Aerospace Dominance Enabler Division
Battle Ready
Modular Threat Emitter (MTE) 450 Volt Power
Supply Industry Day
28 March 2019
Capt. Kathrina Orozco
Program Manager
1UNCLASSIFIED/FOUO28 March 2019
Opening Remarks
Kathleen Beaudoin Deputy Branch Chief, Range Threat Systems Branch
AFLCMC/HBZC
2UNCLASSIFIED/FOUO28 March 2019
Welcome
Thank You for Your Interest!
Turn cell phones to vibrate or off
Be present at your scheduled time for your one-on-one session (located in this conference room)
Contact Phone Numbers (emergency only) Wade Pilcher 801-645-9837
Rest Rooms
Emergency Evacuation
Hold questions until the end
UNCLASSIFIED/FOUO28 March 2019
450V PS Project Overview
Capt Kathrina Orozco MTE Program Manager
AFLCMC/HBZCB
4UNCLASSIFIED/FOUO28 March 2019
Agenda
0830 – 450V PS Project Overview
0900 – Contracting Overview
0930 – Break
0945 – Question and Answer
1130 – Lunch
1300 – 1600 One-on-One Sessions According to Schedule Conducted in Bldg. 1295 Poe Conference Room
5UNCLASSIFIED/FOUO28 March 2019
Org Chart
PEO Weapons Brig Gen Anthony Genatempo
SPM – MDA (Delegated) Col Erik Quigley
PM Support Joe Gordon (CTR)
Equipment Specialists Jeffrey Christensen
Dep Division Chief Bruce Kellogg
USERS
ACC/A3A
USAFE
Branch Chief Lt Col Paul Ferguson
Section Chief & JTE PM Josh Skoglund
MTE PM
Capt Kathrina Orozco
Engineer Zhicai Chen
Rules of Engagement
Open forum seeking industry input
Ideas and information presented may be recorded and publicized in FedBizOpps (please identify upfront any proprietary information/data) or other record for this event
No agreements, promises or other commitments are made or implied by the Government or Contractors participating in Industry day
Copies of slides and other materials will be made available via a FedBizOpps posting within two weeks of industry day
7UNCLASSIFIED/FOUO28 March 2019
Rules of Engagement Cont.
Questions will be answered to the best of the panel’s knowledge at this time
All Non-proprietary questions will be posted on FedBizOpps with formal Government answers
All Proprietary questions must be indicated as such prior to being asked, and will not be posted to FedBizOpps
No information provided will be contractually binding and should only be used for planning purposes
828 March 2019
Purpose
Improve the understanding of Government requirements thereby allowing Offerors to judge whether and how they can satisfy the requirement
Enhance the Government’s ability to obtain quality supplies and services
Obtain competition resulting in reasonable prices
Increase efficiency in proposal preparation, proposal evaluation, negotiation and contract award
Ask your questions and voice your concerns
9UNCLASSIFIED/FOUO28 March 2019
450V PS Project Objectives
Produce 450V Power Supply Production Representative Article
Produce additional 15 units to outfit fleet and 5 units for spares
Manage Contract Data Requirements List submittals
Perform Environmental, Factory Acceptance Test (FAT) and Site Acceptance Test (SAT)
Deliver Technical Data Package
Engineering Drawings
Technical Orders
10UNCLASSIFIED/FOUO28 March 2019
Program Background
The MTE provides Electronic Warfare threat simulators that provide replication of SA-6 and SA-8 Surface-to-Air Missile for aircrew training.
A MTE set consists of an Emitter Pedestal Group and a Shelter
Control Group.
The 450V PS sources voltage and current to the system track transmitter.
The current 1A3PS1 assembly does not protect the host system track transmitter from input AC voltage surges.
The on/off nature of the supply does not allow users to adjust the high voltage output which is necessary when seasoning a new magnetron.
11UNCLASSIFIED/FOUO28 March 2019
Program Background Cont.
An adjustable (0-450V), regulated power supply with over-voltage over-current protection (modified COTS), will correct the problem.
A 2017 project to replace the original 450V PS produced a PRA and data package that requires redesign.
The rise time characteristic of the 28-volt triggered DC output voltage didn’t meet its intended DC set-point voltage in no greater than 3 seconds once the 28-volt push button / signal trigger was activated.
12UNCLASSIFIED/FOUO28 March 2019
450V PS Components
Legacy
450V PS
Initial 450V PS
Redesign
Core Requirements
Statement of Work (SOW)
System Performance Specification (SPS)
Contract Data Requirements List (CDRL) Package
Initial Redesigned 450V PS Government owned Technical Data Package (TDP)
Drawings
Test documents
Technical Order Changes
Sub-system specifications
Interface requirements
14UNCLASSIFIED/FOUO28 March 2019
Contracting Overview
Mr. Kylen Seely Contract Specialist
AFLCMC/PZZKC
15UNCLASSIFIED/FOUO28 March 2019
Contracting Overview
Supply Contract, Single Award
Contract Length: EST. 15 Months
9 Months for Production Representative Article
6 Months for Production
Pricing Arrangement: Firm-Fixed Price Contract with Cost- Reimbursable No-Fee Travel and Shipping.
Source Selection Approach: Lowest Price Technically Acceptable
Anticipating Small Business Set Aside
16UNCLASSIFIED/FOUO28 March 2019
Contracting Overview (cont.)
CLIN TITLE PRICING ARRANGEMENT
0001 PRA Firm Fixed Price
0002 Production Option Firm Fixed Price
0003 Spares Firm Fixed Price
0004 Travel Cost Reimbursable-No Fee
0005 Shipping Cost Reimbursable-No Fee
0006 Contract Data Requirements Lists (CDRLs) Not Separately Priced
Notional Evaluation Factors
Factor 1 – Price
Factor 2 – Technical
Sub-Factor 1 – Program Management
Sub-Factor 2 – Technical Orders and Technical Data
Sub-Factor 3 – Testing
Sub-Factor 4 – Engineering Design
18UNCLASSIFIED/FOUO28 March 2019
Notional Technical Sub-Factors
Sub-factor 1: Program Management
Integrated Master Schedule (IMS)
Data Management
Sub-factor 2: Technical Orders/Data
Technical Order Change Pages
Commercial Manual Development
Preparation and Delivery
19UNCLASSIFIED/FOUO28 March 2019
Notional Technical Sub-Factors
Sub-factor 3: Testing
Overall Approach/Methodology
Test Descriptions and Procedures
Sub-factor 4: Engineering Design
Overall Engineering Design
Approach Compliance With SOW, PS, and Mission Requirements
20UNCLASSIFIED/FOUO28 March 2019
NAICS Assignment
NAICS Code: 335999
Primarily engaged in Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing.
Size Standard: 500 employees
NAICS Codes and Size Standards are designated in the solicitation that which best describes the principal nature of the product or service being acquired. A procurement is usually classified according to the component which accounts for the greatest percentage of the contract value. Final unless appealed.
21UNCLASSIFIED/FOUO28 March 2019
Notional Program Schedule
Schedule Item Date
Release Draft Request for Proposal
(RFP)
March 2019
RFP Release April 2019
Receipt of Proposals June 2019
Discussions (If applicable) July 2019
Final Proposals Revisions (If applicable) August 2019
Award August 2019
Points of Contact
ALL communication after the official RFP posting shall be directed to the contracting office.
Program Lead Primary POC Secondary POC
Capt. Kathrina Orozco Wade Pilcher Kylen Seely
MTE 45V PS Project Lead Procurement Contracting
Officer (PCO)
Contract Specialist
Kathrina.Orozco@us.af.mil Wade.Pilcher@us.af.mil Kylen.Seely@us.af.mil
801-586-9758 801-586-1229 801-775-6532
Break
24UNCLASSIFIED/FOUO28 March 2019
Q & A Session
25UNCLASSIFIED/FOUO28 March 2019
One-on-One Rules of Engagement
Contractors should NOT wait in the hallway or building until 10 minutes before session is to begin
Breakout sessions are limited to 30 minutes based on scheduled start time and will be timed
If Government delays start time, contractors are still guaranteed full 30 minutes
Questions will be answered to the best of the panel’s knowledge at this time
All Non-proprietary questions will be posted on FedBizOpps with formal Government answers
All Proprietary questions must be indicated as such prior to being asked, and will not be posted to FedBizOpps