About this file

CDRLS A001 A002 A003 A004 A005 A008 A009 A0010

View the file

Other files for this federal contract opportunity

Other files attached to Synopsis for Contractor Logistics Support (CLS) for the Advanced Digital Test Station (ADTS), newest first.
File Type Posted
FA8519-13-R-30000_ADTS_Questions_Round_11.pdf PDF
FA8519-13-R-30000_ADTS_Questions_Round_10.pdf PDF
FA8519-13-R-30000_ADTS_Questions_Round_9.pdf PDF
FA851913R30000______0007.pdf PDF
Offeror's_Pricing_Model_(REV_4).xlsx XLSX spreadsheet
FA8519-13-R-30000_ADTS_Questions_Round_8.pdf PDF
FA8519-13-R-30000_ADTS_Questions_Round_7.pdf PDF
FA851913R30000______0006.pdf PDF
Offeror's_Pricing_Model_(REV_3).xlsx XLSX spreadsheet
FA851913R30000______0005.pdf PDF
FA851913R30000______0004.pdf PDF
FA851913R30000______0003.pdf PDF
FA8519-13-R-30000_ADTS_Questions_Round_6.pdf PDF
FA8519-13-R-30000_ADTS_Questions_Round_5.pdf PDF
FA851913R30000______0002.pdf PDF
FA8519-13-R-30000_ADTS_Questions_Round_4.pdf PDF
FA8519-13-R-30000_ADTS_Questions_Round_3.pdf PDF
FA8519-13-R-30000_ADTS_Questions_Round_2.pdf PDF
PWS_Revision2.pdf PDF
FA8519-13-R-30000-0001.pdf PDF
FA8519-13-R-30000_ADTS_Questions_Round_1.pdf PDF
Sheppard_Wage_Determination_-__-_10-18-2013.pdf PDF
FA851913R30000.pdf_-__-_10-21-2013.pdf PDF
Contract_Data_Requirements_Listings_-__-_04-17-2013.pdf PDF
Tinker_Wage_Determination_-__-_10-18-2013.pdf PDF
Attachment_5_-_Present _Past_Performance_Quest.doc_-__-_08-28-2013.doc DOC document
Attachment_6_-_Offeror's_Pricing_Model.xlsx_-__-_08-28-2013.xlsx XLSX spreadsheet
Attachment_1_-_FACTS_Sheet.docx_-__-_08-28-2013.docx DOCX document
Attachment_4_-_Consent_Form.docx_-__-_08-28-2013.docx DOCX document
Performance_Work_Statement_-__-_09-24-2013.pdf PDF
Attachment_3_-_Transmittal_Letter.docx_-__-_08-28-2013.docx DOCX document
Attachment_2_-_Client_Authorization_Letter.docx_-__-_08-28-2013.docx DOCX document
Ellsworth_Wage_Determination_-__-_10-18-2013.pdf PDF
DD_Form_254_Security_-__-_04-10-2013.pdf PDF
Appendix_B_-__-_04-17-2013.doc DOC document
Robins_Wage_Determination_-__-_10-18-2013.pdf PDF
Appendix_C_-__-_04-17-2013.doc DOC document
Dyess_Wage_Determination_-__-_10-18-2013.pdf PDF
Data_List_for_ADTS_Program.pdf PDF
GFE_Spares_for_the_ADTS_Program.pdf PDF
ADTS_RFI_QA.pdf PDF
Response_Due_Date_Extension.pdf PDF
A006_GIDEP_ASA.pdf PDF
ADTS_Request_for_Industry_Review_12_Dec.doc DOC document
A007_Response_to_GIDEP_ASA.pdf PDF
Data_List_for_ADTS_Program_10_Dec.pdf PDF
FD2060-13-30000_PWS_10_Dec.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

B-1B ADTS FD2060-13-30000

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001

CONTRACTOR'S PROGRESS, STATUS, AND MANAGEMENT

REPORT

NONE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-80227 PWS para 4.1, 4.4.1, and 4.7.5 WNAAB

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED MTHLY 60 DAYS ARO

a. ADDRESSEE

b. COPIES

8. APP CODE

D

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

5TH MTHLY Reg Repro

16. REMARKS PROGRAM MANAGER 1

BLOCK 14:

DATA DELIVERY TO WNKBBA SHALL BE WITHOUT ENCLOSURE.

NOTE:

DATA SHALL BE SUBMITTED "ELECTRONICALLY" IN MICROSOFT OFFICE FORMAT.

AFLCMC/WNAAB

ENGINEER 1

AFLCMC/WNAEA

EQUIPMENT SPECIALIST 1

AFLCMC/WNAAA

CONTRACTING 1

AFLCMC/WNKBBA

15. TOTAL ▬▬▬▬► 4

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DAVID RINGLEY, WNAEA

1 Nov 2012

BARABARA BASS, WNABB

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER FNCL

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

B-1B ADTS FD2060-13-30000

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 DEPOT MAINTENANCE COST REPORT NONE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-FNCL-80462 PWS para 4.2.3 WNAAB

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD REQUIRED SEMIA BLOCK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

D

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

A BLOCK 16 BLOCK 16 Reg Repro

16. REMARKS PROGRAM MANAGER 1 1 1

BLOCKS 11/12/13:

FIRST SUBMISSION OF REPORT SHALL BE SUBMITTED 180 DAYS ARO. SUBSEQUENT

DELIVERIES SHALL BE MADE SEMI-ANNAUL (EVERY 6 MONTHS) THROUGHOUT THE CONTRACT

PERIOD OF PERFORMANCE. THE GOVERNMENT WILL HAVE FIVE (5) WORKING DAYS TO

COMMENT ON SUBMITTED REPORTS. THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS

TO ADDRESS/INCORPORATE GOVERNMENT COMMENTS AND RE-SUBMIT REVISED REPORT.

ENGINEER 1 1

EQUIPMENT SPECIALIST 1 1

15. TOTAL ▬▬▬▬► 3 4 1

DAVID RINGLEY, WNAEA

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER QCIC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

B-1B ADTS FD2060-13-30000

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003 FAILURE AND ANALYSIS TRACKING REPORT NONE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-QCIC-80131 PWS para 4.2.4 WNAAB

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD REQUIRED QRTLY BLOCK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

D

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

A BLOCK 16 BLOCK 16 Reg Repro

16. REMARKS PROGRAM MANAGER 1 1

BLOCK 7:

WAWF SHALL BE UTILIZED.

BLOCKS 11/12/13:

FIRST SUBMISSION OF REPORT SHALL BE SUBMITTED 90 DAYS ARO. SUBSEQUENT DELIVERIES

SHALL BE MADE QUARTERLY THROUGHOUT THE CONTRACT PERIOD OF PERFORMANCE. THE

GOVERNMENT WILL HAVE FIVE (5) WORKING DAYS TO COMMENT ON SUBMITTED REPORTS.

THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS TO ADDRESS/INCORPORATE

GOVERNMENT COMMENTS AND RE-SUBMIT REVISED REPORT.

ENGINEER 1 1 1

EQUIPMENT SPECIALIST 1 1 1

15. TOTAL ▬▬▬▬► 3 4 2

DAVID RINGLEY, WNAEA

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

B-1B ADTS FD2060-13-30000

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A004 TECHNICAL REPORT, STUDY/SERVICES NONE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B PWS para 4.3 and 4.4.2 WNAEA

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD REQUIRED BLOCK 16 BLOCK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

D

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

A BLOCK 16 BLOCK 16 Reg Repro

16. REMARKS PROGRAM MANAGER 1 1

BLOCKS 10/11/12/13:

PWS PARAGRAPH 4.3:

FIRST SUBMISSION OF REPORT SHALL BE SUBMITTED 180 DAYS ARO. SUBSEQUENT

DELIVERIES SHALL BE MADE SEMI-ANNUAL THROUGHOUT THE CONTRACT PERIOD OF

PERFORMANCE. THE GOVERNMENT WILL HAVE TEN (10) WORKING DAYS TO COMMENT ON

SUBMITTED REPORTS. THE CONTRACTOR SHALL HAVE TEN (10) WORKING DAYS TO

ADDRESS/INCORPORATE GOVERNMENT COMMENTS AND RE-SUBMIT REVISED REPORT.

PWS PARAGRAPH 4.4.2:

REPORT SHALL BE SUBMITTED WITHIN TEN (10) WORKING DAYS OF COMPLETING AN ON-SITE

TECHNICAL SUPPORT VISIT.

ENGINEER 1 1 1

DAVID RINGLEY, WNAEA

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER ILSS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

B-1B ADTS FD2060-13-30000

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A005 TRAINING MATERIALS NONE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ILSS-80872 PWS para 4.4.3 WNAAB

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD REQUIRED BLOCK 16 BLOCK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

D

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

A BLOCK 16 BLOCK 16 Reg Repro

16. REMARKS PROGRAM MANAGER 1 1 1

BLOCKS 10/11/12/13:

PWS PARAGRAPH 4.3:

THE TRAINING MATERIALS SHALL BE SUBMITTED NLT FIFTEEN (15) WORKING DAYS PRIOR TO

THE SCHEDULED TRAINING EVENT. THE GOVERNMENT WILL HAVE FIVE (5) WORKING DAYS TO

COMMENT ON SUBMITTED TRAINING MATERIALS. THE CONTRACTOR SHALL HAVE FIVE (5)

WORKING DAYS TO ADDRESS/INCORPORATE GOVERNMENT COMMENTS AND RE-SUBMIT

REVISED TRAINING MATERIALS.

DAVID RINGLEY, WNAEA

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER SAFT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

B-1B ADTS FD2060-13-30000

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A008 ACCIDENT/INCIDENT REPORT

TICR/DART (TOTAL INCIDENT CASE RATE/DAYS AWAY

RESTRICTED TRANSFER)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SAFT-81563/T PWS Para.4.7.2 WNAAB

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD REQUIRED AS REQ AS REQ

a. ADDRESSEE

b. COPIES

8. APP CODE

D

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

N/A AS REQ AS REQ Reg Repro

16. REMARKS PROGRAM MANAGER

BLOCK 4: DID PARA 2. C. THRU K. NOT REQUIRED. OTHER PERTINENT INFORMATION FOR PARA

2.L. SHALL BE EXPANSION OF DAYS OFF DUE TO INJURY. THIS SHALL BE THE SAME

INFORMATION THE CONTRACTOR REPORTS ON OSHA 300 LOG. CONTRACTOR FORMAT

ACCEPTABLE.

BLOCK 7: THE GOVERNMENT WILL ACCEPT RECEIVING REPORT THROUGH WAWF.

CONTRACTOR SHALL SUBMIT THE RECEIVING REPORT UPON FINAL SUBMISSION.

BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD

CONTRACTORS ONLY. OTHER REQUESTS SHALL BE REFERRED TO THE CONTRACT

MANAGEMENT TEAM, OFFICE SYMBOL (AFLCMC/WNKBBA), STREET ADDRESS (235 BYRON ST.,

SUITE 19A), ROBINS AFB, GA 31098.

BLOCKS 10-13: CONTRACTOR SHALL SUBMIT ANNUAL UPDATES AS REQUIRED.

BLOCK 14: PROCURING OFFICER(S) E-MAIL ALONG WITH INTEGRATED PRODUCT TEAM E-MAIL

DISTRO LIST WILL BE PROVIDED AS REQUIRED. ELECTRONIC MEDIA SHALL BE PROVIDED BY

CD/DVD MEDIA IN MICROSOFT OFFICE COMPATIBLE FORMAT.

AFLCMC/WNAAB 1

ENGINEER

AFLCMC/WNAEA 1

EQUIPMENT SPECIALIST

AFLCMC/WNAAA 1

CONTRACTING

AFLCMC/WNKBBA 1

DCMA/ACO 1

15. TOTAL ▬▬▬▬► 5

DAVID RINGLEY, WNAEA

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER ENVR

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

B-1B ADTS FD2060-13-30000

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A009 ENVIRONMENTAL HEALTH AND SAFETY PLAN (HSP) SAFETY AND HEALTH PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ENVR-81375 APPENDIX C 78 ABW/SEG

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD REQUIRED BLOCK 16 BLOCK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

D

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

A BLOCK 16 BLOCK 16 Reg Repro

16. REMARKS PROGRAM MANAGER 1 1

BLOCK 4 & 5:

CONTRACTOR FORMAT IS ACCEPTABLE. CONTRACTOR SHALL SUBMIT A SAFETY AND HEALTH

PLAN IN ACCORDANCE WITH THE ELEMENTS LISTED IN APPENDIX C.

THE GOVERNMENT WILL ACCEPT THE RECEIVING REPORT THROUGH WAWF. CONTRACTOR

SHALL SUBMIT THE RECEIVING REPORT UPON FINAL SUBMISSION.

BLOCK 8, 10-12:

CONTRACTOR SHALL SUBMIT A HEALTH AND SAFETY PLAN WITHIN 10 WORKING DAYS AFTER

CONTRACT AWARD. WRITTEN GOVERNMENT ACCEPTANCE/COMMENTS WILL BE WITHIN 10

WORKING DAYS AFTER RECEIPT OF DATA. CONTRACTOR FINAL SUBMISSION SHALL BE

SUBMITTED WITHIN 10 WORKING DAYS OF RECEIVING GOVERNMENT COMMENTS. ACCEPTANCE

BY THE GOVERNMENT IS REQUIRED PRIOR TO FORMAL DISTRIBUTION.

BLOCK 9:

DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS

ONLY. OTHER REQUESTS SHALL BE REFERRED TO THE CONTRACT MANAGEMENT TEAM,

AFLCMC/WNKBBA, 235 BYRON ST., SUITE 19A, ROBINS AFB, GA 31098.

BLOCK 11, 13:

IF, DURING THE PERFORMANCE OF THIS CONTRACT, CHANGES TO THE SAFETY AND HEALTH

PLAN ARE REQUIRED, SUBMIT THE REVISED SAFETY AND HEALTH PLAN TO AFLCMC/WNKBBA

(PCO OFFICE SYMBOL) AND THE SAFETY OFFICE, 78 ABW/SEG. PROCEDURES IDENTIFIED FOR

BLOCKS 8, 10-12 WILL APPLY.

PROCUREMENT OFFICER(S) E-MAIL ALONG WITH INTEGRATED PRODUCT TEAM E-MAIL DISTRO

LIST WILL BE PROVIDED AS REQUIRED. ELECTRONIC MEDIA SHALL BE PROVIDED BY CD/DVD

MEDIA IN MICROSOFT OFFICE COMPATIBLE FORMAT.

ENGINEER 1

78 ABW/SEG 1 1

675 SEVENTH ST

BLDG 707

ROBINS AFB, GA 31098

CONTRACTING 1 1

AFLCMC/WNKBB

15. TOTAL ▬▬▬▬► 3 5

DAVID RINGLEY, WNAEA

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER QCIC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

B-1B ADTS FD2060-13-30000

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A010 QUALITY PROGRAM PLAN (QPP) CONTRACTOR'S QUALITY CONTROL PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-QCIC-81722 PWS para. 4.7.7 WNAAB

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD REQUIRED AS REQ BLOCK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

B

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

N/A 15 DAYS ARO AS REQ Reg Repro

16. REMARKS PROGRAM MANAGER 1 1

BLOCK 7: WAWF ACCEPTOR:

THE GOVERNMENT WILL ACCEPT THE RECEIVING REPORT THROUGH WAWF. CONTRACTOR

SHALL SUBMIT RECEIVING REPORT UPON EACH SUBMISSION.

BLOCK 11:

CONTRACTOR SHALL SUBMIT QPP 15 DAYS AFTER CONTRACT AWARD AND AS CHANGES

OCCUR.

THE PROCURING CONTRACTING OFFICER(S) E-MAIL ALONG WITH INTEGRATED PRODUCT TEAM

E-MAIL DISTRO LIST WILL BE PROVIDED AS REQUIRED. ELECTRONIC MEDIA SHALL BE

PROVIDED IN MICROSOFT OFFICE COMPATIBLE FORMAT.

AFLCMC/WNKBB

15. TOTAL ▬▬▬▬► 3 5

DAVID RINGLEY, WNAEA

File details come from the government source that posted it. Updated .