Draft CDRL Package
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR Number: F2DCBY428B001
Remote Visual Assessment (RVA) Contractor Logistic Support (CLS)
24 April 2014
CDRL Instructions & Master Listing
1. Introduction
This document was developed in accordance with DOD MIL-STD 31000A and represents the general requirements for the Technical Data Package (TDP) for this program. The purpose of this Attachment, Contract
Data Requirement List (CDRL) Instructions and Master Listing, is to supplement the Government Rights in
Data Attachment (GRID). All delivery instructions are specified on the CDRL forms or its digital (word, excel, pdf) equivalent.
2. General Guidelines
The CDRL is a list of data requirements authorized for this specific contract. The CDRLs shall apply to the
Remote Visual Assessment (RVA) Contractor Logistic Support (CLS) program unless otherwise stated. The
CDRL form, Department of Defense (DD) Form 1423, specifies the data required to be delivered to the
Government, as well as the frequency and approval requirements. The Data Item Descriptions (DID), listed on the CDRL form, were selected from the Acquisition Streamlining and Standardization Information System
(ASSIST) and provide additional direction for data preparation.
3. Communications
Any correspondence related to requests for data delivery deviations and/or amendments, additions or deletions to the CDRL form shall be addressed to the Procuring Contracting Officer (PCO) with a courtesy copy to the
Data Management Officer (DMO) (Air Force Nuclear Weapons Center (AFNWC)/NIES) and the cognizant program manager (PM). Copies of all forms & templates noted in this file are available as requested from your program manager, the DMO or your PCO.
4. Codes used in the DD Form 1423
The directions for submittal and approval of data is indicated in Blocks 7, 8, 9, 10, 11, 12, 13, 14, 15 or 16 of the DD Form 1423. Usually, the direction is in the form of a code (explained below). The following abbreviations/codes are common usage within AFNWC.
4.1 Block 7, DD Form 250 Requirements
Block 7 of the CDRL form indicates whether Procurement Quality Assurance (PQA) inspections and acceptance of deliverable data by DD Form 250 is required. “Draft” copies submitted for advance approval and
“Preliminary Draft” copies submitted are exempt from the DD Form 250 requirements. Information copies of
DD Form 250 to accompany each letter of transmittal for this category of data.
Code Inspection Acceptance
SS Source (DD Form 250 or equivalent document) Source (DD Form 250 or equivalent document)
DD Destination (DD Form 250 or equivalent document)
Destination (DD Form 250 or equivalent document)
SD Source (DD Form 250 or equivalent document) Destination (DD Form 250 or equivalent document)
DS Destination (DD Form 250 or equivalent document)
Source (DD Form 250 or equivalent document)
Code Inspection
LT Letter of Transmittal only
NO No inspection or acceptance required
XX Inspection and acceptance requirements specified elsewhere in contract
S Indicates the contractor’s facility
D Indicates the primary destination point
4.2 Block 8, Approval Code
When document approval is required (code “A”), the approval authority (ORG) for that 1423 is designated with an (A). Approval coordination shall be done using the Contract Document Action Form (CDA). When document approval is not required (code “N/A”), no approval of the CDRL is required (note that documents that do not require approval shall also be marked as “NO” or “LT” in block 7.
Code Description
A Approval Required
N/A Approval Not Required
4.3 Block 10, Frequency of Submittals
DAILY Daily
WEKLY Weekly
BI-WE Each 2 weeks
MTHLY Monthly
BI-MO Each 2 months
QRTLY Quarterly
ANNLY Annually
SEMIA Each 6 months
OTIME One time
ONE/R One time and revisions
R/ASR Revisions as required
ASGEN As generated
ASREQ As required*
DFDEL Deferred delivery
DFORD Deferred ordering
DFREQ Deferred requisitioning
ONE/P One time preliminary draft
XTIME Multiple separate submittals (i.e., 2Time, 3Time)
* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block
16.
4.4 Block 12 and 13, Dates of Initial and Subsequent Submissions
ATP Authority To Proceed
ASGEN As generated
ASREQ As required*
CDR Critical Design Review
CA Contract Award
CO Change Order
CD Calendar Day(s)
CP/REQ Change page/as required
CP/O Change page/(only)
DCARC Defense Cost and Research Center
DFDEL Deferred delivery
FQT Formal Qualification Test
FCA Functional Configuration Audit
PCA Physical Configuration Audit
TRR Test Readiness Review
SA Supplemental Agreement
WD Working Day(s)
* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block
16.
5. Supplemental Data Preparation Instructions
5.1 Data Item Description (DID) Tailoring
The DID is a specification for the preparation of data. DID tailoring is reflected in Block 16 of the CDRL form.
“T” entered after the DID number in Block 4, means that the DID has been tailored. Block 4 tailoring is made to either relax preparation instructions or to tailor the DID to be in consonance with the source document tailoring contained in the Statement of Work (SOW), Performance Work Statement (PWS) or Statement of
Objectives (SOO).
5.2 Distribution Statement Marking
The designation in Block 9 of the CDRL form indicates that one of the following seven (7) authorized distribution statements from Department of Defense (DoD) Directive 5230.24 and Air Force Instruction
(AFI) 61.204 shall be annotated on that technical data. Distribution statements will be selected to denote the audience the data is intended for: A distribution statement marking is distinct from and in addition to a security classification marking assigned in accordance with (IAW) DoD 5200.1-R. Should Block 9 of the CDRL form and the DID be in conflict, Block 9 of the CDRL form shall take precedence. The following distribution statements are authorized for use in marking technical documents:
Distribution Statement A:
Approved for public release; distribution is unlimited.
Distribution Statement B:
Distribution authorized to U.S. Government Agencies only
(fill in reason) (date of determination). Other requests for this document shall be referred to (insert controlling DoD office).
Distribution Statement C:
Distribution authorized to U.S. Government Agencies and their contractors (fill in reason) (date of determination).
Other requests for this document shall be referred to (insert controlling DoD office).
Distribution Statement D:
Distribution authorized to the DoD and U.S. DoD contractors only for Administrative or Operational Use determined as of (date of determination). Other requests shall be referred to AFNWC/NI, 6054 Dogwood Ave Bldg
1255, Hill AFB UT 84056-5816.
Distribution Statement E:
Distribution authorized to Department of Defense (DoD)
Components only for Administrative or Operational Use
Distribution Statement F:
Further dissemination only as directed by AFNWC/NI, 6054 Dogwood Ave Bldg 1255, Hill AFB UT 84056-5816.
(date determination). Other requests shall be referred to
AFNWC/NI, 6054 Dogwood Ave Bldg 1255, Hill AFB UT
84056-5816.
(date of determination) or higher Department of Defense
(DoD) authority.
Distribution Statement X:
Distribution authorized to U.S. Government Agencies and private individuals or enterprises eligible to obtain export-controlled technical data in accordance with (IAW) regulations implementing 10 U.S.C. 140 (date of determination). Controlling office is (insert).
5.3 Other Notices
All technical documents marked with Distribution Statements B, C, D, E, F, or X will also be marked with the following notices:
WARNING:
This document/software contains technical data/software whose export is restricted by the Arms Export Control
Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979, as amended, (Title 50, U.S.C., App 2401 et seq). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
Destruction Notice:
For classified documents, follow the procedures in DOD 5220.22M, National Industrial Security Program
Operating Manual, Chapter 5, Section 7, or DOD 5200.1R, Information Security Program Regulation, Chapter
6, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
6. Supplemental Data Delivery Instructions
6.1 Due Dates
Due dates for delivery of data are to be construed as receipt at destination.
6.2 Late Delivery
Delivery of data is considered late if it does not arrive at its destination by 1530 hours (3:30 PM) Mountain
Time on the date specified in Blocks 12, 13 or 16 of the CDRL.
6.3 Submittal Procedures
6.3.1 CDRL Submittal Procedure
For the purposes of data submittal. Unclassified CDRLs are submitted to the government via encrypted email to the recipient outlined in Block 14.
Each data submittal shall be accompanied by a Contract Document Action (CDA) form (please request current version from ORG1). If for any reason a CDA form is not available, a cover letter shall contain the following information:
1. Contract number
2. CDRL sequence number (i.e., A001)
3. Exact title and subtitle (if applicable) of the document being transmitted
4. Line item or CLIN number
5. Modification Number or Order Number
4. Document date, number, and revision information (if applicable)
5. Data delivery method and date of delivery
6. Whether the document is a draft, or final submittal
7. For approval data: State “For Approval”
8. If the document is a re-submittal, reference the Government letter Contractual Document Action (CDA) requesting re-submittal or disapproval of previous submittal
9. For periodic reports: The report period that the document covers
10. Distribution: Information disclosing the total contractual distribution being made per Block 14, or
Block 16 of the CDRL Form
6.3.2 Classified CDRL Submittal Procedure
Classified CDRLs and classified documentation are submitted in accordance with this instruction and are never to be emailed. Classified CDRLs or portions of a CDRL, as applicable, shall be forwarded IAW Appendix B of the DD254. For Classified Disks send two (2) copies.
Outer Envelope:
Address
ATTN: Security Office/Document Control
Inner Envelope:
Addresss
ATTN: Name of person for whom the document should be delivered
7. Supplemental Data Review and Approval Process
7.1 Approval CDRLs
The letter “A” in Block 8 of the DD Form 1423 indicates that the Government must approve the data item. In addition, Block 16 of the form may contain additional directions.
Written
Approval
Written approval indicates agreement or concurrence with the contractor furnished data only and shall not be construed as changing any of the terms or conditions of the subject contract.
The approval authority shall be ORG 1 as outlined in section 9 of this document. Approval shall take the form of either a letter signed by the PCO/DMO or concurrence using the
Contractual Document Action (CDA) form, signed and dated by the representative stated in
ORG 1. Data items submitted for approvals are NOT automatically approved without government approval.
Approved with
Comment or
Disapproved
The Contractor shall revise data items Approved with Comments or Disapproved in accordance with the specific written comments transmitted with the CDA or PCO/DMO letter and resubmit not later than 30 calendar days (unless otherwise directed) from receipt of the Approval with Comments or Disapproval, unless otherwise directed. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.
Draft Versions of the CDRL
If a DD Form 1423 directs the Contractor to submit a “draft” version of an approval CDRL in advance of the final version, the draft will be considered an information only submission.
However, the PCO still retains the right to disapprove a draft data item that does not comply with the contract requirements. Unless otherwise directed by the PCO, the Contractor shall incorporate the Government’s comments in the final submission and shall not resubmit the draft version of the data item.
7.2 Contractual Document Action (CDA)
After the Government receives a data item submission, a Temporary Data Identification Number (TDID), a unique identifier to that submission, will be assigned by the DMO. The Government’s review of that data item will result in a coordinated CDA form, or PCO letter, indicating the data items approval or disapproval. Should the Government have comments on the data item; the CDA will include either comments on the CDA form itself or a Comment Resolution Matrix (CRM). Comments will be provided to the submitter in accordance with the format and timeline noted in block 16. Comments will be assigned one of the following codes:
COMMENT CODE CODE DESCRIPTION
C Critical Comments of a very serious nature that will preclude final approval and publication of the document. You are willing to elevate the comment or issue to senior organization leadership (e.g., general officer) and recommend they non-concur. These are the "show-stoppers". Convincing rationale for critical comments must be provided. The individual making the comment and the document writer will reconcile the comment.
S Substantive Comments of a less serious nature that have noticeable impact on the document's quality or content. The document appears to be incorrect, misleading, confusing, or inconsistent with other sections.
A Administrative Comments that address minor items such as typographical, format and/or grammatical errors.
7.3 Information Only CDRLs
When an “A” is not indicated in Block 8 of the DD Form 1423, the PCO/DMO still retains the right to disapprove any data that does not comply with contract requirements. The Contractor shall revise the disapproved data item in accordance with the specific written comments transmitted with the CDA form or PCO letter and resubmit not later than 30 calendar days, unless otherwise directed, from receipt of the disapproval.
The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.
8. Data Accession List (DAL)
During performance of the contract, requests from the PCO for data ordered from the Data Accession List
(DAL) (with the application of DID DI-MGMT-81453A) shall be provided at no increase in contract price.
Requests for quantities greater than two each per document shall be honored upon receipt of PCO direction and with Contractor concurrence that such request can be filled at no increase in contract price.
9. Organizational Cross Reference List
The following Organizational Cross Reference List shall be used in conjunction with the CDRLs to determine actual addressees for distribution of data. The ORG number will be entered in lieu of a address on the CDRL and will be a part of the CDRL package. Changes to the list will be identified by an asterisk next to the ORG number and a revision date to the list.
ORG#/ Name Address Attention/To Contact Info
ORG1/ AFNWC/NIAC 6030 Gum Ln Bldg 1217 Hill AFB UT 84056-5826
Thomas Holland thomas.holland.3@us.af.mil
ORG2/AFNWC/NIAA 6030 Gum Ln Bldg 1217 Hill AFB UT 84056-5826
Capt Spencer Turner spencer.turner.1@us.af.mil
ORG3/AFNWC/PZBE 6014 Dogwood Ave Bldg 1258 Hill AFB UT 84056-5838
Melanie Thomas melanie.thomas@us.af.mil
ORG4/AFNWC/NIES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056-5816
Nancy Baker nancy.baker.1@us.af.mil
10. CDRL Master Listing Index
CDRL# Description DID
A001 Conference Agenda DI-ADMN-81249A
A002 Briefing Material DI-MGMT-81605
A003 Report, Record of Meeting/Minutes DI-ADMN-81505/T
A004 Statement of Work DI-MGMT-81606
A005 Program Management Plan DI-MGMT-81797
A006 Quality Assurance Program Plan CI-QCIC-81794
A007 Contractor’s Risk Management Plan DI-MGMT-81808
A008 Contractor’s Configuration Management Plan DI-CMAN-80858B
A009 Contract Summary Report DI-ADMN-80447A/T
A010 Engineering Change Proposal DI-CMAN-80639C
A011 Test Plan (Acceptance, Qualification, Integration) DI-NDTI-80566A
A012 Test Procedure (Acceptance, Qualification, Integration) DI-NDTI-80603A
A013 Test/Inspection Report (Acceptance, Qualification, Integration) DI-NDTI-80809B
A014 Technical Report – Study/Services (Opportunities to improve reliability, availability and maintainability)
DI-MISC-80508B/T
A015 Technical Report – Study/Services (Feasibility Studies) DI-MISC-80508B/T
A016 Technical Report – Study/Services (Risks to the Supply Chain) DI-MISC-80508B/T
A017 Technical Report – Study/Services (Fault Tree Analysis) DI-MISC-80508B/T
A018 Technical Report – Study/Services (Transition Plan) DI-MISC-80508B/T
A019 Performance Analysis Report DI-SESS-81938
A020 Computer Software Product DI-ISPC-81488
A021 Man Hours Expenditure Chart DI-FNCL-80003 mailto:thomas.holland.3@us.af.mil mailto:spencer.turner.1@us.af.mil mailto:melanie.thomas@us.af.mil mailto:nancy.baker.1@us.af.mil
A022 Information Systems Accreditation Documentation DI-ADMN-80239
A023 Government Furnished Materiel (GFM) Consumption Report DI-MGMT-80438B
A024 Failure Analysis and Corrective Action Report DI-SESS-81315B
A025 Verification Analysis Record DI-QCIC-80207
A026 Maintenance Service Report DI-MGMT-80995A
A027 Spare Parts Usage Report DI-ILSS-80483
A028 Risk Management Status Report DI-MGMT-81809
A029 Commercial Off-The-Shelf (COTS) Manuals DI-TMSS-81815
A030 Data Accession List (DAL) DI-MGMT-81453A
A031 Integrated Program Management Report (IPMR) DI-MGMT-81861/T
A032 Operating Procedures Manual DI-MISC-81418
11. DD Form 1423s
The purpose of the below references is to provide a single reference for block A and E of the included 1423 forms. This provides for efficient renumbering of blocks A and E, in lieu of renumbering each block at the time of contract award.
*1423’s, block A Reference Number: CLIN number to be added at time of award
**1423’s block E Reference Number: Contract and Mod/TO number to be added at time of award
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
REMOTE VISUAL ASSESSMENT
(RVA) CLS
F2DCBY428B001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 CONFERENCE AGENDA Meeting Agenda
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-81249A PWS Paras 3.5, 3.6.1 AFNWC/NIAC
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT
ASREQ N/A
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
N/A N/A Reg
Repro
16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL
BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 9:
Distribution Statement D: (see pages 3 & 4 for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Conference Agenda (Meeting Agenda) NLT 5 days prior to scheduled meetings or meetings deemed necessary by the
Government. Government will be allowed 2 days, after receipt from contractor, to review for comments. Contractor shall submit revised
Meeting Agenda incorporating Government comments, if applicable, NLT 2 days after receipt from Government.
BLOCK 14: Contractor shall submit Meeting Agenda to ORGs 1&2
(see page 7 for address).
ORG1
ORG2
ORG3 (Lt of delivery only)
ORG4 (Lt of delivery only)
15. TOTAL 2
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Nancy N. Baker, GS-12
Data Manager
AFNWC/NIES
24 Apr 14
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
LM 13-24
1385758126C Typewritten Text 24 Apr 14
1385758126C Typewritten Text
1385758126C Typewritten Text
1385758126C Typewritten Text
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A002 BRIEFING MATERIALS
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81605 PWS Paras 3.5, 3.6.1 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ASREQ SEE BLK 16
a. ADDRESSEE
Draft
Contractor shall submit Briefing Materials NLT 5 days prior to each scheduled meeting and/or any other meeting deemed necessary by the
Government and as requested by the Government. Government will be allowed 2 days, after receipt from contractor, to review for comments.
Contractor shall present corrected Briefing Materials incorporating
Government comments, if applicable, NLT 2 days after receipt from
Government.
BLOCK 14:
Contractor shall submit Briefing Materials to ORGs 1&2 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
1385758126C Typewritten Text 24 Apr 14
1385758126C Typewritten Text
1385758126C Typewritten Text
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A003
REPORT, RECORD OF MEETING/MINUTES
Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-81505/T PWS Paras 3.5, 3.6.1 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
A
N/A SEE BLK 16
BLOCK 4:
1. Paragraph 10.4: Delete in its entirety
Contractor shall submit Report, Record of Meeting Minutes (Meeting
Minutes) NLT 15 days after meeting or event has been held.
Government will be allowed 5 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Meeting Minutes incorporating Government comments, if applicable, NLT 5 days after receipt from Government.
BLOCK 14: Contractor shall submit Meeting Minutes to ORGs 1&2
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A004 STATEMENT OF WORK (SOW)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81606 PWS Para 3.2.1.3.9 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
R/ASR SEE BLK 16
a. ADDRESSEE
Draft
SEE BLK 16 SEE BLK 16
16. REMARKS: CHANGES TO OFICE SYMBOLS, WHEN NECESSARY, SHALL
Contractor shall submit Statement of Work (SOW) NLT the 30 days after contract award. Government will be allowed 15 working days after receipt from contractor to review for approval/disapproval/ comments. Contractor shall resubmit corrected SOW incorporating
Government comments, if applicable, NLT 15 days after receipt from
BLOCK 14: Contractor shall submit SOW to ORGs 1&2 (see page 7
DD Form 1423-1, FEB 2001 Page___1__of___1__Pages
1385758126C
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A005 PROGRAM MANAGEMENT PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81797 PWS Para 3.5.1 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit Program Management Plan NLT 30 days after award of contract. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/comment.
Contractor shall submit revised Program Management Plan incorporating Government comments, if applicable, NLT 15 days after receipt from Government.
Contractor shall submit subsequent submittals as required by the
BLOCK 14: Contractor shall submit Program Management Plan to
ORGs 1&2 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
1385758126C
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A006 QUALITY ASSURANCE PROGRAM PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-QCIC-81794 PWS Para 3.5.2 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ONE/R SEE BLK 16
a. ADDRESSEE
Draft
Contractor shall submit initial Quality Assurance Program Plan NLT
30 days after award of contract. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/ comment. Contractor will submit revised Quality Assurance Program
Plan incorporating Government comments, if applicable, NLT 10 days after receipt from Government.
NOTE: Quality Assurance Program Plan shall be submitted IAW
AS 9100.
BLOCK 14: Contractor shall submit Quality Assurance Program
Plan to ORGs 1&2 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
LM13-24
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A007 CONTRACTOR’S RISK MANAGEMENT PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81808 PWS Para 3.2.8.2 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit Contractor’s Risk Management Plan NLT 30 days after award of contract. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/ comment. Contractor shall submit revised Contractor’s Risk
Management Plan incorporating Government comments, if applicable, NLT 15 days after receipt from Government.
Contractor shall submit subsequent submittals as required by the
BLOCK 14: Contractor shall submit Contractor’s Risk Management
Plan to ORGs 1&2 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
1385758126C
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP_________TM__________OTHER _ X_______
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A008
CONTRACTOR’S CONFIGURATION
MANAGEMNT PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-CMAN-80858B PWS Para 3.2.7.2 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
BLOCKS 10, 11, 12 &13:
Contractor shall submit the Contractor’s Configuration Management
Plan 45 days after contract award. Government will be allowed 10 days after receipt from contractor to review for approval/disapproval/ comments. Contractor shall submit revised Contractor’s Configuration
Management Plan incorporating Government comments, if applicable, NLT 10 working days after receipt from Government.
BLOCK 14a: Contractor shall submit Contractor’s Configuration
Management Plan to ORGs 1&2. (See page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Typewritten Text
1385758126C
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A009
CONTRACT SUMMARY REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-80447A/T PWS Para 3.6.1 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
MTHLY SEE BLK 16
a. ADDRESSEE
Draft
EOM SEE BLK 16
1. Paragraph 2.1: Delete in its entirety
Initial Submittal:
Contractor shall submit initial Contract Summary Report NLT the 20th of the month following the first complete month of the contract.
Subsequent Submittals:
Contractor shall submit subsequent Contract Summary Report NLT the 20th of each month thereafter for the duration of the contract.
Government will be allowed 10 days, after receipt from contractor, to review for comments. Contractor shall submit revised Contract
Summary Report incorporating Government comments, if applicable, NLT 10 days after receipt from Government.
Cutoff date for the information shall be the end of each month.
BLOCK 14: Contractor shall submit Contract Summary Report to
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A010 ENGINEERING CHANGE PROPOSAL (ECP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-CMAN-80639C PWS Paras 3.2.1.3.4, 3.2.4.6 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit Engineering Change Proposal (ECP) NLT 30 days after a need is discovered. Contractor will use red-line control to track changes throughout. Government will be allowed 15 days, after receipt from contractor, to review for approval/disapproval/comments.
Contractor shall submit revised ECP incorporating Government comments, if applicable, NLT 15 days after receipt from Government.
NOTE
: Reference documents. The applicable issue of any documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
NOTE
: Format and content: The ECP shall be prepared using DD form 1692. Copies of the form can be obtained from AFNWC/NIES
(Configuration Manager). The following references may be useful in defining content: MIL-STD-973, Configuration Management (obsolete)
MIL-HDBK-61, Configuration Management Guidance and
ANSI/EIA 649-1998, National Consensus Standard for Configuration
Management.
BLOCK 14: Contractor shall submit ECP to ORGs 1&2 (see page 7
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A011 TEST PLAN Acceptance, Qualification, Integration
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80566A PWS Para 3.4 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
8. APP CODE E 11. AS OF DATE 13. DATE OF SUBSEQUENT
a. ADDRESSEE
Draft
Contractor shall submit Test Plan NLT 45 days prior to start of test.
Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Test Plan incorporating Government comments, if applicable, NLT 15 days after receipt from Government.
NOTE: Test Plan shall be submitted IAW with AFNWCI 99-101 and ICBMSD OI 99-103.
BLOCK 14: Contractor shall submit Test Plan to ORGs 1&2 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A012 TEST PROCEDURE Acceptance, Qualification, Integration
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI- NDTI-80603A PWS Para 3.4 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit Test Procedures NLT 45 days prior to start of test. Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Test Procedures incorporating Government comments, if applicable, NLT 15 days after receipt from Government.
NOTE: Test Procedure shall be submitted IAW with AFNWCI
99-101 and ICBMSD OI 99-103.
BLOCK 14: Contractor shall submit Test Procedures to ORGs 1&2
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
1385758126C
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A013 TEST/INSPECTION REPORT Acceptance, Qualification, Integration
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80809B PWS Para 3.4 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit Test/Inspection Report NLT 30 days after completion of test. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/comments.
Contractor shall submit revised Test/Inspection Report incorporating
Government comments, if applicable, NLT 10 days after receipt from
NOTE: Test/Inspection Report shall be submitted IAW with
AFNWCI 99-101 and ICBMSD OI 99-103.
BLOCK 14: Contractor shall submit Test/Inspection Report to ORGs
1&2 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
1385758126C
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A014
TECHNICAL REPORT – STUDY/SERVICES
Opportunities to Improve Reliability, Availability and Maintainability
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B/T PWS Para 3.2.1.3.5 AFNWC/NAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ANNLY SEE BLK 16
a. ADDRESSEE
Draft
16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY,
SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
1. Paragraph 2., add the words “ Contractor Format Acceptable” after Format.
2. Delete paragraphs 2. (a) & (b) in their entirety
Contractor shall submit initial Technical Report – Study/Services
(Opportunities to Improve Reliability, Availability and
Maintainability) NLT 30 day after review is completed. Contractor shall submit subsequent Opportunities to Improve Reliability, Availability and Maintainability NLT 15 days after an opportunity for improvement arises.
Government will be allowed 30 days, after receipt from contractor, to review for comments. Contractor shall submit revised Opportunities to Improve Reliability, Availability and Maintainability incorporating
Government comments, if applicable, NLT 15 days after receipt from
BLOCK 14: Contractor shall submit Opportunities to Improve
Reliability, Availability and Maintainability to ORGs 1&2 (see page 7
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
1385758126C Typewritten Text
1385758126C Typewritten Text
1385758126C
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A015 TECHNICAL REPORT – STUDY/SERVICES Feasibility Studies
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B/T PWS Para 3.3.2 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit Technical Report – Study/Services (Feasibility
Studies) NLT 30 days after completion of analysis. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised
Feasibility Studies incorporating Government comments, if applicable, BLOCK 14: Contractor shall submit Feasibility Studies to ORGs
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
24 Apr 14
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X006 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A016 TECHNICAL REPORT – STUDY/SERVICES Risks to the Supply Chain
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B/T PWS Paras 3.2.4.6, 3.2.4.8 AFNWC/NIAC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
BLOCKS 10 & 12:
Contractor shall initial submit Technical Report – Study/Services
(Risks to the Supply Chain) NLT 30 days after completion of analysis.
Government will be allowed 10 days, after receipt from contractor to review for approval/disapproval/comments. Contractor shall submit revised Risks to the Supply Chain incorporating Government comments, if applicable, NLT 5 days after receipt from Government.
BLOCK 14: Contractor shall submit Risks to the Supply Chain to
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses.