ATT_11_PREAWARD_SURVEY_OF_PROSPECTIVE_CONTRACTOR_ACCOUNTING_SYSTEM_CHECKLIST.pdf

PDF 480 KB Posted

Attached to
Remote Visual Assessment (RVA) Contractor Logistics Support (CLS)
Solicitation number
FA8204-14-R-7014
Issued by

About this file

Draft Pre-Award Survey for Accounting System

View the file

Other files

File Type Posted
ppi_tool.accdb —
FA820414R7014_ATT_13_NORTH_DAKOTA_WAGE_DETERMINATION.pdf PDF
FA820414R7014_ATT_4_RVA_CDRL_PACKAGE_PRINT.pdf PDF
FA820414R7014_ATT_6_FIXED_PRICE_LABOR_RATE_MATRIX.xlsx XLSX spreadsheet
FA820414R7014_ATT_3_RVA_CLS_PWS.pdf PDF
FA820414R7014_ATT_12_MONTANA_WAGE_DETERMINATION.pdf PDF
FA820414R7014_ATT_11_PREAWARD_SURVEY_OF_PROSPECTIVE_CONTRACTOR_ACCOUNTING_SYSTEM_CHECKLIST.doc DOC document
FA820414R7014_ATT_1_RVA_CLS_Section_L.pdf PDF
FA820414R7014_ATT_5_TEP_CLIN_PRICING_MATRIX.xlsx XLSX spreadsheet
FA820414R7014_ATT_9_PAST_PERFORMANCE_QUESTIONNAIRE.doc DOC document
FA820414R7014_ATT_15_WYOMING_WAGE_DETERMINATION.pdf PDF
FA820414R7014_ATT_8_EZ_SOURCE_PPI_INSTRUCTIONS_TO_OFFERORS.docx DOCX document
FA820414R7014.RTF RTF text file
FA820414R7014_ATT_2_RVA_CLS_Section_M.pdf PDF
FA820414R7014_ATT_7_SAMPLE_QUESTIONNAIRE_COVER_LETTER.doc DOC document
FA820414R7014_ATT_10_SUBCONTRACTOR_PPI_DISCLOSURE_CONSENT_FORM.doc DOC document
FA820414R7014_ATT_14_UTAH_WAGE_DETERMINATION.pdf PDF
ATT_6_FIXED_PRICE_LABOR_RATE_MATRIX.pdf PDF
ATT_4_RVA_CDRL_PACKAGE.pdf PDF
ATT_8_EZ_SOURCE_PPI_INSTRUCTIONS_TO_OFFERORS.pdf PDF
ATT_7_SAMPLE_QUESTIONNAIRE_COVER_LETTER.pdf PDF
ATT_3_RVA_CLS_PWS.pdf PDF
ATT_1_RVA_CLS_Section_L.pdf PDF
ATT_5_TEP_CLIN_PRICING_MATRIX.pdf PDF
FA820414R7014.pdf PDF
ATT_9_PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
ATT_2_RVA_CLS_Section_M.pdf PDF
ATT_10_SUBCONTRACTOR_PPI_DISCLOSURE_CONSENT_FORM.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 11

Preaward Survey of Prospective Contractor Accounting System Checklist

[FAR 16.301-3 states that a cost-reimbursement type contract may be used only when the contractor’s accounting system is adequate for determining costs applicable to the contract. If no information is available in the files to make this determination, a Preaward Survey of Prospective Contractor’s Accounting System (SF1408) can be requested from DCAA. Before requesting such an audit, it is a good idea to send this checklist to prospective contractor’s for completion to ensure they understand the requirements of the SF1408, and to ensure they are ready for DCAA to come in and perform an audit].

Instructions:

1. Mark “X” in the appropriate column.

2. On Page 2, provide a narrative describing how the current accounting system supports your response to each item. Be as descriptive as necessary.

3. Answer the questions on page 3.

Contractor Name:

Point of Contact:

(Name/Ph #/email)

CAGE Code:

DUNS Code:

Yes No N/A Note

1. Is the accounting system in accord with generally accepted accounting principles? 1

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs. 2

b. Identification and accumulation of direct costs by contract. 3

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) 4

d. Accumulation of costs under general ledger control. 5

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. 6

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. 7

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account. 8

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. 9

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. 10

DRAFT

j. Segregation of preproduction costs from production costs. 11

3. Accounting system provides financial information:

a. Required by contract clauses concerning limitation of cost

(FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). 12

b. Required to support requests for progress payments. 13

4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions? 14

5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) 15

Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.

Note Narrative

DRAFT

PLEASE ANSWER ALL QUESTIONS BELOW:

ARE YOU PLANNING ON BIDDING ON COST TYPE CONTRACTS? (YES/NO) ______

ARE YOU READY FOR A DCAA AUDIT? (YES/NO) _____________

HAVE YOU READ THE REQUIREMENTS IN THE SF1408? (YES/NO) ____________

HAVE YOU READ THE "Information for Contractors" DOCUMENT ON DCAA's WEBSITE (http://www.dcaa.mil/)? (YES/NO) _____________

PLEASE IDENTIFY THE DCAA OFFICE THAT IS COGNIZANT OVER YOUR COMPANY -

(Found on DCAA's website (http://www.dcaa.mil/) _____________________

PLEASE IDENTIFY YOUR COMPANY’S POINT OF CONTACT (Name/ph #/ email)

If an Outside CPA/Consultant/Non DoD agency has reviewed your Accounting System, please provide a copy of the Report.

[Insert name and title of individual responsible for design of the accounting system]

Name: ______________________ Signature: ___________________________ Title: ______________________ Date: ______________________________ Contractor: ______________________________________________________________ DRAFT

File details come from the government source that posted it. Updated .