Photo_Notesbak1.docx
DOCX document 14 KB Posted
- Attached to
- Bldg. 503 Repair/Minor Const/Equipment Federal contract opportunity
- Solicitation number
- FA8201-16-B-0009
About this file
Photo Notesbak1
View the file
Other files for this federal contract opportunity
Show all 50
Bldg. 503 Repair/Minor Const/Equipment has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHOTO NOTES 1
If you choose to print the photographs to ensure you get the North arrow and labeling: Print the PDF version, Ensure the box “Fit” is checked under page size and handling and make sure the orientation is in portrait.
The following notes are included to add clarification to the project requirements. The number on the left indicates the photo number which is then followed by the building number and the requirement. Not all photographs are included on this list as they have been addressed in the Questions, Quantities, or Drawings.
| 8 | Building 503 handicap ramp, side joints to caulk with Loctite Crack Filler SL #45005 | |
| 11 | Building 503, replace sidewalk section around this column when performing 45° infill work | |
| 12 | Building 503A, repair bollards with Loctite Magna-Grout #45002 | |
| 13 | Building 503, remove stump and re-sod | |
| 14 | Building 503, new curbing required | |
| 16 | Building 503, new curbing required | |
| 17 | Building 503, remove tree in foreground, remove stump and re-sod | |
| 39 | Building 507, repair asphalt, provide access cover to well, provide permanent nameplate for well to read: | |
| Ground Source Heat Pump Investigation Well | ||
| 40A | Building 507, repair HP ramp deterioration along entire ramp | |
| 44A | Building 507, repair outer perimeter gap around this pad as shown in photograph 45A | |
| 49 | Building 503A, replace sump door with highly corrosion resistant door, provide drain holes on new door | |
| 50 | Building 503A, location of check valve in storm sewer line | |
| 53 | Building 503A, trench pumping system | |
| 54 | Building 507, modify/repair to eliminate tripping hazard | |
| 57 | Building 503H, insulate copper supply line | |
| 65A | Building 503A, boiler room threshold replace | |
| 72 | Building 503, grind raised edges | |
| 73 | Building 503, repair, square up and level stairs with Loctite MagnaGrout #45002 |
Install Safestep fiberglass overlay on these stairs, ensure no water is able to enter under overlays after installation. Ensure no trip edge is present.
| 81 | Building 503, DLA portion of building in Southeast corner showing EFIS repair |
| 86 | Building 503B, extract core, ascertain purpose and repair, provide cover and or lift ring if required |
| 87 | Building 503B, Eastside ramp edge that needs yellow and black safety painting |
| 90B | Building 503, photograph showing repair of dock area and corner of building area |
| 91 | Building 503, loading dock angle and bumper support painting |
| 92 | Building 503, columns along the North dock, chipping of concrete and grinding not required, treat with Loctite Extend as a primer and paint entire column |
| 93 | Building 503, ventilation requirement removed from project |
| 95 | Building 503, location of strip curtain |
| 98 | Building 503, prep surface using low dust techniques as lead paint is present, treat with Loctite Extend |
and paint safety yellow.
| 99 | Building 503, bird screen area, existing screening shown on right. Also see 99A, 99B, 99C. |
| 101 | Building 503B, provide lift ring and infill edges with Loctite MagnaCrete |
| 106 | Building 503A, a portion of the deteriorated sidewalk that needs repair on Southgate Avenue. |