CARA_question_set_4.docx

DOCX document 18 KB Posted

Attached to
A-10 Combined Altitude Radar Altimeter (CARA) Modification Effort Federal contract opportunity
Solicitation number
FA8202-15-R-1003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

CARA Question Set 4

View the file

Other files for this federal contract opportunity

Other files attached to A-10 Combined Altitude Radar Altimeter (CARA) Modification Effort, newest first.
File Type Posted
CARA_section_L.docx DOCX document
FA820215R1003_______0002.pdf PDF
CARA_question_set_5.docx DOCX document
CARA_PWS_July_30.docx DOCX document
RFP_FA8202-15-R-1003-0001.pdf PDF
CARA_question_set_3.docx DOCX document
CARA_question_set_2.docx DOCX document
CARA_question_set_1.docx DOCX document
A006_Integrated_Master_Schedule.pdf PDF
Section_L_Appendix_2_Consent_Letter.pdf PDF
A007_Time_Compliance_Tech_Order.pdf PDF
A003_Tech_Order_Updates.pdf PDF
Section_L_Appendix_3_Client_Authorization_Letter.pdf PDF
A002_Product_Drawings_and_Associated_Lists.pdf PDF
A005_Conference_Minutes.pdf PDF
CARA_PWS.docx DOCX document
section_L_Appendix_1_past_performance_information.pdf PDF
A001_Status_Report.pdf PDF
Section_M.pdf PDF
A004_Conference_Agenda.pdf PDF
CARA_GFP.pdf PDF
Section_L.pdf PDF
FA820215R1003.pdf PDF
CARA_PWS_May_15.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8202-15-R-1003

CARA Question Set #4 13 July 2015

1. Question: A) A TCTO is normally part of a TO effort such as this and it is discussed (ref. page 4, paragraph 15), and Section 2, Table 1 (ref. page 7, item 12) has checked the requirement for a TCTO; however, it is not listed in the DELIVERY SCHEDULE. CLIN 0002 also calls for a TCTO. B) Is this exclusion of a TCTO by design? C) If not, should an estimated price for a TCTO be included as an option?

Answer: The TCTO is going to be completed organically. This is by design. The price of a TCTO should not be included.

2. Question: The method of change is not clearly defined. Are changes to the TOs to be in the form of TO change pages or Technical Order Page Supplements (TOPS) or will we be authoring directly into the A-10 aircraft manuals?

Answer: The changes will be source data.

3. Question: Although the TMCR mentions a ".Document Type Definition (DTD)structure or XML schema structure located in Section 2 Table 1" (ref. page 1, paragraph 4 of the TMCR), there is no requirement for XML or SGML tagging in the DELIVERY SCHEDULE. A) Is this exclusion of a DTD or SGML requirement by design? B) If there is a requirement for a DTD tagging will the schema be provided?

C) If there is a requirement for a DTD tagging, is there a specific publishing engine (such as DL composer) required and if so what is it? If there is, can a compatible alternative be used?

Answer: A) DTD or SGML are not applicable to source data. B) No DTD tagging schema needs to be provided. C) This is not applicable to source data.

4. Question: Are the soft copies of the original manuals (or editable PDFs) available?

Answer: Yes, PDFs are available.

5. Question: The TMCR normally lists the delivery format requirements and associated codes in the DELIVERY SCHEDULE (ref. page 10 of the TMCR). This TMCR lists the following:

For the two IPRs, Verification and Prepublication reviews:

IPDF/1 - Meaning one IPDF copy of each TO file.

For the Final TO Distribution:

I/C/W-2 - . Meaning two IPDF copies of each TO file.

. Meaning two copies of each Vectorized CGM file.

. Meaning two copies of each TO file generated in Word.

CLIN 0003 lists 3 final copies are to be delivered, the DELIVERY SCHEDULE (ref. page 10 of the TMCR) lists only two, which is correct?

Answer: Two (2) copies is the correct number.