Performance_Work_Statement_-__-_09-24-2013.pdf
PDF 603 KB Posted
- Attached to
- Synopsis for Contractor Logistics Support (CLS) for the Advanced Digital Test Station (ADTS) Federal contract opportunity
- Solicitation number
- FA8519-13-R-30000
About this file
Performance Work Statement (PWS) dated 23 Sep 2013
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE-BASED WORK STATEMENT (PWS)
FOR
CONTRACTOR LOGISTICS SUPPORT (CLS) FOR THE
B-1B ADVANCED DIGITAL TEST STATION (ADTS)
BY THE
AUTOMATIC TEST SYSTEMS DIVISION
AIR FORCE LIFE CYCLE MANAGEMENT CENTER (AFLCMC)
September 23, 2013
DISTRIBUTION STATEMENT A. Approved for public release: Distribution is unlimited.
PR: FD2060-13-30000 PWS REVISION: 1 2
PERFORMANCE-BASED WORK STATEMENT (PWS)
Purchase Request: FD2060-13-30000
1.0 DESCRIPTION OF SERVICES This Performance-Based Work Statement (PWS) outlines the tasks and duties the contractor shall perform in order to provide contractor logistics support for the Advanced Digital Test Station (ADTS), NSN 4920-01-527-1350. The contractor logisitics support includes program management, supply chain management, spares management, spares procurement, repair and maintenance, failure reporting and analysis, obsolescence forecasting, and engineering and technical support.
2.0 SERVICES SUMMARY (SS) Contractor logistics support performed under this contract shall meet the following objectives:
Performance
Objective
PWS
Reference Performance Threshold
Timeliness of Data
Deliverables
4.1, 4.2.1, 4.2.3, 4.2.4, 4.3, 4.4.1, 4.4.2, 4.5.2, 4.10.5
The contractor shall deliver the required data items in accordance with schedule requirements identified on the DD Form 1423 for each data item. 100% compliance is required.
Availability of ADTS 4.2
The Contractor shall ensure each ADTS is 100% operational 90% of the time. This requirement is based on an expected usage factor of 24 hours per day, 7 days per week. No more than 2 exceptions per quarter.
Timeliness of On-Site
Technical Support 4.4.2
The contractor shall send a technical representative to the user location within five (5) business days after notification/request by the government. No more than 2 exceptions per contract year.
3.0 GOVERNMENT PROPERTY and SERVICES.
3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in their possession in accordance with the FAR and applicable supplements including, but not limited to, Federal Acquisition Regulation (FAR) Part 45, Government Property; FAR 52.245-1, Government Property; and Defense Federal Acquisition Regulation Supplement (DFARS) Part
245, Government Property. The FAR and applicable supplements can be accessed at:
http://farsite.hill.af.mil.
3.2 Government Furnished Material (GFM)
The government will provide, upon request of the contractor, pertinent background data such as existing engineering drawings, technical orders, deficiency reports, etc., excluding proprietary data. Requests shall be made through appropriate government contracting officer channels. All data shall be returned to the government at the conclusion of the contract period of performance.
http://farsite.hill.af.mil/
PR: FD2060-13-30000 PWS REVISION: 1 3
3.3 Government Furnished Equipment (GFE)
The government shall provide the assets and corresponding quantities as identified in PWS
Attachment A, Government-Owned Spares . These assets shall be used as spares to facilitate the repair of the end item. These assets shall be returned to the government upon completion or termination of this contract. The contractor shall be responsible for shipping costs to return assets to the government upon completion or termination of this contract. The government shall provide one (1) ADTS system, one (1) station self-test Interface Test Adapter (ITA), one (1)
Portable Automatic Test Equipment Calibrator (PATEC), and one (1) station calibration ITA to be used at the contractor’s facility in support of this requirement.
3.4 Access to Government Property
The government shall provide access to the contractor for entry into all government facilities as required. The contractor shall submit visit requests to the location they are traveling at least three (3) business days prior to scheduled visit date. The government will provide the contractor with points of contact for visit requests at each location.
3.5 Loss of Government Property
3.5.1 Definition of Loss of Government Property: In accordance with DFARS 252.245-
7002, Reporting Loss of Government Property, “loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, inadequate storage, theft, lack of security, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing.
Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property
Administrator.
3.5.2 Reporting Loss of Government Property: The Contractor shall use the Defense Contract
Management Agency (DCMA) eTools software application to report loss of Government property at: http://www.dcma.mil/aboutetools.cfm. The reporting requirement does not change any liability provisions or other reporting requirements that may exist under the contract/order.
3.6 Return of Government Property: All Government-Furnished Property (GFP) remains the property of the Government and shall be returned to the Government upon completion of the contract/order. All GFP shall be returned to the Government in the condition provided unless approved in advance by the Procuring Contracting Officer (PCO). All Department of Defense
(DD) Form 1423, Contract Data Requirements List (CDRL), deliverables become the property of the Government upon receipt.
http://www.dcma.mil/aboutetools.cfm
PR: FD2060-13-30000 PWS REVISION: 1 4
3.7 Government Systems
3.7.1 The Government will provide Contractor personnel access to systems necessary to perform tasks under the contract/order. The Contractor shall ensure Contractor personnel who require access to a Government Automated Information System (AIS) have a Department of Defense
National Agency Check Plus Written Inquiries (DNACI) conducted in accordance with
Department of Defense (DoD) 5200.2-R, Personnel Security Program. The Government will provide system access subject to approval of the DD Form 2875, System Authorization Access
Request (SAAR). Upon completion/termination of the contract/order or transfer/termination of
Contractor personnel, the system account will be closed.
3.7.2 Wide Area Workflow (WAWF)
3.7.2.1 In accordance with DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents using WAWF.
3.7.2.2 The CDRL will determine submittal requirements; however, separately priced data must be accepted in WAWF in order for the Contractor to receive payment, and both separately priced and non-separately priced data must be accepted in WAWF in order for the contract line item to be closed out.
3.7.2.3 Contractor personnel shall register to access Wide Area Workflow-Receipt and
Acceptance (WAWF-RA) at: https://wawf.eb.mil/.
3.7.2.4 Within ten calendar days after contract/order award, Contractor personnel shall designate an Electronic Business Point of Contact (EB POC) in the System for Award Management (SAM) site at: https://www.sam.gov/.
4.0 GENERAL INFORMATION: The Contractor shall comply with the delivery performance requirements and other obligations as identified in this PWS. The following sections provide a summary of the principle responsibilities and duties of the contractor.
4.1 Program Management
The contractor shall identify to the government and maintain a single point of contact (Program
Manager) for all matters under this contract. The contractor shall also ensure that all program management personnel assigned to the program shall be available, as required, to meet program objectives. The contractor shall coordinate the duty hours that will be worked by the contractor’s technicians while onsite at each base location. The contractor shall provide a Contractor’s
Progress, Status, and Management Report, outlining the progress of all program activities in accordance with DD Form 1423.
A001 (DI-MGMT-80227, Contractor’s Progress, Status, and Management Report) https://wawf.eb.mil/ https://www.sam.gov/
PR: FD2060-13-30000 PWS REVISION: 1 5
4.2 Supply Chain Management
The contractor shall provide total supply chain management of the ADTS systems to ensure each
ADTS is 100% operational 90% of the time. There shall be no more than two exceptions per quarter. This requirement is based on an expected usage factor of 24 hours per day, 7 days per week. The supply chain management activities include spares management, spares procurement, repair and maintenance, and failure tracking and analysis. The availability metric shall be calculated for each ADTS system on a quarterly basis as follows:
Availability = MTBF / (MTBF + MTTR)
Mean Time Between Failure (MTBF) = the time (in hours) between failures of a system;
a measured result of dividing the number of failures occurred in a given time period into the number of hours in that time period (24/7 usage).
Mean Time To Repair (MTTR) = the time (in hours) from when a part (TRU) is requested/ordered to when it is received by the using location.
Availability is calculated based on parts request to delivery time and average Mean Time to
Repair metrics; excluding preventative maintenance tasks, government calibration, or other station down-time not attributed to waiting on a TRU. Availability metrics are applicable to only failures related to Test Replaceable Units (TRUs) in current production. When the root cause of a failure to meet the availability requirement is based on TRUs that have been determined to be obsolete, then these TRUs will be removed from the availability calculation until a system level
ECP (Engineering Change Proposal) has been approved and deployed to replace the obsolete part. The government shall be notified of obsolete parts via paragraph 4.3 of this PWS.
4.2.1 Spares Management
The contractor shall provide parts support for repair of the ADTS for the contract period of performance. The contractor shall store, manage, and control all parts at a centralized parts storage location. The contractor shall cover shipping, to include packaging and shipping costs, to locations where parts are needed and the return shipment to the centralized storage location.
The contractor shall ensure that all parts provided to using locations are configured properly for use within the ADTS application and IAW the ADTS Software Version Description (SVD), document number CI-248-00. The contractor shall be responsible for packaging and shipping costs of all government-owned spare assets upon termination or expiration of the contract.
The Contractor shall conduct one (1) joint initial spares inventory audit within ninety (90) calendar days of contract award and one (1) joint final spares inventory audit within 90 calendar days of contract completion. The Contractor shall prepare a spares audit report and include it with the next submittal of monthly status report. The Contractor shall request disposition of all parts listed on the spares audit report, which shall be turned over to the Government or may be purchased by the Government.
PR: FD2060-13-30000 PWS REVISION: 1 6
4.2.2 Spares Procurement
Purchase of additional spares is dependent upon the part’s current production status. This option is not available if the part is not in production (obsolete) and no replacement has been identified.
Failure trend analysis results as reported in the Failure and Analysis Tracking Report (PWS
4.2.4, CDRL A003) shall be used to determine the need and quantity of additional spares for procurement by the government. Additional spares shall not be procured by the government for temporary spikes in failures for a single quarter. Only those items that exhibit an increase in failure rate of at least 10% from quarter to quarter for at least three (3) consecutive quarters shall be considered for additional spares procurement by the government (via a CLIN on this contract) to be added to the GFE provided spares pool. Any other spares procured by the contractor to meet availability requirements shall be the property of the contractor. The spares owned by the contractor in support of this contract shall be identified to the government in a contractor-owned asset list to be included in the monthly status report. The contractor shall make these spares available for purchase to the government at the end of the contract. The contractor shall be responsible for packaging and shipping costs of spare assets should the government decide to purchase them.
4.2.3 Repair and Maintenance
The contractor shall provide parts repair services required to support the ADTS and the ancillary equipment associated with the tester to include internal interconnection cables, interface connectors/pins, indicator lights/lamps, circuit breakers, fuses, keyboard, mouse, and other miscellaneous “consumable” items. The contractor shall provide a toll free number to call during normal business hours (M-F, 0800-1700 CST) to order parts repair services.
The contractor shall provide fully serviceable parts that are free of quality defects. All repaired parts shall be fully functional and meet the performance specifications of the Original Equipment
Manufacturer (OEM). The contractor shall ensure that all parts repaired and provided to using locations are configured properly for use within the ADTS application and IAW the ADTS
Software Version Description (SVD), document number CI-248-00. The contractor shall perform Next Higher Assembly (NHA) testing of all parts in the GFE ADTS to ensure proper functionality in the ADTS. The contractor shall provide all costs directly associated with the depot-level repair of TRUs in a Depot Maintenance Cost Report.
A002 (DI-FNCL-80462, Depot Maintenance Cost Report)
4.2.4 Failure Analysis
The contractor shall track and report all repair activities, and parts usage in performance of contract requirements for the period of performance. The contractor shall maintain all usage data for each ADTS to include frequency of failures and contractor’s analysis of trends. The contractor shall prepare a Failure and Analysis Tracking Report.
A003 (DI-QCIC-80131, Failure and Analysis Tracking Report)
PR: FD2060-13-30000 PWS REVISION: 1 7
4.3 Diminishing Manufacturing Sources (DMS) and Obsolescence Forecasting
The contractor shall provide advance notification of anticipated obsolescence to the ADTS system by conducting a semi-annual survey of all vendors supplying Test Replaceable Units
(TRUs) to the ADTS system. The resulting analysis shall identify parts that are, or are scheduled to become, obsolete. Components surveyed shall include hardware and software (as defined in the SVD), which may affect the form, fit, and/or function of the system. The contractor shall then perform an analysis of likely replacements and provide a recommended course of action including last time procurement of materials, form-fit-function replacement, or other obsolescence solutions. The government shall perform all engineering efforts, such as software modifications, required to functionally integrate any replacement TRUs into the ADTS system.
A004 (DI-MISC-80508B, Technical Report, Study/Services)
Once a replacement part is identified for an item no longer in production, the government will provide guidance to the contractor on replacing the part via attrition or retrofit modification. For those parts that are to be replaced by attrition, the government will procure (via a CLIN on this contract) the same quantity of government-owned spares for the legacy part that is currently allocated to this contract as GFE. For those parts that are to be replaced by retrofit modification, the contractor will procure (via a CLIN on this contract) the Time Compliant Technical Order
(TCTO) kits and spare assets for the replacement part(s). The government shall be responsible for the engineering and integration of any replacement part(s) and development of the TCTO for those items to be replaced via retrofit modification. The contractor shall participate and witness the validation and verification of the TCTO kit as an independent third party. The contractor shall procure the TCTO kits per government direction and perform the installation of the TCTO kits to include removal and disposition of the item(s) being replaced.
4.4 Technical Support
The contractor shall provide engineering and technical support to ADTS users to assist with operation, troubleshooting, fault isolation, and general technical issues with the ADTS. Off-site technical support shall be used initially in an attempt to resolve the problem. On-site technical support shall be used only to resolve those problems that cannot be resolved with off-site technical support.
4.4.1 Off-Site Technical Support
The contractor shall provide off-site engineering and technical support to the users upon request.
The off-site technical support shall consist of the contractor fielding questions from the user(s) on technical issues and requests for information as well as providing technical guidance and recommendations to the user(s). The contractor shall provide an email address and a toll free number to call during normal business hours (M-F, 0800-1700 CT) for the off-site technical support. The contractor shall document the technical support provided and method of resolution in the monthly status reports.
PR: FD2060-13-30000 PWS REVISION: 1 8
4.4.2 On-Site Technical Support
The contractor shall provide on-site engineering and technical support to the users upon request.
The quantity of on-site technical support visits shall be identified in the contract. The on-site technical support shall consist of the contractor performing and/or assisting the user(s) with station operation, troubleshooting, fault isolation, inspections, removal/replacement of components, and general technical assistance. The user(s) will initiate the on-site technical support request by contacting the contractor-identified POC. The contractor shall have a technical representative physically present and available at the user location within five (5) business days of the travel request approval provided by PCO IAW PWS paragraph 4.1.4. There shall be no more than two (2) exceptions per contract year. The contractor shall provide a report detailing the findings and resolution implementation of on-site technical support provided to users via the Technical Report.
A004 (DI-MISC-80508B, Technical Report, Study/Services)
4.5 General Requirements
4.5.1 Place of Performance
ADTS systems covered by this PWS are used in support of the B-1B at the following locations:
Dyess AFB, TX; Ellsworth AFB, SD; Tinker AFB, OK, Sheppard AFB, TX, and Robins AFB, GA.
4.5.2 Government-Industry Data Exchange Program (GIDEP)
4.5.2.1 The Contractor shall participate in GIDEP in accordance with Air Force Joint Instruction
(AFJI) 63-108, Government-Industry Data Exchange Program (GIDEP), and GIDEP Operations
Manual S0300-BT-PRO-010, Government-Industry Data Exchange Program. The Contractor shall submit all appropriate data to GIDEP, as it is generated, in accordance with the CDRLs of the contract/order.
4.5.2.2 The Contractor shall review each Alert/Safe-Alert report received from GIDEP to determine if the item or process for which the Alert/Safe Alert report is issued is applicable to the contract/order and take appropriate action. Upon the determination that an Alert/Safe-Alert report is applicable, the Contractor shall inform the impacted organizations and subcontractors in accordance with the CDRLs. The Contractor shall maintain a record of the status and disposition of all Alert/Safe-Alert reports in accordance with the CDRLs below.
A005 (DI-QCIC-80125B, GIDEP Alert/Safe-Alert Report)
A006 (DI-QCIC-80126B, GIDEP Alert Response)
4.6 Government Security Requirements
4.6.1 Actual knowledge and/or generation of classified and/or sensitive, but unclassified, information are not expected to be necessary for performance of the contract/order. Contractor personnel are required to comply with Government security requirements to preclude potential security incidents or violations including potential unauthorized disclosure or compromise of
PR: FD2060-13-30000 PWS REVISION: 1 9
classified and/or sensitive, but unclassified, information. If a change in the security classification of the contract/order from an unclassified status or a lower classification to a higher classification becomes necessary after contract/order award, the Contractor shall make a reasonable effort to continue performance of work under the contract/order in compliance with the change in security classification in accordance with FAR 52.204-2, Security Requirements.
4.6.2 Government Security Regulations: The Contractor shall ensure personnel, information, system, facility, and international security requirements are met. The Contractor shall comply with Government Security regulations including, but not limited to, DoD 5200.2-R; DoD
5220.22-M, National Industrial Security Program Operating Manual (NISPOM); DoD Directive
(DoDD) 5205.02E, DoD Operations Security (OPSEC) Program; DoD Manual 5205.02-M, DoD
Operations Security (OPSEC) Program Manual; Air Force Instruction (AFI) 31-101, Integrated
Defense; and Robins Air Force Base Instruction (RAFBI) 31-101, Installation Security.
4.6.3 Operations Security (OPSEC)
4.6.3.1 The purpose of OPSEC is to reduce the vulnerability of United States Air Force (USAF) missions to adversary collection and exploitation of critical information. Critical Information is defined as information about USAF missions or activities the adversary needs to achieve their goals.
4.6.3.2 The Contractor shall ensure compliance with DoDD 5205.02E and DoD Manual
5205.02-M including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs.
4.6.3.3 The Contractor shall ensure Contractor personnel who perform work on Robins Air
Force Base (AFB) or another Government facility comply with the OPSEC procedures of the facility.
4.6.3.4 Inormation Assurance (IA)
4.6.3.4.1 Malicious Logic. In accordance with AFI 33-138, Enterprise Network Operations and
Tracking, the contractor shall promptly report any incident meeting the requirements as defined in paragraph 5.4, Incidents Defined, to the USAF and cooperate with USAF investigations.
Affected assets shall be immediately quarantined. The contractor shall notify the Contracting
Officer’s Representative (COR) by telephone within 72 hours upon verification of virus. After regular duty hours, the contractor shall notify Robins AFB Command Post at 478-327-2612. The contractor shall not perform any remedial action of affected AF equipment without direction from the PCO.
4.6.3.4.2 Malicious Logic Protection. The contractor shall ensure incoming and outgoing non-volatile storage devices via utilization of human and technological preventative measures such as good cyber hygiene and virus scanning to ensure they are free of malicious logic. (AFMAN 33-
282, 27 March 2012, pp 6.5)
PR: FD2060-13-30000 PWS REVISION: 1 10
4.6.3.4.3 Removable Media. The contractor shall ensure all removable media devices (hard drives, thumb drives, CD, etc.) are free of malicious logic before and after use. (AFMAN 33-
282, pp 6.5.6)
4.6.4 Communications Security (COMSEC): The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified and/or sensitive, but unclassified, information in accordance with DoD 5220.22-M. Applicable equipment shall be safeguarded, maintained, and operated in accordance with DoD 5220.22-M.
4.6.5 Security Clearance
4.6.5.1 The Contractor shall ensure applicable Contractor personnel have security clearances at the secret level for proper accomplishment of contract/order requirements. Contractor personnel shall not be authorized access to classified and/or sensitive, but unclassified, information and/or materials or be permitted to work on classified and/or sensitive, but unclassified, projects and/or programs without a proper security clearance and a need-to-know.
4.6.5.2 The security clearance shall be obtained in accordance with the DD Form 254, Department of Defense Contract Security Classification Specification. The Contractor shall ensure Contractor personnel submit a United States (U.S.) Office of Personnel Management
Standard Form 85P, Questionnaire For Public Trust Positions, (fingerprint card if available) to the Government Security Office.
4.6.5.3 Contractor personnel whose clearances have been suspended or revoked shall immediately be denied access to classified and/or sensitive, but unclassified, information.
4.6.6 Security Incident or Violation: The Contractor shall immediately notify the Government
Security Office of any potential or actual security incident or violation including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.
4.6.7 Access to Government System: The Government will provide Contractor personnel access to systems necessary to perform tasks under the contract/order. The Contractor shall ensure
Contractor personnel who require access to a Government AIS have a DNACI conducted in accordance with DoD 5200.2-R. The Government will provide system access subject to approval of the DD Form 2875. Upon completion/termination of the contract/order or transfer/termination of Contractor personnel, the system account will be closed.
4.6.8 Access to Government Facility
4.6.8.1 The Contractor shall ensure Contractor personnel who require access to a Government facility comply with the security procedures of the facility.
4.6.8.2 If Contractor personnel require repeated access to a Government facility over the life of the contract/order, the Contractor shall ensure they complete, as applicable, a DD Form 1172-2
(Application for Department of Defense Common Access Card – DEERS Enrollment) to obtain
PR: FD2060-13-30000 PWS REVISION: 1 11
a Common Access Card (CAC) or an Air Force Materiel Command (AFMC) Form 496
(Application for AFMC Identification Card) to obtain a Contractor identification card. The DD
Form 1172-2 or AFMC Form 496 shall be submitted to AFLCMC/WNA.
4.6.8.3 Upon completion/termination of the contract/order or transfer/termination of the
Contractor personnel, the CAC or Contractor identification card shall be returned to
AFLCMC/WNA.
4.6.9 Access to Robins AFB
4.6.9.1 In accordance with RAFBI 31-101, paragraph 8.8.2.1, the Contractor shall submit a list of Contractor personnel requiring access to Robins AFB to the PCO.
4.6.9.2 Contractor personnel requiring repeated access to Robins AFB, but not requiring Local
Area Network (LAN) access, to perform work shall submit a Non-Robins 2K Request Form to the applicable Badging Agent to request a Contractor identification card. In accordance with
RAFBI 31-101, paragraph 8.8.2.1.4, the Badging Agent will enter the Contractor personnel information into MAX. Once their information has been input into MAX, the Contractor personnel shall come to 78 SFS/S5P to receive their Contractor card. They shall present a state-issued picture ID and their social security card for identification purposes. If they are not a
United States (U.S.) citizen, documentation must be presented verifying they are permitted to perform work in the U.S.
4.6.9.3 Contractor personnel requiring repeated access to Robins AFB and LAN access to perform work shall submit an Application for Department of Defense Common Access Card in the Contractor Verification System (CVS) to request a CAC. In accordance with RAFBI 31-101, paragraph 8.8.2.1.5, the applicable Trusted Agent (TA) will enter the Contractor personnel into
CVS. The TA will e-mail the Contractor personnel a User ID/password and instructions on accessing the Robins AFB public website. The Contractor personnel shall access the website and complete forms as directed. The Contractor personnel shall make an appointment with the 78
MSS/DPMPS via the CAC Web Scheduler to receive their CAC.
4.6.9.4 In accordance with RAFBI 31-101, paragraph 8.8.2.1.8, upon completion/termination of the contract/order or transfer/termination of the Contractor personnel, the CAC or Contractor card/badge shall be returned to 78 SFS/S5P.
4.7 Continuation of Mission-Essential Services During a Crisis
4.7.1 Definition of Mission-Essential Services: In accordance with DFARS 252.237-7023(a), Continuation of Essential Contractor Services / Definitions, “ ‘Essential contractor service’ means a service provided by a firm or individual under contract to DoD to support mission-essential functions, such as support of vital systems, … associated support activities, … and similar services provided to foreign military sales customers under the Security Assistance
Program. Services are essential if the effectiveness of defense systems or operations has the potential to be seriously impaired by the interruption of these services, as determined by the appropriate functional commander or civilian equivalent.”
PR: FD2060-13-30000 PWS REVISION: 1 12
4.7.2 Designation of Services as Mission-Essential: In accordance with DFARS 252.237-
7023(a) and AFI 10-403, Deployment Planning and Execution, paragraph 1.9.1.33.2, the
Functional Commander (FC) or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis.
4.8 Environmental Management System (EMS)
4.8.1 Executive Order (E.O.) 13423, Strengthening Federal Environmental, Energy, and
Transportation Management, and E.O. 13514, Federal Leadership in Environment, Energy, and
Economic Performance, establish the requirements for an EMS and obligate federal agencies to implement sustainable practices.
4.8.2 In accordance with the Secretary of the Air Force (SAF) Policy Letter, Conformance with
Air Force Environmental Management System (EMS) Requirements for Contracts Performed on
Air Force Installations, dated 11 Dec 06, and the Air Force Materiel Command/Vice Commander
(AFMC/CV) Policy Letter, Conformance with Air Force Environmental Management System
(EMS) Requirements for Contracts Performed on Air Force Installations, dated 1 Aug 07, Contractor personnel who perform work on any USAF installation shall comply with the EMS requirements established by the installation.
4.8.3 Contractor personnel who perform work on Robins AFB shall complete Robins AFB EMS
General Awareness Training prior to beginning work. EMS General Awareness Training will be provided by the 78th Civil Engineering Group Environmental Management Division (78
CEG/CEV). Contractor personnel can satisfy the EMS General Awareness Training requirement by any of the following means:
1) With a CAC, access the 78 CEG/CEV site below, select EMS General Awareness Training, choose option 1.
https://geobase.robins.af.mil/emstraining/EMSTrainingOptions.aspx
2) Without a CAC, request a copy of Robins AFB EMS General Awareness Training via the 78
CEG/CEV Workflow Mailbox at:
78ceg.cev.FrontOfc@robins.af.mil.
3) If a company is International Organization for Standardization (ISO) 14000 certified, Contractor personnel do not have to complete Robins AFB EMS General Awareness Training;
however, the Contractor must provide documentation of ISO 14000 certification to the PCO or as directed by AFLCMC/WNA.
4.8.4 The prime Contractor shall ensure subcontractors comply with the EMS requirement.
https://geobase.robins.af.mil/emstraining/EMSTrainingOptions.aspx mailto:78ceg.cev.FrontOfc@robins.af.mil
PR: FD2060-13-30000 PWS REVISION: 1 13
4.8.5 Green Procurement Program (GPP)
4.8.5.1 Under Secretary of Defense Memorandum, Establishment of the DoD Green
Procurement Program, dated August 27, 2004, establishes the requirement for a GPP. In accordance with FAR 23.101, Sustainable Acquisition Policy / Definition, the GPP requirement applies to all acquisitions, including services, using appropriated Government funds. The GPP is a mandatory federal acquisition program that focuses on the purchase and use of environmentally-preferable products and services. In accordance with FAR 23.404, Agency
Affirmative Procurement Programs, the GPP requires 100% of purchases of Environmental
Protection Agency (EPA)-designated products, included in the Comprehensive Procurement
Guidelines (CPG) list, contain recovered materials unless the item cannot be acquired competitively within a reasonable timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.
4.8.5.2 The prime Contractor shall ensure subcontractors comply with the GPP requirement.
4.9 Inspection of Services
4.9.1 In accordance with FAR 52.246-4, Inspection of Services - Fixed-Price, the Government reserves the right to inspect Contractor performance.
4.9.2 In accordance with FAR 52.246-4, the Contractor shall maintain an inspection process acceptable to the Government.
4.9.3 In accordance with FAR 52.246-4 and/or FAR 52.246-6, the Contractor shall maintain records of inspections which shall be made available to the Government as long as the contract requires.
4.10 Safety and Health Requirements
4.10.1 Contractor Responsibility: The Contractor shall ensure all safety and health requirements are met. The Contractor is responsible for the safety and health of all Contractor and subcontractor personnel.
4.10.2. Contractor Compliance: The Contractor shall comply with Government Safety and
Health regulations including, but not limited to, Public Law 91-596 as amended by Public Law
101-552, Occupational Safety and Health Act (OSHA); DoDD 4715.1E, Environmental, Safety, and Occupational Health (ESOH); AFI 91-202, AFMC Supplement, The US Air Force Mishap
Prevention Program; AFI 91-204, Safety Investigations and Reports; and the Air Force
Contracting Voluntary Protection Program Support Guide. The Contractor shall comply with any applicable local safety and health guidance.
4.10.3. Voluntary Protection Program (VPP): The USAF is a participant in the OSHA VPP.
Contractor and subcontractor personnel performing work on USAF installations shall participate in the local VPP program. Contractor and subcontractor personnel performing work on USAF installations shall review VPP requirements at:
PR: FD2060-13-30000 PWS REVISION: 1 14
http://www.osha.gov/dcsp/vpp/index.html.
4.10.4 Mishap Notification/Investigation: In accordance with AFI 91-204, paragraph 2.12, the
Contractor shall promptly report mishaps involving damage or injury to the USAF and cooperate with USAF safety investigations.
4.10.5 Within ten business days after contract (basic or order, as applicable) award, the
Contractor shall submit a Safety and Health Plan for review and acceptance by the Government.
The Contractor shall establish and maintain a Safety and Health Program in accordance with the requirements listed in the contract (basic or order, as applicable) Appendix C, Industrial Safety
Requirements, and the Safety and Health Plan.
CDRL A007 (DI-ENVR-81375, Environmental Health and Safety Plan)
4.11 Contract Manpower Reporting Requirement
4.11.1 In accordance with the SAF/AQ Memorandum, Implementation of FY11 NDAA Section
8108 [of Public Law 112-10 of the Department of Defense and Full-Year Continuing
Appropriations Act, 2011], Contractor Inventory, the Contractor shall provide an annual count of
Contractor personnel performing services for the DoD if the acquisition is equal to or greater than the Simplified Acquisition Threshold (SAT) [currently $150,000.00], if the acquisition is using Government appropriated funds, and if the DoD is the requiring activity.
4.11.2 The Contractor shall report all Contractor labor hours, including subcontractor labor hours, required for performance of the services provided under the contract at the Contract
Manpower Reporting Application (CMRA) site at: https://www.ecmra.mil.
4.11.3 User manuals are available at the CMRA site.
4.11.4 Inputs shall be made for each Government Fiscal Year (FY) which extends from 1
October to 30 September. While inputs may be made any time during the FY, all data shall be reported no later than 31 October of the following FY.
4.11.5 Information from the CMRA site is considered to be proprietary in nature if the
Contractor name and contract number are associated with the direct labor hours and direct labor dollars. At no time will data be released to the public with the Contractor name and contract number associated with the data.
4.12 Trafficking in Persons
4.12.1 The Contractor shall comply with FAR 52.222-50, Combating Trafficking in Persons.
Additional information about Trafficking in Persons is available at the Department of State’s
Office to Monitor and Combat Trafficking in Persons site at: http://www.state.gov/g/tip.
4.12.2 In accordance with the Department of Defense COR Handbook section on Combating
Trafficking in Persons, the COR(s) must inform the PCO if the Contractor/subcontractor and/or http://www.osha.gov/dcsp/vpp/index.html https://www.ecmra.mil/ http://www.state.gov/g/tip
PR: FD2060-13-30000 PWS REVISION: 1 15
Contractor/subcontractor personnel fail to comply with the requirements of FAR 52.222.50. The
PCO must convey the information to DoD Combat Trafficking in Persons (CTIP) Law
Enforcement and Support / Office of Under Secretary of Defense (OUSD) Personnel and
Readiness (P&R) Defense Human Resources Activity (DHRA).
4.13 Invoicing/Payment and Receipt/Acceptance
4.13.1 In accordance with DFARS 252.232-7003, the Contractor shall submit payment requests
(invoices, Receiving Reports or combos) and receipt/acceptance documents using WAWF.
4.13.2 The CDRL will determine submittal requirements; however, separately priced data must be accepted in WAWF in order for the Contractor to receive payment, and both separately priced and non-separately priced data must be accepted in WAWF in order for the contract line item to be closed out.
4.13.3 Services will be accepted by AFLCMC/WNA Program Manager.
4.13.4 Additional information regarding WAWF is available at: https://wawf.eb.mil.
4.14 Travel
4.14.1 Travel requests for Contractor personnel shall be submitted for approval to the PCO or as directed by AFLCMC/WNA prior to costs being incurred and a minimum of five (5) business days in advance of departure.
4.14.2 Travel by Contractor personnel shall be conducted in accordance with FAR 31.205-46, Travel Costs.
4.15 Over and Above (O&A): During the performance of the contract, additional work (i.e.
over and above work) may be discovered which is not explicitly outlined in the PWS. If over and above work is necessary, the government shall submit a PWS addendum describing the work and requesting a quotation from the contractor. The submission of over and above work and request for quotation does not obligate the government to authorize this work. After receipt, evaluation and negotiation of the contractor’s quotation, a supplemental agreement will be issued to establish the firm fixed price for the over and above work. The price so established shall be evidenced by modification by the PCO. Actual performance of over and above work shall commence once a modification has been issued.
https://wawf.eb.mil/
PR: FD2060-13-30000 PWS REVISION: 1 16
5.0 ATTACHMENTS
Attachment A: Government-Owned Spares
Attachment B: Location of ADTS Systems
Attachment C: List of Applicable Publications
PR: FD2060-13-30000 PWS REVISION: 1 A-1
ATTACHMENT A: Government-Owned Spares
QTY Teradyne PN Vendor Description
1 977-044-00 Marway Power Systems
MPD 100 IEC
Power Distribution Unit (PDU)
2 977-894-00 Teradyne, Inc. Power Distribution Unit (PDU), 30-KVA, 3 Phase
7 Ai-762-50 Note 13
Teradyne, Inc. Analog Test Instrument DSO
7 AMP-300-01
Note 13
Teradyne, Inc. Dual Pulse Amplifier
1 971-565-00 Teradyne, Inc. M918/VP90 Series Adapter
1 610-982-00 Note 7
Tracewell Tracewell Chassis w/ Cable Tray & Ears
6 617-983-90 ADEK ADEK System Controller (Win 7)
36 360-933-08 LITEON, Inc.
iHAP122-04 FRU LITE ON DVD Burner for B-1 ADEs
8 608-115-00 Hewlett Packard Co.
351385 Graphics Video Card
2 358-216-03 Pomona Electronics
2249-C-36
CN 3 BNC TEST CABLE ASSY
10 289-004-00 Teradyne, Inc. CIB, ADTS DTI
2 977-100-00 Teradyne, Inc. M927/VP Wired Adapter
1 987-269-00 Meritec
944564
CBL ASSY .50 OHM, 20CON/JACKET
2 360-550-00 Hewlett Packard
Q5957A#ABA
HP LASER PRINTER LJ2420
3 360-108-01 Note 1
ATTI
VID GEN-502 OPTION 1
PVGA VIDEO SYS W/OPT 1,2,3
3 360-108-05
ATTI
VID GEN-502 OPTION 5
PVGA VIDEO SYS OPT 5
4 360-108-04
ENVID GEN-510
PVGA VIDEO SYS 510
4 360-108-07
ENVID GEN-510 option 6
PVGA VIDGEN-510 FUNNEL ADAPTER
3 360-112-00 VTI Instruments
70-0141-000
SMP1100 SINGLE WIDE BASE UNIT
5 360-113-00 Keithley
DC STIMULUS KEITHLEY 2420
4 360-114-00 VTI Instruments
70-0188-000
SMP5004 5A SPDT RELAY MODULE
PR: FD2060-13-30000 PWS REVISION: 1 A-2
4 360-115-00 VTI Instruments
70-0156-001
SMP6202 17 SPDT COAX SW RELAY
3 360-116-00 VTI Instruments
70-0166-001
SMP4004 DC STIMULUS 2A MATRIX
16 360-117-00 VTI Instruments
SMP2007
SMP2007 ANALOG MEAS SIGNAL MUX
4 360-121-00 VTI Instruments
70-0278-001
28V/73V DISCRETE VT1802
8 360-122-00 VTI Instruments
70-0274-003
SMP2300 24SPST COAX RLY 500V
4 360-123-00 VTI Instruments
70-0273-001
SMP2012 30A RELAYS
6 360-124-00 VTI Instruments
70-0275-001
SMP4028 50R COAX 8X20 MATRIX
5 360-125-00 VTI Instruments
70-0276-001
SMP4044 50R COAX 16X16 MATRIX
6 360-126-00 VTI Instruments
70-0274-004
SMP2300-93C 500V 93 OHM
5 360-127-00 VTI Instruments
70-0277-001
SMP6006 1X16 COAX
5 360-184-01 Agilent
33250A W/OPT ABA, 1CM
AG 33250A W/OPT ABA, 1CM RCKMT
4 360-185-00 Trek
PA1209
PA1209 VOLTAGE AMPLIFIER
8 360-193-00 Note13
EADS
6084 W/OPT222 AND VX407
CARRIER 2 PXD222
6084 WITH OPT222 / 407 CARRIER
14 360-367-00 North Atlantic Instruments, Inc.
65CS2-02B6N
2 SYNCHRO/RESOLV,6 STIMULUS CH
5 360-378-00 VTI Instruments
70-0306-001
SMP4024 93R COAX 2X48 MATRIX
3 360-386-00 VTI Instruments
70-0163-001
SMP6102 50R 17 1X2 COAX SWITCH
2 360-533-00 Delta Digital Video
SSC623
SSC/623 2/3 IN SCAN CONVERTER
4 360-610-00 VTI Instruments
70-0142-000
SMP1200 DBL-SLOT VXI W/OPT 84
PR: FD2060-13-30000 PWS REVISION: 1 A-3
4 360-400-00 Note 12
Conrac
2600C15
DUAL VIDEO REMOTE SYNC MONITOR
5 621-276-00 Note 12
Omni Vision, Inc.
VT19WV7X
Video Monitor
6 360-448-00 Note 13
5601-S-2259
DUAL AMPLIFIER FOR VX407C
25 360-479-00 VTI Instruments
75-0033-000
VM9000 2X2601,2164-16 SPEC CAL with SMP 1200-2-11267
6 360-911-00 North Atlantic Instruments, Inc.
NAI227-S3537
PHASE ANG V METER NAI227-S3537
5 360-912-00 North Atlantic Instruments, Inc.
NAI65DL1-2S
2 LVDT/RVDT STIM NAI65DL1-2S
2 361-190-00 Eagle Electronics
ALB1762L40BWA
Micrologix 24 PT DC RLY AC PWR
10 361-253-00 Note 5
3171 ARB DUAL PULSE GEN MODULE
4 361-253-03 Note 5
3172 ARB DUAL PUSE GEN MODULE
3 361-400-00 VTI Instruments
70-0142-003
SMP1200 DBL-SLOT VXI W/OPT 84
5 361-402-00 VTI Instruments
70-0143-002
SMP5001 FORM A RELAY VXI MOD
3 361-403-00 VTI Instruments
70-0143-003
SMP5002 FORM C VXI RELAY MOD
4 405-032-01 Note 2
Cosel PS SW 48V/22A 85-24VAC
15 405-557-01 Ametek
CW2501-P112
PS AC-AC PGM 0-270VRMS 0-18.6A
7 405-694-00 Ametek
CW801-P-V
PS AC SOURCE 3PH X 800VA
7 405-696-00 Ametek
TW5250-3
PS AC SOURCE1,2 OR 3PH 5250VA
10 405-698-11 Ametek
DLM10-60M9GM36
PS DC PROG10V/60A W/DISCON RLY
5 405-698-20 Ametek
DLM20-30M9G
PS DC PROGRAMMABLE 0-20V/0-30A
21 405-698-40 Ametek
DLM41-15M9GM31
DLM41-15M9GM31
PR: FD2060-13-30000 PWS REVISION: 1 A-4
2 405-704-48 Note 2
Astec
HPS10W-ANR-00
PS 48V/20.8A HPS MODULE
3 405-705-00 Ametek
560-8053-01 IRU
ELGAR AC INTERFACE RELAY UNIT
11 405-947-02 Ametek
SW5250A-3-3-2-128
PS ELGAR SW5250A-3-3-2-128
2 428-215-12 Note 2
Astec
73-810-001
HPR3-00, 73-810-001
2 360-541-00 Hewlett Packard
P9614A#ABA
20”LCD FLAT PANEL MONITOR SIL CAR
5 429-291-01 Agilent
3458A OPT 002/908
HP, 3458A OPT 002/908 OMA
3 429-692-01 Ametek
2107-02
BLOWER, MODIFIED FLOW CONTROL
6 429-715-20 Ametek
DCS40-25EM1M111
ELGAR DCS40-25EM1M11
5 618-156-00 Note 6
Ametek PS AT8R CHASSIS, 115/230VAC, 1PH
0 405-697-00 Note 6
Ametek
AT8A-05-04-01-01-4565
ELGAR MODAT8A 5CHNL PROG DC PS
2 405-502-02
5699959-21 0-20 VDC Master Module
4 405-505-02
5699959-61 0-160 VDC Master Module
2 405-507-02
5699971-01 E3 Processor Board
2 405-509-00
5699951-00 Display Module
2 405-519-02
5691219-02 Chassis, DC Supply
2 405-967-01
5699959-31 0-32 VDC Master Module
2 405-968-01
5699959-51 0-80 VDC Master Module
2 360-181-00 Omega Engineering
EIS-W
MICRO SERVER 9-12VIN 2W
2 361-640-00 Omega Engineering
CNI3233-C24
TEMP PROC CONTROLLER I/32 SYS
PR: FD2060-13-30000 PWS REVISION: 1 A-5
0 360-133-00 Note 4
ADEK
G2-3-04-4
ADEK IND PC RCK MNT G2-3-04-4
3 360-933-99 Note 4
ADEK S9100 FRU ADEK Rack Mounted PC
5 360-947-00 ADEK S9 FRU ADEK Rem Hd Drive Master
5 360-947-01 ADEK S9 FRU ADEK Rem Hd Drive Slave
2 361-312-00 CDW Select Inc.
190786
ETHERNET SW 5 PORT AUTO
3 360-389-00 Black Box
ACU3001A
KVM Switch Assembly
2 360-659-00 Bravo
1042E Parallel Bus Extender
6 360-133-05 ADEK ADEK COMPUTER POWER SUPPLY
6 360-133-06 ADEK ADEK COMPUTER CONTROL PANEL
8 360-133-10 Note 4
ADEK ADEK COMPUTER FAN
2 360-933-02 Note 4
ADEK
Fan 12VDC 80x25MM Ball-Bearing, 3-Wire w/Tach
2.5W 39.5 CFM
2 360-933-03 ADEK
Fan (3-Wire) Cable Adaptor, 2-Wire Molex to 3-Wire Fan
2 360-933-04 ADEK
Filter-826 Air\Dust Filter 826 – FF150-5 PET 11.75”x3.12”x0.5”
2 360-933-05 ADEK
DVD +/- RW. Dual layer, IDE, Beige (Model LH- 20A1P)
2 360-933-06 ADEK
USR5610C V.92 Performance Pro Data Fax/Modem, RoHS
2 360-933-07 ADEK JJ-P20212 SIIG PCI Serial I/O Dual
6 360-934-02 Note 4
ADEK FAN POWER BOARD
7 BI-411-00 Teradyne, Inc. BUS TEST INST 4 CHANNEL SERIAL
8 DI-025-41 Teradyne, Inc. 16 CH Digital Card
19 DI-025-42 Teradyne, Inc. 32 CH Digital Card
2 M-918-04 Teradyne, Inc. CRB 50MHZ 128K ROUTABLE,CE
2 M-927-04 Teradyne, Inc. 50 MHZ C SIZE CC ROUTABLE, CE
1 405-422-00 Note 3
Eaton
MODEL PW5125-1500RM
P/N 05146669-5501
PS UPS 120 VAC 5125
4 608-936-02 Note 3
Eaton
5PX2200RT
PS UPS 5PX 120V 1920/1950W
PR: FD2060-13-30000 PWS REVISION: 1 A-6
1 429-138-00 National Instruments
777185-01
NI, 777185-01 PCI81015 CARD
2 429-139-00 National Instruments
777178-01
NI, 777178-01 VXI-MXI-2/DTU
1 429-582-00 National Instruments
777073-01
NI, 777073-01 PCIGPIB NI-488 SW
1 859-930-00 Teradyne, Inc. Probe Interface Board, Panel
1 429-452-00
EADS
407374-01220
RD, 407374-01220 VXI CC, 1261B9U
2 361-218-00
EADS
407377-910 Racal Dana 1261 Chassis Power Supply
1 361-219-00 EADS Racal Dana 1261 Chassis Fan Tray
0 854-991-11 Tracewell Tracewell CHS. W/CBL TRAY&EARS
2 405-389-00 Note 7
Tracewell Power Supply Module, Tracewell Upper
5 405-389-01 Note 7
Tracewell Power Supply Module, Tracewell Upper
2 405-391-00 Note 7
Tracewell Power Supply Module, Tracewell Lower
5 405-391-01 Note 7
Tracewell Power Supply Module, Tracewell Lower
1 969-175-00 Tracewell Fan Tray Assy, Tracewell
1 969-184-00 Tracewell Control Board Assy, Tracewell
3 604-048-00 Teradyne, Inc. CONTROL BOX ASSM AMETEK BLOWER
1 479-819-00 National Instruments
776335-91
SIGNAL CONDITIONING CBL ADAPTER
1 479-820-00 National Instruments
777690-01
24BIT I/O DIG INTERFACE CARD
1 479-821-00 National Instruments
776336-00
8 OPTO IN SIGNAL COND BD W/CBL
1 479-822-00 National Instruments
776336-02
8 RELAY SIGNAL COND BD W/CBL
2 405-591-00 Condor
HBB512-A+
PS LN 5V/3A 9-15V/1.2A 115/230
1 360-922-00 Teal Elapsed Time Indicator
2 361-194-00 Telemechanique
ALB800AM2CR24
Push Button Switch, 16 MM Red
2 361-195-00 Telemechanique
ALB800AM2CG24
Push Button Switch, 16 MM Green
PR: FD2060-13-30000 PWS REVISION: 1 A-7
2 361-641-00 Omega Engineering
70A-4 Tone Alarm
2 361-841-00 Omega Engineering
5SRTC-TT-J-20-72
Thermocouple
2 361-842-00 Omega Engineering
RMJ-J-R
PANLJAK Mini Black J Thermocouple
2 405-713-00 Allen Bradley
1606-XLP36C
PS DIN RAIL MOUNT +/-12V/15V
1 429-715-30
MINI CIRCUIT
BLP-21.4 LOW PASS
BLP-21.4 LOW PASS Filter
1 429-715-31
MINI CIRCUIT
BLP-50
BLP-50 Filter
1 581-493-00 Allen Bradley
TRU2
RLY 1FORMC TIMEDELAY 10A AC/DC
1 581-494-00 Allen Bradley
700-HA32A24
RLY 2FORMC 24VAC 10A TUBE BASE
1 801-513-04 Telemechanique
ZBZ1604
SW RED PUSHBUTTON OPERATOR GUARD
1 801-515-02 Telemechanique
ZB5AZ102
SW CONTACT BLOCK 1FORMB
2 801-516-04 Telemechanique SW CONTACT BLOCK 24V GREEN LED
2 801-517-02 Telemechanique
ZB5AW813743
SW DUAL ILLUMINATED OPERATOR
1 812-625-00 Telemechanique MUSHROOM –HD PUSH BUT. OPERATOR
1 812-625-01 Telemechanique
ZB5AS54
MUSHROOM –HD PUSH BUT. OPERATOR
2 357-695-00 Virginia Panel
510-109-118
C-SIZE DOUBLE WIDTH FUNNEL
2 360-290-01 National Instruments
777630-01
CBL NI777630-01 MXI2 1M
2 429-571-00 National Instruments
77164-02
CBL NI777164-02 MXI2 2M
2 901-291-00
LCOM Inc
WI CBL SER/PAR M/F 25P
DSUB10'
WI CBL SSER/PAR M/F 25P DSUB 10’
2 901-319-00 Ametek
5161586-01
CBL 37P M/M 4’LNG MASTER/SLAVE
PR: FD2060-13-30000 PWS REVISION: 1 A-8
2 854-980-86 Teradyne, Inc. BTI CABLE ASSEMBLY
2 977-354-00 Virginia Panel
510-104-118
BLANK PANEL
2 987-205-00 Virginia Panel CBL, SMP 5004 #1
2 987-205-01 Virginia Panel CBL, SMP 5004 #2
2 987-208-00 Virginia Panel CBL, SYNC RESOLVE STIM/MEAS
2 987-209-00 Virginia Panel CBL, SMP6202 #1
2 987-210-00 Virginia Panel CBL, DCPS 3A2 J13B
2 987-211-00 Virginia Panel CBL, DCPS 3A2 J26B
2 987-214-00 Virginia Panel CBL, DCPS 3A2 J27A
2 987-216-00 Virginia Panel CBL, AC PWR, AC1 TO IRU
2 987-217-00 Virginia Panel CBL, AC PWR, AC2 TO IRU
2 987-218-00 Virginia Panel CBL, AC PWR, ICA TO AC1-AC3/IRU
2 987-219-00 Virginia Panel CBL, AC PWR, AC4-AC6 TO ICA
2 987-223-00 Virginia Panel CBL, AC, XFMR & CLOCKS
2 987-224-00 Virginia Panel CBL, AC, PHASE TO IRU
2 987-225-00 Virginia Panel CBL, AC, MASTER-SLAVE
2 987-226-00 Virginia Panel CBL, SMP2300 #1
2 987-227-00 Virginia Panel CBL ICA-J21,22.35,36 TO 2A10
2 987-251-00 Virginia Panel CBL ASSY J18 TO 2A10A9
2 987-253-00 Virginia Panel CBL,VT1802 TO RECEIVER
2 987-254-00 Virginia Panel CBL ASSY 4044,6006,3171
2 987-255-00 Virginia Panel CBL ASSY 3A2A2J23A-DC STIM
2 987-263-00 Virginia Panel CBL, UUT PWR INHIBIT
2 987-263-01 Virginia Panel CBL, DFI SHUTDOWN
2 987-264-00 Virginia Panel CBL, UUT PWR INHIBIT EXTENSION
2 987-280-00 Virginia Panel CBL ASSY SMB TO BNC 12" JMP
2 987-280-01 Virginia Panel CBL AMPLIFIER TO ATTENUATOR
2 987-280-02 Virginia Panel CBL SLOT 0 EXT CLK TO VM2164
2 987-281-00 Virginia Panel CBL ASSY BNC 66" JMP
2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .