ATTACHMENT_6_SELM-GMLEC_SOO.docx

DOCX document 55 KB Posted

Attached to
Modification of Equipment Federal contract opportunity
Solicitation number
FA8214-14-R-0005
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment 6 - Awardable Task 1 SOO (SELM/GMLEC)

View the file

Other files for this federal contract opportunity

Other files attached to Modification of Equipment, newest first.
File Type Posted
ATTACHMENT_1_Ground_PWS_10Feb14.docx DOCX document
Sample_Sustainment_Scenario_Task.docx DOCX document
ATTACHMENT_14_Mapping_Worksheet_UPDATE_5Feb14.xlsx XLSX spreadsheet
GSSC_Questions_and_Answers_Combined_4.xlsx XLSX spreadsheet
ATTACHMENT_12_Labor_Category_Description_UPDATE_5Feb14.docx DOCX document
ATTACHMENT_18_Ground_GFP_UPDATE_3Feb2014.xlsx XLSX spreadsheet
ATTACHMENT3CDRLInstructionsandCDRLsUPDATE22Jan14.pdf PDF
ATTACHMENT6SELMGMLECSOOUPDATE14Jan14.docx DOCX document
ATTACHMENT21SectionLAttachments.pdf PDF
ATTACHMENT7SELMGMLECGRID.docx DOCX document
ATTACHMENT15GSSCLaborRateMatrixUPDATE.xlsx XLSX spreadsheet
ATTACHMENT16BreakoutofLabCosts.xlsx XLSX spreadsheet
FA821414R0005_______0003.pdf PDF
ATTACHMENT22SectionMUPDATE.docx DOCX document
ATTACHMENT10SoftwareGRID.docx DOCX document
ATTACHMENT2BasicGRID.docx DOCX document
ATTACHMENT11CrossReferenceMatrixUPDATE.xlsx XLSX spreadsheet
ATTACHMENT13PricingMatrix.xlsx XLSX spreadsheet
ATTACHMENT20SectionLUPDATE.docx DOCX document
GSSC_Questions_and_Answers_Combined_3.xlsx XLSX spreadsheet
Data_Rights_H-Clause_Comments.doc DOC document
GSSC_Questions_and_Answers_Combined_2.xlsx XLSX spreadsheet
ppi_tool.accdb —
Classified_Bidders_List.docx DOCX document
ATTACHMENT_3_CDRL_Instructions_and_CDRLs-UPDATE_16JAN14.pdf PDF
GSSC_Questions_ _Answers_Combined.xlsx XLSX spreadsheet
ATTACHMENT_19_Award_Fee_Plan_UPDATE_15Jan14.pdf PDF
ATTACHMENT_22_Section_M_UPDATE_9Jan14.docx DOCX document
ATTACHMENT_18_Ground_GFP_UPDATE_15JAN14.xlsx XLSX spreadsheet
FA821414R0005_______0001.pdf PDF
ATTACHMENT_4_QASP.docx DOCX document
ATTACHMENT_21_Section_L_Attachments.pdf PDF
ATTACHMENT_19_Award_Fee_Plan.pdf PDF
ATTACHMENT_13_Pricing_Matrix.xlsx XLSX spreadsheet
ATTACHMENT_5_Awardable_Task_1_RFP.docx DOCX document
ATTACHMENT_3_CDRL_Instructions_and_CDRLs.pdf PDF
ATTACHMENT_15_GSSC_Labor_Rate_Matri.xlsx XLSX spreadsheet
ATTACHMENT_22_Section_M.docx DOCX document
ATTACHMENT_2_Basic_GRID.docx DOCX document
ATTACHMENT_12_Labor_Category_Description.docx DOCX document
ATTACHMENT_14_Mapping_Worksheet.xlsx XLSX spreadsheet
ATTACHMENT_10_Software_GRID.docx DOCX document
ATTACHMENT_7_SELM_GMLEC_GRID.docx DOCX document
ATTACHMENT_11_Cross_Reference_Matrix.xlsx XLSX spreadsheet
ATTACHMENT_20_Section_L.docx DOCX document
ATTACHMENT_9_Software_SOO.docx DOCX document
ATTACHMENT_8_Awardable_TASK_2_RFP.docx DOCX document
ATTACHMENT_18_Ground_GFP.xlsx XLSX spreadsheet
ATTACHMENT_17_DD254.pdf PDF
ATTACHMENT_22_Section_M.docx DOCX document
Show all 50

Modification of Equipment has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revision: Draft

STATEMENT OF OBJECTIVES

FOR THE

INTERCONTINENTAL BALLISTIC MISSILE (ICBM)

GROUND SUBSYSTEMS SUPPORT CONTRACT (GSSC)

SIMULATED ELECTRONIC LAUNCH – MINUTEMAN (SELM)/

GUIDED MISSILE LAUNCHER ELECTRICAL CIRCUIT (GMLEC) TEST SET REPLACEMENT PROGRAM

7 November 2013

Air Force Nuclear Weapons Center (AFNWC) ICBM Systems Directorate (AFNWC/NI) Hill Air Force Base, Utah 84056-5824

1.0 Program Objectives

1.1 This Statement of Objectives (SOO) is for the execution of development and production efforts for the Simulated Electronic Launch – Minuteman (SELM) and Guided Missile Launcher Electrical Circuit (GMLEC) Test Set Replacement Program. All Ground Subsystems Support Contract (GSSC) Performance Work Statement requirements apply in performing the work to accomplish the contract objectives below.

1.2 The objective of the SELM/GMLEC program is to replace aging and unsupportable test support equipment in order to mitigate risks associated with Air Force Global Strike Command Force Development Evaluation (FDE) testing and to sustain the Intercontinental Ballistic Missile (ICBM) weapon system through 2030 and beyond. While SELM and GMLEC have historically been two separate end items, this program will combine the functionality of the existing equipment into one end item. This effort will be accomplished in two phases.

1.2.1 Phase 1: Engineering and Manufacturing Development (EMD)

1.2.1.1 Use Government-furnished information including the drawings, interface control documents, specifications, T.O.s, and problem reports to evaluate requirements allocation design concepts with emphasis on the following features:

1.2.1.1.1 Combine functional requirements of the separate SELM and GMLEC test sets from current drawings and specifications.

1.2.1.1.2 Eliminate any obsolete design requirements existing in the current drawings and specifications.

1.2.1.1.2.1Design to meet maximum dimension requirements:
Item
Maximum Dimensions (inches)
Cable Box (C1)
23x24x20
Cable Box (C2)
23x24x20
Cable Box (C3)
23x24x20
SELM Control Monitor
23x24x13

1.2.1.1.3 Identify to the Government resolutions for any conflicting requirements between the existing GMLEC and the existing SELM configurations.

1.2.1.2 Complete system requirements review (SRR) with the Government within 3 months and preliminary design review (PDR) within 6 months after reviewing trade study results of best design solutions.

1.2.1.3 Complete critical design review (CDR) within 6 months of PDR.

1.2.1.4 Produce and test two first article SELM/GMLEC test sets based on the approved CDR design.

1.2.1.4.1 First article testing will be used to qualify the design to the standards and specifications developed in the Phase I effort. A system level qualification will address system operational capabilities of the redesigned system. Qualification tests will be further defined in a Test Plan

1.2.1.4.2 Test planning and execution shall include delivery of test plan and test procedure documents and conduct a test readiness review (TRR) in accordance with AFI 99-103, Capabilities-Based Test and Evaluation.

1.2.1.5 Conduct a functional configuration audit (FCA) and a physical configuration audit (PCA).

1.2.1.6 Deliver to the Government the SELM/GMLEC development tools, assets, and documentation required to sustain/maintain the SELM/GMLEC and make system upgrades through 2030.

1.2.1.7 Develop special packaging/shipping instructions for providing sufficient test sets to operational field locations to support SELM testing, Replacement of the SELM vans is not part of this effort.

1.2.2 Phase 2: Production

1.2.2.1 Fabricate 28 SELM/GMLEC units to the design qualified under Phase 1.

1.2.2.1.1 Each unit will have associated acceptance testing which will be done by the contractor at the contractor’s facility.

1.2.2.1.2 Each unit will have a 1 year warranty from the date that the SLEM/GMLEC unit is delivered to Hill AFB Depot.

1.2.2.1.3 Deliver 14 SELM/GMLEC units to Hill AFB Depot no later than 4 months prior to the end of the Period of Performance.

1.2.2.1.4 Deliver the remaining 14 SELM/GMLEC units to Hill AFB Depot no later than the last day of the Period of Performance.

2.0 Contract Objectives

2.1 The objective of the SELM/GMLEC contract is to establish the best technically acceptable/best value approach for all phases of the program.

2.2 Provide a detailed Contractor Statement of Work (CSOW). The CSOW shall address each SOO statement and define the work required to meet the completion of this effort.

2.3 The effort will be structured as two phases: (1) SELM/GMLEC EMD and (2) SELM/GMLEC Production.

2.3.1 The period of performance shall not exceed 2 years for Phase 1 and 1 year for Phase 2 of this program.

3.0 Management Objectives

3.1 Provide Government insight on program performance.

3.1.1 Manage and maintain clear Government visibility, and keep the Government apprised of program cost, schedule, technical performance, engineering data, test analyses, and risks. Earned value management information will be provided to the subcontractor level.

3.1.2 Develop communication processes to ensure maximum benefit from engineering organizational structure and practices.

3.1.3 Develop and deliver at the start of this effort a program schedule, detailing all tasks and deliverables associated with this effort. The schedule will be maintained and kept current throughout the program. Program milestones shall include but not be limited to: SRR, PDR, CDR, TRR, and FCA/PCA.

3.1.4 Deliver a progress status report on a monthly basis. This report will briefly detail technical progress made during the reporting period, provide a cost and schedule summary, and identify any issues which may impact the program.

3.1.5 Ensure timely and accurate delivery of all data deliverables and ensure data has appropriate classification markings.

3.1.6 Conduct technical interchanges, design reviews, and program management reviews as appropriate to ensure the program status is efficiently communicated to the Government.

3.1.7 Provide required documentation and technical support required to obtain Air Force Safety Center nuclear certification per AFI 91-103, Air Force Nuclear Safety Design Certification Program.

4.0 Technical Objectives

4.1 Ensure a sequential unique identification convention for each produced SELM/GMLEC test set.

4.2 Establish, implement, and deliver configuration identification, control, status accounting, and audits for configuration management baselines and data prepared for the program.

4.3 The SELM/GMLEC test set shall be resistant to premature triggering and support the collection of performance data.

4.4 Evaluate requirements allocation design concepts with emphasis on the following features:

4.4.1 Combine functional requirements of the separate SELM and the GMLEC test sets from current drawings and specifications.

4.4.2 Identify to the Government resolutions for any conflicting requirements between the existing GMLEC and the existing SELM configurations.

4.4.3 Develop and deliver to the Government new development and fabrication specifications, drawings, T.O.s, interface control documents, and system requirements analysis.

4.5 The equipment developed as part of this program shall be supportable through 2030. Appropriate documentation shall be developed to support operation, maintenance, and provisioning of the new test set through its intended life cycle (i.e., logistics support analysis/logistics support analysis report, T.O.s, spares quantities, etc.).

4.6 The replacement test set shall be compatible with the mechanical, electrical, signal, data format, and timing interface characteristics of the existing test set operational interfaces and non-operational interfaces.

4.7 Ensure compliance with Weapon System Safety Rules per AFI 91-114, Safety Rules for the Intercontinental Ballistic Missile System.

5.0 Standards/Specifications:

MIL-STD-129Military Marking for Shipment and Storage
MIL-STD-130Identification Marking of U.S. Military Property
MIL-STD-889Dissimilar Metals
MIL-STD-1472Human Engineering
MIL-STD-1686Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies, and Equipment (Excluding Electrically Initiated Explosive Devices)
MIL-STD-882System Safety

6.0 Other Compliance Publications:

AFI 91-103Air Force Nuclear Safety Design Certification Program
AFI 91-114Safety Rules for the Intercontinental Ballistic Missile System
AFI 99-103Capabilities-Based Test and Evaluation
TO 00-5-3AF Technical Order Life Cycle Management

7.0 Reference Documents

Document Number
Document Title
25-26514
SELM to MGS and MGS Battery – Mechanical Envelopes and Electrical
25-26515
SELM to G&C Coupler and Missile Umbilical Circuits – Electrical Programming and Timing
25-26516
SELM to SDC Power Supply, Missile Umbilical and Junction Box Set
25-92922
ICD of PT Replacement for SELM Spacer
D-25-92139 Vol I/ Vol II
GMLEC Test Set to the VAFB LF OGE – Mechanical/ Envelope/ Electrical/Sequencing and Timing
S-122-09519
Hardware Specification for the GMLEC
S-133-12745A (Part 1)
Prime Item Development Specification for Simulated Electronic Launch - Minuteman Test Set
S-133-12745A (Part 2)
Prime Item Product Fabrication Specification for Simulated Electronic Launch - Minuteman Test Set
S-133-12747A (Part 1)
Non-Complex Item Development Specification for Cable Set, Test, Simulated Electronic Launch, Minuteman
S-133-12747A (Part 2)
Non-Complex Item Fabrication Specification for Cable Set, Test, Simulated Electronic Launch, Minuteman
S-133-128D
Support Equipment
S-133-19541
Interface Design Document for the Guided Missile Launcher Electrical Circuit Test Set
S-133-19541
Software Requirements Specification for the GMLEC Control Software of the Guided Missile Launcher Electrical Circuit Test Set
S-133-19541
Interface Requirements Specification for the Guided Missile Launcher Electrical Circuit test Set
S-133-19541
Software Product Specification for the GMLEC Control Software of the Guided Missile Launcher Electrical Circuit Test Set
S-133-19541
Software Programmers Manual for the GMLEC Control Software of the Guided Missile Launcher Electrical Circuit Test Set

8.0 Deliverables

CDRL #
Description
Authority
A001-001
Integrated Program Management Report (IPMR)
DI-MGMT-81861
A005-001
Conference Agenda (Meeting Agenda)
DI-ADMN-81249A
A006-001
Briefing Materials
DI-MGMT-81605
A007-001
Report, Record of Meeting/Minutes (Meeting Minutes)
DI-ADMN-81505
A008-001
Status Report
DI-MGMT-80368A
A014-001
Contract Funds Status Report (CFSR)
DI-MGMT-81468
A016-001
Performance and Cost Report
DI-FNCL-80912
A024-001
Tradeoff Studies and Analysis (subtitle)
DI-MISC-80508B/T
A029-001
Diminishing Manufacturing Sources & Material Shortages (DMSMS) Report (subtitle)
DI-MISC-80508B/T
A032-001
Reliability and Maintainability Program Plan
DI-SESS-81613
A037-001
Proposed Spare Parts List
DI-ILSS-80134A
A039-001
Changes to ICBM Items in the Master Nuclear Certification List (subtitle)
DI-MISC-80508B/T
A040-001
Nuclear Surety Evaluation Report (NSER) (subtitle)
DI-MISC-80508B/T
A048-001
Software User Manual
DI-IPSC-81443A
A050-001
IUID Marking Activity, Validation, and Verification Report
DI-MGMT-81804A
A051-001
Prime Item Requirements Specification (subtitle)
DI-MGMT-81453
A054-001
Test Plan
DI-NDTI-80566A
A055-001
Test Procedures
DI-NDTI-80603A
A056-001
Test/Inspection Report
DI-NDTI-80809B
A059-001
Automated Computer Program Identification Number (ACPIN) Data and Control Record
DI-MISC-81454B
A060-001
Product Drawing/Models and Associated List
DI-SESS-81000E
A065-001
Interface Control Documents (ICD)
DI-CMAN-81248A
A066-001
Request for Nomenclature (DD Form 61)
DI-CMAN-81254B
A067-001
Configuration Audit Plan
DI-SESS-81646
A068-001
System/Subsystem Specification (SSS)
DI-IPSC-81431A
A069-001
Performance Specification Documents
DI-SDMP-81465A
A071-001
Program-Unique Specification Documents
DI-SDMP-81493A
A073-001
Master Engineering Documents Listings (MEDL)
DI-MISC-81189
A075-001
Software Development Plan (SDP)
DI-IPSC-81427A
A076-001
Software Version Description (SVD)
DI-IPSC-81442A
A077-001
Software Requirements Specification (SRS)
DI-IPSC-81433A
A078-001
Software Product Specification
DI-IPSC-81441A
A079-001
Software Design Description (SDD)
DI-IPSC-81435A
A080-001
Computer Program End Item Documentation
DI-IPSC-80590B
A081-001
Software Test Plan (STP)
DI-IPSC-81438A
A082-001
Software Test Description (STD)
DI-IPSC-81439A
A083-001
Software Test Report (STR)
DI-IPSC-81440A
A087-001
Safety Assessment Report (SAR)
DI-SAFT-80102B
A088-001
System Safety Hazard Analysis Report (SSHAR)
DI-SAFT-80101B
A092-001
Nuclear Certification Impact Statement (NCIS)
DI-NUOR-81888
A113-001
Technical Manual Contracts Requirement
TMCR TM-86-01N
A114-001
Commercial Off the Shelf (COTS) Manuals and Associated Supplemental Data
DI-TMSS-80527C
A116-001
Technical Data Package Index
DI-EGDS-80918

File details come from the government source that posted it. Updated .