Response_to_Questions_Posted_15_June_2017.pdf

PDF 53 KB Posted

Attached to
Computed Radiography Imaging System
Solicitation number
FA8517-17-R-0003
Issued by

About this file

Response to Questions Posted 15 June 2017.

View the file

Other files

File Type Posted
FA8517-17-R-0003-0002.pdf PDF
Response_to_Questions_Post__2__15_June_2017.pdf PDF
Response_to_Questions_Posted_14_June_2017.pdf PDF
Questions_12_Juen_2017.pdf PDF
FA8517-17-R-0003-0001.pdf PDF
Response_to_Questions.pdf PDF
CDRL_A001-A004.pdf PDF
CDRL_A007.pdf PDF
AFMC_Form_158.pdf PDF
Technical_Manual_33B-1-2_Appendix_1.pdf PDF
Transportation_Form_1653.pdf PDF
TM-86-01P.pdf PDF
Appendix_2.pdf PDF
Product_Description_PD-AFLCMC-EZPT-17-01.pdf PDF
FA8517-17-R-0003.pdf PDF
Appendix_3.pdf PDF
CDRL_A005-A006.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1) When is the Commercial Manual to be submitted?

a) On page 3 of the RFP under the LPTA process, para 1. – it says to include a commercial manual or specification sheet with your proposal.

b) Per page 46 of RFP – Para C. Volume III, Commercial Manual – says it should be provided at the time of proposal.

c) On page 45 of the RFP, in bold text, between paragraphs A and B, it says, “Volumes I & II of the RFP are due no later than 19 June 2017”. Vol I is the completed RFP and Vol II is the Technical Information Package. The Commercial Manual is Vol III, so it would appear that is is not required with the proposal.

d) CDRL A001 says draft of the Commercial Manual is due to Engineering with the Pre‐ production Unit.

2) Is the Commercial Manual the same as our Operations Manual?

3) In the Product Description (PD), page 13, para 6.1 – Does commercial operation and maintenance instructions equal the Commercial Manual referenced in CDRL A001?

4) In the Product Description (PD), page 13, para 6.1 – Does the CR System’s Operation and Technical Manual equal the Technical Manual referenced in CDRL A007?

5) Can Bid packages be submitted via unencrypted email? Or must they be submitted hard copy if we do not have encrypted email?

Answers to the above questions.

1. The Commercial Manual is due when proposals are due 19 June 2017 at 4:00 PM EDST.

2. Included with the system would be the commercial operations manual (how to Use the system), the user‐level maintenance instructions (how to maintain The system), and the illustrated parts breakdown (all separate components That make up the system). This information may be in one document or Separate documents.

3. Same as #2 above.

4. Same as #2 above.

5. Source Selection Information must be encrypted. As outlined on page 45 of the solicitation, Communications paragraph.