Draft of RFP Schedule.pdf

PDF 37 KB Posted

Attached to
B-1 Advanced Radar/Electronic Warfare Test Stations (ARTS) Synopsis Federal contract opportunity
Solicitation number
FA8533-11-R-31160
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Draft Schedule of CLINs and SubCLINs

View the file

Other files for this federal contract opportunity

Other files attached to B-1 Advanced Radar/Electronic Warfare Test Stations (ARTS) Synopsis, newest first.
File Type Posted
Drawing 3202300 Sheets 24 25.pdf PDF
FA853311R31160______0004.pdf PDF
PD10WRGBGBEA34_Rev_E.doc DOC document
PD10WRGBGBEA34_Rev_D.pdf PDF
FA853311R31160______0003.pdf PDF
QA 6 Jan 12.doc DOC document
LCU_fitting_info.pdf PDF
QA 16 Dec 11.doc DOC document
FA853311R31160______0002.pdf PDF
Attachment_6_Quantity_Ranges.doc DOC document
PD_Rev_C.pdf PDF
9579777_98752.pdf PDF
9579776_98752.pdf PDF
QA RFP.doc DOC document
Wrapper Common SRS 20110405.pdf PDF
FA853311R31160______0001.pdf PDF
VDATS_Wrapper_Style_Guide.pdf PDF
FA853311R31160_C003_Computer_Software_Flowchart.pdf PDF
FA853311R31160.RTF RTF text file
FA853311R31160_Appendix_B_13Oct11_7pages.doc DOC document
FA853311R31160_B002_Integrated_Master_Schedule.pdf PDF
FA853311R31160_DD_Form_254.pdf PDF
FA853311R31160_A003_Technical_Report-Study_Services.pdf PDF
FA853311R31160_A006_Training_Materials.pdf PDF
FA853311R31160_A002_Test_Inspection_Report.pdf PDF
FA853311R31160_Attachment_3_Transmittal_Letter.doc DOC document
FA853311R31160_B006_Request_for_Deviation.pdf PDF
FA853311R31160_B003_Conference_Agenda.pdf PDF
FA853311R31160_E001_LMI_Data_Products.pdf PDF
FA853311R31160_D001_TMCR.pdf PDF
FA853311R31160_B-1-Weapon-System-Program-Security-Classification-Guide_Section-IX.pdf PDF
FA853311R31160_ARTSSOW.docx DOCX document
FA853311R31160_Attachment_1_FACTS_Sheet.pdf PDF
FA853311R31160_AFMC158.pdf PDF
FA853311R31160_Attachment_6_Quantity_Ranges.doc DOC document
FA853311R31160_Attachment_4_Client_Authorization_Ltr.doc DOC document
FA853311R31160_C009_ACPIN.pdf PDF
FA853311R31160_A001_Test_Plan.pdf PDF
Questions and Answers_14 Nov 2011.doc DOC document
B-1 Weapon System Program Security Classification Guide Section IX.pdf PDF
DD Form 254.pdf PDF
Q A and Reminder--DRFP.doc DOC document
Information--DRFP.doc DOC document
NA-84-1110H B-1B ATLAS and Protocol Programming Manual Vol I.pdf PDF
Q A DRFP.doc DOC document
ARTS SOW_30 Mar 11.pdf PDF
ARTS SOW--24 Mar 2011.pdf PDF
Data List for ARTS Program.pdf PDF
Instructions B-1 ARTS Draft Request for Proposal.pdf PDF
PATEC Core Specification Document REV5.pdf PDF
Show all 50

B-1 Advanced Radar/Electronic Warfare Test Stations (ARTS) Synopsis has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B-1 Advanced Radar Test Station (ARTS) Draft Request for Proposal (DRFP) FA8533-11-R-31160

Draft Schedule of CLIN Structure and Delivery Requirements 01 April 2011

Basic Contract Period (Effective from date of contract award through a period of twenty-four months.)

BEQ Unit Extended Qty U/I Price Price

TESTERS

0001 Preproduction Units, Tester 3 Ea $________

0002 Station TPS Development 0002AA Self-Test iaw PD para 3.4.3.1.2 1 Ea $___________ 0002AB Cal-Test iaw PD para 3.4.3.2 1 Ea $___________

DATA

0003 DATA in support of CLINs 0001 - 0002 (ELIN B00x) 0003AA Design Review Information 2 Lot $___________ Package 0003AB Test Plan 4 Lot $___________ 0003AC Test/Inspection Report 4 Lot $___________

0004 DATA in support of CLINs 0001 - 0002 (ELIN C00x) 0004AA Technical Manual 3 Lot $___________ 0004AB Product Drawings 3 Lot $___________

0005 DATA in support of CLIN 0001 (ELIN D00x) 0005AA LMI Data Products 1 Lot $___________ 0005AB Supplemental Data for 1 Lot $___________ Provisioning

0006 DATA in support of CLIN 0002 (ELIN E00x) 0006AA Computer Software Flowchart 2 Lot $___________

0007 DATA in support of CLIN 0001 (ELIN E00x) 0007AA System/Subsystem Specification 1 Lot $___________ 0007AB Software Product Specification 1 Lot $___________ 0007AC Calibration/Meas. Req. Summary 1 Lot $___________

Comment [B.M.1]: 2 Test Plans for CLIN 0001 and 2 Test Plans for CLIN 0002

Comment [B.M.2]: 2 Test Reports for CLIN 0001 and 2 Test Reports for CLIN 0002

0008 DATA in support of CLIN 0001 (ELIN F00x) 0008AA Technical Report – 1 Lot $___________ Study/Services 0008AB Engineering Change Proposal 1 Lot NSP 0008AC Request for Deviation 1 Lot NSP

0009 DATA in support of CLIN 0002 (ELIN B00x) 0009AA Engineering Support Data 2 Lot $___________

TPS Group I

0010 LRU TPS for NSN 5865-01-551-7118 1 Ea $___________

0011 LRU TPS for NSN 5865-01-553-2000 1 Ea $___________

0012 LRU TPS for NSN 5865-01-545-4411 1 Ea $___________

DATA

0013 DATA in support of CLINs 0010 - 0012 (ELIN B00x) 0013AA Design Review Information 1 Lot $___________ Package 0013AB Test Plan 1 Lot $___________ 0013AC Test/Inspection Report 1 Lot $___________

0014 DATA in support of CLINs 0010 - 0012 (ELIN C00x) 0014AA Technical Manual 3 Lot $___________ 0014AB Product Drawings 3 Lot $___________

0015 DATA in support of CLINs 0010 - 0012 (ELIN D00x) 0015AA LMI Data Products 1 Lot $___________ 0015AB Supplemental Data for 1 Lot $___________ Provisioning

0016 DATA in support of CLINs 0010 - 0012 (ELIN E00x) 0016AA Computer Software Flowchart 3 Lot $___________

0017 DATA in support of CLIN 0010 - 0012 (ELIN B00x) 0017AA Engineering Support Data 3 Lot $___________

0018 Copy of Station TPS ITA and cables only 0008AA Self-Test 2 Ea $___________ 0008AB Calibration 2 Ea $___________

Comment [B.M.3]: Technical Manual and Product Drawings CDRLs will be delivered for each

TPS NSN

Comment [B.M.4]: Provisioning CDRLs will be delivered for each TPS NSN

Comment [B.M.5]: Computer Software Flowchart CDRL will be delivered for each TPS

NSN

Comment [B.M.6]: Engineering Support Data CDRL will be delivered for each TPS NSN

0019 Copy of LRU TPS ITA 2 Ea $___________ and cables only, NSN 5865-01-551-7118

0020Copy of LRU TPS ITA 2 Ea $___________ and cables only, NSN 5865-01-553-2000

0021 Copy of LRU TPS ITA 2 Ea $___________ and cables only, NSN 5865-01-545-4411

0022 Application Development Environment 6 Ea $___________

0023 DATA in support of CLINs 0001 – 0022 (ELIN A00x) 0013AA Monthly Status Reports 1 Lot NSP 0013AB Integrated Master Schedule 1 Lot NSP 0013AC Conference Agenda 1 Lot NSP 0013AD Conference Minutes 1 Lot NSP

0024 DATA in support of CLINs 0001 – 0002, 0010 - 0012 (ELIN E00x) 0024AA Data Accession List 1 Lot NSP 0024AB Firmware Support Manual 1 Lot NSP 0024AC Computer Software Product 1 Lot NSP End Items 0024AD Auto. Computer Program ID 1 Lot NSP No. Data and Control Record

0025 DATA in support of CLINs 0001 – 0002, 0010 - 0012 (ELIN F00x) 0025AA Request for Nomenclature 1 Lot NSP

Comment [B.M.7]: Request for Nomenclature

Option I. Effective twenty-four months after contract award through a period of seventy-two months after contract award date. Option I may be exercised on or before the last effective date of the Basic Contract Period.

Year 1: from beginning of Option period through twelve months (months 24 - 36) Year 2: from end of first year through twelve months (months 36 - 48) Year 3: from end of second year through twelve months (months 48 - 60) Year 4: from end of third year through twelve months (months 60 – 72)

Unit Extended BEQ U/I Price Price

TESTERS

1001 Production Testers 20 Ea 1001AA If ordered within year 1 $__________ 1001AB If ordered within year 2 $__________ 1001AC If ordered within year 3 $__________ 1001AD If ordered within year 4 $ _____

TPS Group II

1002 LRU TPS for NSN 5865-01-545-2484 1 Ea 1002AA If ordered within year 1 $__________ 1002AB If ordered within year 2 $__________ 1002AC If ordered within year 3 $__________ 1002AD If ordered within year 4 $__________

1003 LRU TPS for NSN 5865-01-257-2789 1 Ea 1003AA If ordered within year 1 $__________ 1003AB If ordered within year 2 $__________ 1003AC If ordered within year 3 $__________ 1003AD If ordered within year 4 $__________

1004 LRU TPS for NSN 5865-01-257-1341 1 Ea 1004AA If ordered within year 1 $__________ 1004AB If ordered within year 2 $__________ 1004AC If ordered within year 3 $__________ 1004AD If ordered within year 4 $__________

1005 LRU TPS for NSN 5865-01-264-3364 1 Ea 1005AA If ordered within year 1 $__________ 1005AB If ordered within year 2 $__________ 1005AC If ordered within year 3 $__________ 1005AD If ordered within year 4 $__________

1006 LRU TPS for NSN 5895-01-497-7220 1 Ea 1006AA If ordered within year 1 $__________ 1006AB If ordered within year 2 $__________ 1006AC If ordered within year 3 $__________ 1006AD If ordered within year 4 $__________

1007 LRU TPS for NSN 5868-01-516-0698 1 Ea 1007AA If ordered within year 1 $__________ 1007AB If ordered within year 2 $__________ 1007AC If ordered within year 3 $__________ 1007AD If ordered within year 4 $__________

TPS Group III

1008 LRU TPS for NSN 5865-01-331-2557 1 Ea 1008AA If ordered within year 1 $__________ 1008AB If ordered within year 2 $__________ 1008AC If ordered within year 3 $__________ 1008AD If ordered within year 4 $__________

1009 LRU TPS for NSN 5865-01-362-6438 1 Ea 1009AA If ordered within year 1 $__________ 1009AB If ordered within year 2 $__________ 1009AC If ordered within year 3 $__________ 1009AD If ordered within year 4 $__________

1010 LRU TPS for NSN 5865-01-240-3754 1 Ea 1010AA If ordered within year 1 $__________ 1010AB If ordered within year 2 $__________ 1010AC If ordered within year 3 $__________ 1010AD If ordered within year 4 $__________

1011 LRU TPS for NSN 5865-01-256-2544 1 Ea 1011AA If ordered within year 1 $__________ 1011AB If ordered within year 2 $__________ 1011AC If ordered within year 3 $__________ 1011AD If ordered within year 4 $__________

1012 LRU TPS for NSN 5895-01-239-8983 1 Ea 1012AA If ordered within year 1 $__________ 1012AB If ordered within year 2 $__________ 1012AC If ordered within year 3 $__________ 1012AD If ordered within year 4 $__________

1013 LRU TPS for NSN 5865-01-258-1148 1 Ea 1013AA If ordered within year 1 $__________ 1013AB If ordered within year 2 $__________ 1013AC If ordered within year 3 $__________ 1013AD If ordered within year 4 $__________

TPS Group IV

1014 LRU TPS for NSN 5865-01-240-3755 1 Ea 1014AA If ordered within year 1 $__________ 1014AB If ordered within year 2 $__________ 1014AC If ordered within year 3 $__________ 1014AD If ordered within year 4 $__________

1015 LRU TPS for NSN 5895-01-240-0091 1 Ea 1015AA If ordered within year 1 $__________ 1015AB If ordered within year 2 $__________ 1015AC If ordered within year 3 $__________ 1015AD If ordered within year 4 $__________

1016 LRU TPS for NSN 5865-01-257-1244 1 Ea 1016AA If ordered within year 1 $__________ 1016AB If ordered within year 2 $__________ 1016AC If ordered within year 3 $__________ 1016AD If ordered within year 4 $__________

1017 LRU TPS for NSN 5865-01-258-7062 1 Ea 1017AA If ordered within year 1 $__________ 1017AB If ordered within year 2 $__________ 1017AC If ordered within year 3 $__________ 1017AD If ordered within year 4 $__________

1018 LRU TPS for NSN 5865-01-258-1133 1 Ea 1018AA If ordered within year 1 $__________ 1018AB If ordered within year 2 $__________ 1018AC If ordered within year 3 $__________ 1018AD If ordered within year 4 $__________

1019 LRU TPS for NSN 5865-01-454-0015 1 Ea 1019AA If ordered within year 1 $__________ 1019AB If ordered within year 2 $__________ 1019AC If ordered within year 3 $__________ 1019AD If ordered within year 4 $__________

TPS GROUP V

1020 LRU TPS for NSN 5865-01-240-0092 1 Ea 1020AA If ordered within year 1 $__________ 1020AB If ordered within year 2 $__________ 1020AC If ordered within year 3 $__________ 1021AD If ordered within year 4 $__________

1021 LRU TPS for NSN 5865-01-257-2861 1 Ea 1021AA If ordered within year 1 $__________ 1021AB If ordered within year 2 $__________ 1021AC If ordered within year 3 $__________ 1021AD If ordered within year 4 $__________

1022 LRU TPS for NSN 5865-01-256-6556 1 Ea 1022AA If ordered within year 1 $__________ 1022AB If ordered within year 2 $__________ 1022AC If ordered within year 3 $__________ 1022AD If ordered within year 4 $__________

1023 LRU TPS for NSN 5865-01-258-7063 1 Ea 1023AA If ordered within year 1 $__________ 1023AB If ordered within year 2 $__________ 1023AC If ordered within year 3 $__________ 1023AD If ordered within year 4 $__________

COPIES

1024 Copy of Station TPS ITA and cables 5 Ea Only – Self Test 1024AA If ordered within year 1 $__________ 1024AB If ordered within year 2 $__________ 1024AC If ordered within year 3 $__________ 1024AD If ordered within year 4 $__________

1025 Copy of Station TPS ITA and cables 5 Ea Only – Calibration 1025AA If ordered within year 1 $__________ 1025AB If ordered within year 2 $__________ 1025AC If ordered within year 3 $__________ 1025AD If ordered within year 4 $__________

COPIES Group I

1026 Copy of LRU TPS ITA 5 Ea and cables only – NSN 5865-01-551-7118 1026AA If ordered within year 1 $__________ 1026AB If ordered within year 2 $__________ 1026AC If ordered within year 3 $__________ 1026AD If ordered within year 4 $__________

1027 Copy of LRU TPS ITA 5 Ea and cables only – NSN 5865-01-553-2000 1027AA If ordered within year 1 $__________ 1027AB If ordered within year 2 $__________ 1027AC If ordered within year 3 $__________ 1027AD If ordered within year 4 $__________

1028 Copy of LRU TPS ITA 5 Ea and cables only – NSN 5865-01-545-4411 1028AA If ordered within year 1 $__________ 1028AB If ordered within year 2 $__________ 1028AC If ordered within year 3 $__________ 1028AD If ordered within year 4 $__________

COPIES Group II

1029 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5865-01-545-2484 1029AA If ordered within year 1 $__________ 1029AB If ordered within year 2 $__________ 1029AC If ordered within year 3 $__________ 1029AD If ordered within year 4 $__________

1030 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5865-01-257-2789 1030AA If ordered within year 1 $__________ 1030AB If ordered within year 2 $__________ 1030AC If ordered within year 3 $__________ 1030AD If ordered within year 4 $__________

1031 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5865-01-257-1341 1031AA If ordered within year 1 $__________ 1031AB If ordered within year 2 $__________ 1031AC If ordered within year 3 $__________ 1031AD If ordered within year 4 $__________

1032 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5865-01-264-3364 1032AA If ordered within year 1 $__________ 1032AB If ordered within year 2 $__________ 1032AC If ordered within year 3 $__________ 1032AD If ordered within year 4 $__________

1033 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5895-01-497-7220 1033AA If ordered within year 1 $__________ 1033AB If ordered within year 2 $__________ 1033AC If ordered within year 3 $__________ 1033AD If ordered within year 4 $__________

1034 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5868-01-516-0698 1034AA If ordered within year 1 $__________ 1034AB If ordered within year 2 $__________ 1034AC If ordered within year 3 $__________ 1034AD If ordered within year 4 $__________

COPIES Group III

1035 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5865-01-331-2557 1035AA If ordered within year 1 $__________ 1035AB If ordered within year 2 $__________ 1035AC If ordered within year 3 $__________ 1035AD If ordered within year 4 $__________

1036 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5865-01-362-6438 1036AA If ordered within year 1 $__________ 1036AB If ordered within year 2 $__________ 1036AC If ordered within year 3 $__________ 1036AD If ordered within year 4 $__________

1037 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5865-01-240-3754 1037AA If ordered within year 1 $__________ 1037AB If ordered within year 2 $__________ 1037AC If ordered within year 3 $__________ 1037AD If ordered within year 4 $__________

1038 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5865-01-256-2544 1038AA If ordered within year 1 $__________ 1038AB If ordered within year 2 $__________ 1038AC If ordered within year 3 $__________ 1038AD If ordered within year 4 $__________

1039 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5895-01-239-8983 1039AA If ordered within year 1 $__________ 1039AB If ordered within year 2 $__________ 1039AC If ordered within year 3 $__________ 1039AD If ordered within year 4 $__________

1040 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5865-01-258-1148 1040AA If ordered within year 1 $__________ 1040AB If ordered within year 2 $__________ 1040AC If ordered within year 3 $__________ 1040AD If ordered within year 4 $__________

COPIES Group IV

1041 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5865-01-240-3755 1041AA If ordered within year 1 $__________ 1041AB If ordered within year 2 $__________ 1041AC If ordered within year 3 $__________ 1041AD If ordered within year 4 $__________

1042 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5895-01-240-0091 1042AA If ordered within year 1 $__________ 1042AB If ordered within year 2 $__________ 1042AC If ordered within year 3 $__________ 1042AD If ordered within year 4 $__________

1043 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5865-01-257-1244 1043AA If ordered within year 1 $__________ 1043AB If ordered within year 2 $__________ 1043AC If ordered within year 3 $__________ 1043AD If ordered within year 4 $__________

1044 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5865-01-258-7062 1044AA If ordered within year 1 $__________ 1044AB If ordered within year 2 $__________ 1044AC If ordered within year 3 $__________ 1044AD If ordered within year 4 $__________

1045 Copy of LRU TPS ITA 7 Ea and cables only – NSN 5865-01-258-1133 1045AA If ordered within year 1 $__________ 1045AB If ordered within year 2 $__________ 1045AC If ordered within year 3 $__________ 1045AD If ordered within year 4 $__________

1046 Copy of LRU TPS ITA and cables only – NSN 5865-01-454-0015 7 Ea

1046AA If ordered within year 1 $__________ 1046AB If ordered within year 2 $__________ 1046AC If ordered within year 3 $__________ 1046AD If ordered within year 4 $__________

COPIES Group V

1047 Copy of LRU TPS ITA and cables only - NSN 5865-01-240-0092 7 Ea 1047AA If ordered within year 1 $__________ 1047AB If ordered within year 2 $__________ 1047AC If ordered within year 3 $__________ 1047AD If ordered within year 4 $__________

1048 Copy of LRU TPS ITA and cables only - NSN 5865-01-257-2861 7 Ea 1048AA If ordered within year 1 $__________ 1048AB If ordered within year 2 $__________ 1048AC If ordered within year 3 $__________ 1048AD If ordered within year 4 $__________

1049 Copy of LRU TPS ITA and cables only - NSN 5865-01-256-6556 7 Ea 1049AA If ordered within year 1 $__________ 1049AB If ordered within year 2 $__________ 1049AC If ordered within year 3 $__________ 1049AD If ordered within year 4 $__________

1050 Copy of LRU TPS ITA and cables only - NSN 5865-01-258-7063 7 Ea

1050AA If ordered within year 1 $__________ 1050AB If ordered within year 2 $__________ 1050AC If ordered within year 3 $__________ 1050AD If ordered within year 4 $__________

DATA in support of CLINs 1001 – 1050

1051 ELINs A001 – A00x 1051AA Monthly Status Reports 4 Lot NSP 1051AB Integrated Master Schedule 4 Lot NSP 1051AC Conference Agenda 4 Lot NSP 1051AD Conference Minutes 4 Lot NSP

DATA in support of CLINs 1001

1052 ELIN C00x, Training Material 4 Lot 1052AA If ordered within year 1 $__________ 1052AB If ordered within year 2 $__________ 1052AC If ordered within year 3 $__________ 1052AD If ordered within year 4 $__________

DATA in support of CLINs 1002 – 1023

1053 ELIN B00x, Design Review 4 Lot Information Package 1053AA If ordered within year 1 $__________ 1053AB If ordered within year 2 $__________ 1053AC If ordered within year 3 $__________ 1053AD If ordered within year 4 $__________

1054 ELIN B00x, Test Plan 4 Lot 1054AA If ordered within year 1 $__________ 1054AB If ordered within year 2 $__________ 1054AC If ordered within year 3 $__________ 1054AD If ordered within year 4 $__________

1055 ELIN B00x, Test/Inspection Report 4 Lot 1055AA If ordered within year 1 $__________ 1055AB If ordered within year 2 $__________ 1055AC If ordered within year 3 $__________ 1055AD If ordered within year 4 $__________

Comment [B.M.8]: 1 Lot per delivery order

Comment [B.M.9]: Training to take place at each location; only for the stations

Comment [B.M.10]: Design Review Information Package CDRL to be delivered for each TPS Group (or sub-group if broken into sub-groups)

Comment [B.M.11]: Test Plan CDRL to be delivered for each TPS Group (or sub-group if broken into sub-groups)

Comment [B.M.12]: Test Report CDRL to be delivered for each TPS Group (or sub-group if broken into sub-groups)

1056 ELIN B00x, Engineering Support Data 22 Lot 1056AA If ordered within year 1 $__________ 1056AB If ordered within year 2 $__________ 1056AC If ordered within year 3 $__________ 1056AD If ordered within year 4 $__________

1057 ELIN C00x, Product Drawings 22 Lot 1057AA If ordered within year 1 $__________ 1057AB If ordered within year 2 $__________ 1057AC If ordered within year 3 $__________ 1057AD If ordered within year 4 $__________

1058 ELIN C00x, Technical Manual 22 Lot 1058AA If ordered within year 1 $__________ 1058AB If ordered within year 2 $__________ 1058AC If ordered within year 3 $__________ 1058AD If ordered within year 4 $__________

1059 ELIN D00x, LMI Data Products 4 Lot 1059AA If ordered within year 1 $__________ 1059AB If ordered within year 2 $__________ 1059AC If ordered within year 3 $__________ 1059AD If ordered within year 4 $__________

1060 ELIN D00x, Supplemental Data for 4 Lot Provisioning 1060AA If ordered within year 1 $__________ 1060AB If ordered within year 2 $__________ 1060AC If ordered within year 3 $__________ 1060AD If ordered within year 4 $__________

1061 ELIN E00x, Firmware Support Manual 4 Lot NSP

1062 ELIN E00x, Computer Software Product 4 Lot NSP End Items

1063 ELIN E00x, Computer Software 22 Lot Flowchart 1063AA If ordered within year 1 $__________ 1063AB If ordered within year 2 $__________ 1063AC If ordered within year 3 $__________ 1063AD If ordered within year 4 $__________

1064 ELIN E00x, Data Accession List 4 Lot NSP

Comment [B.M.13]: Engineering Support Data

Comment [B.M.14]: Product Drawings CDRL will be delivered for each TPS NSN

Comment [B.M.15]: Technical Manual CDRL will be delivered for each TPS NSN

Comment [B.M.16]: Provisioning CDRL will be delivered for each TPS NSN

Comment [B.M.17]: Provisioning CDRL will be delivered for each TPS NSN

Comment [B.M.18]: Firmware Support Manual CDRL will be delivered for each TPS NSN

Comment [B.M.19]: Computer Software Product End Items CDRL will be delivered for each

TPS NSN

Comment [B.M.20]: Data Accession List CDRL will be delivered for each TPS NSN

1065 ELIN E00x, Auto. Computer Program ID 4 Lot NSP No. Data and Control Record

1066 ELIN F00x, Request for Nomenclature 4 Lot NSP

*Anticipated Delivery Requirements: Pre-production – 2 ea Tester Stations NLT 24 months ARO effective date of delivery order; 1 ea Tester Station NLT 30 months ARO effective date of delivery order; TPS Group I (each TPS) NLT 30 months ARO effective date of delivery order

Production units – Test Stations: each test station no later than 12 months ARO effective date of delivery order

Production units – TPSs: each TPS no later than 24 months ARO effective date of delivery order

Copies of LRU TPS ITA and cables only – each copy no later than 24 months ARO effective date of delivery order

*Each CLIN/SubCLIN will be Firm-Fixed Price.

Comment [B.M.21]: Auto. Computer Program ID No. Data and Control Record CDRL will be delivered for each TPS NSN

Comment [B.M.22]: Request for Nomenclature

File details come from the government source that posted it. Updated .