Quality Assurance Surveillance Plan (QASP)
View the file
Other files for this federal contract opportunity
Show all 50
Modification of Equipment has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revision: 01/03/06
QUALITY ASSURANCE SURVEILLANCE PLAN
Ground Subsystem Support Contract
1. Objective. The objective is to provide program management support, engineering services, and emergency response that adhere to the Ground Subsystems Support Contract.
2. Purpose. This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor’s performance while implementing the terms and conditions of the Performance-based Work Statement (PWS). It is designed to provide an effective surveillance method of monitoring contractor performance for each objective on the Services Summary (SS). The QASP provides a systematic method to evaluate the services and products the contractor is required to furnish. The QASP is based on the premise that the contractor, and not the government, is responsible for management and quality control actions to meet the terms of the contract. The role of the government quality assurance is to ensure contract standards are met.
3. The Multi-Functions Team (MFT) roles and responsibilities are:
3.1. Technical Representative. Responsible to serve as principle technical expert most familiar with the requirement to ensure contractor performance meets contracted requirements.
3.2. Contracting Officer Representative (COR). Provides management and oversight of the task order and keeps all stakeholders apprised of developments. Duties include those required of COR which involve researching/implementing common surveillance or quality control methods, performing surveillance, approving Material Support Request’s (MSR) and providing reports of contractor performance to the Contracting Officer (CO).
3.3. Contracting Officer (CO). The CO has the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government.
3.4. Additional Stakeholders. Responsible to ensure USAF requirements are satisfied in the most efficient/effective manner in accordance with the attached PWS.
4. Performance Assessment. Details the performance objectives required by the government to measure contractor performance. It consists of individual performance objectives associated with specific references to the PWS, performance thresholds, methods of surveillance, and performance incentives as documented in Attachment 1. The standardized form used for recording performance assessments is the Quality Performance Assessment (QPA) provided under Attachment 2.
4.1. Performance Assessment Items not Specifically Identified. All other tasks required under the PWS may be inspected on a random basis at a frequency determined by the CO, and/or COR per the Inspection of Services Clause in the contract.
4.2. Remedies for Non-Conformance. If any aspect of contractor performance is unacceptable, the Quality Assurance Personnel will submit a QPA to the contractor’s point of contact specifying the deficiencies needing correction. If deficiencies are not corrected within the required timeframe identified on the QPA, the COR shall notify the CO of applicable negative incentives for action.
5. Methods of Surveillance. Any or all of the following methods of surveillance may be used in the administration of the QASP:
5.1. Customer Surveys. Customer surveys may be obtained from the results of formal customer satisfaction surveys or from random customer feedback information. Customer complaints should be provided in writing to the COR. The COR shall maintain a summary log and enter findings into the QPA.
5.2. Random sampling may be utilized to determine compliance with performance objectives.
5.3. 100% Inspection. Inspection will be accomplished on each CDRL deliverable and may be accomplished on all information provided by the vendor.
5.4. Periodic Inspection. Periodic inspections may be conducted at time of Project Start, or on a monthly basis.
5.5. Contract Performance Assessment Reporting System (CPARS). CPARS will be initiated annually, documenting contractor performance for this specific contract. More frequent updates may be made as required to document a significant improvement or degradation of the level of contract performance. The Assessing Official Representative will be the COR; the Assessing Official will be the Functional Commander/Functional Director.
6. Meetings. MFT meetings shall be held either in conjunction with Program Management Reviews or as required ensuring the best possible service is provided for the life of the task order.
7. Disputes. Every attempt will be made to resolve all disputes arising under this task order using Alternate Dispute Resolution (ADR) as outlined in FAR 33.214. If no resolution can be made under ADR the CO will render a CO’s final decision.
8. Revisions. Revisions to this document are the responsibility of the CO. Any member of the MFT may submit proposed changes through the COR for coordination with the contractor. This is a living document that may be revised or modified as circumstances warrant.
Jody K. Lindley Contracting Officer
AFNWC/PZBF
Maj Jeremiah B. Stahr Program Manager/COR
AFNWC/NIA
Ryan J. Sandoval Program Engineer/COR
AFNWC/NIAD
Contractor Personnel - TBD
Attachment 1 – Performance Assessment
| Performance Objective |
| PWS Para |
| Performance Threshold |
| Frequency |
Quality: Quality of work and level of support met task requirements. Work required little or no rework and services met or exceeded expectations. Deliverables were complete and accurate to meet customer objectives.
No more than two (2) verified formal customer complaints/contract discrepancy reports per quarter.
The contractor must resolve or provide resolution plan for customer complaints within 10 working days of receipt.
If Government requires peer review, then ensure peer review has occurred before initial delivery to Government.
Customer Surveys
COR will conduct periodic interviews/surveys with ICBMSD personnel to ensure quality of work and services received are satisfactory
Schedule: Deliverables are completed in a timely manner.
98% of requests for products received on agreed upon date.
100% of requests for products/services received on agreed upon date + 5 working days.
100% of comments and edits are incorporated per CDRL requirements.
Customer Surveys
COR will conduct periodic interviews/surveys with ICBMSD personnel to ensure items are being delivered in accordance with the CDRL requirements
Cost Control
Contractor performs tasks within +/-10% of allocated hours and schedule.
Periodic inspections
COR will conduct periodic interviews/surveys
| Data Rights |
| 1.6.3.3 |
| 100% of Government-rights data provided IAW applicable CDRLs |
| Semi-Annually in PMR |
| Systems Engineering |
| 1.6.4.1 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.1 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| Risk Management |
| 1.6.4.1.4 |
| 100% of identified risks are managed IAW the current ICBMSD Risk Management Plan |
100% assessment of medium and high cost risks with appropriate cost analyses and estimating or logistics costs models
100% compliance with the applicable performance requirements detailed in 1.6.4.1.4 Monthly Status Report for new; Quarterly RMB for on-going
| Trade Studies |
| 1.6.4.1.5 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.1.5 |
| Annually in PMR |
| Configuration Management |
| 1.6.4.1.6 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.1.6 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| System Safety |
| 1.6.4.1.8 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.1.8 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| Electromagnetic Radiation |
| 1.6.4.1.9 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.1.9 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| Nameplates & Product Markings |
| 1.6.4.1.10 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.1.10 |
| Physical inspection upon receipt |
| Software Development |
| 1.6.4.1.12 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.1.12 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| Hardware Development |
| 1.6.4.1.14 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.1.14 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| Sustainment Engineering |
| 1.6.4.2 |
| 100% of requests for assistance acknowledged within 1 business day; 100% of requests for assistance prioritized within 3 business days |
Coordinate 100% of tasks (to include contractor prioritizations) with Government within 5 business days as detailed in 1.6.4.2 Monthly Status Report for new; Quarterly PMR for on-going
| Software Sustainment |
| 1.6.4.2.2 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.2.2 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| Hardware Sustainment |
| 1.6.4.2.3 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.2.3 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| Parts, Materials, and Maintenance Support |
| 1.6.4.2.5 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.2.5. |
| Monthly Status Report for new; Quarterly PMR for on-going |
| DMSMS |
| 1.6.4.2.5.1.2 |
| Provide Government a DMSMS Plan (contractor draft) within 365-days of contract Period of Performance start |
Review DMSMS Plan annually and provide Government updated DMSMS Plan (contractor draft) addressing any applicable improvement recommendations and all applicable new technologies and processes; detailed in 1.6.4.2.5.1.2 Receipt of document; annually reviewed in PMR following document delivery
| TO Support |
| 1.6.4.2.6 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.2.6 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| Technical Risk Assessment |
| 1.6.4.3.2 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.3.2 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| Aging Surveillance |
| 1.6.4.3.3 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.3.3 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| Nuclear Hardness and Survivability |
| 1.6.4.3.4 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.3.4 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| Nuclear Surety |
| 1.6.4.3.5 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.3.5 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| Test & Evaluation |
| 1.6.4.4.1 |
| 100% compliance with the applicable performance requirements detailed in 1.6.4.4.1 |
| Monthly Status Report for new; Quarterly PMR for on-going |
| Program Management Support |
| 1.6.3 |
| 100% of requests for assistance acknowledged within 1 business day; 100% of requests for assistance prioritized within 3 business days |
Coordinate assignment of 100% of tasks (to include contractor prioritizations) with Government within 5 business days Monthly Status Report for new; Quarterly PMR/Task Log Review for on going
| Transition |
| 1.6.3.2 |
Compliance with 100% of Transition Plan elements within 180 calendar days of Government approval of Transition Plan (threshold)
Compliance with 100% of Transition Plan elements within 90 calendar days of Government approval of Transition Plan (objective) Monthly Status Report and Quarterly PMR until Government declares end to transition period
| Cost Reporting |
| 1.6.3.1.4 |
| Provide program and subcontractor approach and status information at the IPT-level in a clear, organized manner for 100% of applicable activities |
Provide recovery plans which clearly describe the necessary steps and estimated timelines associated with 100% of important issues/delays and of significant issues/delays
Provide assessments for 100% of “medium and high” consequence cost risks with appropriate cost analyses and estimating or logistics costs models (threshold)
Monthly Status Report for new; Quarterly PMR for on-going
| Integration Management |
| 1.6.3.1.1 |
| Clearly present cost, schedule, performance, technical issues, and status for 100% of sustainment tasks and in-scope programs/activities as described in 1.6.3.1.1 |
Provide 100% of the EVMS products described in 1.6.3.1.1 on a monthly basis Monthly Status Report for new; Quarterly PMR for on-going
| Subcontractor Small Business Utilization and Participation |
| 1.6.3.1.6.5 |
| Contractor is proactive in conducting market research and seeking qualified small business sources to meet goals established in subcontracting plan. |
| Review of Small Business report submissions |
Review GSSC subcontractor awards to ensure goal is being met
| Emergency Response |
| 1.6.5 |
| 100% compliance with the applicable performance requirements detailed in 1.6.5 |
| Event-driven (evaluated at each exercise or event debrief) |
| Environmental Controls |
| 4.9 |
| 100% compliance with the applicable performance requirements detailed in 4.9 and associated governing regulations and statutory laws on the tasks assigned and completed |
| Annually in PMR |
ATTACHMENT 2 – QUALITY PERFORMANCE ASSESSMENT
QUALITY PERFORMANCE ASSESSMENT (QPA)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. BRIEF DESCRIPTION OF SERVICES |
4. Quality Assurance Personnel (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. |_| Task Performance |_| Services Concern |_| Non Conformance |_| Unacceptable Performance
8. SERVICES SUMMARY or SOW PARAGRAPH ITEM REVIEWED
9. BRIEF DESCRIPTION OF FINDING
10. DETAILED PERFORMANCE ASSESSMENT
II. CONTRACTOR RESPONSE
11. CONTRACTOR REPRESENTATIVE
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF FINDING
III. GOVERNMENT ACCEPTANCE
14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
16. CONTRACTOR REPRESENTATIVE REMARKS
Quality Performance Assessment (QPA) Template, Jul 10 (OO-ALC/GHSBHOO-ALC/GHSBH)
QUALITY PERFORMANCE ASSESSMENT
Continuation Sheet (Number to correspond with applicable Item Number on reverse)
Quality Performance Assessment (QPA) Template, Jul 10 (OO-ALC/GHSBH) Quality Performance Assessment (QPA) Instructions
Block 1. COR enters contract or task order number.
Block 2. COR enters contractor name.
Block 3. COR enters brief description of services.
Block 4. COR signs and dates.
Block 5. COR enters telephone number.
Block 6. COR assigns suspense date for Contractor Response. No response by designated date indicates concurrence with findings.
Part I. Contractor Performance
Block 7. COR checks all boxes that apply.
Task Performance – Indicates positive performance assessments or close-out of Task Order with no further action required by the contractor.
Service Concern – Indicates performance assessments needing immediate attention by the contractor that may require a resolution plan to mitigate risk of identified findings, or further information from the contractor to clarify specific aspects of the tasking to meet government expectations.
Non-Conformance – Indicates performance that did not meet acceptable thresholds and a resolution plan is mandatory to mitigate further risk to the project prior to completion.
Unacceptable Performance – Indicates performance that did not meet acceptable thresholds and is beyond the known capability of the contractor to resolve prior to project completion.
Block 8. COR enters Services Summary or Performance-based Work Statement (PWS) paragraph item reviewed.
Block 9. COR enters brief description of finding.
Block 10. COR enters a detailed performance assessment.
Part II. Contractor Response
Block 11. Contractor Representative Name
Block 12. Contractor Representative enters Estimated Completion Date of Corrective Action and continues to Block 13.
Block 13. Contractor Representative details Contractor’s action taken to prevent recurrence or addresses specific required action within Section I.
Part III. Government Acceptance
Block 14. COR checks appropriate block, signs, and dates.
Block 15. (Required Entry) COR remarks regarding the Contractor’s Response.
Block 16. Contractor Representative enters remarks if further discussion is needed about COR concurrence with Contractor’s Response.