Q&A_2.pdf

PDF 183 KB Posted

Attached to
F-16 Data Entry Display
Solicitation number
FA8251-19-R-0005
Issued by

About this file

Question and Answer

View the file

Other files

File Type Posted
Post_award_notification_memo.pdf PDF
DED_PWS_V_2.0.pdf PDF
Q&A_4.pdf PDF
FA825119R0005_______0002.pdf PDF
PWSCURRENT.pdf PDF
Q&A_3.pdf PDF
FA825119R0005_______0001.pdf PDF
Q&A_1.pdf PDF
Section_L_Price_Only_QR__(1).pdf PDF
DRILS_Technician_Guide.pdf PDF
RDL.pdf PDF
FA825119R0005.pdf PDF
PWS.pdf PDF
Packaging.pdf PDF
CAV_AF_Requirements.pdf PDF
Transportation.pdf PDF
SOW.pdf PDF
CDRL.pdf PDF
Section_M_Price_Only_QR__(1).pdf PDF
RepairQualificationRequirements.pdf PDF
Wage_Determniation.pdf PDF
IUID_Requirments.pdf PDF
Special_Packaging_Instructions.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question: The differences between old and new PWS for F-16 dDED standard repair new says subjected to vibration testing to include 30 minutes of operation, this replaces old language which discusses ESS at this point, what is the frequency? Or frequency range?

The PWS doesn't say anything about what happens to those units that fail vibration test same language about p7 and p8 connectors being replaced then standard repair is performed but how do you know when p7 and p8 connectors have been replaced?

Enhanced bonding language does this mean all units that require standard repair are to have enhanced bonding as described?

Expanded repair new language doesn't say when to use expanded repair?

Joint inspection implies contractor and government inspection team/s together at the same time and place sign the inspection sheet to show government acceptance. Does this mean in Ogden? Does this mean each time repaired assets are presented to the government? There is no difference in language from this PWS and the last one.

Answer:

1. Vibration testing frequency range 50 - 50Khz @ 10g . Failing vibration test causes repair/rework for broken connections.

2. P7 and P8 determination requires visual inspection

3. All units that require standard repair are to have enhanced bonding as described.

4. Expanded repair requires p7 and p8 connector replacement.

5. DCMA will inspect testing onsite, either during or after contractor testing, to verify PWS compliance