Appendix H - LEED.pdf
PDF 59 KB Posted
- Attached to
- Golf Course Clubhouse Federal contract opportunity
- Solicitation number
- FA8201-16-B-0006
About this file
Appendix H - LEED
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| E-700 Letter Revised.pdf | ||
| Bldg 720 Existing Elevations.pdf | ||
| Amendment 0002.pdf | ||
| E-700 Revised.pdf | ||
| A-404 Revised.pdf | ||
| Bldg 720 Existing Floor plans.pdf | ||
| Answers to Contractor Questions V2.pdf | ||
| Amendment 0001.pdf | ||
| AF 66 Form.xlsx | XLSX spreadsheet | |
| AF 3065 Form.xfdl | XFDL file | |
| AF 3064 Form.xls | XLS spreadsheet | |
| Answers to Contractor's Questions.pdf | ||
| Site_Visit_Attendance_Record.pdf | ||
| Site_Visit_Transportation_Request_8-11-16.pdf | ||
| Combined_Specifications.zip | ZIP file | |
| Utilities_and_Demo_Drawings.zip | ZIP file | |
| CEN-CEIE Plan Review Checklist.pdf | ||
| Solicitation_FA8201-16-B-0006.pdf | ||
| Asbestos Survey.pdf | ||
| APPENDIX C.pdf | ||
| 8-8-2016_SOW.pdf | ||
| Wage Determinations.pdf | ||
| LBP Survey.pdf | ||
| 5-5-2016 BASE FACILITY DESIGN STANDARD.pdf | ||
| Clubhouse_Drawings.zip | ZIP file | |
| TAB K 1 Aug 11.pdf |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEED 2009 for New Construction and Major Renovations Hill AFB Golf Clubhouse
Project Checklist 11/25/2014-Current
11 1 14 Possible Points: 26 Y ? N Y ? N
Y Prereq 1 2 Credit 4 1 to 2 1 Credit 1 1 2 Credit 5 1 to 2
5 Credit 2 5 1 Credit 6 Rapidly Renewable Materials 1 1 Credit 3 Brownfield Redevelopment 1 1 Credit 7 1 6 Credit 4.1 6 1 Credit 4.2 1 11 1 3 Possible Points: 15
3 Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3 2 Credit 4.4 2 Y Prereq 1
1 Credit 5.1 Site Development—Protect or Restore Habitat 1 Y Prereq 2
1 Credit 5.2 Site Development—Maximize Open Space 1 1 Credit 1 1 1 Credit 6.1 Stormwater Design—Quantity Control 1 1 Credit 2 1 1 Credit 6.2 Stormwater Design—Quality Control 1 1 Credit 3.1 1
1 Credit 7.1 Heat Island Effect—Non-roof 1 1 Credit 3.2 1 1 Credit 7.2 1 1 Credit 4.1 1 1 Credit 8 Light Pollution Reduction 1 1 Credit 4.2 1
1 Credit 4.3 1 3 3 Possible Points: 10 1 Credit 4.4 1
1 Credit 5 1 Y Prereq 1 1 Credit 6.1 Controllability of Systems—Lighting 1 2 Credit 1 Water Efficient Landscaping 2 to 4 1 Credit 6.2 1
2 Credit 2 Innovative Wastewater Technologies 2 1 Credit 7.1 1 1 1 Credit 3 2 to 4 1 Credit 7.2 Thermal Comfort—Verification 1
1 Credit 8.1 1 11 5 19 Possible Points: 35 1 Credit 8.2 1
Y Prereq 1 6 Possible Points: 6 Y Prereq 2
Y Prereq 3 1 Credit 1.1 1 11 8 Credit 1 1 to 19 1 Credit 1.2 1
7 Credit 2 1 to 7 1 Credit 1.3 1 2 Credit 3 2 1 Credit 1.4 1
2 Credit 4 2 1 Credit 1.5 1 3 Credit 5 3 1 Credit 2 1
2 Credit 6 2 3 1 3 Possible Points: 4
7 7 Possible Points: 14 1 Credit 1.1 1
Y Prereq 1 1 Credit 1.2 1 3 Credit 1.1 1 to 3 2 2 Credit 1.3 1 1 Credit 1.2 Building Reuse—Maintain 50% of Interior Non-Structural Elements 1 1 Credit 1.4 1
2 Credit 2 1 to 2 2 Credit 3 1 to 2 52 8 49 Possible Points: 110
Regional Priority: EAc1: Optimize Energy Performance Regional Priority: EQc8.1- Daylight and views Regional Priority: WEc1: Water Efficient Landscaping Regional Priority: Specific Credit
Measurement and Verification
Innovation in Design: Exemplary Performance MRc5 Green Cleaning Energy Star Appliances Reduce Kitchen Water consumption by 10% SS: Radon Mitigation
Materials Reuse
Storage and Collection of Recyclables
Materials and Resources
Fundamental Commissioning of Building Energy Systems
Total Construction Waste Management
Enhanced Commissioning On-Site Renewable Energy
Enhanced Refrigerant Management
Construction IAQ Management Plan—Before Occupancy
Materials and Resources, Continued
Water Efficiency
Building Reuse—Maintain Existing Walls, Floors, and Roof
Alternative Transportation—Parking Capacity
Heat Island Effect—Roof
Recycled Content Regional Materials
Certified Wood
Alternative Transportation—Bicycle Storage and Changing Rooms
Sustainable Sites
Alternative Transportation—Public Transportation Access
Site Selection Development Density and Community Connectivity
Construction Activity Pollution Prevention
Low-Emitting Materials—Adhesives and Sealants Low-Emitting Materials—Paints and Coatings
Optimize Energy Performance
Energy and Atmosphere
Water Use Reduction—20% Reduction
Low-Emitting Materials—Composite Wood and Agrifiber Products Low-Emitting Materials—Flooring Systems
Indoor Chemical and Pollutant Source Control
Thermal Comfort—Design Controllability of Systems—Thermal Comfort
Green Power
Water Use Reduction
Minimum Energy Performance Fundamental Refrigerant Management
Daylight and Views—Views
LEED Accredited Professional
Daylight and Views—Daylight
Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110
Construction IAQ Management Plan—During Construction
Outdoor Air Delivery Monitoring
Indoor Environmental Quality
Minimum Indoor Air Quality Performance Environmental Tobacco Smoke (ETS) Control
Increased Ventilation
Regional Priority Credits
Innovation and Design Process
Air Force MILCON Sustainability Requirements Scoresheet version LEED® 2009 (Updated September 2013) * required entry
General Information xxxxxxxxxxxxxxxxxx Project ID (e.g. ABCD12345) xxxxxxxxxxxxxxxxxx Real Property Unique ID (RPUID) Hill AFB - Golf Clubhouse Building Name New Building Construction Project Type Hill AFB Installation Ogden City * UT State * Yes CONUS * Air Education & Training Command MAJCOM Mark Hinton PM Name $5,552,000.00 PA ($k) 15,400 Building Size (SF) 2016 Program Year (FY####) RFP/35% Design Project Phase 2014 Design Started (FY####)
8/6/2014 BOD (MM/DD/YY)
In Progress Pursuing formal LEED® Certification
LEED® 2009 LEED® Rating System 53 LEED® Points Status Silver LEED® Certification Level Status 24 LEED® Energy and Water Points Status 77% HPSB Compliant 30% Energy Efficiency Achieved (% below ANSI/ASHRAE/IESNA
Standard 90.1-2010) 8/6/2014 Date Scoresheet Completed or Revised * 2013_V0 Scoresheet version
Color Coding: See Instructions Tab for more detail Recommended (not required) Yes or N/A Maybe
LEED Prerequisite No
* required entry
Federal Requirements for High Performance and Sustainable Buildings (HPSB) & UFC 1-200-02 HPSB I: Employ Integrated Design Principles (UFC 1-200-02 para 2-2)
Total Points 2 Possible Points 2 Yes HPSB I.1 Integrated Design 1 * Yes HPSB I.2 Commissioning 1 *
UFC 1-200-02 para 2-3. Promote Sustainable Location and Site Development
Total Points 1 Possible Points (HPSB only) 1 Yes UFC para 2-3.1 Site selection 1 *
Maybe UFC para 2-3.2 Mitigation of Heat Island Effect 1 * Yes UFC para 2-3.3 Reduction of Light Pollution 1 * Yes HPSB III.3-4 Stormwater Management 1 *
Drop-Down Box
Federal Requirements
Complete
No Entry Required Custom Entry
Fees ($)
Registration Certification
Date Project Registered (MM/DD/YY)
Date Project Certified by GBCI (MM/DD/YY)
LEED Points Awarded by GBCI (e.g. 42)
LEED Certification Level Awarded by GBCI
LEED Energy and Water Points Awarded by GBCI
11/17/2014 1
HPSB II: Optimize Energy Performance (UFC 1-200-02 para 2-4) Total Points 2 Possible Points 4
Yes HPSB II.1 Energy Efficiency 1
Yes Reduce energy use 30% below ANSI/ASHRAE/IESNA Standard 90.1-2010 or if not - achieve maximum energy efficiency that is lifecycle cost effective
30.0% Insert percentage below ANSI/ASHRAE/IESNA Standard 90.1-2010 in terms of energy use (e.g. 32)
Insert building energy intensity (kBtu/yr-sqft) calculated IAW 10 CFR
No HPSB II.2 On-site Renewable Energy - Solar Hot Water Heater System 1
No Installed solar hot water heater system or found installation not lifecycle cost effective
Insert generation capacity (MMBtu/yr)
Insert percentage of demand No HPSB II.3 On-site Renewable Energy 1
No Installed renewable energy elements or projects were not lifecycle cost effective
Renewable energy types (check below)
Insert generation capacity (kW)
Insert percentage of total building Yes HPSB II.4 Measurement and Verification 1
Yes Water Metering: Select N/A if no service * Yes Electric Metering: Select N/A if no service * Yes Natural Gas Metering: Select N/A if no service * N/A Steam Metering: Select N/A if no service
HPSB III: Protect and Conserve Water (UFC 1-200-02 para 2-5) Total Points 3 Possible Points 3
Yes HPSB III.1 Indoor Water 1 * Yes HPSB III.2 Outdoor Water 1 * N/A HPSB III.4 Water used for heating and cooling 1
N/A Water efficient measures were implemented with heating and cooling equipment when life cycle effective
HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02 para 2-6) Total Points 5 Possible Points 6
Yes HPSB IV.1 Thermal Comfort 1 * Yes HPSB IV.2 Ventilation 1 * Yes HPSB IV.3 1 *
Maybe HPSB IV.4 Daylighting 1 * Yes HPSB IV.5 Low Emitting Materials 1 * Yes HPSB IV.6 Protect Indoor Air Quality during Construction 1 * Yes HPSB IV.7 Environmental Tobacco Smoke *
HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02 para 2-6) Total Points 4 Possible Points 6
Yes HPSB V.1 Recycled Content 1 * Maybe HPSB V.2 Biologically-based Products 1 * Maybe HPSB V.3 Environmentally Preferable Products 1 *
Yes HPSB V.4 Waste and Materials Management - Recycling 1 * Yes HPSB V.5 Waste and Materials Management - Divert 50% from Disposal 1
75.0% Insert percentage diverted from landfill * Data element is not applicable *
Yes HPSB V.6 Ozone Depleting Substances 1 * HPSB Totals Possible Points 22
17 Federal Requirements - Yes or N/A 3 Federal Requirements - Maybe 2 Federal Requirements - No
77% Percentage of Federal Requirements Met
Moisture Control
Solar PV
Solar CP
Solar Thermal Electric
Geothermal
GSHP Wind
Hydro Waste to Energy
Renewables were not
11/17/2014 2
LEED® Credits and/or Prerequisites that meet HPSB/UFC Requirements LEED® Credits and/or Prerequisites that align closely with HPSB/UFC Requirements LEED® Credits that meet USAF Energy & Water Criteria (may depend on technologies & strategies)
Sustainable Sites Achievable Points 11 Sustainable Sites Possible Points 26
Yes Prereq 1 Construction Activity Pollution Prevention (HPSB GP3) Required Yes Credit 1 1 No Credit 2 5 No Credit 3 1
Maybe Credit 4.1 6 Yes Credit 4.2 1 Yes Credit 4.3 3 Yes Credit 4.4 2 No Credit 5.1 1
Maybe Credit 5.2 1 Yes Credit 6.1 1 Yes Credit 6.2 1 No Credit 7.1 Heat Island Effect - Non-Roof (UFC) 1 Yes Credit 7.2 Heat Island Effect - Roof (UFC) 1 Yes Credit 8 Light Pollution Reduction 1
Option 1 Select which LEED® Interior Lighting Option was used Water Efficiency Achievable Points 4 Possible Points 10
Yes Prereq 1 Required 2 Credit 1 Water Efficient Landscaping (HPSB GP3) 2 to 4
2 Reduce Potable Water Use by 50% (HPSB GP3) 2 4 No Potable Use or Irrigation (HPSB GP3) 2
No Credit 2 2 2 Credit 3 Water Use Reduction (HPSB GP3) 2 to 4
2 30% Reduction (HPSB GP3) 2 3 35% Reduction (HPSB GP3) 1 4 40% Reduction (HPSB GP3) 1
Energy & Atmosphere Achievable Points 11 Possible Points 35
Yes Prereq 1 Required Yes Prereq 2 Minimum Energy Performance (HPSB GP2) Required Yes Prereq 3 Fundamental Refrigerant Management (HPSB GP5) Required 11 Credit 1 Optimize Energy Performance (HPSB GP2) 1 to 19
1 12% for New Buildings/8% for Existing Building Renovations 1 2 14% for New Buildings/10% for Existing Building Renovations 1 3 16% for New Buildings/12% for Existing Building Renovations 1 4 18% for New Buildings/14% for Existing Building Renovations 1 5 20% for New Buildings/16% for Existing Building Renovations 1 6 22% for New Buildings/18% for Existing Building Renovations 1 7 24% for New Buildings/20% for Existing Building Renovations 1 8 26% for New Buildings/22% for Existing Building Renovations 1 9 28% for New Buildings/24% for Existing Building Renovations 1
10 30% for New Buildings/26% for Existing Building Renovations 1 11 32% for New Buildings/28% for Existing Building Renovations 1 12 34% for New Buildings/30% for Existing Building Renovations 1 13 36% for New Buildings/32% for Existing Building Renovations 1 14 38% for New Buildings/34% for Existing Building Renovations 1 15 40% for New Buildings/36% for Existing Building Renovations 1 16 42% for New Buildings/38% for Existing Building Renovations 1 17 44% for New Buildings/40% for Existing Building Renovations 1 18 46% for New Buildings/42% for Existing Building Renovations 1 19 48%+ for New Buildings/44%+ for Existing Building Renovations 1
0 Credit 2 On-Site Renewable Energy (HPSB GP2) 1 to 7 1 On-site 1% 1 2 On-site 3% 1 3 On-site 5% 1 4 On-site 7% 1 5 On-site 9% 1 6 On-site 11% 1 7 On-site 13% 1
No Credit 3 2 Maybe Credit 4 2 Maybe Credit 5 3
No Credit 6 2
Enhanced Refrigerant Management (HPSB GP5) Measurement & Verification (HPSB GP2) Green Power
Site Development - Maximize Open Space
Alternative Transportation - Parking Capacity Site Development - Protect or Restore Habitat
LEED® 2009 Checklist
Fundamental Commissioning of the Building Energy Systems (HPSB GP1)
Brownfield Redevelopment
Alternative Transportation - Bicycle Storage & Changing Rooms
Water Use Reduction - 20% Reduction (HPSB GP3)
Stormwater Design - Quantity Control (HPSB GP3) Stormwater Design - Quality Control (HPSB GP3)
Alternative Transportation - Low-Emitting & Fuel Efficient Vehicles
Enhanced Commissioning (HPSB GP1)
Site Selection Development Density & Community Connectivity
Alternative Transportation - Public Transportation Access
Innovative Wastewater Technologies
11/17/2014 3
Materials & Resources Achievable Points 6 Possible Points 14
Yes Prereq 1 Storage & Collection of Recyclables (HPSB GP5) Required 0 Credit 1.1 Building Reuse - Maintain Existing Walls Floors & Roof 1 to 3
1 Maintain 55% of Existing Walls Floors & Roof 1 2 Maintain 75% of Existing Walls Floors & Roof 1 3 Maintain 95% of Existing Walls Floors & Roof 1
No Credit 1.2 1 2 Credit 2 Construction Waste Management (HPSB GP5) 1 to 2
1 50% Recycled or Salvaged 1 2 75% Recycled or Salvaged 1
0 Credit 3 Materials Reuse 1 to 2 1 5% of value of material reused content 1 2 10% of value of material reused content 1
2 Credit 4 1 to 2 1 10% of value of material recycled content 1 2 20% of value of material reused content 1
1 Credit 5 Regional Materials 1 to 2 1 10% Extracted, Processed & Manufactured 1 2 20% Extracted, Processed & Manufactured 1
Maybe Credit 6 1 Yes Credit 7 1
Indoor Environmental Quality Achievable Points 14 Possible Points 15
Yes Prereq 1 Minimum IAQ Performance (HPSB GP4) Required Yes Prereq 2 Environmental Tobacco Smoke (ETS) Control (HPSB GP4) Required No Credit 1 1 Yes Credit 2 1 Yes Credit 3.1 1 Yes Credit 3.2 1 Yes Credit 4.1 1 Yes Credit 4.2 1 Yes Credit 4.3 1 Yes Credit 4.4 1 Yes Credit 5 1 Yes Credit 6.1 1 Yes Credit 6.2 1 Yes Credit 7.1 1 Yes Credit 7.2 1 Yes Credit 8.1 1 Yes Credit 8.2 1
Innovation & Design Process Achievable Points 5 Possible Points 6
Yes Credit 1.1 Innovation in Design 1.1 1 Energy Select if ID 1.1 was for energy and/or water
Yes Credit 1.2 Innovation in Design 1.2 1 Water Select if ID 1.2 was for energy and/or water
Yes Credit 1.3 Innovation in Design 1.3 1 Energy Select if ID 1.3 was for energy and/or water
Yes Credit 1.4 Innovation in Design 1.4 1 Water Select if ID 1.4 was for energy and/or water
No Credit 1.5 Innovation in Design 1.5 1 Select if ID 1.5 was for energy and/or water
Yes Credit 2 LEED® Accredited Professional 1 Regional Priority Credits Achievable Points 2 Possible Points 4
Yes Credit 1.1 Regional Priority 1.1 1 Water Select if RP 1.1 was for energy and/or water
Yes Credit 1.2 Regional Priority 1.2 1 Energy Select if RP 1.2 was for energy and/or water
No Credit 1.3 Regional Priority 1.3 1 Select if RP 1.3 was for energy and/or water
No Credit 1.4 Regional Priority 1.4 1 Select if RP 1.4 was for energy and/or water
LEED Project Totals (pre-certification estimates) Possible Points 110 53 Total LEED® Yes Points 5 Total LEED® Maybe Points
12 Total LEED® No Points 24 Total LEED® Energy and Water Related Points
Silver LEED® Certification Status
N/A LEED® Horizontal Benchmark Level Horizontal N/A
N/A LEED® Utility Benchmark Level Utilities N/A
N/A LEED® Industrial Benchmark Level Industrial N/A
LEED®: Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points, Platinum: 80-110
Certified Wood (HPSB GP5) Rapidly Renewable Materials (HPSB GP5)
Recycled Content (HPSB GP5)
Building Reuse - Maintain 50% of Interior Non-Structural Elements
Daylight & Views - Views for 90% of Spaces
Controllability of Systems, Thermal Comfort Thermal Comfort, Design (HPSB GP4)
Indoor Chemical & Pollutant Source Control Controllability of Systems, Lighting (HPSB GP4)
Thermal Comfort, Verification Daylight & Views - Daylight 75% of Spaces (HPSB GP4)
Outside Air Delivery Monitoring
Low Emitting Materials, Flooring Systems (HPSB GP4) Low Emitting Materials, Composite Wood & Agrifiber Products (HPSB GP4)
Construction IAQ Management Plan, During Construction (HPSB GP4) Construction IAQ Management Plan, Before Occupancy (HPSB GP4) Low Emitting Materials, Adhesives & Sealants (HPSB GP4) Low Emitting Materials, Paints & Coatings (HPSB GP4)
Increased Ventilation
11/17/2014 4
| 140919_HAFB- LEED Scorecard |
| MILCONSust_LEED09HPSB_10Mar14_Full_v0(2) |