_Submittal_Register.pdf
PDF 531 KB Posted
- Attached to
- Bldg. 850 G Renovate For New Workload Federal contract opportunity
- Solicitation number
- FA8201-16-B-0002
About this file
Submittal Register Bldg. 850 bay G
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Line
Acti vity
Trans-mittal #
Specification Section
SD
# Submittal Description Item Submitted
Paragraph
Classificati on: GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth Date RCD From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
1 03 30 00 01 Preconstruction Submittals Concrete Curing Plan
2 03 30 00 03 Product Data Recycled Aggregate Materials
3 03 30 00 03 Product Data Cementitious Materials 2.4.1
4 03 30 00 03 Product Data Admixtures 2.4.5
5 03 30 00 05 Design Data mix design 2.3.1
6 03 30 00 06 Test Reports Concrete mix design 1.6.1.1
7 03 30 00 06 Test Reports Fly ash 1.6.3.1
8 03 30 00 06 Test Reports Pozzolan 1.6.3.1
9 03 30 00 06 Test Reports Aggregates 2.4.3
10 03 30 00 06 Test Reports Compressive strength tests 3.14.2.3
11 03 30 00 06 Test Reports Slump Tests 3.14.2.1
12 03 30 00 06 Test Reports Water 2.4.2
13 03 30 00 07 Certificates Material Safety Data Sheets
14 03 30 53 02 Shop Drawings Installation Drawings 1.5
15 03 30 53 03 Product Data Air-Entraining Admixture 2.2.3.1
16 03 30 53 03 Product Data Water-Reducing or Retarding Admixture 2.2.3.2
17 03 30 53 03 Product Data Curing Materials 2.2.5
18 03 30 53 03 Product Data Batching and Mixing Equipment
19 03 30 53 03 Product Data Conveying and Placing Concrete 3.2
20 03 30 53 03 Product Data Mix Design Data 2.3
21 03 30 53 03 Product Data Ready-Mix Concrete 2.3
22 03 30 53 06 Test Reports Aggregates 2.2.2
23 03 30 53 06 Test Reports Concrete Mixture Proportions 2.1.3
24 03 30 53 06 Test Reports Compressive Strength Testing 3.9.3
25 03 30 53 06 Test Reports Slump 3.9.3
26 03 30 53 06 Test Reports Water 2.2.4
27 03 30 53 07 Certificates Cementitious Materials 2.2.1
28 03 30 53 07 Certificates Pozzolan
29 03 30 53 08 Manufacturer’s Instructions Chemical Floor Hardener 2.4.2
30 03 30 53 08 Manufacturer’s Instructions Curing Compound 2.4.3
31 05 12 00 02 Shop Drawings Erection Plan 1.5.2.1 G
32 05 12 00 03 Product Data Shop primer 2.4
33 05 12 00 03 Product Data Welding electrodes and rods 2.3.1
34 05 12 00 03 Product Data Non-Shrink Grout 2.3.2
35 05 12 00 06 Test Reports Class B coating 2.4
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
36 05 12 00 06 Test Reports Bolts, nuts, and washers 2.2
37 05 12 00 07 Certificates Steel 2.1
38 05 12 00 07 Certificates Bolts, nuts, and washers 2.2
39 05 12 00 07 Certificates Galvanizing 2.5
40 05 12 00 07 Certificates Welding procedures and qualifications 1.5.2.2
41 05 30 00 02 Shop Drawings Fabrication Drawings 1.3.3
42 05 30 00 02 Shop Drawings Ridge Plates
43 05 30 00 02 Shop Drawings Metal Closure Strips
44 05 30 00 03 Product Data Accessories 2.2
45 05 30 00 03 Product Data Galvanizing Repair Paint 2.1.5
46 05 30 00 03 Product Data Joint Sealant Material 2.1.4
47 05 30 00 03 Product Data Repair Paint 2.3.3
48 05 30 00 03 Product Data Welder Qualifications 1.3.2
49 05 30 00 03 Product Data Welding Equipment 1.3.2
50 05 30 00 03 Product Data Welding Rods and Accessories 1.3.2
51 05 30 00 04 Samples Flexible Closure Strips 2.1.6
52 05 30 00 04 Samples Flexible Closure Strips 2.3
53 05 30 00 07 Certificates Welding Procedures
54 05 50 15 02 Shop Drawings Miscellaneous Metals & Standard Metal Articles 2.1
55 05 50 15 06 Test Reports Miscellaneous Metals & Standard Metal Articles 2.1
56 07 61 14.00 20 02 Shop Drawings Roofing 1.2.4 G
57 07 61 14.00 20 03 Product Data Roofing panels 2.1 G
58 07 61 14.00 20 03 Product Data Attachment clips; G
59 07 61 14.00 20 03 Product Data Closures; G
60 07 61 14.00 20 03 Product Data Accessories; G
61 07 61 14.00 20 03 Product Data Fasteners; G
62 07 61 14.00 20 03 Product Data Sealants; G
63 07 61 14.00 20 03 Product Data warranty 1.7 G
64 07 61 14.00 20 04 Samples panel 2.1
65 07 61 14.00 20 04 Samples Accessories 2.4
66 07 61 14.00 20 04 Samples Sealants 2.4.3
67 07 61 14.00 20 04 Samples Intermediate Support 2.2
68 07 61 14.00 20 05 Design Data Design calculations 1.5
69 07 61 14.00 20 06 Test Reports Field Inspection 3.6
70 07 61 14.00 20 06 Test Reports Structural performance 1.3.3
71 07 61 14.00 20 06 Test Reports Finish 1.6.6
72 07 61 14.00 20 07 Certificates Manufacturer's Technical Representative 1.6.3
73 07 61 14.00 20 07 Certificates Installer's Qualifications 1.6.4
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
74 07 61 14.00 20 07 Certificates Coil stock G
75 07 61 14.00 20 08 Manufacturer’s Instructions Installation 3.3 G
76 07 61 14.00 20 11 Closeout Submittals Information card
77 07 84 00 02 Shop Drawings Firestopping Materials 2.1 G
78 07 84 00 06 Test Reports Inspection 3.3 G
79 07 84 00 07 Certificates Inspector Qualifications 1.4.2
80 07 84 00 07 Certificates Firestopping Materials 2.1
81 07 84 00 07 Certificates Installer Qualifications 1.4.1 G
82 07 92 00 03 Product Data Sealants 2.1
83 07 92 00 03 Product Data Primers 2.2
84 07 92 00 03 Product Data Bond breakers 2.3
85 07 92 00 03 Product Data Backstops 2.4
86 07 92 00 07 Certificates Sealant 3.3.6
87 08 11 13 02 Shop Drawings Doors 2.1 G
88 08 11 13 02 Shop Drawings Doors 2.1 G
89 08 11 13 02 Shop Drawings Frames 2.5 G
90 08 11 13 02 Shop Drawings Frames 2.5 G
91 08 11 13 02 Shop Drawings Accessories 2.3
92 08 11 13 02 Shop Drawings Weatherstripping 2.6
93 08 11 13 03 Product Data Doors 2.1 G
94 08 11 13 03 Product Data Frames 2.5 G
95 08 11 13 03 Product Data Accessories 2.3
96 08 11 13 03 Product Data Weatherstripping 2.6
97 08 14 00 02 Shop Drawings Doors 2.1 G
98 08 14 00 03 Product Data Doors 2.1 G
99 08 14 00 03 Product Data Accessories 2.2
100 08 14 00 03 Product Data Water-resistant sealer 2.3.7
101 08 14 00 03 Product Data warranty 1.4
102 08 14 00 03 Product Data Sound transmission class rating 2.1.2 G
103 08 14 00 03 Product Data Certification
104 08 14 00 04 Samples Doors 2.1
105 08 14 00 04 Samples Door finish colors 2.3.6.2 G
106 08 14 00 06 Test Reports Cycle-slam 2.4
107 08 14 00 06 Test Reports Hinge loading resistance 2.4
108 08 51 23 02 Shop Drawings Windows 2.2
109 08 51 23 03 Product Data Hardware 2.5.2
110 08 51 23 03 Product Data Materials 2.1
111 08 51 23 03 Product Data Fasteners 2.5.3
112 08 51 23 03 Product Data Accessories 2.5
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
113 08 51 23 04 Samples Color coating G
114 08 51 23 04 Samples Windows 2.2
115 08 51 23 06 Test Reports Air infiltration 1.3.1
116 08 51 23 06 Test Reports Water infiltration 1.3.1
117 08 51 23 06 Test Reports Mullion and transom bar wind load 1.3.2
118 08 51 23 10 Operation and Maintenance Data Windows 2.2 G
119 08 71 00 02 Shop Drawings Hardware schedule 1.3 G
120 08 71 00 02 Shop Drawings Keying system 2.3.5
121 08 71 00 03 Product Data Hardware items 2.3 G
122 08 71 00 08 Manufacturer’s Instructions Installation 3.1
123 08 71 00 10 Operation and Maintenance Data Hardware Schedule 1.3 G
124 08 71 00 11 Closeout Submittals Key Bitting 1.4
125 08 81 00 02 Shop Drawings Installation
126 08 81 00 03 Product Data Glass
127 08 81 00 03 Product Data Glazing Accessories 1.3
128 08 81 00 04 Samples Glass
129 08 81 00 04 Samples Glazing Compound 2.2.2
130 08 81 00 04 Samples Tape 2.2.5
131 08 81 00 04 Samples Sealant
132 08 81 00 07 Certificates Glass
133 08 81 00 07 Certificates Glazing Accessories 1.3
134 08 81 00 08 Manufacturer’s Instructions Setting and sealing materials 2.2
135 08 81 00 08 Manufacturer’s Instructions Glass setting 3.2
136 09 22 00 02 Shop Drawings Metal support systems 2.1 G
137 09 29 00 03 Product Data Glass Mat Water-Resistant Gypsum Tile Backing Board 2.1.2
138 09 29 00 03 Product Data Impact Resistant Gypsum Board 2.1.3
139 09 29 00 03 Product Data Accessories 2.1.6
140 09 29 00 03 Product Data Certification
141 09 29 00 03 Product Data Gypsum Board 2.1.1
142 09 29 00 03 Product Data Adhesives
143 09 29 00 03 Product Data Joint Treatment Materials 2.1.4
144 09 29 00 07 Certificates Asbestos Free Materials 2.1 G
145 09 29 00 08 Manufacturer’s Instructions Material Safety Data Sheets 2.1
146 09 29 00 10 Operation and Maintenance Data Manufacturer maintenance instructions 2.1
147 09 29 00 10 Operation and Maintenance Data Waste Management 3.5
148 09 51 00 02 Shop Drawings Approved Detail Drawings 1.2
149 09 51 00 03 Product Data Acoustical Ceiling Systems
150 09 51 00 03 Product Data Certification
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
151 09 51 00 04 Samples Acoustical Units 2.1
152 09 51 00 04 Samples Acoustic Ceiling Tiles 2.1.1
153 09 51 00 06 Test Reports Ceiling Attenuation Class and Test 1.2.1
154 09 51 00 07 Certificates Acoustical Units 2.1
155 09 51 00 07 Certificates Acoustic Ceiling Tiles 2.1.1
156 09 62 38 03 Product Data Static-Control Flooring 2.1 G
157 09 62 38 03 Product Data Accessories 2.1 G
158 09 62 38 03 Product Data Adhesives 2.1.1.3 G
159 09 62 38 03 Product Data Warranty 1.7
160 09 62 38 04 Samples Static-Control Flooring 2.1 G
161 09 62 38 04 Samples Accessories 2.1 G
162 09 62 38 06 Test Reports Moisture, Alkalinity and Bond 3.2
163 09 62 38 06 Test Reports Testing 3.6
164 09 62 38 07 Certificates Static-Control Flooring 2.1
165 09 62 38 07 Certificates Accessories 2.1
166 09 62 38 07 Certificates Adhesives 2.1.1.3
167 09 62 38 07 Certificates Qualifications of Applicator 1.4
168 09 62 38 08 Manufacturer’s Instructions Static-Control Flooring 2.1 G
169 09 62 38 08 Manufacturer’s Instructions Accessories 2.1 G
170 09 62 38 10 Operation and Maintenance Data Static-Control Flooring 2.1 G
171 09 62 38 10 Operation and Maintenance Data Accessories 2.1 G
172 09 65 00 02 Shop Drawings Resilient Flooring and Accessories 2.7 G
173 09 65 00 03 Product Data Resilient Flooring and Accessories 2.7 G
174 09 65 00 03 Product Data Adhesives 2.3
175 09 65 00 03 Product Data Vinyl Composition Tile 2.1
176 09 65 00 03 Product Data Sheet Vinyl Flooring
177 09 65 00 03 Product Data Wall Base 2.2
178 09 65 00 04 Samples Resilient Flooring and Accessories 2.7 G
179 09 65 00 06 Test Reports Moisture, Alkalinity and Bond Tests 3.3 G
180 09 65 00 08 Manufacturer’s Instructions Surface Preparation 3.2 G
181 09 65 00 08 Manufacturer’s Instructions Installation 3.1 G
182 09 65 00 10 Operation and Maintenance Data Resilient Flooring and Accessories 2.7 G
183 09 68 00 02 Shop Drawings Installation Drawings 3.4 G
184 09 68 00 03 Product Data Carpet 2.1 G
185 09 68 00 03 Product Data Physical Characteristics 2.1.1
186 09 68 00 03 Product Data Environmental Data
187 09 68 00 04 Samples Carpet 2.1 G
188 09 68 00 06 Test Reports Moisture and Alkalinity Tests 3.2 G
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
189 09 68 00 07 Certificates Carpet 2.1
190 09 68 00 07 Certificates Regulatory Requirements 1.5
191 09 68 00 08 Manufacturer’s Instructions Surface Preparation 3.1
192 09 68 00 08 Manufacturer’s Instructions Installation 3.4
193 09 68 00 10 Operation and Maintenance Data Carpet 2.1 G
194 09 68 00 10 Operation and Maintenance Data Cleaning and Protection 3.5 G
195 09 68 00 10 Operation and Maintenance Data Maintenance Service 3.6.2
196 09 90 00 02 Shop Drawings Piping identification 3.9
197 09 90 00 02 Shop Drawings stencil 3.9
198 09 90 00 03 Product Data Certification
199 09 90 00 03 Product Data Environmental Data
200 09 90 00 03 Product Data Materials 2.1
201 09 90 00 03 Product Data Coating 2.1 G
202 09 90 00 03 Product Data Manufacturer's Technical Data Sheets 2.1
203 09 90 00 03 Product Data Sealant 3.2.5
204 09 90 00 04 Samples Color 1.10 G
205 09 90 00 07 Certificates Applicator's qualifications 1.3
206 09 90 00 07 Certificates Qualification Testing 1.4.1.2 G
207 09 90 00 08 Manufacturer’s Instructions Application instructions 3.3.1
208 09 90 00 08 Manufacturer’s Instructions Mixing 3.6.2
209 09 90 00 08 Manufacturer’s Instructions Manufacturer's Material Safety Data Sheets 1.7.2
210 09 90 00 10 Operation and Maintenance Data Coatings: 2.1 G
211 09 96 00 01 Preconstruction Submittals Material, Equipment and Fixture List 1.3
212 09 96 00 03 Product Data Epoxy Coatings 2.1
213 09 96 00 03 Product Data Polyurethane Coatings
214 09 96 00 04 Samples Color Chips 1.3
215 09 96 00 07 Certificates Epoxy Coatings 2.1
216 09 96 00 07 Certificates Polyurethane Coatings
217 10 10 00 03 Product Data Projection Screen G
218 10 10 00 07 Certificates Projection Screen
219 10 14 00.20 02 Shop Drawings Detail Drawings 1.3.2 G
220 10 14 00.20 03 Product Data Installation 3.1 G
221 10 14 00.20 03 Product Data Warranty 1.5 G
222 10 14 00.20 04 Samples Interior Signage 1.3.1 G
223 10 14 00.20 10 Operation and Maintenance Data Approved Manufacturer's Instructions 3.1 G
224 10 14 00.20 10 Operation and Maintenance Data Protection and Cleaning 3.1.2 G
225 10 26 13 02 Shop Drawings Corner Guards 2.2 G
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
226 10 26 13 03 Product Data Corner Guards 2.2 G
227 10 26 13 04 Samples Finish 2.4 G
228 10 26 13 06 Test Reports Corner Guards 2.2
229 10 26 13 07 Certificates Corner Guards 2.2
230 10 44 16 01 Preconstruction Submittals Manufacturer's Data 2.1
231 10 44 16 02 Shop Drawings Fire Extinguishers 2.1
232 10 44 16 02 Shop Drawings Accessories 1.3.1
233 10 44 16 02 Shop Drawings Cabinets Part 2
234 10 44 16 02 Shop Drawings Wall Brackets 1.3.1
235 10 44 16 03 Product Data Fire Extinguishers 2.1
236 10 44 16 03 Product Data Accessories 1.3.1
237 10 44 16 03 Product Data Cabinets Part 2
238 10 44 16 03 Product Data Wall Brackets 1.3.1
239 10 44 16 03 Product Data Replacement Parts 3.2.1
240 10 44 16 04 Samples Fire Extinguisher 1.3.1
241 10 44 16 04 Samples Cabinet 1.3.1
242 10 44 16 04 Samples Wall Brackets 1.3.1
243 10 44 16 04 Samples Accessories 1.3.1
244 10 44 16 07 Certificates Fire Extinguishers 2.1
245 10 44 16 07 Certificates Manufacturer's Warranty with Inspection Tag 2.1
246 10 51 13 02 Shop Drawings Types 2.1 G
247 10 51 13 02 Shop Drawings Location 1.4 G
248 10 51 13 02 Shop Drawings Installation 3.1
249 10 51 13 02 Shop Drawings Numbering system 3.2
250 10 51 13 03 Product Data Material 2.2
251 10 51 13 03 Product Data Locking Devices 2.3.1
252 10 51 13 03 Product Data Handles 2.3.4
253 10 51 13 03 Product Data Finish 2.2.2
254 10 51 13 03 Product Data components 2.3
255 10 51 13 03 Product Data Assembly 3.1
256 10 51 13 04 Samples Color chips 1.5.1 G
257 10 56 13 01 Preconstruction Submittals Shelving Units 2.1
258 10 56 13 03 Product Data Shelving Units 2.1
259 10 56 13 03 Product Data Accessories 2.2
260 10 56 13 03 Product Data Installation instructions 3.2
261 10 56 13 04 Samples Finish 2.3
262 10 56 13 06 Test Reports Shelving Units 2.1
263 10 56 13 06 Test Reports Finish 2.3
264 12 36 00 02 Shop Drawings Fabrication 2.3 G
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
265 12 36 00 02 Shop Drawings Installation Drawings 3.1 G
266 12 36 00 03 Product Data Corrosion-Resistant Steel G
267 12 36 00 03 Product Data Plywood 2.2 G
268 12 36 00 03 Product Data Adhesives 2.2 G
269 12 36 00 03 Product Data Filler Material 2.2 G
270 12 36 00 03 Product Data Fasteners 2.2 G
271 12 36 00 03 Product Data Accessories and Hardware 2.5 G
272 12 36 00 03 Product Data Plastic Laminate 2.2 G
273 12 36 00 04 Samples Countertop 2.3 G
274 12 36 00 04 Samples Accessories and Hardware 2.5 G
275 12 36 00 04 Samples Manufacturer's Standard Color Charts 2.1 G
276 12 36 00 07 Certificates Adhesives 2.2 G
277 12 36 00 08 Manufacturer’s Instructions Manufacturer's Instructions 2.1 G
278 12 48 13 02 Shop Drawings Installation Drawings 3.2 G
279 12 48 13 02 Shop Drawings Detail Drawings 3.2 G
280 12 48 13 03 Product Data Entrance Floor Mats and Frames 2.1 G
281 12 48 13 04 Samples Entrance Floor Mats and Frames 2.1 G
282 12 48 13 08 Manufacturer’s Instructions Manufacturer's Instructions 3.2 G
283 12 48 13 10 Operation and Maintenance Data Protection, Maintenance, and Repair Information 3.2 G
284 12 50 00 02 Shop Drawings Detail Drawings 1.4.4 G
285 12 50 00 02 Shop Drawings Installation 3.1 G
286 12 50 00 03 Product Data Furniture Systems G
287 12 50 00 03 Product Data Warranty 1.6
288 12 50 00 03 Product Data Workstations 1.2.1
289 12 50 00 03 Product Data Materials 2.1
290 12 50 00 04 Samples Workstations 1.2.1 G
291 12 50 00 06 Test Reports Selected Components 1.2.4.1 G
292 12 50 00 06 Test Reports Panel Acoustics G
293 12 50 00 06 Test Reports Fire Safety 1.4.2 G
294 12 50 00 06 Test Reports Electrical System 1.4.3 G
295 12 50 00 06 Test Reports Emissions
296 12 50 00 07 Certificates Workstations 1.2.1
297 12 50 00 08 Manufacturer’s Instructions Material Safety Data Sheets 2.1.2
298 12 50 00 10 Operation and Maintenance Data Assembly Manuals 2.2.1 G
299 12 50 00 10 Operation and Maintenance Data Assembly Manuals 2.2.2 G
300 12 50 00 10 Operation and Maintenance Data Maintenance Manuals 3.2 G
301 12 50 00 10 Operation and Maintenance Data Cleaning 3.2 G
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
302 12 50 00 10 Operation and Maintenance Data Electrical System 1.4.3 G
303 12 50 00 10 Operation and Maintenance Data Plastic Identification 2.1
304 12 50 00 10 Operation and Maintenance Data Maintenance Service 1.7
305 21 13 13.00 10 02 Shop Drawings Shop Drawings 1.4.3 G
306 21 13 13.00 10 02 Shop Drawings As-Built Drawings 3.8
307 21 13 13.00 10 03 Product Data Fire Protection Related Submittals 1.4.1
308 21 13 13.00 10 03 Product Data Materials and Equipment 2.3 G
309 21 13 13.00 10 03 Product Data Spare Parts 1.6
310 21 13 13.00 10 03 Product Data Preliminary Tests 3.7 G
311 21 13 13.00 10 03 Product Data Final Acceptance Test 3.8 G
312 21 13 13.00 10 03 Product Data Onsite Training 3.9 G
313 21 13 13.00 10 03 Product Data Fire Protection Specialist 1.4.1 G
314 21 13 13.00 10 03 Product Data Sprinkler System Installer 1.4.2 G
315 21 13 13.00 10 05 Design Data Sway Bracing 1.4.3 G
316 21 13 13.00 10 05 Design Data Hydraulic Calculations 1.2.1.3 G
317 21 13 13.00 10 06 Test Reports Preliminary Test Report 3.7
318 21 13 13.00 10 06 Test Reports Final Acceptance Test Report 3.8
319 21 13 13.00 10 07 Certificates Inspection by Fire Protection Specialist 3.3
320 21 13 13.00 10 10 Operation and Maintenance Data Operating and Maintenance Manuals 3.9 G
321 22 00 00 02 Shop Drawings Plumbing System G
322 22 00 00 03 Product Data Backflow prevention assemblies G
323 22 00 00 03 Product Data Welding 1.5.1
324 22 00 00 03 Product Data Vibration-Absorbing Features 3.2 G
325 22 00 00 03 Product Data Plumbing System
326 22 00 00 06 Test Reports Tests, Flushing and Disinfection 3.5
327 22 00 00 07 Certificates Materials and Equipment 1.3
328 22 00 00 07 Certificates Bolts
329 22 00 00 10 Operation and Maintenance Data Plumbing System G
330 22 05 48.00 20 02 Shop Drawings Inertia bases 2.7
331 22 05 48.00 20 02 Shop Drawings Machinery bases 2.6
332 22 05 48.00 20 02 Shop Drawings Platforms 2.6
333 22 05 48.00 20 02 Shop Drawings Rails 2.6
334 22 05 48.00 20 02 Shop Drawings Saddles 2.6
335 22 05 48.00 20 03 Product Data Isolators 2.3
336 22 05 48.00 20 03 Product Data Flexible connectors 2.8
337 22 05 48.00 20 03 Product Data Flexible duct connectors 2.9
338 22 05 48.00 20 03 Product Data Pipe guides 2.11
339 22 05 48.00 20 03 Product Data Seismic snubbers 2.10
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
340 22 05 48.00 20 03 Product Data Vertical stops 3.1.3
341 22 05 48.00 20 03 Product Data Thrust restraints 2.12
342 22 05 48.00 20 03 Product Data Inertia bases 2.7
343 22 05 48.00 20 03 Product Data Machinery bases 2.6
344 22 05 48.00 20 03 Product Data Machinery foundations and subbases 3.1.13
345 22 05 48.00 20 03 Product Data Platforms 2.6
346 22 05 48.00 20 03 Product Data Rails 2.6
347 22 05 48.00 20 03 Product Data Saddles 2.6
348 22 05 48.00 20 03 Product Data Machinery manufacturer's sound data 1.4.2
349 22 05 48.00 20 05 Design Data Inertia bases 2.7
350 22 05 48.00 20 05 Design Data Machinery bases 2.6
351 22 05 48.00 20 05 Design Data Platforms 2.6
352 22 05 48.00 20 05 Design Data Rails 2.6
353 22 05 48.00 20 05 Design Data Saddles 2.6
354 22 05 48.00 20 05 Design Data machinery 1.4.3
355 22 05 48.00 20 05 Design Data machinery over 300 pounds 1.4.4
356 22 05 48.00 20 06 Test Reports Seismic snubbers 2.10
357 22 05 48.00 20 06 Test Reports Equipment vibration tests 3.2.3.1
358 22 05 48.00 20 06 Test Reports Equipment sound level tests 3.2.3.2
359 22 05 48.00 20 06 Test Reports Protected spring isolators 2.4
360 22 05 48.00 20 08 Manufacturer’s Instructions Vibration and noise isolation components 3.1.1
361 22 05 48.00 20 08 Manufacturer’s Instructions Seismic protection components 2.13
362 22 07 19.00 40 02 Shop Drawings Installation Drawings 1.2 G
363 22 07 19.00 40 03 Product Data Adhesives 2.3 G
364 22 07 19.00 40 03 Product Data Coatings 2.3 G
365 22 07 19.00 40 03 Product Data Insulating Cement 2.3 G
366 22 07 19.00 40 03 Product Data Insulation Materials 2.3 G
367 22 07 19.00 40 03 Product Data Jacketing 2.3 G
368 22 07 19.00 40 03 Product Data Tape 2.3 G
369 22 07 19.00 40 07 Certificates Recycled Materials 1.4.1 G
370 22 07 19.00 40 08 Manufacturer’s Instructions Installation Manual 1.2 G
371 22 15 14.00 40 02 Shop Drawings Installation Drawings 1.6
372 22 15 14.00 40 03 Product Data Equipment and Performance Data 1.4
373 22 15 14.00 40 03 Product Data Underground Piping Materials 2.1
374 22 15 14.00 40 03 Product Data Aboveground Piping Materials 2.2
375 22 15 14.00 40 03 Product Data Piping Specialties 2.3
376 22 15 14.00 40 03 Product Data Supporting Elements 2.7
377 22 15 14.00 40 03 Product Data Air Compressors 2.4
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
378 22 15 14.00 40 03 Product Data Valves 2.5
379 22 15 14.00 40 03 Product Data Accessories 3.2.1
380 22 15 14.00 40 03 Product Data Miscellaneous Materials 2.6
381 22 15 14.00 40 03 Product Data Vibration Isolation 3.2.6
382 22 15 14.00 40 05 Design Data Design Analysis and Calculations 1.4
383 22 15 14.00 40 05 Design Data Flow Rates 1.4
384 22 15 14.00 40 05 Design Data Air Distribution 1.4
385 22 15 14.00 40 05 Design Data Pressure Requirements 1.4
386 22 15 14.00 40 05 Design Data Insulation Requirements 1.4
387 22 15 14.00 40 05 Design Data Equipment and Performance Data 1.4
388 22 15 14.00 40 06 Test Reports Hydrostatic Testing 3.3.1
389 22 15 14.00 40 06 Test Reports Compressed Air Systems Testing 3.3
390 22 15 14.00 40 06 Test Reports Valve-Operating Tests 3.3.1
391 22 15 14.00 40 06 Test Reports Drainage Tests 3.3.1
392 22 15 14.00 40 06 Test Reports Pneumatic Testing 3.3.1
393 22 15 14.00 40 07 Certificates Underground Piping Materials 2.1
394 22 15 14.00 40 07 Certificates Aboveground Piping Materials 2.2
395 22 15 14.00 40 07 Certificates Supporting Elements 2.7
396 22 15 14.00 40 07 Certificates Riser Alarm Equipment 1.4
397 22 15 14.00 40 07 Certificates Sprinkler Heads 1.4
398 22 15 14.00 40 07 Certificates Valves 2.5
399 22 15 14.00 40 07 Certificates Miscellaneous Materials 2.6
400 22 15 14.00 40 10 Operation and Maintenance Data Operation and Maintenance Manuals 1.5
401 22 60 70 01 Preconstruction Submittals Local/Regional Materials 1.2.2.1 G
402 22 60 70 01 Preconstruction Submittals Environmental Data G
403 22 60 70 01 Preconstruction Submittals Manufacturer qualifications 1.4.1 G
404 22 60 70 01 Preconstruction Submittals Installer qualifications 1.4.2 G
405 22 60 70 01 Preconstruction Submittals Inspector qualifications 1.4.3.1 G
406 22 60 70 01 Preconstruction Submittals Verifier qualifications 1.4.3.2 G
407 22 60 70 01 Preconstruction Submittals Inspection, Testing, and Verification Agency 1.6.1 G
408 22 60 70 03 Product Data Nitrogen and Instrument Compressed Air Control Panels 2.4 G
409 22 60 70 03 Product Data Hangers and Supports 2.5 G
410 22 60 70 03 Product Data Warning Systems 2.7 G
411 22 60 70 03 Product Data Vibration-Absorbing Features G
412 22 60 70 06 Test Reports Test Reports 3.8.1 G
413 22 60 70 07 Certificates Station Outlets/Inlets
414 23 00 00 02 Shop Drawings Detail Drawings 1.4.5 G
415 23 00 00 03 Product Data Metallic Flexible Duct 2.8.1.1
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
416 23 00 00 03 Product Data Insulated Nonmetallic Flexible Duct Runouts 2.8.1.2
417 23 00 00 03 Product Data Duct Connectors 2.8.1.2
418 23 00 00 03 Product Data Duct Access Doors 2.8.2 G
419 23 00 00 03 Product Data Fire Dampers 2.8.3
420 23 00 00 03 Product Data Manual Balancing Dampers G
421 23 00 00 03 Product Data Automatic Smoke-Fire Dampers
422 23 00 00 03 Product Data Sound Attenuation Equipment 2.8.5
423 23 00 00 03 Product Data Acoustical Duct Liner 2.8.5.3
424 23 00 00 03 Product Data Diffusers 2.8.6.1
425 23 00 00 03 Product Data Registers and Grilles 2.8.6.2
426 23 00 00 03 Product Data Louvers 2.8.7
427 23 00 00 03 Product Data Air Vents, Penthouses, and Goosenecks 2.8.8
428 23 00 00 03 Product Data Centrifugal Fans 2.9.1.1
429 23 00 00 03 Product Data In-Line Centrifugal Fans 2.9.1.2
430 23 00 00 03 Product Data Axial Flow Fans
431 23 00 00 03 Product Data Panel Type Power Wall Ventilators 2.9.1.3
432 23 00 00 03 Product Data Centrifugal Type Power Wall Ventilators 2.9.1.4
433 23 00 00 03 Product Data Centrifugal Type Power Roof Ventilators 2.9.1.5
434 23 00 00 03 Product Data Propeller Type Power Roof Ventilators 2.9.1.6
435 23 00 00 03 Product Data Air-Curtain Fans
436 23 00 00 03 Product Data Ceiling Exhaust Fans 2.9.1.7
437 23 00 00 03 Product Data Air Handling Units 2.10 G
438 23 00 00 03 Product Data Room Fan-Coil Units 2.11.1 G
439 23 00 00 03 Product Data Coil Induction Units 2.11.2 G
440 23 00 00 03 Product Data Dual Duct Terminal Units G
441 23 00 00 03 Product Data Ceiling Induction Terminal Units G
442 23 00 00 03 Product Data Reheat Units 2.11.3.5 G
443 23 00 00 03 Product Data Unit Ventilators 2.11.4
444 23 00 00 03 Product Data Energy Recovery Devices G
445 23 00 00 03 Product Data Test Procedures 1.4.6
446 23 00 00 03 Product Data Diagrams G
447 23 00 00 06 Test Reports Performance Tests 3.11 G
448 23 00 00 06 Test Reports Damper Acceptance Test 3.9 G
449 23 00 00 07 Certificates Bolts
450 23 00 00 08 Manufacturer’s Instructions Manufacturer's Installation Instructions 3.2
451 23 00 00 08 Manufacturer’s Instructions Operation and Maintenance Training 3.13.2
452 23 00 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.13.1 G
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
453 23 00 00 10 Operation and Maintenance Data Fire Dampers 2.8.3 G
454 23 00 00 10 Operation and Maintenance Data Manual Balancing Dampers G
455 23 00 00 10 Operation and Maintenance Data Automatic Smoke-Fire Dampers G
456 23 00 00 10 Operation and Maintenance Data Centrifugal Fans 2.9.1.1 G
457 23 00 00 10 Operation and Maintenance Data In-Line Centrifugal Fans 2.9.1.2 G
458 23 00 00 10 Operation and Maintenance Data Axial Flow Fans G
459 23 00 00 10 Operation and Maintenance Data Panel Type Power Wall Ventilators 2.9.1.3 G
460 23 00 00 10 Operation and Maintenance Data Centrifugal Type Power Wall Ventilators 2.9.1.4 G
461 23 00 00 10 Operation and Maintenance Data Centrifugal Type Power Roof Ventilators 2.9.1.5 G
462 23 00 00 10 Operation and Maintenance Data Propeller Type Power Roof Ventilators 2.9.1.6 G
463 23 00 00 10 Operation and Maintenance Data Air-Curtain Fans G
464 23 00 00 10 Operation and Maintenance Data Ceiling Exhaust Fans 2.9.1.7 G
465 23 00 00 10 Operation and Maintenance Data Air Handling Units 2.10 G
466 23 00 00 10 Operation and Maintenance Data Room Fan-Coil Units 2.11.1 G
467 23 00 00 10 Operation and Maintenance Data Constant Volume, Single Duct Terminal Units 2.11.3.1 G
468 23 00 00 10 Operation and Maintenance Data Variable Volume, Single Duct Terminal Units 2.11.3.2 G
469 23 00 00 10 Operation and Maintenance Data Reheat Units 2.11.3.5 G
470 23 00 00 10 Operation and Maintenance Data Unit Ventilators 2.11.4 G
471 23 01 30.41 01 Preconstruction Submittals Record of Existing Conditions 3.2.1 G
472 23 01 30.41 01 Preconstruction Submittals Coordination Plan 3.2.2 G
473 23 01 30.41 01 Preconstruction Submittals NADCA Firm 1.4.1 G
474 23 01 30.41 01 Preconstruction Submittals NADCA Team Assistants 1.4.1 G
475 23 01 30.41 01 Preconstruction Submittals NADCA Air System Cleaning Specialist
(ASCS) 1.4.1 G
476 23 01 30.41 01 Preconstruction Submittals NADCA Supervisor Qualifications 1.4.1 G
477 23 01 30.41 01 Preconstruction Submittals Records of Experience in the Field of HVAC System Cleaning 1.4.2 G
478 23 01 30.41 01 Preconstruction Submittals NADCA Work Execution Schedule 1.6.1 G
479 23 01 30.41 06 Test Reports Testing Procedures Summary 3.7 G
480 23 01 30.41 06 Test Reports Gravimetric Analysis 3.6.3 G
481 23 01 30.41 06 Test Reports Post-Project Report 3.7 G
482 23 05 15 01 Preconstruction Submittals Material, Equipment, and Fixture Lists 1.2 G
483 23 05 15 02 Shop Drawings Record Drawings 1.2 G
484 23 05 15 02 Shop Drawings Connection Diagrams 1.2 G
485 23 05 15 02 Shop Drawings Coordination Drawings 1.2 G
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
486 23 05 15 02 Shop Drawings Fabrication Drawings 1.2 G
487 23 05 15 02 Shop Drawings Installation Drawings 3.1 G
488 23 05 15 03 Product Data Pipe and Fittings 2.2 G
489 23 05 15 03 Product Data Piping Specialties 2.3 G
490 23 05 15 03 Product Data Valves 2.4 G
491 23 05 15 03 Product Data Miscellaneous Materials 2.5 G
492 23 05 15 03 Product Data Supporting Elements 2.6 G
493 23 05 15 03 Product Data Equipment Foundation Data 1.2 G
494 23 05 15 04 Samples Manufacturer's Standard Color Charts 1.2 G
495 23 05 15 05 Design Data Pipe and Fittings 2.2 G
496 23 05 15 05 Design Data Piping Specialties 2.3 G
497 23 05 15 05 Design Data Valves 2.4 G
498 23 05 15 06 Test Reports Hydrostatic Tests 3.1 G
499 23 05 15 06 Test Reports Air Tests 3.1 G
500 23 05 15 06 Test Reports Valve-Operating Tests 3.1 G
501 23 05 15 06 Test Reports Drainage Tests 3.1 G
502 23 05 15 06 Test Reports Pneumatic Tests 3.1 G
503 23 05 15 06 Test Reports Non-Destructive Electric Tests 3.1 G
504 23 05 15 06 Test Reports System Operation Tests 3.1 G
505 23 05 15 07 Certificates Record of Satisfactory Field Operation 1.4.2 G
506 23 05 15 07 Certificates List of Qualified Permanent Service Organizations 1.4.3 G
507 23 05 15 07 Certificates Listing of Product Installations 1.2 G
508 23 05 15 07 Certificates Records of Existing Conditions 1.2 G
509 23 05 15 07 Certificates Surface Resistance 3.1 G
510 23 05 15 07 Certificates Shear and Tensile Strengths 3.1 G
511 23 05 15 07 Certificates Temperature Ratings 3.1 G
512 23 05 15 07 Certificates Bending Tests 3.1 G
513 23 05 15 07 Certificates Flattening Tests 3.1 G
514 23 05 15 07 Certificates Transverse Guided Weld Bend Tests 3.1 G
515 23 05 15 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.12 G
516 23 05 48.00 40 02 Shop Drawings Installation Drawings 1.2 G
517 23 05 48.00 40 02 Shop Drawings Outline Drawings 1.2 G
518 23 05 48.00 40 03 Product Data Equipment and Performance Data 1.2 G
519 23 05 48.00 40 03 Product Data Isolators 2.3 G
520 23 05 48.00 40 06 Test Reports Type of Isolator 2.1 G
521 23 05 48.00 40 06 Test Reports Type of Base 2.1 G
522 23 05 48.00 40 06 Test Reports Allowable Deflection 2.1 G
523 23 05 48.00 40 06 Test Reports Measured Deflection 2.1 G
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
524 23 07 00 02 Shop Drawings MICA Plates G
525 23 07 00 02 Shop Drawings Pipe Insulation Systems
526 23 07 00 02 Shop Drawings Duct Insulation Systems
527 23 07 00 03 Product Data Pipe Insulation Systems G
528 23 07 00 03 Product Data Duct Insulation Systems G
529 23 07 00 04 Samples Thermal Insulation 2.2.1.3 G
530 23 07 00 04 Samples Display Samples 3.1.1 G
531 23 07 00 08 Manufacturer’s Instructions Pipe Insulation Systems G
532 23 07 00 08 Manufacturer’s Instructions Duct Insulation Systems G
533 23 08 00.00 10 02 Shop Drawings Commissioning Plan 1.5.2.2 G
534 23 08 00.00 10 03 Product Data Pre-Functional Performance Test Checklists 3.2.1 G
535 23 08 00.00 10 03 Product Data Functional Performance Tests 3.2.2 G
536 23 08 00.00 10 06 Test Reports Commissioning Report 3.3 G
537 23 08 00.00 10 07 Certificates Commissioning Firm 1.5.1 G
538 23 08 00.00 10 07 Certificates Commissioning Specialist 1.5.2 G
539 23 08 01.00 20 06 Test Reports Preliminary review report 1.4.5.1 G
540 23 08 01.00 20 06 Test Reports Smoke tests report 1.4.5.2 G
541 23 08 01.00 20 06 Test Reports Fan operating points report 1.4.5.3 G
542 23 08 01.00 20 06 Test Reports Static pressure report 1.4.5.4 G
543 23 08 01.00 20 06 Test Reports Volume and velocity flow rates report 1.4.5.5 G
544 23 08 01.00 20 06 Test Reports Pitot traverse report 1.4.5.6 G
545 23 08 01.00 20 07 Certificates Test agency Qualifications 1.4.2.1 G
546 23 08 01.00 20 07 Certificates Record of Document Submittal to Testing Agency 1.4.2.2 G
547 23 08 01.00 20 07 Certificates Work plan 1.4.2.3 G
548 23 08 01.00 20 07 Certificates List of test instruments 1.4.2.4 G
549 23 09 23.13 20 02 Shop Drawings Control system drawings title sheet 1.3.1.1 G
550 23 09 23.13 20 02 Shop Drawings List of I/O Points 1.3.1.2 G
551 23 09 23.13 20 02 Shop Drawings Control System Components List 1.3.1.3 G
552 23 09 23.13 20 02 Shop Drawings Control system schematics 1.3.1.4 G
553 23 09 23.13 20 02 Shop Drawings HVAC Equipment Electrical Ladder diagrams 1.3.1.5 G
554 23 09 23.13 20 02 Shop Drawings Component wiring diagrams 1.3.1.6 G
555 23 09 23.13 20 02 Shop Drawings Terminal strip diagrams 1.3.1.7 G
556 23 09 23.13 20 02 Shop Drawings BACnet communication architecture schematic 1.3.1.8 G
557 23 09 23.13 20 03 Product Data Direct Digital Controllers 2.1.1 G
558 23 09 23.13 20 03 Product Data BACnet Gateways 2.1.1.13 G
559 23 09 23.13 20 03 Product Data BACnet Protocol Analyzer 2.1.5 G
560 23 09 23.13 20 03 Product Data DDC Software 2.1.2 G
561 23 09 23.13 20 03 Product Data BACnet Operator Workstation 2.1.3 G
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
562 23 09 23.13 20 03 Product Data BACnet Operator Workstation DDC Software 2.1.3.3 G
563 23 09 23.13 20 03 Product Data Notebook Computer 2.1.4 G
564 23 09 23.13 20 03 Product Data Sensors and Input Hardware 2.2 G
565 23 09 23.13 20 03 Product Data Output Hardware 2.3 G
566 23 09 23.13 20 03 Product Data Surge and transient protection 2.4.2 G
567 23 09 23.13 20 03 Product Data Indicators 2.6 G
568 23 09 23.13 20 03 Product Data Air compressors 2.7.1 G
569 23 09 23.13 20 03 Product Data Refrigerated air dryers 2.7.2 G
570 23 09 23.13 20 03 Product Data Pneumatic tubing 2.7.6 G
571 23 09 23.13 20 03 Product Data Duct smoke detectors 2.5.1 G
572 23 09 23.13 20 03 Product Data Variable frequency (motor) drives 2.8 G
573 23 09 23.13 20 05 Design Data Performance Verification Testing Plan 3.4.2 G
574 23 09 23.13 20 05 Design Data Pre-Performance Verification Testing Checklist 3.4.4 G
575 23 09 23.13 20 06 Test Reports Performance Verification Testing Report 3.4.11 G
576 23 09 23.13 20 07 Certificates Contractor's Qualifications 1.5.6 G
577 23 09 23.13 20 09 Manufacturer’s Field Reports Pre-PVT Checklist 3.4.1 G
578 23 09 23.13 20 10 Operation and Maintenance Data BACnet Direct Digital Control Systems 1.3 G
579 23 09 23.13 20 10 Operation and Maintenance Data Controls System Operators Manuals 3.3 G
580 23 09 23.13 20 10 Operation and Maintenance Data VFD Service Manuals 2.8.2 G
581 23 09 23.13 20 11 Closeout Submittals Training documentation 3.5.1 G
582 23 11 25 02 Shop Drawings Gas Piping System 1.5.3 G
583 23 11 25 02 Shop Drawings Gas Piping System 2.2 G
584 23 11 25 02 Shop Drawings Gas Piping System 3.3 G
585 23 11 25 03 Product Data Pipe and Fittings 1.6.1 G
586 23 11 25 03 Product Data Gas equipment connectors 1.5.3 G
587 23 11 25 03 Product Data Gas Piping System 1.5.3 G
588 23 11 25 03 Product Data Gas Piping System 2.2 G
589 23 11 25 03 Product Data Gas Piping System 3.3 G
590 23 11 25 03 Product Data Pipe Coating Materials 2.1 G
591 23 11 25 03 Product Data Pressure regulators 2.6 G
592 23 11 25 03 Product Data Risers 2.4 G
593 23 11 25 03 Product Data Transition fittings 2.2.9 G
594 23 11 25 03 Product Data Valves 2.3 G
595 23 11 25 03 Product Data Warning and identification tape 2.2.5 G
596 23 11 25 06 Test Reports Testing 3.18 G
597 23 11 25 06 Test Reports Pressure Tests 3.18.1 G
598 23 11 25 06 Test Reports Test With Gas 3.18.2 G
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
599 23 11 25 07 Certificates Welders procedures and qualifications 1.5.1 G
600 23 11 25 07 Certificates assigned number, letter, or symbol 1.5.1 G
601 23 11 25 08 Manufacturer’s Instructions PE pipe and fittings 1.5.2 G
602 23 11 25 08 Manufacturer’s Instructions pipe coating materials 2.1 G
603 23 11 25 10 Operation and Maintenance Data Gas facility system and equipment operation 1.3.1 G
604 23 11 25 10 Operation and Maintenance Data Gas facility system maintenance 1.3.2 G
605 23 11 25 10 Operation and Maintenance Data Gas facility equipment maintenance 1.3.3 G
606 23 23 00 02 Shop Drawings Refrigerant Piping System 2.3 G
607 23 23 00 03 Product Data Refrigerant Piping System 2.3
608 23 23 00 03 Product Data Spare Parts 1.5.2
609 23 23 00 03 Product Data Qualifications 1.3.1 G
610 23 23 00 03 Product Data Refrigerant Piping Tests 3.5 G
611 23 23 00 03 Product Data Demonstrations 3.4 G
612 23 23 00 03 Product Data Verification of Dimensions 3.1
613 23 23 00 06 Test Reports Refrigerant Piping Tests 3.5
614 23 23 00 07 Certificates Service Organization 2.1 G
615 23 23 00 10 Operation and Maintenance Data Maintenance 1.5
616 23 23 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.4
617 23 31 13.00 40 01 Preconstruction Submittals Material, Equipment, and Fixture Lists Part 2 G
618 23 31 13.00 40 01 Preconstruction Submittals Records of Existing Conditions 2.1.1 G
619 23 31 13.00 40 02 Shop Drawings Connection Diagrams 2.1 G
620 23 31 13.00 40 02 Shop Drawings Record Drawings 1.3 G
621 23 31 13.00 40 02 Shop Drawings Offset Fitting Configurations 2.3.1 G
622 23 31 13.00 40 02 Shop Drawings Offset Fitting Configurations 2.3.4 G
623 23 31 13.00 40 03 Product Data Equipment and Performance Data 2.1.1 G
624 23 31 13.00 40 03 Product Data Galvanized Steel Ductwork Materials 2.2.1 G
625 23 31 13.00 40 03 Product Data Brazing Materials 2.2.2 G
626 23 31 13.00 40 03 Product Data Mill-Rolled Reinforcing and Supporting Materials 2.2.3 G
627 23 31 13.00 40 03 Product Data Round Sheet Metal Duct Fittings 2.3.1 G
628 23 31 13.00 40 03 Product Data Round, High-Pressure, Double-Wall Sheet Metal Ducts 2.3.2 G
629 23 31 13.00 40 03 Product Data Turning Vanes 2.3.5 G
630 23 31 13.00 40 03 Product Data Sound Traps 2.3.7 G
631 23 31 13.00 40 03 Product Data Flexible Connectors 2.3.8 G
632 23 31 13.00 40 03 Product Data Flexible Duct Materials 2.3.11 G
633 23 31 13.00 40 03 Product Data Power Operated Dampers 2.3.14 G
634 23 31 13.00 40 03 Product Data Fire Dampers and Wall Collars 2.3.15 G
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
635 23 31 13.00 40 03 Product Data Gravity Backdraft and Relief Dampers 2.3.13 G
636 23 31 13.00 40 03 Product Data Manual Volume Dampers 2.3.12 G
637 23 31 13.00 40 05 Design Data Design Analysis and Calculations 2.1 G
638 23 31 13.00 40 05 Design Data Design Analysis and Calculations 2.1.1 G
639 23 31 13.00 40 06 Test Reports Ductwork Leakage Tests 3.4.2 G
640 23 31 13.00 40 06 Test Reports Operational Tests 3.4.1 G
641 23 31 13.00 40 07 Certificates Listing of Product Installations 3.2 G
642 23 31 13.00 40 07 Certificates Galvanized Steel Ductwork Materials 2.2.1 G
643 23 31 13.00 40 07 Certificates Brazing Materials 2.2.2 G
644 23 31 13.00 40 07 Certificates Mill-Rolled Reinforcing and Supporting Materials 2.2.3 G
645 23 31 13.00 40 07 Certificates Round Sheet Metal Duct Fittings 2.3.1 G
646 23 31 13.00 40 07 Certificates Round, High-Pressure, Double-Wall Sheet Metal Ducts 2.3.2 G
647 23 31 13.00 40 07 Certificates Turning Vanes 2.3.5 G
648 23 31 13.00 40 07 Certificates Dampers 2.3.6 G
649 23 31 13.00 40 07 Certificates Sound Traps 2.3.7 G
650 23 31 13.00 40 07 Certificates Flexible Connectors 2.3.8 G
651 23 31 13.00 40 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.6 G
652 23 31 13.00 40 10 Operation and Maintenance Data Power Operated Dampers 2.3.14 G
653 23 31 13.00 40 10 Operation and Maintenance Data Fire Dampers and Wall Collars 2.3.15 G
654 23 34 23.00 40 02 Shop Drawings Shop Drawings 2.1 G
655 23 34 23.00 40 02 Shop Drawings Installation Drawings 3.1 G
656 23 34 23.00 40 03 Product Data Housing 2.2 G
657 23 34 23.00 40 03 Product Data Fan 2.3 G
658 23 34 23.00 40 03 Product Data Motor 2.5 G
659 23 34 23.00 40 03 Product Data Bases 2.6 G
660 23 34 23.00 40 03 Product Data Roof Curbs 2.7 G
661 23 34 23.00 40 03 Product Data Dampers 2.8 G
662 23 34 23.00 40 03 Product Data Screens 2.9 G
663 23 34 23.00 40 03 Product Data Sound Baffles 2.10 G
664 23 34 23.00 40 06 Test Reports Final Test Reports 3.2.3 G
665 23 34 23.00 40 11 Closeout Submittals Record Drawings 3.3 G
666 23 36 00.00 40 01 Preconstruction Submittals Records of Existing Conditions 1.3 G
667 23 36 00.00 40 02 Shop Drawings Fan-Powered Air Terminal Units 2.1 G
668 23 36 00.00 40 02 Shop Drawings Shutoff Single-Duct Air Terminal Units 2.2 G
669 23 36 00.00 40 02 Shop Drawings Integral-Diffuser Air Terminal Units 2.3 G
670 23 36 00.00 40 02 Shop Drawings Record Drawings 3.3 G
671 23 36 00.00 40 03 Product Data Fan-Powered Air Terminal Units 2.1 G
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
672 23 36 00.00 40 03 Product Data Shutoff Single-Duct Air Terminal Units 2.2 G
673 23 36 00.00 40 03 Product Data Integral-Diffuser Air Terminal Units 2.3 G
674 23 36 00.00 40 03 Product Data Spare Parts 1.3 G
675 23 36 00.00 40 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.3 G
676 23 37 13.00 40 01 Preconstruction Submittals Material, Equipment, and Fixture Lists 2.1 G
677 23 37 13.00 40 01 Preconstruction Submittals Records of Existing Conditions 2.1 G
678 23 37 13.00 40 02 Shop Drawings Fabrication Drawings 2.1 G
679 23 37 13.00 40 02 Shop Drawings Installation Drawings 3.1 G
680 23 37 13.00 40 03 Product Data Equipment and Performance Data 1.3 G
681 23 37 13.00 40 04 Samples Manufacturer's Standard Color Chart G
682 23 37 13.00 40 10 Operation and Maintenance Data Type TS Supply Troffer 2.2.25 G
683 23 37 13.00 40 10 Operation and Maintenance Data Type TSR Combination Supply and Return Troffer 2.2.27 G
684 23 52 00 02 Shop Drawings Detail Drawings 1.5
685 23 52 00 03 Product Data Materials and Equipment 2.1.1
686 23 52 00 03 Product Data Spare Parts 1.5
687 23 52 00 03 Product Data Water Treatment System 2.14
688 23 52 00 03 Product Data Boiler Water Treatment 2.14
689 23 52 00 03 Product Data Heating System Tests 3.8
690 23 52 00 03 Product Data Fuel System Tests 3.11
691 23 52 00 03 Product Data Unit Heaters 2.7
692 23 52 00 03 Product Data Welding 1.3
693 23 52 00 03 Product Data Qualifications 3.8
694 23 52 00 03 Product Data Field Instructions 3.10
695 23 52 00 03 Product Data Tests 3.4
696 23 52 00 06 Test Reports Heating System Tests 3.8
697 23 52 00 06 Test Reports Fuel System Tests 3.11
698 23 52 00 06 Test Reports Water Treatment Testing 3.8.1
699 23 52 00 07 Certificates Bolts 2.10.10.3
700 23 52 00 07 Certificates Continuous Emissions Monitoring 2.10.1
701 23 52 00 07 Certificates Energy Star 2.1.3
702 23 52 00 10 Operation and Maintenance Data Operation and Maintenance Instructions 3.10
703 23 52 00 10 Operation and Maintenance Data Water Treatment System 2.14
704 23 64 10 03 Product Data Water Chiller 2.5 G
705 23 64 10 03 Product Data Water Chiller 2.5 G
706 23 64 10 03 Product Data Water Chiller 3.1 G
707 23 64 10 03 Product Data Water Chiller 3.1 G
708 23 64 10 03 Product Data Water Chiller 3.4.1 G
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
709 23 64 10 03 Product Data Water Chiller 3.4.1 G
710 23 64 10 03 Product Data Water Chiller 3.4.2 G
711 23 64 10 03 Product Data Water Chiller 3.4.2 G
712 23 64 10 03 Product Data Posted Instructions 3.6
713 23 64 10 03 Product Data Verification of Dimensions 1.5.1
714 23 64 10 03 Product Data Manufacturer's Multi-Year Compressor Warranty 1.7
715 23 64 10 03 Product Data Factory Tests 2.9
716 23 64 10 03 Product Data System Performance Tests 3.5
717 23 64 10 03 Product Data Demonstrations 3.6
718 23 64 10 06 Test Reports Field Acceptance Testing 3.4
719 23 64 10 06 Test Reports Water Chiller 2.5
720 23 64 10 06 Test Reports Water Chiller 3.1
721 23 64 10 06 Test Reports Water Chiller 3.4.1
722 23 64 10 06 Test Reports Water Chiller 3.4.2
723 23 64 10 06 Test Reports Factory Tests 2.9
724 23 64 10 06 Test Reports System Performance Tests 3.5
725 23 64 10 07 Certificates Refrigeration System 3.1.2 G
726 23 64 10 08 Manufacturer’s Instructions Water Chiller 2.5 G
727 23 64 10 08 Manufacturer’s Instructions Water Chiller 3.1 G
728 23 64 10 08 Manufacturer’s Instructions Water Chiller 3.4.1 G
729 23 64 10 08 Manufacturer’s Instructions Water Chiller 3.4.2 G
730 23 64 10 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.6 G
731 23 73 13.00 40 02 Shop Drawings Installation Drawings 3.1 G
732 23 73 13.00 40 02 Shop Drawings Fabrication and Connection Drawings 2.1 G
733 23 73 13.00 40 03 Product Data Equipment and Performance Data 2.1 G
734 23 73 13.00 40 03 Product Data Sample Warranty 1.3.2 G
735 23 73 13.00 40 03 Product Data Coating Specimen 2.2.2 G
736 23 73 13.00 40 03 Product Data Final Test Reports 3.2.3 G
737 23 73 13.00 40 07 Certificates Listing of Product Installations 1.3 G
738 23 73 13.00 40 07 Certificates Certificates of Conformance 1.3.1 G
739 23 73 13.00 40 07 Certificates Unit Cabinet 2.2.2 G
740 23 73 13.00 40 07 Certificates Fan 2.2.3 G
741 23 73 13.00 40 07 Certificates Drain Pans 2.2.4 G
742 23 73 13.00 40 07 Certificates Insulation 2.2.5 G
743 23 73 13.00 40 07 Certificates Plenums 2.2.6 G
744 23 73 13.00 40 07 Certificates Multizone AHU G
745 23 73 13.00 40 07 Certificates Blow-Through AHU 2.2.7 G
746 23 73 13.00 40 07 Certificates Spare Parts 2.1 G
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
747 23 73 13.00 40 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.3.1 G
748 23 73 13.00 40 11 Closeout Submittals Warranty 1.5 G
749 23 74 33.00 40 02 Shop Drawings Packaged Unit
750 23 74 33.00 40 02 Shop Drawings Compressor 2.1.1.1
751 23 74 33.00 40 02 Shop Drawings Cooling Coil 2.1.1.2
752 23 74 33.00 40 02 Shop Drawings Controls 2.1.1.5
753 23 74 33.00 40 02 Shop Drawings Casing 2.1.1.4
754 23 74 33.00 40 02 Shop Drawings Condenser 2.1.1.7
755 23 74 33.00 40 02 Shop Drawings Installation Drawings 3.1
756 23 74 33.00 40 03 Product Data Equipment and Performance Data 1.3
757 23 74 33.00 40 03 Product Data Air-Conditioning Systems 3.2.1
758 23 74 33.00 40 03 Product Data Compressor 2.1.1.1
759 23 74 33.00 40 03 Product Data Cooling Coil 2.1.1.2
760 23 74 33.00 40 03 Product Data Fans 2.1.1.3
761 23 74 33.00 40 03 Product Data Controls 2.1.1.5
762 23 74 33.00 40 03 Product Data Casing 2.1.1.4
763 23 74 33.00 40 03 Product Data Filters 2.1.1.6
764 23 74 33.00 40 03 Product Data Condenser 2.1.1.7
765 23 74 33.00 40 03 Product Data Vibration Isolation 2.2.1
766 23 74 33.00 40 07 Certificates Listing of Product Installations 3.1
767 23 74 33.00 40 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.3
768 23 81 00.00 20 02 Shop Drawings Field-assembled refrigerant piping 2.8.2
769 23 81 00.00 20 02 Shop Drawings Control system wiring diagrams 1.4.2
770 23 81 00.00 20 03 Product Data Room air conditioners 2.1
771 23 81 00.00 20 03 Product Data Packaged terminal units 2.2
772 23 81 00.00 20 03 Product Data Heat pumps 2.3
773 23 81 00.00 20 03 Product Data Air conditioners 2.4
774 23 81 00.00 20 03 Product Data Filters 2.5
775 23 81 00.00 20 03 Product Data Thermostats 2.4.12
776 23 81 00.00 20 03 Product Data Refrigerant piping and accessories 2.8
777 23 81 00.00 20 03 Product Data Coatings for finned tube coils 2.6
778 23 81 00.00 20 03 Product Data Local/Regional Materials 1.7.1
779 23 81 00.00 20 06 Test Reports Salt-spray tests 2.10.1
780 23 81 00.00 20 06 Test Reports Start-up and initial operational tests 3.8.3
781 23 81 00.00 20 08 Manufacturer’s Instructions Room air conditioners 2.1
782 23 81 00.00 20 08 Manufacturer’s Instructions Packaged terminal units 2.2
783 23 81 00.00 20 08 Manufacturer’s Instructions Heat pumps 2.3
784 23 81 00.00 20 08 Manufacturer’s Instructions Air conditioners 2.4
TITLE: Hill AFB B850 Bay G Cleanroom
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING…