FA8224-15-R-0023 _Questions_and_Answers.pdf
PDF 181 KB Posted
- Attached to
- Inventory & Records Management Support Services
- Solicitation number
- FA8224-15-R-0023
About this file
Questions and Answers 27 Jan 15
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Air Force Response to Comments/Questions from Industry
Inventory and Records Management Support Services
FA8224-15-R-0023
Last Updated: 27 January 2015
Below is a list of questions/comments the Air Force has received from industry regarding the
Solicitation FA8224-15-R-0023 posted on 15 January 2015, and the Air Force responses to said questions/comments. Air Force responses are based on the best information available at this time and are subject to change in the event the requirement is amended. Only the Solicitation and
Solicitation Amendments, if issued, should be relied upon while preparing proposals.
1. Industry Question: Will there be an opportunity to visit the location (prebid site visit) to review facilities; determine vehicle/material handling requirements; and converse with the Contracting
Official?
Air Force Response: The government is not hosting a site visit for this solicitation. Please send us your specific questions regarding the vehicle and material handling requirements of the solicitation.
2. Industry Question: Is the operation currently under contract? With whom?
Air Force Response: No, the requirements of this solicitation are not currently provided under a contract.
3. Industry Question: Is there a Collective Bargaining Agreement (CBA) in effect for the current employees?
Air Force Response: No, a CBA is not in place.
4. Industry Question: Will bonding and insurance be required for this contract?
Air Force Response: No.
5. Industry Question: Reference Section L, page 23, paragraph 2.1, Program Structure and
Objectives, Page 24, paragraph 3.2, General Instructions. Will the SSA host a pre bid site visit and conference to allow contractors to see the facility and observe operations to better prepare realistic proposals? If a formal site visit is not planned, can a contractor arrange a visit through the local procurement office?
Air Force Response: The government is not hosting a site visit for this solicitation. Please send us your specific questions regarding the facility and operations.
6. Industry Question: Reference Section L, page 26, Cross Reference Matrix. Question: The reference to paragraph 4.2.1.1 in Section L does not appear in the Section. Only 4.2.1 is shown.
Please clarify the reference
Air Force Response: The Cross Reference Matrix in Section L, table 2 is revised to remove a reference to paragraph 4.2.1.1 and is included in the solicitation amendment 0001.
7. Industry Question: Reference Performance Work Statement (PWS), page 3, paragraph 1.1, Description of Services. Question: Can you provide the name of the contractor who is currently providing the service and the annual amount of the contract?
Air Force Response: The requirements of this solicitation are not currently provided under a
8. Industry Question: Reference Section M, page 37, paragraph 3.2, Past Performance. Can a newly established company that has no current contracts, submit past performance as an individual who was the Project (Site) Manager for numerous supply contracts with similar processes of stock control, storage, issue, requisitioning, accounting and disposition?
Air Force Response: Offerors shall submit past performance information in accordance with
Section L, paragraph 3 and will be evaluated in accordance with Section M, paragraph 3.
9. Industry Question: Reference Section M, page 37, paragraph 3.2, Past Performance. Will 27 years professional experience as a senior Supply executive be considered relevant?
Air Force Response: Please reference question and answer #8 above.
10. Industry Question: Please confirm that a Small Business Subcontracting plan is not required if the offeror is a small business.
Air Force Response: A subcontracting plan is not required. This is a total small business set-aside. The Section L and M requirements for a small business subcontracting plan is removed in the solicitation amendment 0001.
11. Industry Question: Please provide details/requirements for the Safety Plan that was requested to be included in the Contract Documentation section of the response.
Air Force Response: The specific requirements are in Section II of Appendix C of the PWS, dated
16 Dec 2014.
12. Industry Question: Please advise if this is an unrestricted procurement or a small business set-aside?
Air Force Response: This is a total small business set-aside.
13. Industry Question: Is the Service Contract Act applicable to this solicitation?
Air Force Response: Yes, Service Contract Labor Standards (formerly known as the Service
Contract Act of 1965) applies to this solicitation. FAR clauses 52.222-41 and 52.222-43 are added to the solicitation in amendment 0001.
14. Industry Question: Will the Government sponsor offerors for a facility clearance if they do not possess one at time of submission?
Air Force Response: Please refer to Section 16 of the PWS, dated 16 Dec 2014.
15. Industry Question: In order for offerors to accurately estimate the level of effort for this program, can the Government please provide the desired number of full time equivalents (FTEs) needed to support this program?
Air Force Response: Reference contract line item numbers 0X01, the government estimates “five
(5) supply technician equivalents.”
16. Industry Question: Reference Appendix B, page 17, AMARGI 21-109, Air Force Depot
Maintenance Activity Group Facilities and Equipment. This reference is not available through the Air Force epublication on line service. Can you provide an electronic download copy for review?
Air Force Response: AMARG Instruction 21-109, dated 3 July 2013 is now attached to the
17. Industry Questions/Comment: Reference PWS, page 12, paragraph 16.1, Security Requirements.
The PWS requires employees to possess SECRET clearances prior to period of performance.
Office of Personnel Management, Systems Access Support Team indicates that it takes approximately 2-4 months to receive a clearance. Do current employees all have current SECRET clearances? Will the base security office process the Form 86 once they are completed by the employees? Will the contractor be allowed to request interim clearances, pending receipt of final clearances?
Air Force Response: The Air Force is preparing a DD Form 254 and will provide more information at a later date.
18. Industry Question/Comment: Reference PWS, Appendix B, Applicable Regulations, Manuals, Specifications, page 17. The PWS requires the contractor to comply with requirements set forth in
AMARGI 21-109, Chapters 3 and 4. That document is not available on government e-publications. Will the government allow bidders access to the base technical library to review this publication?
19. Industry Question: Section L - 7.2.2. Section B - Services and Prices. Supplies or Services and
Costs or Prices: Do not input pricing information in Section B of the Model Contract and
Solicitation. All required prices shall be proposed in the TEP Worksheet Section J Attachment 3 -
TEP Worksheet. Please provide Section J Attachment 3 - TEP Worksheet
Air Force Response: A TEP Worksheet is added as a section J attachment (attachment 5) to the solicitation amendment 0001.
20. Industry Question: Page 17 of the RFP states: 52.219-1 SMALL BUSINESS PROGRAM
REPRESENTATIONS (OCT 2014) - ALTERNATE I (MAY 2014) (a)(1) The North American
Industry Classification System (NAICS) code for this acquisition is 541990. Page 38 of the RFP states: 4.3. Total Case Incident Rate (TCIR) and Days Away, Restricted and Transferred
(DART) rates, or, injury and illness rates should be equal to or lower than the most recently published Bureau of Labor Statistics (BLS) national average for North American Industry
Classification System (NAICS) 336413. Page 31 states: 7.2.4. Section K - Representations, Certifications, and other Statements of Offerors - Complete representations, certifications, acknowledgments and statements. Offeror must have filled out an online FAR provision 52.204-
8 Annual Representations and Certifications (May 2014), Online Reps and Certs at http://www.sam.gov. Offeror shall ensure certification as a small business under North American
Industry Classification System (NAICS) 812332. Please clarify which NAICS Code applies.
Air Force Response: NAICS 541990 applies to this acquisition. Corrections are made to the solicitation in amendment 0001 to remove other NAICS referenced.
21. Industry Question: Paragraph 3.17.2 states "The offeror shall fill out the page (Pg.) column of
Table 2 - Cross Reference Matrix in the format below, indicating information as it relates to the
Section L - Instructions to Offerors, and Section M - Evaluation Factors for Award, PWS CLIN numbers and CDRL references found therein. This shall be included in the Technical Volume
(Volume II). The Cross Reference Matrix Section L refers to Paragraph 4.2.1 and 4.2.1.1.
Section L does not contain these paragraphs. Please clarify. The Cross Reference Matrix PWS column refers to 4.1.14, 4.2.1, 4.2.2, and 4.2.3. The PWS does not contain these paragraphs.
Please clarify.
Air Force Response: The Cross Reference Matrix in Section L, table 2 is revised to remove incorrect references and is included in solicitation amendment 0001.
22. Industry Question: Section L and Section M technical descriptions do not correspond with each other. Please clarify. SECTION L (Pg. 29) and SECTION M (Pg. 34)
Air Force Response: Section L and M are revised to correspond with each other. Please see solicitation amendment 0001.
23. Industry Question: Sections L & M do not align for Volume IV - Contract Documentation. Please clarify. SECTION L (Pg. 30) and SECTION M (Pg. 37)
7.2. Model Contract and Solicitation Representations and Certifications
7.2.1. Section A - Solicitation and Model Contract Form
7.2.2. Section B - Services and Prices.
7.2.3. Section I - Contract Clauses
7.2.4. Section K - Representations, Certifications, and other Statements of
Offerors
7.3. Exceptions to Solicitation Requirements
4.2. The proposal shall contain evidence of adequate financial resources.
4.3. Total Case Incident Rate (TCIR) and Days Away, Restricted and Transferred
(DART) rates, or, injury and illness rates should be equal to or lower than the most recently published Bureau of Labor Statistics (BLS) national average for
North American Industry Classification System (NAICS) 336413
4.4. Safety Plan
Air Force Response: Section L and M are revised to align with each other. Please see solicitation amendment 0001.
24. Industry Question: PWS Section A - Solicitation and Model Contract Form: Complete blocks
17a, 17b, 28, 30a, 30b, and 30c. Signature by the offeror on the SF 1449 constitutes an offer, which the Government may accept. Question: Section A of the PWS references form SF 1449 but
SF 33 is provided. Please Clarify.
Air Force Response: Instructions to complete the SF 33 are added to Section L, para. 7.2.1 and SF
1449 instructions are deleted. Please see solicitation amendment 0001.
25. Industry Question: Is the Quality Plan (Pg. 11 of PWS) required with the proposal or after award?
Air Force Response: The Quality Plan shall be provided in accordance with PWS, paragraph 13 and as required by Contract Data Requirements List (CDRL) A003. The Quality Plan is required after award, as indicated by CDRL A003: the Quality Plan is required “NLT ten (10) days prior to period of performance start” and “NLT ten (10) days after a required revision.”
26. Industry Question: Will a site visit be allowed at the Davis-Monthan Air Force Base (AFB)?
Air Force Response: The government is not hosting a site visit for this solicitation. Please send us your specific questions regarding the facility and operations.
27. Industry Question: Level of effort is not identified in the RFP. What info does the government plan to provide to quantify LOE?
Air Force Response: This is a performance based requirement. Offerors are expected to provide services in accordance with the PWS. PWS paragraph 5, Service Summary, outlines specific performance objectives and thresholds.
28. Industry Question: Is the Prime Contractor required to have their Secret Facility Clearance at the time of award or proposal submission? Will the Government sponsor the Prime Contractor's
Facility's Clearance?
29. Industry Question: Is there an incumbent contractor? If so, please provide name of contractor.
30. Industry Question: Is the incumbent contractor eligible for recomplete?
31. Industry Question: Will the Government provide the current contract values for each POP?
32. Industry Question: Will the Government provide the number of incumbent employees currently working shift hours 1430 to 2300?
33. Industry Question: What is the historical frequency of the shift hours?
contract and no such historical information is available.
34. Industry Question: Will the Government provide the number of FTEs supporting current incumbent contract?
Air Force Response: The requirements of this solicitation are not currently provided under a contract. However, please reference contract line item numbers 0X01, the government estimates
“five (5) supply technician equivalents” will be required.
35. Industry Question: The Government has referenced TEP Worksheet in Section J - Attachment 3;
however, we are unable to locate the TEP Worksheet as an attachment. Please provide.
Air Force Response: The TEP Worksheet is now attached to the solicitation as attachment 5.
Please see solicitation amendment 0001.
36. Industry Question: On page 26 of the solicitation (Section L) Table 2 – Cross Reference Matrix.
Under the PWS paragraph heading it refers to PWS paragraph 4.1.14, 4.2.1, 4.2.2, & 4.2.3 however, the PWS does not contain those references.
Air Force Response: The Cross Reference Matrix in Section L, table 2 is revised to remove incorrect references and is included in solicitation amendment 0001.
37. Industry Question: On page 30 of the solicitation (Section L) paragraph 7.2.1 refers to signing of the SF1449. However, there is no SF 1449, rather a SF 33. The paragraph goes on to refer to blocks 17a, 17b, 28, 30a, 30b, and 30c which are blocks on a SF 1149 but not a SF 33.
Air Force Response: Instructions to complete the SF 33 are added to Section L, para. 7.2.1 and
SF 1449 instructions are deleted. Please see solicitation amendment 0001.
38. Industry Question: PWS paragraph 16.1 states: "Contractor employees shall possess a valid
SECRET clearance prior to the period of performance (POP). We currently do not have a secret facility clearance. Is there a period after award that will allow personnel to work without a secret clearance until the DD 254 is issued and the facility clearance is awarded which allows our company to hold secret clearances of our personnel? Can our company participate as a team member using our qualifications as part of the team and receive a clearance once the DD 254 is issued to the prime and the prime sponsors our company to receive a clearance?
39. Industry Question: Will the government provide any training during the orientation period for the multiple government databases (11) listed in the PWS? Rationale: This is a very tough resume requirement; finding individuals with experience in all of these databases is simply not feasible.
Specific database requirements from the PWS: “The contractor shall accurately enter inventory data transactions into Government Data systems examples which include: Air Force Equipment
Management System (AFEMS), AMARG Business System MAXIMO, the electronic Tooling
Information Management System (eTIMS) used for Navy ST/STE, Material Asset Management
Application (MAMA), and other Department of Defense (DoD) automated equipment information systems.”; “The contractor shall scan/electronically file, appropriately name, and transfer the data files in the 309 AMARG Electronic Records Management (ERM) data base.”;
“The contractor shall accurately process various supply transactions into the Enterprise Solution –
Supply (ES-S).”; and “The contractor shall perform research and processes reports using various web-based Government logistics data systems. Examples of these systems include: Air Force
Supply Central Database (AFSCDB) Discoverer (Query and Analysis system), D043, Fed LOG, Federal Logistics Information System Web Search (Web FLIS), Enhanced Technical Information
Management System (ETIMS), Logistics Installations and Mission Support Enterprise View
(LIMS-EV), and DoD Emall.”.
Air Force Response: IAW PWS paragraph 4.1.1 and 4.1.2, offerors need to be familiar with and able to accurately enter data into systems described in the PWS or like systems used across DoD.
Training will be provided for AMARG specific systems.
40. Industry Question: Will the government provide an independent estimate of manpower requirements? Since no Industry Day was not announced for this work, it is very difficult to figure out how many FTEs are needed to do the work.
Air Force Response: Reference contract line item numbers 0X01, the government estimates “five
(5) supply technician equivalents.”
41. Industry Question: Using the Cross Reference Matrix on FA8224-15-R-0023 Page 26 of 38, either there are errors either in the cross reference matrix of Section L, because the references below are not available as depicted on page 36. Section L: No Paragraphs found for 4.2.1, 4.2.1.1, 5.4.2.1, 7.6.2 PWS: No Para found for 4.1.14, 4.2.1, 4.2.2, 4.2.3
Air Force Response: The Cross Reference Matrix was revised to remove incorrect references and is included in solicitation amendment 0001.
42. Industry Question: Should the solicitation have a pricing proposal spreadsheet?
Air Force Response: A TEP Worksheet is now attached to the solicitation as attachment 5. Please see solicitation amendment 0001.
43. Industry Question: In the RFP Section L it states Vol II - Technical will have two subfactors and titles sub-factor one as “Staffing Plan” but in section M it refers to sub-factor one as
“Operational Plan”. Which is correct as the two names infer different types of plans.
Air Force Response: Section L, paragraph 5.4.1 was incorrect. The title for technical sub-factor one is Operational Plan. Please see solicitation amendment 0001 which corrects the title.
44. Industry Question: Will a bidder’s library be provided in support of Appendix B – Applicable
Regulations, Manuals and Specification requirements. These are not all available on e-pubs on-line.
solicitation. All other regulations, manuals, and specifications should already be available online.
File details come from the government source that posted it. Updated .