CARA_question_set_2.docx

DOCX document 18 KB Posted

Attached to
A-10 Combined Altitude Radar Altimeter (CARA) Modification Effort Federal contract opportunity
Solicitation number
FA8202-15-R-1003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

CARA Question Set 2

View the file

Other files for this federal contract opportunity

Other files attached to A-10 Combined Altitude Radar Altimeter (CARA) Modification Effort, newest first.
File Type Posted
CARA_section_L.docx DOCX document
FA820215R1003_______0002.pdf PDF
CARA_question_set_5.docx DOCX document
CARA_PWS_July_30.docx DOCX document
CARA_question_set_4.docx DOCX document
RFP_FA8202-15-R-1003-0001.pdf PDF
CARA_question_set_3.docx DOCX document
CARA_question_set_1.docx DOCX document
A006_Integrated_Master_Schedule.pdf PDF
Section_L_Appendix_2_Consent_Letter.pdf PDF
A007_Time_Compliance_Tech_Order.pdf PDF
A003_Tech_Order_Updates.pdf PDF
Section_L_Appendix_3_Client_Authorization_Letter.pdf PDF
A002_Product_Drawings_and_Associated_Lists.pdf PDF
A005_Conference_Minutes.pdf PDF
CARA_PWS.docx DOCX document
section_L_Appendix_1_past_performance_information.pdf PDF
A001_Status_Report.pdf PDF
Section_M.pdf PDF
A004_Conference_Agenda.pdf PDF
CARA_GFP.pdf PDF
Section_L.pdf PDF
FA820215R1003.pdf PDF
CARA_PWS_May_15.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8202-15-R-1003

CARA Question Set #2 24 June 2015

1. Question: The APN-232 CARA system is capable of outputting radar altitude in both an analog and MIL-STD-1553 signal format. The Operational Assessment (OA) configured the aircraft for both. Is it the intent of this proposed contractual effort to provide a group A wiring solution that comprises both analog and MIL-STD-1553 radar altitude outputs or just an analog radar altitude output only?

Answer: Our reason for not including the 1553 (digital) wiring in this effort is primarily due to the prohibitive cost. Additional cost to install is due to the kit cost, and the need for a depot and/or contractor field team support to perform the install was also considered for not including the 1553.

2. Question: If non-stock listed parts are required to connect to the governments provided LRU with no other option, will the government perform cataloging and provisioning?

Answer: The Government would perform cataloging and provisioning if needed. However, the SPO would need to know which parts by name would be considered (to help anticipate impact to field modification of the aircraft). If this is deemed as a major impact to the field for non-stock listed parts, the SPO would be likely have issues on the proposed modification.

3. Question: Will the successful contractor be authorized to use tail number 79-0138, located in building 205 at Hill AFB, for fit checks and trial installs?

Answer: It is anticipated that the successful bidder will be so authorized; however, 79-0138 is managed by the 309th Software Maintenance Group (SMXG). Authorization would need to occur through that organization. The A-10 SPO will work with the successful bidder and the 309th SMXG for authorization.

4. Question: We did not see a DD254. What are the security requirements?

Answer: It is not anticipated a DD254 will be required/needed for this effort. See PWS 5.1, 5.1.1, 5.2, 5.2.1 for security related requirements for this effort.

5. Question: Is it the intent of the Government for the offeror to evolve the T2 drawing/data package to a permanent drawing/data package? The offeror would like to understand if the bidder’s library is complete as provided and contains all the information available or developed to date that supports this solicitation to include the pricing requirement. Are drawings listed in the drawing tree available for kits, wiring diagrams, etc. or were they never fully developed?

Answer: The government provided the T2 as a history of the project. A new design is needed in order to properly integrate the CARA into the A-10 aircraft. The bidder's library is not all-inclusive. It contains the data that we (the gov't) believe is needed for the effort. There may be more data that is found to be relevant to this effort in the future. The drawings in the drawing tree were never fully developed. They were created as part of an organic effort to complete this modification.