Appendix H - LEED

View the file

Other files for this federal contract opportunity

Other files attached to Golf Course Clubhouse, newest first.
File Type Posted
E-700 Letter Revised.pdf PDF
Bldg 720 Existing Elevations.pdf PDF
Amendment 0002.pdf PDF
E-700 Revised.pdf PDF
A-404 Revised.pdf PDF
Bldg 720 Existing Floor plans.pdf PDF
Answers to Contractor Questions V2.pdf PDF
Amendment 0001.pdf PDF
AF 66 Form.xlsx XLSX spreadsheet
AF 3065 Form.xfdl XFDL file
AF 3064 Form.xls XLS spreadsheet
Answers to Contractor's Questions.pdf PDF
Site_Visit_Attendance_Record.pdf PDF
Site_Visit_Transportation_Request_8-11-16.pdf PDF
Combined_Specifications.zip ZIP file
Utilities_and_Demo_Drawings.zip ZIP file
CEN-CEIE Plan Review Checklist.pdf PDF
Solicitation_FA8201-16-B-0006.pdf PDF
Asbestos Survey.pdf PDF
APPENDIX C.pdf PDF
8-8-2016_SOW.pdf PDF
Wage Determinations.pdf PDF
LBP Survey.pdf PDF
5-5-2016 BASE FACILITY DESIGN STANDARD.pdf PDF
Clubhouse_Drawings.zip ZIP file
TAB K 1 Aug 11.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEED 2009 for New Construction and Major Renovations Hill AFB Golf Clubhouse

Project Checklist 11/25/2014-Current

11 1 14 Possible Points: 26 Y ? N Y ? N

Y Prereq 1 2 Credit 4 1 to 2 1 Credit 1 1 2 Credit 5 1 to 2

5 Credit 2 5 1 Credit 6 Rapidly Renewable Materials 1 1 Credit 3 Brownfield Redevelopment 1 1 Credit 7 1 6 Credit 4.1 6 1 Credit 4.2 1 11 1 3 Possible Points: 15

3 Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3 2 Credit 4.4 2 Y Prereq 1

1 Credit 5.1 Site Development—Protect or Restore Habitat 1 Y Prereq 2

1 Credit 5.2 Site Development—Maximize Open Space 1 1 Credit 1 1 1 Credit 6.1 Stormwater Design—Quantity Control 1 1 Credit 2 1 1 Credit 6.2 Stormwater Design—Quality Control 1 1 Credit 3.1 1

1 Credit 7.1 Heat Island Effect—Non-roof 1 1 Credit 3.2 1 1 Credit 7.2 1 1 Credit 4.1 1 1 Credit 8 Light Pollution Reduction 1 1 Credit 4.2 1

1 Credit 4.3 1 3 3 Possible Points: 10 1 Credit 4.4 1

1 Credit 5 1 Y Prereq 1 1 Credit 6.1 Controllability of Systems—Lighting 1 2 Credit 1 Water Efficient Landscaping 2 to 4 1 Credit 6.2 1

2 Credit 2 Innovative Wastewater Technologies 2 1 Credit 7.1 1 1 1 Credit 3 2 to 4 1 Credit 7.2 Thermal Comfort—Verification 1

1 Credit 8.1 1 11 5 19 Possible Points: 35 1 Credit 8.2 1

Y Prereq 1 6 Possible Points: 6 Y Prereq 2

Y Prereq 3 1 Credit 1.1 1 11 8 Credit 1 1 to 19 1 Credit 1.2 1

7 Credit 2 1 to 7 1 Credit 1.3 1 2 Credit 3 2 1 Credit 1.4 1

2 Credit 4 2 1 Credit 1.5 1 3 Credit 5 3 1 Credit 2 1

2 Credit 6 2 3 1 3 Possible Points: 4

7 7 Possible Points: 14 1 Credit 1.1 1

Y Prereq 1 1 Credit 1.2 1 3 Credit 1.1 1 to 3 2 2 Credit 1.3 1 1 Credit 1.2 Building Reuse—Maintain 50% of Interior Non-Structural Elements 1 1 Credit 1.4 1

2 Credit 2 1 to 2 2 Credit 3 1 to 2 52 8 49 Possible Points: 110

Regional Priority: EAc1: Optimize Energy Performance Regional Priority: EQc8.1- Daylight and views Regional Priority: WEc1: Water Efficient Landscaping Regional Priority: Specific Credit

Measurement and Verification

Innovation in Design: Exemplary Performance MRc5 Green Cleaning Energy Star Appliances Reduce Kitchen Water consumption by 10% SS: Radon Mitigation

Materials Reuse

Storage and Collection of Recyclables

Materials and Resources

Fundamental Commissioning of Building Energy Systems

Total Construction Waste Management

Enhanced Commissioning On-Site Renewable Energy

Enhanced Refrigerant Management

Construction IAQ Management Plan—Before Occupancy

Materials and Resources, Continued

Water Efficiency

Building Reuse—Maintain Existing Walls, Floors, and Roof

Alternative Transportation—Parking Capacity

Heat Island Effect—Roof

Recycled Content Regional Materials

Certified Wood

Alternative Transportation—Bicycle Storage and Changing Rooms

Sustainable Sites

Alternative Transportation—Public Transportation Access

Site Selection Development Density and Community Connectivity

Construction Activity Pollution Prevention

Low-Emitting Materials—Adhesives and Sealants Low-Emitting Materials—Paints and Coatings

Optimize Energy Performance

Energy and Atmosphere

Water Use Reduction—20% Reduction

Low-Emitting Materials—Composite Wood and Agrifiber Products Low-Emitting Materials—Flooring Systems

Indoor Chemical and Pollutant Source Control

Thermal Comfort—Design Controllability of Systems—Thermal Comfort

Green Power

Water Use Reduction

Minimum Energy Performance Fundamental Refrigerant Management

Daylight and Views—Views

LEED Accredited Professional

Daylight and Views—Daylight

Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110

Construction IAQ Management Plan—During Construction

Outdoor Air Delivery Monitoring

Indoor Environmental Quality

Minimum Indoor Air Quality Performance Environmental Tobacco Smoke (ETS) Control

Increased Ventilation

Regional Priority Credits

Innovation and Design Process

Air Force MILCON Sustainability Requirements Scoresheet version LEED® 2009 (Updated September 2013) * required entry

General Information xxxxxxxxxxxxxxxxxx Project ID (e.g. ABCD12345) xxxxxxxxxxxxxxxxxx Real Property Unique ID (RPUID) Hill AFB - Golf Clubhouse Building Name New Building Construction Project Type Hill AFB Installation Ogden City * UT State * Yes CONUS * Air Education & Training Command MAJCOM Mark Hinton PM Name $5,552,000.00 PA ($k) 15,400 Building Size (SF) 2016 Program Year (FY####) RFP/35% Design Project Phase 2014 Design Started (FY####)

8/6/2014 BOD (MM/DD/YY)

In Progress Pursuing formal LEED® Certification

LEED® 2009 LEED® Rating System 53 LEED® Points Status Silver LEED® Certification Level Status 24 LEED® Energy and Water Points Status 77% HPSB Compliant 30% Energy Efficiency Achieved (% below ANSI/ASHRAE/IESNA

Standard 90.1-2010) 8/6/2014 Date Scoresheet Completed or Revised * 2013_V0 Scoresheet version

Color Coding: See Instructions Tab for more detail Recommended (not required) Yes or N/A Maybe

LEED Prerequisite No

* required entry

Federal Requirements for High Performance and Sustainable Buildings (HPSB) & UFC 1-200-02 HPSB I: Employ Integrated Design Principles (UFC 1-200-02 para 2-2)

Total Points 2 Possible Points 2 Yes HPSB I.1 Integrated Design 1 * Yes HPSB I.2 Commissioning 1 *

UFC 1-200-02 para 2-3. Promote Sustainable Location and Site Development

Total Points 1 Possible Points (HPSB only) 1 Yes UFC para 2-3.1 Site selection 1 *

Maybe UFC para 2-3.2 Mitigation of Heat Island Effect 1 * Yes UFC para 2-3.3 Reduction of Light Pollution 1 * Yes HPSB III.3-4 Stormwater Management 1 *

Drop-Down Box

Federal Requirements

Complete

No Entry Required Custom Entry

Fees ($)

Registration Certification

Date Project Registered (MM/DD/YY)

Date Project Certified by GBCI (MM/DD/YY)

LEED Points Awarded by GBCI (e.g. 42)

LEED Certification Level Awarded by GBCI

LEED Energy and Water Points Awarded by GBCI

11/17/2014 1

HPSB II: Optimize Energy Performance (UFC 1-200-02 para 2-4) Total Points 2 Possible Points 4

Yes HPSB II.1 Energy Efficiency 1

Yes Reduce energy use 30% below ANSI/ASHRAE/IESNA Standard 90.1-2010 or if not - achieve maximum energy efficiency that is lifecycle cost effective

30.0% Insert percentage below ANSI/ASHRAE/IESNA Standard 90.1-2010 in terms of energy use (e.g. 32)

Insert building energy intensity (kBtu/yr-sqft) calculated IAW 10 CFR

No HPSB II.2 On-site Renewable Energy - Solar Hot Water Heater System 1

No Installed solar hot water heater system or found installation not lifecycle cost effective

Insert generation capacity (MMBtu/yr)

Insert percentage of demand No HPSB II.3 On-site Renewable Energy 1

No Installed renewable energy elements or projects were not lifecycle cost effective

Renewable energy types (check below)

Insert generation capacity (kW)

Insert percentage of total building Yes HPSB II.4 Measurement and Verification 1

Yes Water Metering: Select N/A if no service * Yes Electric Metering: Select N/A if no service * Yes Natural Gas Metering: Select N/A if no service * N/A Steam Metering: Select N/A if no service

HPSB III: Protect and Conserve Water (UFC 1-200-02 para 2-5) Total Points 3 Possible Points 3

Yes HPSB III.1 Indoor Water 1 * Yes HPSB III.2 Outdoor Water 1 * N/A HPSB III.4 Water used for heating and cooling 1

N/A Water efficient measures were implemented with heating and cooling equipment when life cycle effective

HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02 para 2-6) Total Points 5 Possible Points 6

Yes HPSB IV.1 Thermal Comfort 1 * Yes HPSB IV.2 Ventilation 1 * Yes HPSB IV.3 1 *

Maybe HPSB IV.4 Daylighting 1 * Yes HPSB IV.5 Low Emitting Materials 1 * Yes HPSB IV.6 Protect Indoor Air Quality during Construction 1 * Yes HPSB IV.7 Environmental Tobacco Smoke *

HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02 para 2-6) Total Points 4 Possible Points 6

Yes HPSB V.1 Recycled Content 1 * Maybe HPSB V.2 Biologically-based Products 1 * Maybe HPSB V.3 Environmentally Preferable Products 1 *

Yes HPSB V.4 Waste and Materials Management - Recycling 1 * Yes HPSB V.5 Waste and Materials Management - Divert 50% from Disposal 1

75.0% Insert percentage diverted from landfill * Data element is not applicable *

Yes HPSB V.6 Ozone Depleting Substances 1 * HPSB Totals Possible Points 22

17 Federal Requirements - Yes or N/A 3 Federal Requirements - Maybe 2 Federal Requirements - No

77% Percentage of Federal Requirements Met

Moisture Control

Solar PV

Solar CP

Solar Thermal Electric

Geothermal

GSHP Wind

Hydro Waste to Energy

Renewables were not

11/17/2014 2

LEED® Credits and/or Prerequisites that meet HPSB/UFC Requirements LEED® Credits and/or Prerequisites that align closely with HPSB/UFC Requirements LEED® Credits that meet USAF Energy & Water Criteria (may depend on technologies & strategies)

Sustainable Sites Achievable Points 11 Sustainable Sites Possible Points 26

Yes Prereq 1 Construction Activity Pollution Prevention (HPSB GP3) Required Yes Credit 1 1 No Credit 2 5 No Credit 3 1

Maybe Credit 4.1 6 Yes Credit 4.2 1 Yes Credit 4.3 3 Yes Credit 4.4 2 No Credit 5.1 1

Maybe Credit 5.2 1 Yes Credit 6.1 1 Yes Credit 6.2 1 No Credit 7.1 Heat Island Effect - Non-Roof (UFC) 1 Yes Credit 7.2 Heat Island Effect - Roof (UFC) 1 Yes Credit 8 Light Pollution Reduction 1

Option 1 Select which LEED® Interior Lighting Option was used Water Efficiency Achievable Points 4 Possible Points 10

Yes Prereq 1 Required 2 Credit 1 Water Efficient Landscaping (HPSB GP3) 2 to 4

2 Reduce Potable Water Use by 50% (HPSB GP3) 2 4 No Potable Use or Irrigation (HPSB GP3) 2

No Credit 2 2 2 Credit 3 Water Use Reduction (HPSB GP3) 2 to 4

2 30% Reduction (HPSB GP3) 2 3 35% Reduction (HPSB GP3) 1 4 40% Reduction (HPSB GP3) 1

Energy & Atmosphere Achievable Points 11 Possible Points 35

Yes Prereq 1 Required Yes Prereq 2 Minimum Energy Performance (HPSB GP2) Required Yes Prereq 3 Fundamental Refrigerant Management (HPSB GP5) Required 11 Credit 1 Optimize Energy Performance (HPSB GP2) 1 to 19

1 12% for New Buildings/8% for Existing Building Renovations 1 2 14% for New Buildings/10% for Existing Building Renovations 1 3 16% for New Buildings/12% for Existing Building Renovations 1 4 18% for New Buildings/14% for Existing Building Renovations 1 5 20% for New Buildings/16% for Existing Building Renovations 1 6 22% for New Buildings/18% for Existing Building Renovations 1 7 24% for New Buildings/20% for Existing Building Renovations 1 8 26% for New Buildings/22% for Existing Building Renovations 1 9 28% for New Buildings/24% for Existing Building Renovations 1

10 30% for New Buildings/26% for Existing Building Renovations 1 11 32% for New Buildings/28% for Existing Building Renovations 1 12 34% for New Buildings/30% for Existing Building Renovations 1 13 36% for New Buildings/32% for Existing Building Renovations 1 14 38% for New Buildings/34% for Existing Building Renovations 1 15 40% for New Buildings/36% for Existing Building Renovations 1 16 42% for New Buildings/38% for Existing Building Renovations 1 17 44% for New Buildings/40% for Existing Building Renovations 1 18 46% for New Buildings/42% for Existing Building Renovations 1 19 48%+ for New Buildings/44%+ for Existing Building Renovations 1

0 Credit 2 On-Site Renewable Energy (HPSB GP2) 1 to 7 1 On-site 1% 1 2 On-site 3% 1 3 On-site 5% 1 4 On-site 7% 1 5 On-site 9% 1 6 On-site 11% 1 7 On-site 13% 1

No Credit 3 2 Maybe Credit 4 2 Maybe Credit 5 3

No Credit 6 2

Enhanced Refrigerant Management (HPSB GP5) Measurement & Verification (HPSB GP2) Green Power

Site Development - Maximize Open Space

Alternative Transportation - Parking Capacity Site Development - Protect or Restore Habitat

LEED® 2009 Checklist

Fundamental Commissioning of the Building Energy Systems (HPSB GP1)

Brownfield Redevelopment

Alternative Transportation - Bicycle Storage & Changing Rooms

Water Use Reduction - 20% Reduction (HPSB GP3)

Stormwater Design - Quantity Control (HPSB GP3) Stormwater Design - Quality Control (HPSB GP3)

Alternative Transportation - Low-Emitting & Fuel Efficient Vehicles

Enhanced Commissioning (HPSB GP1)

Site Selection Development Density & Community Connectivity

Alternative Transportation - Public Transportation Access

Innovative Wastewater Technologies

11/17/2014 3

Materials & Resources Achievable Points 6 Possible Points 14

Yes Prereq 1 Storage & Collection of Recyclables (HPSB GP5) Required 0 Credit 1.1 Building Reuse - Maintain Existing Walls Floors & Roof 1 to 3

1 Maintain 55% of Existing Walls Floors & Roof 1 2 Maintain 75% of Existing Walls Floors & Roof 1 3 Maintain 95% of Existing Walls Floors & Roof 1

No Credit 1.2 1 2 Credit 2 Construction Waste Management (HPSB GP5) 1 to 2

1 50% Recycled or Salvaged 1 2 75% Recycled or Salvaged 1

0 Credit 3 Materials Reuse 1 to 2 1 5% of value of material reused content 1 2 10% of value of material reused content 1

2 Credit 4 1 to 2 1 10% of value of material recycled content 1 2 20% of value of material reused content 1

1 Credit 5 Regional Materials 1 to 2 1 10% Extracted, Processed & Manufactured 1 2 20% Extracted, Processed & Manufactured 1

Maybe Credit 6 1 Yes Credit 7 1

Indoor Environmental Quality Achievable Points 14 Possible Points 15

Yes Prereq 1 Minimum IAQ Performance (HPSB GP4) Required Yes Prereq 2 Environmental Tobacco Smoke (ETS) Control (HPSB GP4) Required No Credit 1 1 Yes Credit 2 1 Yes Credit 3.1 1 Yes Credit 3.2 1 Yes Credit 4.1 1 Yes Credit 4.2 1 Yes Credit 4.3 1 Yes Credit 4.4 1 Yes Credit 5 1 Yes Credit 6.1 1 Yes Credit 6.2 1 Yes Credit 7.1 1 Yes Credit 7.2 1 Yes Credit 8.1 1 Yes Credit 8.2 1

Innovation & Design Process Achievable Points 5 Possible Points 6

Yes Credit 1.1 Innovation in Design 1.1 1 Energy Select if ID 1.1 was for energy and/or water

Yes Credit 1.2 Innovation in Design 1.2 1 Water Select if ID 1.2 was for energy and/or water

Yes Credit 1.3 Innovation in Design 1.3 1 Energy Select if ID 1.3 was for energy and/or water

Yes Credit 1.4 Innovation in Design 1.4 1 Water Select if ID 1.4 was for energy and/or water

No Credit 1.5 Innovation in Design 1.5 1 Select if ID 1.5 was for energy and/or water

Yes Credit 2 LEED® Accredited Professional 1 Regional Priority Credits Achievable Points 2 Possible Points 4

Yes Credit 1.1 Regional Priority 1.1 1 Water Select if RP 1.1 was for energy and/or water

Yes Credit 1.2 Regional Priority 1.2 1 Energy Select if RP 1.2 was for energy and/or water

No Credit 1.3 Regional Priority 1.3 1 Select if RP 1.3 was for energy and/or water

No Credit 1.4 Regional Priority 1.4 1 Select if RP 1.4 was for energy and/or water

LEED Project Totals (pre-certification estimates) Possible Points 110 53 Total LEED® Yes Points 5 Total LEED® Maybe Points

12 Total LEED® No Points 24 Total LEED® Energy and Water Related Points

Silver LEED® Certification Status

N/A LEED® Horizontal Benchmark Level Horizontal N/A

N/A LEED® Utility Benchmark Level Utilities N/A

N/A LEED® Industrial Benchmark Level Industrial N/A

LEED®: Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points, Platinum: 80-110

Certified Wood (HPSB GP5) Rapidly Renewable Materials (HPSB GP5)

Recycled Content (HPSB GP5)

Building Reuse - Maintain 50% of Interior Non-Structural Elements

Daylight & Views - Views for 90% of Spaces

Controllability of Systems, Thermal Comfort Thermal Comfort, Design (HPSB GP4)

Indoor Chemical & Pollutant Source Control Controllability of Systems, Lighting (HPSB GP4)

Thermal Comfort, Verification Daylight & Views - Daylight 75% of Spaces (HPSB GP4)

Outside Air Delivery Monitoring

Low Emitting Materials, Flooring Systems (HPSB GP4) Low Emitting Materials, Composite Wood & Agrifiber Products (HPSB GP4)

Construction IAQ Management Plan, During Construction (HPSB GP4) Construction IAQ Management Plan, Before Occupancy (HPSB GP4) Low Emitting Materials, Adhesives & Sealants (HPSB GP4) Low Emitting Materials, Paints & Coatings (HPSB GP4)

Increased Ventilation

11/17/2014 4

140919_HAFB- LEED Scorecard
MILCONSust_LEED09HPSB_10Mar14_Full_v0(2)