LBP Survey.pdf
PDF 235 KB Posted
- Attached to
- Golf Course Clubhouse Federal contract opportunity
- Solicitation number
- FA8201-16-B-0006
About this file
Lead Based Paint Survey
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bldg 720 Existing Floor plans.pdf | ||
| Answers to Contractor Questions V2.pdf | ||
| E-700 Revised.pdf | ||
| A-404 Revised.pdf | ||
| E-700 Letter Revised.pdf | ||
| Bldg 720 Existing Elevations.pdf | ||
| Amendment 0002.pdf | ||
| Appendix H - LEED.pdf | ||
| Answers to Contractor's Questions.pdf | ||
| Amendment 0001.pdf | ||
| AF 66 Form.xlsx | XLSX spreadsheet | |
| AF 3065 Form.xfdl | XFDL file | |
| AF 3064 Form.xls | XLS spreadsheet | |
| Site_Visit_Attendance_Record.pdf | ||
| Site_Visit_Transportation_Request_8-11-16.pdf | ||
| 5-5-2016 BASE FACILITY DESIGN STANDARD.pdf | ||
| Clubhouse_Drawings.zip | ZIP file | |
| TAB K 1 Aug 11.pdf | ||
| 8-8-2016_SOW.pdf | ||
| Wage Determinations.pdf | ||
| Combined_Specifications.zip | ZIP file | |
| Utilities_and_Demo_Drawings.zip | ZIP file | |
| CEN-CEIE Plan Review Checklist.pdf | ||
| Solicitation_FA8201-16-B-0006.pdf | ||
| Asbestos Survey.pdf | ||
| APPENDIX C.pdf |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
75TH CIVIL ENGINEERING (CEEV)
HILL AIR FORCE BASE, UTAH
9 June 2014
MEMORANDUM FOR: 75 FSS (Constance Dalamater)
FROM: 75 CES/CEOHA
SUBJECT: Lead Based Paint (LBP) Survey, Building 720 & 722 (WO #54127).
Demolish facilities.
1. On 23 Aug. 2013 and 11 April 2014, Nickolas King (Utah LBP Certification #PB-1244) and Neldon Anderson (Utah LBP Certification #PB-0054) tested the painted components of building 720 that would be impacted by demolishing the facilities.
Building 720 was constructed in 1943 and Building 722 was constructed in 1973. A Niton XL2 600 XRF Analyzer (Serial # 56999) and Niton XL3t 300 XRF Analyzer (Serial # 30660) were used to test the painted surfaces of these components. Please refer to specific results of our survey; see attachment 1.
2. The table below summarizes the building components in building 720 & 722 that tested positive for LBP. These components should be segregated or abated prior to renovation or demolition, and a composite TCLP taken of the waste before disposal.
(See attached results for further detail).
Sampled 23 August 2013 by Neldon Anderson with Niton XL2 600 XRF Analyzer
Component Color Lead Read Condition
Wood Ceiling Below Wood Deck White/Crème 3.8 Good Wood Ceiling Below Wood Deck White/Crème 4.2 Good Wood Ceiling Below Wood Deck White/Crème 3.8 Good Wood Ceiling Below Wood Deck Crème 3.9 Good
Sampled 11 April 2013 by Nickolas King with Niton XL3t 300 XRF Analyzer
Component Color Lead Read Condition
Wood Deck Joists Crème 2.4 Fair
3. The U.S. Department of Housing and Urban Development defines Lead-based paint as any paint, vanish, stain, or other applied coating that has 1mg/cm2 as measured by an X-ray Fluorescence (XRF) Analyzer or laboratory analysis or 0.5 percent by weight (5,000ug/g by dry weight) by laboratory analysis, or more of lead. All other components tested were less than 1 mg/cm2.
4. Any effort to disturb lead paint can create lead dust. Please ensure that appropriate abatement, cleanup, and disposal will be accomplished and that the appropriate safety
Bldg. 720 Repair deck
WO #53601
23 August 2013 1100 Hours measures are taken IAW 29 CFR 1926.62. If you have any questions please feel free to call Nickolas King at 586-7094.
//original signed//
Neldon Anderson
75 CES/CEOHA
Certified LBP Inspector Utah Certification #PB-0054
Attch:
Survey Results
Inspector:
PB # :
PbL (+/‐) Serial # Cal. Standard
1404 1.10 1405 1.10 1406 1.20 Average: 1.13
Side Condition South Good South Good South Good South Good South Good South Good South Good East Good West Good West Good North Good North Good West Good North Good North Good North Good West Good South Good North Good
30‐April‐2014
Neldon Anderson
PB‐1072
PbL(mg/cm2)
1.00 1.00 1.00 1.00
White Black Brown
0.00 0.00
54127
Exterior Exterior
Exterior Room interior Exterior Exterior Exterior interior interior interior
Metal
Metal
Drywall Drywall Drywall
PbL(mg/cm2)
1.04 +/‐ 0.06 interior
Exterior Exterior interior interior
Exterior interior
PbL(mg/cm2)
0.00 0.00 0.07 0.00
Substrate
Wood Wood Wood
Color Brown Brown Brown Brown
0.00 0.00 0.00
White White White White
Metal
Exterior Exterior
Roof Beam Ceiling Wall Door
Door Jamb
0.00
0.07
0.06 0.00 0.00 0.00
Metal Metal
Wood Metal 0.02
Wood Wood Drywall Wood Wood
0.02 Wall
Column Safety Rail Safety Rail
Building:
Date:
Time:
Work Order:
XL Number
Pre Calibration
NEG
Soffit
NEG
NEG
NEG
NEG
NEG
NEG
NEG
NEG
NEG/POS
NEG
NEG
NEG
NEG
0.00
Roll‐Up door Frame Column Wall Facia
Structure Column
Model# Niton XL3t 300 30660
PbL (+/‐) Cal. Standard
Average:
Post Calibration
1.04 +/‐ 0.06
NEG
NEG
NEG
NEG
NEG
NEG
Facia Soffit Wall
Column
Wood
0.05
Brown Brown Brown Brown Brown Brown Brown Brown
PbL (+/‐) Serial # Cal. Standard
1486 1.00 1487 1.00 1488 1.00 Average: 1.00
Side Condition North Good East Good North Good North Good South Good North Good North Good North Good South Good South Good South Good South Good North Good North Good North Good West Good East Good East Good
Center Good North Good Center Good South Good
Time: 0715 Work Order: 54127
Pre Calibration
PbL(mg/cm2) Model#
Post Calibration PbL(mg/cm2) PbL (+/‐)
Niton XL3t 300 30660 Cal. Standard
Building: 720 Neldon Anderson Date: 02‐May‐2014 PB‐1072
XL Number Room Structure Substrate Color PbL(mg/cm2) NEG/POS
1.04 +/‐ 0.06
1559 1.00
1.04 +/‐ 0.06 1560 1.00 1561 1.00 Average: 1.00
1491 Bar Storage Door Wood Light Brown 0.00 NEG 1492 Bar Storage Door Jamb Wood Light Brown 0.00 NEG
1489 Main Foyer Wall Drywall Cream 0.00 NEG 1490 Bar Storage Wall Drywall Light Tan 0.00 NEG
1495 Main Floor Column Wood Brown Stain 0.00 NEG 1496 Main Floor Trim Wood Brown Stain 0.00 NEG
1493 Bar Storage Floor Slate Tan 0.00 NEG 1494 Bar Wall Drywall Cream 0.00 NEG
1499 Main Floor Ceiling Access Door Wood White 0.00 NEG 1500 Main Floor Storage Wall Drywall Cream 0.00 NEG
1497 Main Floor Ceiling Drywall White 0.00 NEG 1498 Main Floor Ceiling Access Trim Metal White 0.02 NEG
1503 Main Floor Storage Door Jamb Wood Brown Stain 0.00 NEG 1504 Men's Main Restroom Wall Drywall Cream 0.00 NEG
1501 Main Floor Storage Ceiling Drywall Cream 0.00 NEG 1502 Main Floor Storage Door Wood Brown Stain 0.00 NEG
1507 Women's Main Restroom 2" Floor Tile Ceramic Tan 0.00 NEG 1508 Women's Main Restroom Door Jamb Metal Cream 0.00 NEG
1505 Men's Main Restroom 4" Wall Tile Ceramic Tan 0.00 NEG 1506 Men's Main Restroom 4" Wall Tile Ceramic Grey 0.01 NEG
1509 Kitchen 12" Floor Tile Ceramic Tan 0.01 NEG 1510 Kitchen Ceiling Drywall White 0.08 NEG
PbL (+/‐) Serial # Cal. Standard
1486 1.00 1487 1.00 1488 1.00 Average: 1.00
Side Condition East Good East Good West Good West Good North Good Center Good South Good North Good West Good East Good West Good Center Good North Good East Good West Good West Good West Good West Good East Good West Good South Good South Good
Building: 720 Neldon Anderson
Time: 0715 Work Order: 54127
Pre Calibration
PbL(mg/cm2) Model#
Post Calibration PbL(mg/cm2) PbL (+/‐)
Niton XL3t 300 30660 Cal. Standard
Date: 02‐May‐2014 PB‐1072
XL Number Room Structure Substrate Color PbL(mg/cm2) NEG/POS
1.04 +/‐ 0.06
1559 1.00
1.04 +/‐ 0.06 1560 1.00 1561 1.00 Average: 1.00
1513 Kitchen Prep Wall Drywall White 0.00 NEG 1514 Main Floor Deck Column Concrete Cream 0.00 NEG
1511 Kitchen Prep Door Metal Tan 0.00 NEG 1512 Kitchen Prep Door Jamb Metal Tan 0.00 NEG
1517 Basement Women's Restroom 12" Floor Tile Ceramic Tan 0.07 NEG 1518 Basement Women's Locker Room Wall Drywall Cream 0.08 NEG
1515 Main Floor Deck Deck Glass Frame Metal Cream 0.00 NEG 1516 Basement Women's Restroom Ceiling Drywall Cream 0.00 NEG
1521 Basement Men's Locker Room 4" Wall Tile Ceramic Grey 0.00 NEG 1522 Basement Men's Locker Room 2" Floor Tile Ceramic Tan 0.00 NEG
1519 Basement Men's Restroom Stall Metal Brown 0.03 NEG 1520 Basement Men's Locker Room 4" Wall Tile Ceramic Tan 0.00 NEG
1525 Men's Locker Room Column Concrete Cream 0.01 NEG 1526 Basement Entry Door Wood Light Brown 0.00 NEG
1523 Men's Locker Room 4" Window Sill Tile Ceramic White 0.00 NEG 1524 Men's Locker Room Wall Drywall Cream 0.00 NEG
1529 Basement Mechanical Ceiling Drywall White 0.00 NEG 1530 Basement Mechanical Column Concrete White 0.00 NEG
1527 Pro Shop Wall Drywall Cream 0.00 NEG 1528 Boiler Wall Drywall White 0.00 NEG
1531 Pro Shop Door Metal Light Brown 0.00 NEG 1532 Pro Shop Door Jamb Metal Light Brown 0.07 NEG
PbL (+/‐) Serial # Cal. Standard
1486 1.00 1487 1.00 1488 1.00 Average: 1.00
Side Condition West Good South Good South Good West Good East Good East Good East Good East Good
Building: 720 Neldon Anderson Date: 02‐May‐2014 PB‐1072
1.04 +/‐ 0.06
1559 1.00
1.04 +/‐ 0.06 1560 1.00 1561 1.00 Average: 1.00
Time: 0715 Work Order: 54127
Pre Calibration
PbL(mg/cm2) Model#
Post Calibration PbL(mg/cm2) PbL (+/‐)
Niton XL3t 300 30660 Cal. Standard
1533 Exterior Window Frame Metal Brown 0.08 NEG 1534 Exterior Door Metal Brown 0.00 NEG
XL Number Room Structure Substrate Color PbL(mg/cm2) NEG/POS
1537 Exterior Handrail Metal Brown 0.07 NEG 1538 Exterior Column Concrete Cream 0.00 NEG
1535 Exterior Door Metal Brown 0.01 NEG 1536 Exterior Sprinkler Pipe Metal Tan 0.00 NEG
1539 Exterior Door Jamb Metal Brown 0.00 NEG 1540 Exterior Door Metal Brown 0.00 NEG
PbL (+/‐) Serial # Cal. Standard
2332 1.00
Average: 1.00 Side Condition Center Fair Center Fair Center Fair Center Fair Center Fair Center Fair
Building: 720 Nickolas King
Work Order: 54127
Pre Calibration
PbL(mg/cm2) Model#
Post Calibration PbL(mg/cm2) PbL (+/‐)
Niton XL3t 300 30660 Cal. Standard
Date: 11‐April‐2013 PB‐1244 Time: 0910
XL Number Room Structure Substrate Color PbL(mg/cm2) NEG/POS
1.04 +/‐ 0.06
2247 1.10
1.04 +/‐ 0.06
Average: 1.10
2341 Below Deck Fire Suppression Metal Red 0.08 NEG 2342 Deck Column Cap Concrete Cream 0.00 NEG
2339 Below Deck Siding Wood Grey 0.17 NEG 2340 Below Deck Deck Joists Wood Cream 2.40 POS
2343 Deck Railing Metal Cream 0.00 NEG 2344 Deck Deck Joists Concrete Grey 0.00 NEG
PbL (+/‐) Serial # Cal. Standard
1050 0.90
Average: 0.90 Side Condition North Good Center Good South Good North Good North Good
Building: 720 Neldon Anderson
Work Order: 54127
Pre Calibration
PbL(mg/cm2) Model#
Post Calibration PbL(mg/cm2) PbL (+/‐)
Niton XL3t 300 30660 Cal. Standard
Date: 11‐April‐2013 PB‐1072 Time: 0910
XL Number Room Structure Substrate Color PbL(mg/cm2) NEG/POS
1.04 +/‐ 0.06
1060 1.10
1.04 +/‐ 0.06
Average: 1.10
1055 Below Deck Ceiling Wood White/Cream 3.80 POS 1056 Below Deck Ceiling Wood Cream 3.90 POS
1053 Below Deck Ceiling Wood White/Cream 3.80 POS 1054 Below Deck Ceiling Wood White/Cream 4.20 POS
1057 Below Deck Paint Chip Paint White 0.03 NEG
The existing building material involved with this project is
Asbestos/LBP Shop (801)777‐8006
POTENTIAL FOR ADDITIONAL MATERIALS:
Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance.
Chase Johnson (Utah Certified Asbestos Inspector ASB#‐5645) of the 75 CES/CEOHA Asbestos/LBP Shop.
Cell: (801)430‐4785
Supervisor: Nickolas King: DSN: (801)586‐7094
Asbetsos/LBP Shop 75 CES(CEOHA)
CONTACT INFORMATION
Replace existing fire pump, jockey pump, controls, lighting, heating, and buiding insulation and ceiling.
DEPARTMENT OF THE AIR FORCE
75 CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
HILL AFB BUILDING 723
22 July 2015
Chase Johnson (Utah Certified
Asbestos Inspector ASB#‐5645)
HILL AFB BUILDING 723
Inspection Date:
75 CES
Date Requested:
Requester:
Organization:
Location & Building:
Work Order:
UPDATE FACILITY AND EQUIPMENT
LIMITED ASBESTOS INSPECTION REPORT
This report was inspected by:
metal and wood.
This inspection report only encompasses the areas/materials as described in the provided scope of work.
Should the scope of the project be altered in any way or any materials found that are not identified in this report shall require additional assessment. This report cannot be used for any other projects within the building.
No drywall, ceiling tile, or thermal systems insulation will/may be disturbed.
Therefore, it is not regulated asbestos containing materials (RACM) or even a suspect asbestos containing mateirals.
After a discussion of the exact scope of work involved in this project, this was determined to be a removal/replacement project only, for the following reasons:
Building 723 Pump HouseAffected Area:
August 2013
Bill Kopfman Inspector:
56958
Statement of Work:
APPENDIX B
ASBESTOS/LEAD BASED PAINT (LBP) ABATEMENT
CONTRACTOR QUALIFICATION
REQUIREMENTS
PART 1: REGULATORY COMPLIANCE
The contractor must comply with all applicable provisions of the following:
A. 40 Code of Federal Regulations (CFR) 61 Subpart M (All notifications will be made to the Utah Division of Air Quality
[UDAQ].)
B. 29 CFR 1910.1001 (Asbestos) 29 CFR 1910.1025 (Lead) C. Air Force Occupational Safety and Health (AFOSH) Standard 48-8 D. 29 CFR 1926.1101 (Asbestos) 29 CFR 1926.62 (Lead) E. Utah Asbestos Rule R307-801
PART 2: SUBMITTAL REQUIREMENTS
The following information must be submitted for prequalification in sequential order:
2.1 List of employees by date of last exams, who are medically qualified to work with asbestos (29 CFR 1926.1101) and Lead (29 CFR 1926.62). Include examiner's name, signature, medical qualifications and place of employment. At least 50% of the employees must be current at time of submittal. 100% of employees must show current medical qualification documents at the beginning of each abatement job.
2.2 Contractor's respiratory protection program (29 CFR 1926.1101, 29
CFR 1926.62, EPA Publication 560/5-85-024).
2.3 Air sampling protocol used to support sampling requirements found in 29 CFR 1926.1101, 29 CFR 1926.62.
2.4 List of equipment to be used for asbestos/LBP work under this contract. Examples of equipment include negative air machines (with maintenance logs/ High Efficiency Particulate Air [HEPA] filter documentation), scaffolding, decontamination facilities, disposable clothing, air pressure differential measuring devices (with proof of annual calibration), HEPA vacuums, etc. Copy of manufacturers' certification of HEPA filter for vacuum. (EPA Publication560/5-85- 024).
2.5 List of National Institute for Occupational Safety and Health
(NIOSH)-approved respirators to be used on site by employees.
Include NIOSH approval numbers and proof of approval (29 CFR 1926.1101, 29 CFR 1926.62, EPA Publication 560/5-85-024).
2.6 Qualifications of the Independent Third Party Industrial Hygienist
(IH) who will oversee the project to include certification date, college degrees, years of experience, and any other qualifications to perform this work. It is required that the IH overseeing the project be an American Board of Industrial Hygiene-Certified Industrial Hygienist or college graduate with at least four years of work related experience. The third party on site monitor must have current UDAQ Contractor/Supervisor Certification. If more than one IH consultant is used, list those who may oversee the asbestos/LBP work.
2.7 List of employees fit tested for respirator use in accordance with 29
CFR 1926.1101, 29 CFR 1926.62. List these employees by date and respirator. Include proof of employee fit testing and the name and qualifications of the fit tester. At least 50% of the employees must be current (i.e., WITHIN SIX MONTHS) at the time of submittal.
100% of employees must show current fit test documents at the beginning of each abatement job.
2.8 Asbestos - Proof of at least one year minimum work experience in
Utah as a UDAQ certified asbestos abatement company. Provide a current list of employees who have received training in accordance with 29 CFR 1926.1101 and EPA Publication 560/5-85-024. Proof of UDAQ certification is required for all asbestos work categories.
Include proof of training (i.e., written certification of completion) from a nationally recognized EPA asbestos training course for each employee. At least 100% of the employees submitted as having received training must be currently certified at the time of submittal.
All workers, contractor/supervisors, project designers must show current UDAQ certification documents before the beginning of each abatement job.
2.9 Lead – Proof of at least one year minimum work experience in Utah as a UDAQ certified lead abatement company. Provide proof of employee training in accordance with 29 CFR 1926.62 (i.e., written certification of completion) from an EPA approved course for each employee. All workers, contractor/supervisors must show current UDAQ certification documents before the beginning of each abatement job.
2.10 Copies of air monitoring data taken during and after abatement from previous projects completed by contractor (not to exceed five projects). (29 CFR 1926.1101, EPA Publication 560/5-85-024).
2.11 List of prior asbestos abatement contracts performed during the past two years. Include the names, addresses, telephone numbers and dates the projects were performed. (EPA Publication 560/5-85-024).
2.12 Additional information to adequately show compliance with applicable laws and regulations in the following areas:
A. Medical certification B. NIOSH Analytical Lab Certification (independent lab) C. Disposal of waste D. Department of Transportation transport of asbestos waste E. Cleanup procedures
2.13 List of any asbestos/LBP abatement projects that have been prematurely terminated including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent. Include the circumstances surrounding the termination. (EPA Publication 560/5-85-024).
2.14 List of any contractual penalties within the past two years including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent, whom the contractor has paid for breach or noncompliance with contract specifications. (EPA Publication 560/5-024).
2.15 List any enforcement action levied by any Federal, State or local government agencies against the contractor for violations related to asbestos/LBP within the past two years including those of any corporation, Limited Liability Company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent. . The citations will be identified by contractor including the name and location of the project, the date(s) and how the allegations were resolved. (EPA Publication 560/5-85-024).
2.16 Description of all legal proceedings, lawsuits or claims which have been filed or levied against the contractor or any of his past or present employees for asbestos/LBP related activities within the past two years including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent.. (EPA Publication 560/5-85-024).
PART 3: INSURANCE
3.1 The contractor will provide proof of insurance to work with asbestos-containing materials/LBP. Insurance must be occurrence type and provide up to $1,000,000.00 in coverage.
ALL INFORMATION SUBMITTED IS SUBJECT TO CONFIRMATION
BY GOVERNMENT. ANY INFORMATION FOUND TO BE FALSE,
WILL BE GROUNDS FOR IMMEDIATE DISQUALIFICATION OF
CONTRACTOR.
UPDATE/ REQUALIFICATION OF ALL QUALIFIED CONTRACTORS IS
REQUIRED EVERY TWO YEARS, WITH THE EXCEPTION OF IDIQ
CONTRACTORS WHICH SHALL BE QUALIFIED FOR THE DURATION
OF THE CONTRACT. (The update will require that all qualified contractors show proof of compliance with the sections listed above.)
THE GOVERNMENT RESERVES THE RIGHT TO DISQUALIFY ANY
ABATEMENT CONTRACTOR FOR INTENTIONALLY REMOVING
ASBESTOS/LBP MATERIALS IN VIOLATION OF APPLICABLE
REGULATIONS.
ABATEMENT CONTRACTORS ARE REQUIRED TO COORDINATE ALL
ABATEMENT WORK/PROJECT DOCUMENTATION THROUGH THE 75
CES/CEHOA ASBESTOS/LBP SHOP.
(Issue date: 12 June 1997/updated 8 October 2013)
PLEASE MAIL PREQUALIFICATION PACKAGE TO:
DEPARTMENT OF THE AIR FORCE
75 CES/CEOHA
5643 Lahm Ln.
HILL AIR FORCE BASE, UT 84056-5300
ATTN: Nickolas King Telephone# 801-586-7094
File details come from the government source that posted it. Updated .