ATT_4_RVA_CDRL_PACKAGE.pdf

PDF 2 MB Posted

Attached to
Remote Visual Assessment (RVA) Contractor Logistics Support (CLS) Federal contract opportunity
Solicitation number
FA8204-14-R-7014
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Draft CDRL Package

View the file

Other files for this federal contract opportunity

Other files attached to Remote Visual Assessment (RVA) Contractor Logistics Support (CLS), newest first.
File Type Posted
ppi_tool.accdb —
FA820414R7014_ATT_12_MONTANA_WAGE_DETERMINATION.pdf PDF
FA820414R7014_ATT_8_EZ_SOURCE_PPI_INSTRUCTIONS_TO_OFFERORS.docx DOCX document
FA820414R7014_ATT_10_SUBCONTRACTOR_PPI_DISCLOSURE_CONSENT_FORM.doc DOC document
FA820414R7014_ATT_1_RVA_CLS_Section_L.pdf PDF
FA820414R7014_ATT_9_PAST_PERFORMANCE_QUESTIONNAIRE.doc DOC document
FA820414R7014_ATT_15_WYOMING_WAGE_DETERMINATION.pdf PDF
FA820414R7014_ATT_2_RVA_CLS_Section_M.pdf PDF
FA820414R7014_ATT_14_UTAH_WAGE_DETERMINATION.pdf PDF
FA820414R7014_ATT_13_NORTH_DAKOTA_WAGE_DETERMINATION.pdf PDF
FA820414R7014_ATT_4_RVA_CDRL_PACKAGE_PRINT.pdf PDF
FA820414R7014_ATT_6_FIXED_PRICE_LABOR_RATE_MATRIX.xlsx XLSX spreadsheet
FA820414R7014_ATT_3_RVA_CLS_PWS.pdf PDF
FA820414R7014_ATT_11_PREAWARD_SURVEY_OF_PROSPECTIVE_CONTRACTOR_ACCOUNTING_SYSTEM_CHECKLIST.doc DOC document
FA820414R7014_ATT_5_TEP_CLIN_PRICING_MATRIX.xlsx XLSX spreadsheet
FA820414R7014.RTF RTF text file
FA820414R7014_ATT_7_SAMPLE_QUESTIONNAIRE_COVER_LETTER.doc DOC document
ATT_11_PREAWARD_SURVEY_OF_PROSPECTIVE_CONTRACTOR_ACCOUNTING_SYSTEM_CHECKLIST.pdf PDF
ATT_10_SUBCONTRACTOR_PPI_DISCLOSURE_CONSENT_FORM.pdf PDF
ATT_1_RVA_CLS_Section_L.pdf PDF
ATT_5_TEP_CLIN_PRICING_MATRIX.pdf PDF
FA820414R7014.pdf PDF
ATT_9_PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
ATT_2_RVA_CLS_Section_M.pdf PDF
ATT_6_FIXED_PRICE_LABOR_RATE_MATRIX.pdf PDF
ATT_8_EZ_SOURCE_PPI_INSTRUCTIONS_TO_OFFERORS.pdf PDF
ATT_7_SAMPLE_QUESTIONNAIRE_COVER_LETTER.pdf PDF
ATT_3_RVA_CLS_PWS.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR Number: F2DCBY428B001

Remote Visual Assessment (RVA) Contractor Logistic Support (CLS)

24 April 2014

CDRL Instructions & Master Listing

1. Introduction

This document was developed in accordance with DOD MIL-STD 31000A and represents the general requirements for the Technical Data Package (TDP) for this program. The purpose of this Attachment, Contract

Data Requirement List (CDRL) Instructions and Master Listing, is to supplement the Government Rights in

Data Attachment (GRID). All delivery instructions are specified on the CDRL forms or its digital (word, excel, pdf) equivalent.

2. General Guidelines

The CDRL is a list of data requirements authorized for this specific contract. The CDRLs shall apply to the

Remote Visual Assessment (RVA) Contractor Logistic Support (CLS) program unless otherwise stated. The

CDRL form, Department of Defense (DD) Form 1423, specifies the data required to be delivered to the

Government, as well as the frequency and approval requirements. The Data Item Descriptions (DID), listed on the CDRL form, were selected from the Acquisition Streamlining and Standardization Information System

(ASSIST) and provide additional direction for data preparation.

3. Communications

Any correspondence related to requests for data delivery deviations and/or amendments, additions or deletions to the CDRL form shall be addressed to the Procuring Contracting Officer (PCO) with a courtesy copy to the

Data Management Officer (DMO) (Air Force Nuclear Weapons Center (AFNWC)/NIES) and the cognizant program manager (PM). Copies of all forms & templates noted in this file are available as requested from your program manager, the DMO or your PCO.

4. Codes used in the DD Form 1423

The directions for submittal and approval of data is indicated in Blocks 7, 8, 9, 10, 11, 12, 13, 14, 15 or 16 of the DD Form 1423. Usually, the direction is in the form of a code (explained below). The following abbreviations/codes are common usage within AFNWC.

4.1 Block 7, DD Form 250 Requirements

Block 7 of the CDRL form indicates whether Procurement Quality Assurance (PQA) inspections and acceptance of deliverable data by DD Form 250 is required. “Draft” copies submitted for advance approval and

“Preliminary Draft” copies submitted are exempt from the DD Form 250 requirements. Information copies of

DD Form 250 to accompany each letter of transmittal for this category of data.

Code Inspection Acceptance

SS Source (DD Form 250 or equivalent document) Source (DD Form 250 or equivalent document)

DD Destination (DD Form 250 or equivalent document)

Destination (DD Form 250 or equivalent document)

SD Source (DD Form 250 or equivalent document) Destination (DD Form 250 or equivalent document)

DS Destination (DD Form 250 or equivalent document)

Source (DD Form 250 or equivalent document)

Code Inspection

LT Letter of Transmittal only

NO No inspection or acceptance required

XX Inspection and acceptance requirements specified elsewhere in contract

S Indicates the contractor’s facility

D Indicates the primary destination point

4.2 Block 8, Approval Code

When document approval is required (code “A”), the approval authority (ORG) for that 1423 is designated with an (A). Approval coordination shall be done using the Contract Document Action Form (CDA). When document approval is not required (code “N/A”), no approval of the CDRL is required (note that documents that do not require approval shall also be marked as “NO” or “LT” in block 7.

Code Description

A Approval Required

N/A Approval Not Required

4.3 Block 10, Frequency of Submittals

DAILY Daily

WEKLY Weekly

BI-WE Each 2 weeks

MTHLY Monthly

BI-MO Each 2 months

QRTLY Quarterly

ANNLY Annually

SEMIA Each 6 months

OTIME One time

ONE/R One time and revisions

R/ASR Revisions as required

ASGEN As generated

ASREQ As required*

DFDEL Deferred delivery

DFORD Deferred ordering

DFREQ Deferred requisitioning

ONE/P One time preliminary draft

XTIME Multiple separate submittals (i.e., 2Time, 3Time)

* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block

16.

4.4 Block 12 and 13, Dates of Initial and Subsequent Submissions

ATP Authority To Proceed

ASGEN As generated

ASREQ As required*

CDR Critical Design Review

CA Contract Award

CO Change Order

CD Calendar Day(s)

CP/REQ Change page/as required

CP/O Change page/(only)

DCARC Defense Cost and Research Center

DFDEL Deferred delivery

FQT Formal Qualification Test

FCA Functional Configuration Audit

PCA Physical Configuration Audit

TRR Test Readiness Review

SA Supplemental Agreement

WD Working Day(s)

* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block

16.

5. Supplemental Data Preparation Instructions

5.1 Data Item Description (DID) Tailoring

The DID is a specification for the preparation of data. DID tailoring is reflected in Block 16 of the CDRL form.

“T” entered after the DID number in Block 4, means that the DID has been tailored. Block 4 tailoring is made to either relax preparation instructions or to tailor the DID to be in consonance with the source document tailoring contained in the Statement of Work (SOW), Performance Work Statement (PWS) or Statement of

Objectives (SOO).

5.2 Distribution Statement Marking

The designation in Block 9 of the CDRL form indicates that one of the following seven (7) authorized distribution statements from Department of Defense (DoD) Directive 5230.24 and Air Force Instruction

(AFI) 61.204 shall be annotated on that technical data. Distribution statements will be selected to denote the audience the data is intended for: A distribution statement marking is distinct from and in addition to a security classification marking assigned in accordance with (IAW) DoD 5200.1-R. Should Block 9 of the CDRL form and the DID be in conflict, Block 9 of the CDRL form shall take precedence. The following distribution statements are authorized for use in marking technical documents:

Distribution Statement A:

Approved for public release; distribution is unlimited.

Distribution Statement B:

Distribution authorized to U.S. Government Agencies only

(fill in reason) (date of determination). Other requests for this document shall be referred to (insert controlling DoD office).

Distribution Statement C:

Distribution authorized to U.S. Government Agencies and their contractors (fill in reason) (date of determination).

Other requests for this document shall be referred to (insert controlling DoD office).

Distribution Statement D:

Distribution authorized to the DoD and U.S. DoD contractors only for Administrative or Operational Use determined as of (date of determination). Other requests shall be referred to AFNWC/NI, 6054 Dogwood Ave Bldg

1255, Hill AFB UT 84056-5816.

Distribution Statement E:

Distribution authorized to Department of Defense (DoD)

Components only for Administrative or Operational Use

Distribution Statement F:

Further dissemination only as directed by AFNWC/NI, 6054 Dogwood Ave Bldg 1255, Hill AFB UT 84056-5816.

(date determination). Other requests shall be referred to

AFNWC/NI, 6054 Dogwood Ave Bldg 1255, Hill AFB UT

84056-5816.

(date of determination) or higher Department of Defense

(DoD) authority.

Distribution Statement X:

Distribution authorized to U.S. Government Agencies and private individuals or enterprises eligible to obtain export-controlled technical data in accordance with (IAW) regulations implementing 10 U.S.C. 140 (date of determination). Controlling office is (insert).

5.3 Other Notices

All technical documents marked with Distribution Statements B, C, D, E, F, or X will also be marked with the following notices:

WARNING:

This document/software contains technical data/software whose export is restricted by the Arms Export Control

Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979, as amended, (Title 50, U.S.C., App 2401 et seq). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

Destruction Notice:

For classified documents, follow the procedures in DOD 5220.22M, National Industrial Security Program

Operating Manual, Chapter 5, Section 7, or DOD 5200.1R, Information Security Program Regulation, Chapter

6, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

6. Supplemental Data Delivery Instructions

6.1 Due Dates

Due dates for delivery of data are to be construed as receipt at destination.

6.2 Late Delivery

Delivery of data is considered late if it does not arrive at its destination by 1530 hours (3:30 PM) Mountain

Time on the date specified in Blocks 12, 13 or 16 of the CDRL.

6.3 Submittal Procedures

6.3.1 CDRL Submittal Procedure

For the purposes of data submittal. Unclassified CDRLs are submitted to the government via encrypted email to the recipient outlined in Block 14.

Each data submittal shall be accompanied by a Contract Document Action (CDA) form (please request current version from ORG1). If for any reason a CDA form is not available, a cover letter shall contain the following information:

1. Contract number

2. CDRL sequence number (i.e., A001)

3. Exact title and subtitle (if applicable) of the document being transmitted

4. Line item or CLIN number

5. Modification Number or Order Number

4. Document date, number, and revision information (if applicable)

5. Data delivery method and date of delivery

6. Whether the document is a draft, or final submittal

7. For approval data: State “For Approval”

8. If the document is a re-submittal, reference the Government letter Contractual Document Action (CDA) requesting re-submittal or disapproval of previous submittal

9. For periodic reports: The report period that the document covers

10. Distribution: Information disclosing the total contractual distribution being made per Block 14, or

Block 16 of the CDRL Form

6.3.2 Classified CDRL Submittal Procedure

Classified CDRLs and classified documentation are submitted in accordance with this instruction and are never to be emailed. Classified CDRLs or portions of a CDRL, as applicable, shall be forwarded IAW Appendix B of the DD254. For Classified Disks send two (2) copies.

Outer Envelope:

Address

ATTN: Security Office/Document Control

Inner Envelope:

Addresss

ATTN: Name of person for whom the document should be delivered

7. Supplemental Data Review and Approval Process

7.1 Approval CDRLs

The letter “A” in Block 8 of the DD Form 1423 indicates that the Government must approve the data item. In addition, Block 16 of the form may contain additional directions.

Written

Approval

Written approval indicates agreement or concurrence with the contractor furnished data only and shall not be construed as changing any of the terms or conditions of the subject contract.

The approval authority shall be ORG 1 as outlined in section 9 of this document. Approval shall take the form of either a letter signed by the PCO/DMO or concurrence using the

Contractual Document Action (CDA) form, signed and dated by the representative stated in

ORG 1. Data items submitted for approvals are NOT automatically approved without government approval.

Approved with

Comment or

Disapproved

The Contractor shall revise data items Approved with Comments or Disapproved in accordance with the specific written comments transmitted with the CDA or PCO/DMO letter and resubmit not later than 30 calendar days (unless otherwise directed) from receipt of the Approval with Comments or Disapproval, unless otherwise directed. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.

Draft Versions of the CDRL

If a DD Form 1423 directs the Contractor to submit a “draft” version of an approval CDRL in advance of the final version, the draft will be considered an information only submission.

However, the PCO still retains the right to disapprove a draft data item that does not comply with the contract requirements. Unless otherwise directed by the PCO, the Contractor shall incorporate the Government’s comments in the final submission and shall not resubmit the draft version of the data item.

7.2 Contractual Document Action (CDA)

After the Government receives a data item submission, a Temporary Data Identification Number (TDID), a unique identifier to that submission, will be assigned by the DMO. The Government’s review of that data item will result in a coordinated CDA form, or PCO letter, indicating the data items approval or disapproval. Should the Government have comments on the data item; the CDA will include either comments on the CDA form itself or a Comment Resolution Matrix (CRM). Comments will be provided to the submitter in accordance with the format and timeline noted in block 16. Comments will be assigned one of the following codes:

COMMENT CODE CODE DESCRIPTION

C Critical Comments of a very serious nature that will preclude final approval and publication of the document. You are willing to elevate the comment or issue to senior organization leadership (e.g., general officer) and recommend they non-concur. These are the "show-stoppers". Convincing rationale for critical comments must be provided. The individual making the comment and the document writer will reconcile the comment.

S Substantive Comments of a less serious nature that have noticeable impact on the document's quality or content. The document appears to be incorrect, misleading, confusing, or inconsistent with other sections.

A Administrative Comments that address minor items such as typographical, format and/or grammatical errors.

7.3 Information Only CDRLs

When an “A” is not indicated in Block 8 of the DD Form 1423, the PCO/DMO still retains the right to disapprove any data that does not comply with contract requirements. The Contractor shall revise the disapproved data item in accordance with the specific written comments transmitted with the CDA form or PCO letter and resubmit not later than 30 calendar days, unless otherwise directed, from receipt of the disapproval.

The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.

8. Data Accession List (DAL)

During performance of the contract, requests from the PCO for data ordered from the Data Accession List

(DAL) (with the application of DID DI-MGMT-81453A) shall be provided at no increase in contract price.

Requests for quantities greater than two each per document shall be honored upon receipt of PCO direction and with Contractor concurrence that such request can be filled at no increase in contract price.

9. Organizational Cross Reference List

The following Organizational Cross Reference List shall be used in conjunction with the CDRLs to determine actual addressees for distribution of data. The ORG number will be entered in lieu of a address on the CDRL and will be a part of the CDRL package. Changes to the list will be identified by an asterisk next to the ORG number and a revision date to the list.

ORG#/ Name Address Attention/To Contact Info

ORG1/ AFNWC/NIAC 6030 Gum Ln Bldg 1217 Hill AFB UT 84056-5826

Thomas Holland thomas.holland.3@us.af.mil

ORG2/AFNWC/NIAA 6030 Gum Ln Bldg 1217 Hill AFB UT 84056-5826

Capt Spencer Turner spencer.turner.1@us.af.mil

ORG3/AFNWC/PZBE 6014 Dogwood Ave Bldg 1258 Hill AFB UT 84056-5838

Melanie Thomas melanie.thomas@us.af.mil

ORG4/AFNWC/NIES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056-5816

Nancy Baker nancy.baker.1@us.af.mil

10. CDRL Master Listing Index

CDRL# Description DID

A001 Conference Agenda DI-ADMN-81249A

A002 Briefing Material DI-MGMT-81605

A003 Report, Record of Meeting/Minutes DI-ADMN-81505/T

A004 Statement of Work DI-MGMT-81606

A005 Program Management Plan DI-MGMT-81797

A006 Quality Assurance Program Plan CI-QCIC-81794

A007 Contractor’s Risk Management Plan DI-MGMT-81808

A008 Contractor’s Configuration Management Plan DI-CMAN-80858B

A009 Contract Summary Report DI-ADMN-80447A/T

A010 Engineering Change Proposal DI-CMAN-80639C

A011 Test Plan (Acceptance, Qualification, Integration) DI-NDTI-80566A

A012 Test Procedure (Acceptance, Qualification, Integration) DI-NDTI-80603A

A013 Test/Inspection Report (Acceptance, Qualification, Integration) DI-NDTI-80809B

A014 Technical Report – Study/Services (Opportunities to improve reliability, availability and maintainability)

DI-MISC-80508B/T

A015 Technical Report – Study/Services (Feasibility Studies) DI-MISC-80508B/T

A016 Technical Report – Study/Services (Risks to the Supply Chain) DI-MISC-80508B/T

A017 Technical Report – Study/Services (Fault Tree Analysis) DI-MISC-80508B/T

A018 Technical Report – Study/Services (Transition Plan) DI-MISC-80508B/T

A019 Performance Analysis Report DI-SESS-81938

A020 Computer Software Product DI-ISPC-81488

A021 Man Hours Expenditure Chart DI-FNCL-80003 mailto:thomas.holland.3@us.af.mil mailto:spencer.turner.1@us.af.mil mailto:melanie.thomas@us.af.mil mailto:nancy.baker.1@us.af.mil

A022 Information Systems Accreditation Documentation DI-ADMN-80239

A023 Government Furnished Materiel (GFM) Consumption Report DI-MGMT-80438B

A024 Failure Analysis and Corrective Action Report DI-SESS-81315B

A025 Verification Analysis Record DI-QCIC-80207

A026 Maintenance Service Report DI-MGMT-80995A

A027 Spare Parts Usage Report DI-ILSS-80483

A028 Risk Management Status Report DI-MGMT-81809

A029 Commercial Off-The-Shelf (COTS) Manuals DI-TMSS-81815

A030 Data Accession List (DAL) DI-MGMT-81453A

A031 Integrated Program Management Report (IPMR) DI-MGMT-81861/T

A032 Operating Procedures Manual DI-MISC-81418

11. DD Form 1423s

The purpose of the below references is to provide a single reference for block A and E of the included 1423 forms. This provides for efficient renumbering of blocks A and E, in lieu of renumbering each block at the time of contract award.

*1423’s, block A Reference Number: CLIN number to be added at time of award

**1423’s block E Reference Number: Contract and Mod/TO number to be added at time of award

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

REMOTE VISUAL ASSESSMENT

(RVA) CLS

F2DCBY428B001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001 CONFERENCE AGENDA Meeting Agenda

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-ADMN-81249A PWS Paras 3.5, 3.6.1 AFNWC/NIAC

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT

ASREQ N/A

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

N/A

N/A N/A Reg

Repro

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see pages 3 & 4 for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Conference Agenda (Meeting Agenda) NLT 5 days prior to scheduled meetings or meetings deemed necessary by the

Government. Government will be allowed 2 days, after receipt from contractor, to review for comments. Contractor shall submit revised

Meeting Agenda incorporating Government comments, if applicable, NLT 2 days after receipt from Government.

BLOCK 14: Contractor shall submit Meeting Agenda to ORGs 1&2

(see page 7 for address).

ORG1

ORG2

ORG3 (Lt of delivery only)

ORG4 (Lt of delivery only)

15. TOTAL 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Nancy N. Baker, GS-12

Data Manager

AFNWC/NIES

24 Apr 14

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

LM 13-24

1385758126C Typewritten Text 24 Apr 14

1385758126C Typewritten Text

1385758126C Typewritten Text

1385758126C Typewritten Text

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A002 BRIEFING MATERIALS

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81605 PWS Paras 3.5, 3.6.1 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

ASREQ SEE BLK 16

a. ADDRESSEE

Draft

Contractor shall submit Briefing Materials NLT 5 days prior to each scheduled meeting and/or any other meeting deemed necessary by the

Government and as requested by the Government. Government will be allowed 2 days, after receipt from contractor, to review for comments.

Contractor shall present corrected Briefing Materials incorporating

Government comments, if applicable, NLT 2 days after receipt from

Government.

BLOCK 14:

Contractor shall submit Briefing Materials to ORGs 1&2 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

1385758126C Typewritten Text 24 Apr 14

1385758126C Typewritten Text

1385758126C Typewritten Text

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A003

REPORT, RECORD OF MEETING/MINUTES

Meeting Minutes

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ADMN-81505/T PWS Paras 3.5, 3.6.1 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

A

N/A SEE BLK 16

BLOCK 4:

1. Paragraph 10.4: Delete in its entirety

Contractor shall submit Report, Record of Meeting Minutes (Meeting

Minutes) NLT 15 days after meeting or event has been held.

Government will be allowed 5 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Meeting Minutes incorporating Government comments, if applicable, NLT 5 days after receipt from Government.

BLOCK 14: Contractor shall submit Meeting Minutes to ORGs 1&2

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A004 STATEMENT OF WORK (SOW)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81606 PWS Para 3.2.1.3.9 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

R/ASR SEE BLK 16

a. ADDRESSEE

Draft

SEE BLK 16 SEE BLK 16

16. REMARKS: CHANGES TO OFICE SYMBOLS, WHEN NECESSARY, SHALL

Contractor shall submit Statement of Work (SOW) NLT the 30 days after contract award. Government will be allowed 15 working days after receipt from contractor to review for approval/disapproval/ comments. Contractor shall resubmit corrected SOW incorporating

Government comments, if applicable, NLT 15 days after receipt from

BLOCK 14: Contractor shall submit SOW to ORGs 1&2 (see page 7

DD Form 1423-1, FEB 2001 Page___1__of___1__Pages

1385758126C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A005 PROGRAM MANAGEMENT PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81797 PWS Para 3.5.1 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

Contractor shall submit Program Management Plan NLT 30 days after award of contract. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/comment.

Contractor shall submit revised Program Management Plan incorporating Government comments, if applicable, NLT 15 days after receipt from Government.

Contractor shall submit subsequent submittals as required by the

BLOCK 14: Contractor shall submit Program Management Plan to

ORGs 1&2 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

1385758126C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A006 QUALITY ASSURANCE PROGRAM PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-QCIC-81794 PWS Para 3.5.2 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

ONE/R SEE BLK 16

a. ADDRESSEE

Draft

Contractor shall submit initial Quality Assurance Program Plan NLT

30 days after award of contract. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/ comment. Contractor will submit revised Quality Assurance Program

Plan incorporating Government comments, if applicable, NLT 10 days after receipt from Government.

NOTE: Quality Assurance Program Plan shall be submitted IAW

AS 9100.

BLOCK 14: Contractor shall submit Quality Assurance Program

Plan to ORGs 1&2 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

LM13-24

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A007 CONTRACTOR’S RISK MANAGEMENT PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81808 PWS Para 3.2.8.2 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

Contractor shall submit Contractor’s Risk Management Plan NLT 30 days after award of contract. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/ comment. Contractor shall submit revised Contractor’s Risk

Management Plan incorporating Government comments, if applicable, NLT 15 days after receipt from Government.

Contractor shall submit subsequent submittals as required by the

BLOCK 14: Contractor shall submit Contractor’s Risk Management

Plan to ORGs 1&2 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

1385758126C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP_________TM__________OTHER _ X_______

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A008

CONTRACTOR’S CONFIGURATION

MANAGEMNT PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-CMAN-80858B PWS Para 3.2.7.2 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

BLOCKS 10, 11, 12 &13:

Contractor shall submit the Contractor’s Configuration Management

Plan 45 days after contract award. Government will be allowed 10 days after receipt from contractor to review for approval/disapproval/ comments. Contractor shall submit revised Contractor’s Configuration

Management Plan incorporating Government comments, if applicable, NLT 10 working days after receipt from Government.

BLOCK 14a: Contractor shall submit Contractor’s Configuration

Management Plan to ORGs 1&2. (See page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Typewritten Text

1385758126C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A009

CONTRACT SUMMARY REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ADMN-80447A/T PWS Para 3.6.1 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

MTHLY SEE BLK 16

a. ADDRESSEE

Draft

EOM SEE BLK 16

1. Paragraph 2.1: Delete in its entirety

Initial Submittal:

Contractor shall submit initial Contract Summary Report NLT the 20th of the month following the first complete month of the contract.

Subsequent Submittals:

Contractor shall submit subsequent Contract Summary Report NLT the 20th of each month thereafter for the duration of the contract.

Government will be allowed 10 days, after receipt from contractor, to review for comments. Contractor shall submit revised Contract

Summary Report incorporating Government comments, if applicable, NLT 10 days after receipt from Government.

Cutoff date for the information shall be the end of each month.

BLOCK 14: Contractor shall submit Contract Summary Report to

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A010 ENGINEERING CHANGE PROPOSAL (ECP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-CMAN-80639C PWS Paras 3.2.1.3.4, 3.2.4.6 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

Contractor shall submit Engineering Change Proposal (ECP) NLT 30 days after a need is discovered. Contractor will use red-line control to track changes throughout. Government will be allowed 15 days, after receipt from contractor, to review for approval/disapproval/comments.

Contractor shall submit revised ECP incorporating Government comments, if applicable, NLT 15 days after receipt from Government.

NOTE

: Reference documents. The applicable issue of any documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

NOTE

: Format and content: The ECP shall be prepared using DD form 1692. Copies of the form can be obtained from AFNWC/NIES

(Configuration Manager). The following references may be useful in defining content: MIL-STD-973, Configuration Management (obsolete)

MIL-HDBK-61, Configuration Management Guidance and

ANSI/EIA 649-1998, National Consensus Standard for Configuration

Management.

BLOCK 14: Contractor shall submit ECP to ORGs 1&2 (see page 7

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A011 TEST PLAN Acceptance, Qualification, Integration

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80566A PWS Para 3.4 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

8. APP CODE E 11. AS OF DATE 13. DATE OF SUBSEQUENT

a. ADDRESSEE

Draft

Contractor shall submit Test Plan NLT 45 days prior to start of test.

Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Test Plan incorporating Government comments, if applicable, NLT 15 days after receipt from Government.

NOTE: Test Plan shall be submitted IAW with AFNWCI 99-101 and ICBMSD OI 99-103.

BLOCK 14: Contractor shall submit Test Plan to ORGs 1&2 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A012 TEST PROCEDURE Acceptance, Qualification, Integration

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI- NDTI-80603A PWS Para 3.4 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

Contractor shall submit Test Procedures NLT 45 days prior to start of test. Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Test Procedures incorporating Government comments, if applicable, NLT 15 days after receipt from Government.

NOTE: Test Procedure shall be submitted IAW with AFNWCI

99-101 and ICBMSD OI 99-103.

BLOCK 14: Contractor shall submit Test Procedures to ORGs 1&2

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

1385758126C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A013 TEST/INSPECTION REPORT Acceptance, Qualification, Integration

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80809B PWS Para 3.4 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

Contractor shall submit Test/Inspection Report NLT 30 days after completion of test. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/comments.

Contractor shall submit revised Test/Inspection Report incorporating

Government comments, if applicable, NLT 10 days after receipt from

NOTE: Test/Inspection Report shall be submitted IAW with

AFNWCI 99-101 and ICBMSD OI 99-103.

BLOCK 14: Contractor shall submit Test/Inspection Report to ORGs

1&2 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

1385758126C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A014

TECHNICAL REPORT – STUDY/SERVICES

Opportunities to Improve Reliability, Availability and Maintainability

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B/T PWS Para 3.2.1.3.5 AFNWC/NAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

ANNLY SEE BLK 16

a. ADDRESSEE

Draft

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY,

SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

1. Paragraph 2., add the words “ Contractor Format Acceptable” after Format.

2. Delete paragraphs 2. (a) & (b) in their entirety

Contractor shall submit initial Technical Report – Study/Services

(Opportunities to Improve Reliability, Availability and

Maintainability) NLT 30 day after review is completed. Contractor shall submit subsequent Opportunities to Improve Reliability, Availability and Maintainability NLT 15 days after an opportunity for improvement arises.

Government will be allowed 30 days, after receipt from contractor, to review for comments. Contractor shall submit revised Opportunities to Improve Reliability, Availability and Maintainability incorporating

Government comments, if applicable, NLT 15 days after receipt from

BLOCK 14: Contractor shall submit Opportunities to Improve

Reliability, Availability and Maintainability to ORGs 1&2 (see page 7

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

1385758126C Typewritten Text

1385758126C Typewritten Text

1385758126C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A015 TECHNICAL REPORT – STUDY/SERVICES Feasibility Studies

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B/T PWS Para 3.3.2 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

Contractor shall submit Technical Report – Study/Services (Feasibility

Studies) NLT 30 days after completion of analysis. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised

Feasibility Studies incorporating Government comments, if applicable, BLOCK 14: Contractor shall submit Feasibility Studies to ORGs

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

24 Apr 14

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X006 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A016 TECHNICAL REPORT – STUDY/SERVICES Risks to the Supply Chain

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B/T PWS Paras 3.2.4.6, 3.2.4.8 AFNWC/NIAC

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

BLOCKS 10 & 12:

Contractor shall initial submit Technical Report – Study/Services

(Risks to the Supply Chain) NLT 30 days after completion of analysis.

Government will be allowed 10 days, after receipt from contractor to review for approval/disapproval/comments. Contractor shall submit revised Risks to the Supply Chain incorporating Government comments, if applicable, NLT 5 days after receipt from Government.

BLOCK 14: Contractor shall submit Risks to the Supply Chain to

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .