CDRL.pdf

PDF 1 MB Posted

Attached to
F-16 Data Entry Display
Solicitation number
FA8251-19-R-0005
Issued by

About this file

CDRLs

View the file

Other files

File Type Posted
Post_award_notification_memo.pdf PDF
DED_PWS_V_2.0.pdf PDF
Q&A_4.pdf PDF
FA825119R0005_______0002.pdf PDF
PWSCURRENT.pdf PDF
Q&A_3.pdf PDF
FA825119R0005_______0001.pdf PDF
Q&A_2.pdf PDF
Q&A_1.pdf PDF
PWS.pdf PDF
Packaging.pdf PDF
CAV_AF_Requirements.pdf PDF
Transportation.pdf PDF
Section_L_Price_Only_QR__(1).pdf PDF
DRILS_Technician_Guide.pdf PDF
RDL.pdf PDF
FA825119R0005.pdf PDF
SOW.pdf PDF
Section_M_Price_Only_QR__(1).pdf PDF
RepairQualificationRequirements.pdf PDF
Wage_Determniation.pdf PDF
IUID_Requirments.pdf PDF
Special_Packaging_Instructions.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved 0MB No. 0704-0 188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewin5 instructions searching existing data sources, gathering and maintaining the data needed, and campleting and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, includin suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-01551, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law no person shall be sublect to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please DO NOT RE1'URN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

listed in Block E.

A. CONTRACT UNE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

MGM

TOP TM OTHER

T

D. SYSTEM/ITEM (GUB -18-063)

Data Entry Display Group (DED Group)

E. CONTRACT/PR NO.

FD2020- 19-00006

F. CONTRACTOR

1. DATA ITEM NO.

AOl

2. TITLE OF DATA ITEM

Commercial Asset Visibility Air Force (CAV AF)/ Government Furnished Material Report

3. SUBTITLE

CAV AF End Item Reporting for CFM

4. AUTHORITY (Dare Acqu/sit/on Document No.)

DI-MGMT-81634C/T

5. CONTRACT REFERENCE

PWS Paragraphs: 9.1, 10

6. REQUIRING OFFICE

416 SCMS/GUMAC

7. DD 250 REQ

N/A

9. 01ST STATEMENT

REQUIRED

N/A

10. FREQUENCY

SEE BLK 16

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMMON

aft Final

16. REMARKS

1. BLK1O:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or one business day of maintenance action JAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site lAW CAY AF Contractor User's Guide.

2. BLK 11: Data shall be current within one (1) business day of last End Item maintenance occurrence and reflect an accurate representation/status of all assets at -a contractor for repair.

3. BLK 12: Date of first submission shall be within one business day following a maintenance transaction after the contract award date and Government training as specified lAW CAY AF Users Guide.

4. BLK 13: Date of subsequent submittal(s) shall be within one (1) business day of each maintenance action/occurrence.

416 SCMS/ 1

GTJMAC

6070 Gum LN

Bldg.], 1213 Attn: DED Group Logistic Mgt.

Specialist (LMS)

Hill AFB, UT 84056-5825

SEE BLK 16

15.TOTAL 0 1 0

2018 y20

17. PRICE GROUP

NSP

18. ESTIMATED

TOTAL PRICE

0.00

DO FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. ] Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) 0MB No. 0704-0 188

The public reporting burden for this cotection of information is estimated to average 10 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports 10701-0188), 1215 Jefferson Davis Highway, Suite 12D4, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid QIB Please DO NOT RE1'URN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY: PSESS

TOP TM OTHER

D. SYSTEM/ITEM (GUB-18-063)

Data Entry Display Group (DED Group)

E. CONTRACT/PR NO.

FD2020-19-00006

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM Production Monthly Status Report

4. AUTHORITY (Dare Acquisirion Documenr No.)

DI-PSSS-81995/T

5. CONTRACT REFERENCE

PWS Paragraphs: 9.2, 10

6. REQUIRING OFFICE

416 SCMS/GTJMAC

7. DO 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

Monthly

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

3. APP CODE

N/A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SEE BLK 16

Draft

Final

16.REMARI(S

1. Reports shall continue to be be submitted by the contractor unless the requirement is tenninated by the F-16 CDEEU Logistics Management Specialist (LMS) and the Production Management Specialist (PMS). The CDM Production

2. BLK 3:

a. The Monthly Status Report that is submitted for the final reporting period on contract shall be annotated °F1NAL REPORT'1.

3. BLK4:

a. The contractor shall submit the CDM Production Monthly Status Report lAW TABLE I format

b. The contractor shall submit data for EACH repair location, including subcontractor facilities, if applicable, for which the contractor produced assets during the reporting period.

c. The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities, if appliOable), shop floor, bond room and/or receiving/shipping docks, etc., for each repair.

4. BLK7, 10, 14:

a. DISTRIBUTION shall be JAW BLK 14a of this CDRL.

b. The contractor shall submit a Letter of Transmittal (LT) via e-mail to the following e-mail addresses:

1. james.fleshman.1us.af.mil

2. christopher.chase@us.af.mil

c. The contractor shall submit the Annual Government Property Inventory Report via e-mail to the following e-mail addresses:

1. james.fleshman. 1 @us.af.mil

2. christopher.chase@us. afmil

5. BLK 9: The Distribution Statement, Export Control Warning and Destruction Notice shall be placed on the first sheet of each document and be located in a conspicuous location.

416SCM5/ 1

GUMAC

6070Gum LN

Bldg. 1213

Attn::DED Group

Logistic Mgt.

Specialist (LMS)

Hill AFB, UT 84056-5825

SEE BLK 16

416 SCMS/

GUMAA

Bldg. 1213

Attn:i DED Group Prod. Mgt. SPEC.

Hill AFB, UT 84056-5825

SEE BLK 16

15. TOTAL 0 2 0

G. PREPARED BY Q

Nila Dagsen (Contractor Data Mana r)

H. DATE

24 July 2018

I. APPROBY

JameFéshn (LO Mgt. SPEC.)

J.DATE

24 July 2018

17. PRICE GROUP

NSP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER

D. SYSTEM/ITEM (GUB-18-063) E. CONTRACT/PR NO. F. CONTRACTOR

Data Entry Display Group (DED Group) FD2020-19-00006

16. REMARKS (Continued)

a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administration or Operational Use). (20 July 2018). Other requests for this document shall be referred to (416 SCMS/GUMAC, Hill

AFB, UT 84056-5826).

EXPORT CONTROL WARNING: All technical documents/data @rinted, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

b. EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Actof 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate JAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

6. BLKs 10, 11, 12, 13:

a. Delivery of CDM Production Monthly Status Report CANNOT be deferred.

b. The CDM Production Monthly Status Report shall be provided within five (5) calendar date.

7zà arPREPARED BY: Ni a Dagsen (Contractor Data Manager) Date: 24 July 2018

APPROVED

Date: 24 July days of the previous month's last

James Fleshman (LOG Mgt. SPEC.)

DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages

CONTRACT DATA REQUIREMENTS UST

The public reporting burden for this collection of itformation is estimated to average 110 hours per response, including th data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Ser other aspect of this collection of information, includina suggestions for reducing the burden, to Department of Defense, Information Operations and Reports 0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22 notwithstanding any other provision of aw no person shall be subject to any penalty for failing to comply with a collection 0MB control number. Please DO NOT RE1'URN your form to the above address. Send completed form to the Governmett listed In Block E.

Form Approved 0MB No. 0704-0188 for reviewing instructions, sea be

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY: MGMT

TOP TM OTHER ______________________________

D. SYSTEM/ITEM (GUB-18-063)

Data Entry Display Group (DED Group)

E. CONTRACT/PR NO.

FD2020- 19-00006

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Government Property Inventory Report

3. SUBTITLE

Annual Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80441C/T

5. CONTRACT REFERENCE

PWS Paragraphs: 9.3, 10

6. REQUIRING OFFICE

416 SCMS/GUMAC

7. DO 250 REQ

LT

9. 01ST STATEMENT

REQUIRED

10. FREQUENCY

Annually

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft Final tag Repro

16. REMARKS

1. BLK4: Paragraph2. Content.

a. Change 2. M.

FROM: Unit Acquisition Cost TO: Unit Acquisition Cost (CAP ONLY)

b. Change 2. T.

FROM: Date of Transaction/Date of Acquisition TO: Date contractor received Government Furnished Property (GFP)

c. Change2.U.

FROM: Date Placed in Service TO: First (1st) Date in Contractor Depot Maintenance Production

(CDMP) Repair

2. BLK7, 10, 14:

a. The contractor shall submit a Letter of Transmittal (LT) and the

Government Property Inventory Annual Report via e-mail to the following e-mail address: james.fleshman. 1 @us.af.mil

b. The Reporting Period is one (1) year.

3. BLK 9: The Distribution Statement, Export Control Warning and Destruction Notice shall be placed on the first sheet of each document and be located in a conspicuous location.

a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administration or Operational Use). (20 July 2018). Other requests for this document shall be referred to (416 SCMS/GIJMAC, Hill AFB, UT 84056-5826).

EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

b. EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, etseq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate lAW provisions of DoD Directive 5230.25.

416 SCMS/ 1

GTJMAC

6070 Gum LN

Bldg. 1213 Attn: DED Group

Logistic Mgt.

Specialist (LMS) Hill AFB, UT 84056-5825

SEEBLK16

15.TOTAL

G. PREPARED BY)-1 .,/)

Nila Dagsen (Contractor Data Manager)

H. DATE

24 July 2018

I. APPROVEOJY ,A

James Nushman (LOG Ngt. SPEC.)

J.DATE

24 July 2018

17. PRICE GROUP

NSP

18. ESTIMATED

TOTAL PRICE

1)1) 1-0KM 1423-1, 1-1±13 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages

CONTRACT DATA REQUIREMENTS

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TOP TM OTHER MGMT

0. SYSTEM/ITEM (GUB-18-063) E. CONTRACT/PR NO. F. CONTRACTOR

Data Entry Display Group (DED Group) FD2020- 19-00006

16. REMARKS (Continued)

4. BLK 11: The data shall be representative of the Contractor's Internal Property ControL System and shall be current as of the last day of the annual reporting period. If period of performance begins on 13 September 2018, the first (1st) annual reporting period ends 12 September 2019). If the Government Property Inventory Report is requested outside of an annual cadence, the data shall be current as of the date requested by the Government.

5. BLKs 12, 13: The Annual Government Property Inventory Report shall be delivered to the Government NLT seven (7) calendar days of the end of the first (1st) reporting period and annually thereafter, or within seven (7) calendar days of Government request.

PREPARED BY: Nila Dagsen (Contractor Data Manager) Date: 24 July 2018

APPROVED BY: James Fleshman (LOG Mgt. SPEC.)

Date: 24 July 2018 o reporting burden for this collection of information is estimated to average 110 he ceo, tethering end maintaining the data needed, and completing and reviewing the ect ol this collection of information, including suggestions for reducing the burdei in Operations and Reports 0701-0188), 1215 Jefferson Davis Highway, Suit andino any other provision of aw, no peroon shall be subleot to any penalty for failir to Department of Defense, 1204, Arlington, VA 2 to comply with a collection ted form to the Government

Form Approved 0MB No. 0704-0188 for reviewing instructions, sea or

A. CONTRACT UNE ITEM NO. B. EXHIBIT

A

C. CATEGORY: sc

TOP TM OTHER _____________________________

D. SYSTEM/ITEM (GUB-18-063)

Data Entry Display Group (DED

E. CONTRACT/PR NO.

FD2020-19-00006

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Maintenance Data Collection Record (MDCR)

3. SUBTITLE

Defense Repair Information Logistics System

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-82003/T

5. CONTRACT REFERENCE

PWS Paragraphs: 9.4, 10

6. REQUIRING OFFICE

416 SCMS/GUMAC

7. DO 250 REQ

LT

9. 01ST STATEMENT

REQUIRED

N/A

10. FREQUENCY

SEE BLK 16

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft Final

Reg Repro

16. REMARKS

1. NOTE: Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

2. BLK 4: See attached Defense Repair Information Logistics System (DRILS) Technician Guide for instruction.

Data shall be generated by the contractor when maintenance is accomplished.

3. BLKs 7, 8, 14: Letter of Transmittals (LTs) shall be submitted the last day of the month in which transactions occurred, covering all reports transmitted electronically for the preceding month. LTs shall be submitted via e-mail to the following e-mail address: james.fleshman.1@us.af.mil

4. BLK 9: No Distribution Statement is required as data shall be entered into DRILS, a maintenance data database. Reference DRILS Field Technician Guide dated, 2003.

5. BLKs 10, 11, 12, 13: Data shall be entered into DRILS as the data is generated in real time.

416 SCMS/ 1

GUMAC

6070 Gum LN Bldg. 1213 Attn: DED Group Logistics Mgt.

Specialist (LMS) Hill AFB, UT 84056-5825

SEE: BLK 16

15.TOTAL 0 1 0

G. PREPARED BY

Nila Dagsen (Contractor Data Ma ager)

H. DATE

24 July 2018

I. APBY

Jam lshman (LOG Mgt. SPEC.)

J.DATE

24 July 2018

17. PRICE GROUP

NSP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST I Form Approved (1 Data Item) 0MB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports j07O1-O1BS), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law no person shall be subject to any penalty for failing to comply with a collection of information if t does not display a currently valid 0MB control number. Please DO NOT RE'I'URN your form to the above address. Send completed form to the Government lssi.iing Contracting Officer for the Contract/PR No.

listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

MISC

TDP TM OTHER _____________________________

D. SYSTEM/ITEM (GUB-18-063) j Data Entry Display Group (DED GroL

E. CONTRACT/PR NO.

FD2020-19-00006

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Contractor's Counterfeit Prevention Plan

3. SUBTITLE

CPP

4. AUTHORITY (Date Acquisition Document No.)

DI-MISC-81732/T

5. CONTRACT REFERENCE

PWS Paragraphs: 9.5, 10

6. REQUIRING OFFICE

416 SCMS/GTJMAC

7. DD 250 REQ

DD

9. 01ST STATEMENT

REQUIRED

10. FREQUENCY

ONE TIME

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft Final eg

Repro

16. REMARKS

1. NOTE:

a. Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

b. All data deliveries shall be submitted in the English language.

2. BLKs 7, 8, 14:

a. The contractor shall submit DD Form 250 (Material Inspection and

Receiving Report) electronically via the Internet to iRAPT (WAWIF) website address: https://wawf.eb.mil using DODAAC FA825 1. MARK FOR: Address in block 14a.

b. The contractor shall submit a Letter of Transmittal (LT) and the Contractors Counterfeit Protection Plan (CPP) via e-mail to the following e-mail address: james.fleshman.l@us.af.mil

2. BLKs 8, 10, 11, 12, 13: The contractor shall deliver the Counterfeit prevention Plan (CPP) NLT thirty (30) calendar days after contract award. The Government comments will be provided to the contractor within fourteen (14) calendar days after receipt. The contractor shall resubmit the CPP NLT seven (7) calendar days after receipt of Government comments.

3. BLK 9: The Distribution Statement, Export Control Warning and Destruction Notice shall be placed on the first sheet of each document and be located in a conspicuous location.

a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administration or Operational Use). (20 July 2018). Other requests for this document shall be referred to (416 SCMS/GUMAC, Hill AFB, UT 84056-5826).

EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

416 SCMS/

GUMAC

6070 Gum LN Bldg. 1213 Attn: DED Group Logistics Mgt.

Specialist (LMS) Hill AFB, UT 84056-5825

SEEBLK 16

15.TOTAL 0 1 0

G. PREPARED BY2z 9 Nila Dagsen (Contractor Data Man er)

H. DATE

24 July 2018

I. APçBJ.4JamesF1T11 an (LOcMgt. SPEC.)

J.DATE

24 July 2018

17. PRICE GROUP

NSP

'18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

M

A TOP TM OTHER

D. SYSTEM/ITEM (GUB-18-063) E. CONTRACT/PR NO. F. CONTRACTOR

Data Entry Display Group (DED Group) FD2020- 19-00006

16. REMARKS (Continued)

b. EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate JAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or recOnstruction of the document.

PREPARED BY: Nila Dagsen(Contractor Data Manager) Date: 24 July 2018

APPROVED BY: James Fleshman (LOG Mgt. SPEC.)

COMTRACT DATA FIEQUIREMENTS LIST

en for this collection of information is eotirrrated to average 110 ho eron shell be oubject to your form to the above

Form Approved 0MB No. 0704-0188 for reviewing instructions, sea or

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY: MGMT

TOP TM OTHER

D. SYSTEM/ITEM (GUB-18-063)

Data Entry Display Group (DED Group)

E. CONTRACT/PR NO.

FD2020-19-00006

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Item Unique Identification (IUID) Marking Plan

3. SUBTITLE

IUID Marking Plan

4. AUTHORITY (Data Acquisition Document No.1

DI-MGMT-81803/T

5. CONTRACT REFERENCE

PWS Paragraphs: 9.6, 10

6. REQUIRING OFFICE

416 SCMS/GUMAC

7. DO 250 REQ

DD

5. 01ST STATEMENT

REQUIRED

10. FREQUENCY

SEE BLK 16

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

aADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. NOTE:

a. Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

b. All data deliveries shall be submitted in the English language.

2. BLK 4: Contractor's format is acceptable using Microsoft Office 2013 compatible products (Word, Powerpoint) or Adobe Portable Document Format

(PDF).

3. BLKs 7, 8, 14: DCMA inspector/acceptor may request a hard copy at the contractor's facility during the time of inspection and acceptance.

a. The contractor shall submit DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil using DODAAC FA825 1. MARK FOR: Address in block 14a

b. The contractor shall submit a Letter of Transmittal (LT) and the IUID Marking Plan via e-mail to the following e-mail address:

james.fleshman.1@us.af.mil

4. BLKs 8, 10, 11, 12, 13: The contractor shall deliver the RJID Plan as required NLT thrity (30) days after contract award. The Government will review and provide comments NLT ten (10) business days following receipt. The contract shall then have ten (10) business days to make correction(s) and resubmit.

5. BLK 9: The Distribution Statement, Export Control Warning and Destruction Notice shall be placed on the first sheet of each document and be located in a conspicuous location.

a. DISTRIBUTION STATEMENT Dc: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administration or Operational Use). (20 July 2018). Other requests for this document shall be referred to (416 SCMS/GUMAC, Hill AFB, UT 84056-5 826).

416 SCMS/ 1 1

GUII\4AC

6070, Gum LN

Bldg. 1213

Attn: DED Group

Logistics Mgt.

SpecIalist (LMS) Hill AFB, UT 84056-5825: - -

SEE BLK 16

15.TOTAL 1 1 0

G PREPARED BY 74 14

2018 f::5:L'- 24 July 2018

17. PRICE GROUP

NSP

18. ESTIMATED

TOTAL PRICE

Lit) 1-UKIVI i4Z -I, I-t ZOU1 I-REVIOUS EDI11ON MAY BE USED. Page 1 of 2 Pages

CONTRACT DATA REQUIREMENTS L

A. CONTRACT UNE ITEM NO. I B. EXHIBIT C.

A j TOP TM OTHER

0. SYSTEM/ITEM (GUB-18-063) E. CONTRACT/PR NO. F. CONTRACTOR

Data Entry Display Group (DED Group) FD2020-19-00006

16. REMARKS (Continued)

EXPORT CONTROL WARNING: All technical documents/data @rinted, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

b. EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate JAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in; DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

PREPARED BY: Nila agsen (Contractor Data Manager) APPROVED BY: James Fleshman (LOG Mgt. SPEC.)

Date: 24 July 2018 Date: 24 July 2018

CONTRACT DATA REQUIREMENTS IJST Form Approved (1 Data Item) 0MB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the date needed, and completing and reviewing the collection of information. Send comments regarding this burtien estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports 0701-0185), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of ew no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please DO NOT REfURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY: MGMT

TOP TM OTHER

0. SYSTEM/ITEM (GUB-18-063)

Data Entry Display Group (DED Group)

E. CONTRACT/PR NO.

FD2020-19-00006

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Item Unique Identification (ILJiD) Marking Activity, Validation and Verification Report

3. SUBTITLE

]IUTD Marking Activity & Verification Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81804A/T

5. CONTRACT REFERENCE

PWS Paragraphs: 9.7, 10

6. REQUIRING OFFICE

416 SCMS/GUMAC

7. 00 250 REQ

DD

9. 01ST STATEMENT

REQUIRED

10. FREQUENCY

SEE BLK 16

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEEBLK16

13. DATE OF SUBSEQUENT

SUBMISSION

SEEBLK16

Draft Final

Peg Repro

16. REMARKS

1. NOTE:

a. Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

b. All data deliveries shall be submitted in the English language.

2. BLK 4: Contractor's format is acceptable using Microsoft Office 2013 compatible products (Word, Powerpoint) or Adobe Portable Document Format

(PDF).

3. BLKs 7, 8, 14:

a. The contractor shall submit DD Form 250 (Material Inspection and

Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mii using DODAAC FA8251. MARK FOR: Address in block 14a

b. Contractor shall submit Letter of Transmittal (LT) and the IUTD Marking Activity & Verification Report via e-mail to the following e-mail address:

james.fleshman.1us.af.mil

4. BLKs 8, 10, 11, 12, 13: First submission of information due NLT ninety (90) days after contract award and monthly thereafter. DCMA will review and provide comments in coordination with the F- 16 CDEEU Program Office NLT seven (7) calendar days following receipt. Final report is due NLT seven (7) business days after receipt and incorporation of DCMA comments.

5. BLK 9: The Distribution Statement, Export Control Warning and Destruction Notice shall be placed on the first sheet of each document and be located in a conspicuous location.

a. DISTRIBUTION STATEMENT "D5: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administration or Operational Use). (20 July 2018). Other requests for this document shall be referred to (416 SCMS/GUMAC, Hill AFB, UT 84056-5826).

DCMA 1 1

416 SCMS/ 1 1

GUIVIAC

6070 Gum LN

Bldg. 1213 Attn DED Group Logistics Mgt.

Specialist (LMS) Hill AFB, UT 84056-5825

BLK 16

15.TOTAL 2 2 0

G. PREPARED BY7j 7 , Nila Dagsen (Contractorata

H. DATE

24 July 2018

I. APPROVE Y

James (LOG

J.DATE

1)1) 1-0KM 14Z-1, FEB 2001 PREVIOUS EDITION MAY BE USED.

17. PRICE GROUP

NSP

18. ESTIMATED

TOTAL PRICE

0.00

C.) 24July2018

Page 1 of 2 Pages

CONTRACT DATA REQUIREMENTS

A. CONTRACT LINE ITEM NO. I B. EXHIBIT

A TDP TM OTHER""

D. SYSTEM/ITEM (GUB-18-063) E. CONTRACT/PR NO. F. CONTRACTOR

Data Entry Display Group (DED Group) FD2020-19-00006

16. REMARKS (Continued)

EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

b. EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate JAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.l -R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

PREPARED BY: Nila Dagsen (Contractor Data Manager) Date: 24 July 2018

APPROVED BY: James Fleshman (LOG Mgt. SPEC.)

File details come from the government source that posted it.