of review, study, analysis, etc.

The Government will reject a deliverable if one or more technical errors or two or more minor errors are found within the deliverable. The Government will review and approve or disapprove within fifteen business days. Contractor shall have five business days to incorporate comments/corrections and resubmit.

(Administrative or Operational use) (28 Feb 2018). Other request for this aflcmc.wiub1.sust@ 1 us.af.mil tyrone.hendrix@ 1 us.af.mil

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

28 Feb 2018

I. APPROVED BY

WITTER.GARY.L.106 Digitally signed by

WITTER.GARY.L.1062900020

2900020 Date: 2018.06.14 14:45:39 -04'00'

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A006

Analytical Condition Inspection Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81391

5. CONTRACT REFERENCE

PWS Para. 4.7.5

6. REQUIRING OFFICE

AFLCMC/WIUBA

7. DD 250 REQ

DD

SEE BLK 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

BLK 7: FINAL WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC

FA8552, via Wide Area Work Flow (WAWF) attention tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by

BLKs 8, 10-13: The Contractor shall provide requested Analytical Condition Inspection Report as required in support of the TH-1H helicopter DLM. The Contractor shall provide a draft report five business days prior to scheduled conference/meeting to discuss the results of the inspection and recommended rework on each PDM aircraft. Final report shall be submitted at final aircraft delivery.

(Administrative or Operational use) (5 Mar 2018). Other request for this document shall be referred to AFLCMC/WIUBC.

aflcmc.wiub1.sust@ 1 1 us.af.mil tyrone.hendrix@ 1 1 us.af.mil

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

5 Mar 2018

I. APPROVED BY

WITTER.GARY.L.106 Digitally signed by

WITTER.GARY.L.1062900020

2900020 Date: 2018.06.14 14:46:06 -04'00'

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A007

Contractor's Progress and Status Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81928

5. CONTRACT REFERENCE

PWS Para. 4.7.1, 4.7.2, 4.23.9

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

DD

SEE BLK 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

N/A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

BLK 7: FINAL WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC

FA8552, via Wide Area Work Flow (WAWF) attention tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by

BLKs 8, 10-13: The following reports will be provided as required:

Weekly Status and Material Management Report: The contractor shall provide a weekly report which summarizes the overall status of each aircraft (based upon the initial schedule provided at the 45 day induction meeting) to include but not limited to the current repair phase and tasks being accomplished, the percentage of completion and estimated completion of the phase broken down to the hourly level; a list of all TCTOs being accomplished; a narrative which identifies any issues or production delays to include the root cause, solution, number of days/hours affected, and the projected date of resolution; and the estimated aircraft completion date.

a. The status of material being procured or locally manufactured in support of the line items in long lead item listing. This listing should also include the quantity required , on hand and the due date for missing items. This should also include a summary of the actions taken to procure the needed items.

b. The status of all requirements for the government to provided parts or any other material required.

c. Any issues that require an engineering, program management, contracting officer, system program office, DCMA input/action or any type of Government review.

BLK14: Submit a digital copy in Microsoft® Office® or Adobe® Portable aflcmc.wiub1.sust@ 1 us.af.mil tyrone.hendrix@ 1 us.af.mil

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

5 Mar 2018

I. APPROVED BY

WITTER.GARY.L.106 Digitally signed by

WITTER.GARY.L.1062900020

2900020 Date: 2018.06.14 14:46:31 -04'00'

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A008

Status of Government Furnished Equipment (GFE)

Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80269

5. CONTRACT REFERENCE

PWS Para. 4.19

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

DD

ANNLY

12. DATE OF FIRST SUBMISSION

8. APP CODE

N/A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

BLK 7: Submit final DD Form 250 via iRAPT (formally WAWF) to collectively account for data previously submitted.

(Administrative or Operational use) (5 Mar 2018). Other requests shall be referred to the production management team, AFLCMC/WIUWB.

BLKs 10 - 13: The Contractor shall provide Status of Government Furnished Equipment (GFE) Report annually. The Contractor shall provide data deliverables 30 business day prior to the end of each period of performance. The Government will reject a deliverable if one or more technical errors or two or more minor errors are found within the deliverable. The Government will review and approve or disapprove within fifteen business days. Contractor shall have five business days to incorporate comments/corrections and resubmit.

aflcmc.wiub1.sust@ 1 us.af.mil tyrone.hendrix@ 1 us.af.mil

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

5 Mar 2018

I. APPROVED BY

WITTER.GARY.L.1062 Digitally signed by

WITTER.GARY.L.1062900020

900020 Date: 2018.06.14 14:46:59 -04'00'

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A009

Integrated Program Management Report (IPMR)

3. SUBTITLE

Integrated Master Schedule

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81861A

5. CONTRACT REFERENCE

PWS Para. 4.7.1, 4.7.2, 4.23.9, 4.23.12

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

DD

MTHLY

12. DATE OF FIRST SUBMISSION

8. APP CODE

N/A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

BLK 7: FINAL WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC

FA8552, via Wide Area Work Flow (WAWF) attention tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by

BLKs 8, 10-13: The Contractor shall provide Integrated Program Management Report no later than the 15th of each month. The contractor’s report shall be complete and accurate so that the number of report rejections shall not exceed one per quarter. Government Program Manager will approve/disapprove within 15 business days. Contractor shall incorporate comments/corrections and resubmit within three business days.

(Administrative or Operational use) (5 Mar 2018). Other request for this document aflcmc.wiub1.sust@ 1 us.af.mil tyrone.hendrix@ 1 us.af.mil us.af..mil

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

5 Mar 2018

I. APPROVED BY

WITTER.GARY.L.106 Digitally signed by

WITTER.GARY.L.1062900020

2900020 Date: 2018.06.14 14:47:58 -04'00'

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A00A

Trip/Travel Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81943

5. CONTRACT REFERENCE

PWS Para. 4.12, 4.14.2

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

DD

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

BLK 7: FINAL WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC

FA8552, via Wide Area Work Flow (WAWF) attention tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by

BLKs 8, 11-13: The contractor shall submit a draft Trip Report within five business days after return to local area from travel. The report shall contain no more than two typographical errors or one or more technical inaccuracies. The Government will have fifteen business days to approve/disapprove the draft.

Contractor shall have five business days to incorporate comments and resubmit.

(Administrative or Operational use) (29 June 2016). Other request for this aflcmc.wiub1.sust@ 1 1 us.af.mil tyrone.hendrix@ 1 1 us.af.mil

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

6 Mar 2018

I. APPROVED BY

WITTER.GARY.L.106 Digitally signed by

WITTER.GARY.L.1062900020

2900020 Date: 2018.06.14 14:48:35 -04'00'

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A00B

Counterfeit Prevention Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81832

5. CONTRACT REFERENCE

PWS Para. 4.10

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

DD

SEE BLK 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

N/A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

BLK 7: FINAL WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC

FA8552, via Wide Area Work Flow (WAWF) attention tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by

BLKs 8, 10-13: Contractor shall submit a Counterfeit Prevention Plan within thirty

(30) calendar days after contract award. Written Government approval/comments or disapproval will be returned within ten business days after receipt of data.

Contractor's final submission shall be submitted within ten business days of receiving Government comments. Approval by the Government is required prior to formal distribution.

(Administrative or Operational use) (6 Mar 2018). Other request for this document aflcmc.wiub1.sust@ 1 us.af.mil tyrone.hendrix@ 1 us.af.mil

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

6 Mar 2018

I. APPROVED BY

WITTER.GARY.L.1062 Digitally signed by

WITTER.GARY.L.1062900020

900020 Date: 2018.06.14 14:49:51 -04'00'

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A00C

Quality Assurance Program Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-81794

5. CONTRACT REFERENCE

PWS Para. 5.7

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

DD

SEE BLK 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

BLK 7: FINAL WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC

FA8552, via Wide Area Work Flow (WAWF) attention tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by

BLK 8, 10-13: Contractor shall submit draft document with updates/revisions 30 days after each occurrence. The Government will provide comments/approval within 30 days after receipt of revised document. Final document will be submitted within 10 days after receipt of Government comments.

contractors (Administrative or Operational use) (6 Mar 2018) Other request for

Document Format (PDF) format.

aflcmc.wiub1.sust@ 1 1 us.af.mil tyrone.hendrix@ 1 1 us.af.mil

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

6 Mar 2018

I. APPROVED BY

WITTER.GARY.L.106 Digitally signed by

WITTER.GARY.L.1062900020

2900020 Date: 2018.06.14 14:50:37 -04'00'

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

PSSS

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A00D

Bill of Materials (BOM) for Logistics and Supply Chain

Risk Management

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-PSSS-81656

5. CONTRACT REFERENCE

PWS Para. 4.23.10

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

DD

SEE BLK 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

BLK 7: FINAL WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC

FA8552, via Wide Area Work Flow (WAWF) attention tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by

BLK 8, 10-13: Draft submittal shall be submitted at each 45 Day Induction Meeting. Final submittal (to include a tracked changes version and a clean version) due 10 days after receipt of Government comments. Subsequent draft submittals due at each aircraft's 45 Day Induction Meeting thereafter. Subsequent final submittal (to include a tracked changes version and a clean version) due 10 days after receipt of Government comments.

aflcmc.wiub1.sust@ 1 1 us.af.mil tyrone.hendrix@ 1 1 us.af.mil

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

6 Mar 2018

I. APPROVED BY

WITTER.GARY.L.106 Digitally signed by

WITTER.GARY.L.1062900020

2900020 Date: 2018.06.14 14:51:26 -04'00'

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

FNCL

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A00E

Funds and Man-Hours Expenditure Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-FNCL-80331A

5. CONTRACT REFERENCE

PWS Para. 4.23.9

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

DD

MTHLY

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

BLK 7: FINAL WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC

FA8552, via Wide Area Work Flow (WAWF) attention tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by

BLKs 8, 10-13: A draft report shall be delivered on the 15th of every month. If the 15th falls on a holiday/weekend, the report is due the next business day. The initial report is due the 15th of the month after contract award. The Government will review and approve or disapprove within fifteen business days. Contractor shall have five business days to incorporate comments and resubmit.

Document Format (PDF) via email to:

aflcmc.wiub1.sust@ 1 1 us.af.mil tyrone.hendrix@ 1 1 us.af.mil

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

6 Mar 2018

I. APPROVED BY

WITTER.GARY.L.1062 Digitally signed by

WITTER.GARY.L.1062900020

900020 Date: 2018.06.14 14:52:34 -04'00'

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

FNCL

TH-1H DLM

E. CONTRACT/PR NO.

FD2060-19-31026

A00F

Manhour Estimate, Technical Cost Proposals

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-FNCL-81116

5. CONTRACT REFERENCE

PWS Para. 4.23.11

6. REQUIRING OFFICE

AFLCMC/WIUBC

7. DD 250 REQ

DD

SEE BLK 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

BLK 7: FINAL WILL BE SUBMITTED WITH A DD FORM 250 to DODAAC

FA8552, via Wide Area Work Flow (WAWF) attention tyrone.hendrix@us.af.mil, william.grun@us.af.mil, to collectively account for data previously submitted by

BLKs 8, 10-13: A draft Manhour Estimate, Technical Cost Proposal shall be submitted at each 45 Day Induction Meeting. Contractor shall incorporate comments and corrections and resubmit within five business days after the negotiated and Government approved schedule accomplished at the 45 Day Induction Meeting. Government will approve within 15 business days.

aflcmc.wiub1.sust@ 1 1 us.af.mil tyrone.hendrix@ 1 1 us.af.mil

Tyrone Hendrix, AFLCMC/WIUBC

H. DATE

6 Mar 2018

I. APPROVED BY

WITTER.GARY.L.106 Digitally signed by

WITTER.GARY.L.1062900020

2900020 Date: 2018.06.14 14:53:45 -04'00'

File details come from the government source that posted it. Updated .