Bldg_850_Amend_04_Solicit.docx

DOCX document 39 KB Posted

Attached to
Bldg. 850 G Renovate For New Workload Federal contract opportunity
Solicitation number
FA8201-16-B-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

BLDG.- 850 Clean Rooms Amendment 04 is to incorporate additional information found in Section J. Except as provided by this amendment all terms and conditions remain unchanged and in full force and effect.

View the file

Other files for this federal contract opportunity

Other files attached to Bldg. 850 G Renovate For New Workload, newest first.
File Type Posted
060316_Specification.pdf PDF
060316_Cleanroom_HVAC_Loads.pdf PDF
062116_Drawings.pdf PDF
Projector_PT-RZ570.pdf PDF
Alltec_Screens_Manual_Screen_Info_and_Specifications.pdf PDF
B850_addendum1_QA-22_June_2016.pdf PDF
Bldg_850_Amend_03.docx DOCX document
060316_Cleanroom_HVAC_Loads.pdf PDF
General_Decision_Number_UT160104_22_April_2016_UT_104.pdf PDF
060316_Specification.pdf PDF
Answers_to_Contractor_Questions_-_B850_-_3_June_2016.pdf PDF
Amendment_02_-_FA8201-16-B-0002_-_Bldg_850_-_9_June_2016.pdf PDF
060316_Drawings.pdf PDF
BLD_850_Site_Visit_List.pdf PDF
BLDG_850_AMEND_01.docx DOCX document
General_Decision_Number.docx DOCX document
Asbestos_Report_Bldg-850_Bay_G_WO57154.xlsx XLSX spreadsheet
614162_-_HAFB_B850_Cleanroom.pdf PDF
Lead_Paint_Bldg-850_Bay_G_WO57154.xlsx XLSX spreadsheet
TAB_K__1_Aug_11.pdf PDF
APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_March_2015.docx DOCX document
_3-3-15_SPECS_Final_Combined.pdf PDF
BLDG_850_bay_G_Solicitation_R3.doc DOC document
BASE_FACILITY_DESIGN_STANDARD.docx DOCX document
_Submittal_Register.pdf PDF
Final_B850_Design_Analysisr1.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8201-16-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS

AMENDMENT 04

060316 Cleanroom HVAC, 27 Jan 2015, 36 pages 060316 Specifications, 1 Jun 2016, 1222 pages 062116 Drawings, no date 73 pages Alltech Screens Manual Screen Info, no date, 3 pages B850 Addendum1,Contractor Q&A 22 Jun 2016, 16 pages Projector PT-RZ570, no date, 5 pages

AMENDMENT 03 –NO ATTACHMENTS

AMENDMENT 02

Contractor Questions and Answers, 3 Jun 16, 12 pages Cleanroom HVAC Loads, 27 Jan 2015, 36 pages WAGE RATE REQUIREMENT UT160104 04/22/2016, 5 pages Drawings Hill AFB Bldg 850, bay G Cleanroom Note: All attachments 1- 72, 1 Page

G-001Title Sheet
G-002Index Sheet
CU-100Utility Overall Plan
CU-101Utility Plan
C-101Overall Site Plan
C-102Site Plan
C-103Site Details
D-101Demolition Plan
A-101Floor Plan
A-102Roof Plan
A-201Exterior Elevation
A-301Building/Wall Sections
A-401Enlarged Plans
A-402Interior Elevations
A-601Finish Floor Plan
A-602Schedules
A-650Equipment Plan
A-701Reflected Ceiling plan
M-000Mechanical Symbols
M-001Mechanical General Notes
M-002Mechanical Com/Check
M-101Mechanical Plan
M-102Mechanical Roof Plan
M-301Mechanical Sections
M-401Enlarged Mechanical Plan
M-501Mechanical Details
M-601Mechanical Schedules
M-602Mechanical Schedules
M-603Mechanical Schedules
M-701Mechanical Schematics
M-702Mechanical Schematics
M-703Mechanical Schematics
M-704Mechanical Schematics
M-705Mechanical Schematics
MPD-101Mechanical Piping Demolition
MP-101Mechanical Piping Plan
P-101Plumbiing Plan
P-102Natural Gas Plan
P-501Plumbing Details
P-601Plumbing Schedules
LG-101Lab Gas Plan
LG-102Lab Gas Schematics
HP-101Hydraulic Power Pack System
HP-102Hydraulic Power Pack System
HP-103Hydraulic Power Pack System
HP-104Hydraulic Power Pack System
HP-105Hydraulic Power Pack System
EE-001Symbol Schedule
EE-601Panel Schedules
EE-602Panel Schedules
EE-603Panel Schedules
ES-101Electrical Site Plan
ED-101Demolition Plan
EP-101Power Plan
EP-102Roof Power Plan
EP-401Enlarged Power Plan
EP-402Enlarged Power Plan
EP-501Details
EP-502Details
EP-503Details
EP-601Demolition One Line Diagram
EP-602New One Line Diagram
EP-603Equipment Schedule
EL-101Lighting Plan
EL-601Lighting Fixture Schedule
EY-101Auxilary Plan
EY-501Auxilary Details
EY-601Auxilary Diagrams
FA-101Fire Alarm Plan
FA-801Fire Alarm Details
FP-101Fire Protection Plan
FP-601Fire Protection Details

Specifications Final Design Submittal, 1 June 2016, 1222 pages

AMENDMENT 01

CONTRACTOR SIGN-IN SHEETS, 11 MAY 16, 7 PAGES

**DESIGN ANALYSIS, 2 MAR 2015, 384 PAGES (see below)

SUBMITTAL REGISTER, NO DATE, 24 PAGES

BASE FACILITY DESIGN STANDARD, 17 FEB 2016, 85 PAGES

ARCHITECTURAL COMPATIBILTY STANDARD, APR 2013, 47 PAGES

WAGE RATE REQUIREMENT UT160104 UT104, 03/04/2016, 5 PAGES

LIMITED ASBESTOS INSPECTION REPORT, 24 FEB 2016, 3 PAGES

LEAD BASED PAINT (LBP) SURVEY, 24 MAR 2016, 2 PAGES

TAB K, 01 Aug 2011, 21 PAGES

APPENDEX C, 2 MAR 2015, 15 PAGES

SPECIFICATIONS

Hill AFB B850 Bay G Cleanroom **KRSM 142043/143043C FINAL DESIGN SUBMITTAL, 2 MAR 2015 (see break down below) Div. # Description Date #of pages

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE, 5/14 25 pages 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE, 05/14 11 pages

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL, 11/11 9 pages 05 30 00 STEEL DECKS, 11/11 6 pages 05 50 13 MISCELLANEOUS METAL FABRICATIONS, 5/10 7 pages 05 50 15 CIVIL WORKS FABRICATIONS, 5/14 79 pages

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 61 14.00 20 STEEL STANDING SEAM ROOFING, 5/11 15 pages 07 84 00 FIRESTOPPING, 5/10 6 pages 07 92 00 JOINT SEALANT, 01/07 8 pages

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES, 02/10 7 pages 08 14 00 WOOD DOORS, 08/11 6 pages 08 51 23 STEEL WINDOWS, 08/11 7 pages 08 71 00 DOOR HARDWARE, 08/08 11 pages 08 81 00 GLAZING,08/11 7 pages

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD, 02/10 3 pages 09 29 00 GYPSUM BOARD, 05/11 8 pages 09 51 00 ACOUSTICAL CEILINGS, 8/10 8 pages 09 62 38 STATIC-CONTROL FLOORING, 11/12 7 pages 09 65 00 RESILIENT FLOORING, 08/10 6 pages 09 68 00 CARPETING,11/11 8 pages 09 90 00 PAINTS AND COATINGS 05/11 26 pages 09 96 00 HIGH-PERFORMANCE COATINGS,7/7 5 pages

DIVISION 10 - SPECIALTIES

10 10 00 VISUAL COMMUNICATIONS SPECIALTIES, 2/9 3 pages 10 14 00.20 INTERIOR SIGNAGE, 11/12 5 pages 10 26 13 WALL AND CORNER GUARDS,8/10 4 pages 10 44 16 FIRE EXTINGUISHERS,5/12 5 pages 10 51 13 METAL LOCKERS, 5/11 5 pages 10 56 13 STEEL SHELVING, 4/6 3 pages

DIVISION 12 - FURNISHINGS

12 36 00 COUNTERTOPS,5/9 7 pages 12 48 13 ENTRANCE FLOOR MATS AND FRAMES, 2/14 3 pages 12 50 00 FURNITURE SYSTEMS, 2/9 17 pages

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION, 5/9 17 pages

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE, 11/11 28 pages 22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL,4/6 27 pages 22 07 19.00 40 PLUMBING PIPING INSULATION, 8/13 12 pages 22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE,2/11 27p 22 60 70 GAS AND VACUUM SYSTEMS FOR HEALTHCARE FACILITIES, 5/9 18 pages

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS,8/10 41p 23 01 30.41 HVAC SYSTEM CLEANING, 8/10 10 pages 23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS, 8/10 5 pages 23 05 15 COMMON PIPING FOR HVAC, 2/14 32 pages

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT, 2/11 page 10 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC, 8/9 13 pages 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS,2/13 13 pages 23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS, 1/8 63 pages 23 08 01.00 20 TESTING INDUSTRIAL VENTILATION SYSTEMS,4/6 26 pages 23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC,8/9 54p 23 11 25 FACILITY GAS PIPING,11/8 19p 23 23 00 REFRIGERANT PIPING, 10/7 22p 23 31 13.00 40 METAL DUCTS, 11/12 11p 23 34 23.00 40 HVAC POWER VENTILATORS, 5/4 7p 23 36 00.00 40 AIR TERMINAL UNITS, 2/11 11p 23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS, 5/10 7p 23 52 00 HEATING BOILERS, 4/8 43p 23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE, 8/8 29p 23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS, 5/14 12p

23 74 33.00 40 PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP,

AIR-CONDITIONERS, 2/11 6p 23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT, 11/09 19p 23 82 00.00 20 TERMINAL HEATING AND COOLING UNITS, 11/08 5p 23 84 13 GAS FIRED HUMIDIFIER, 11/8 5p

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS,7/06 5p 26 05 13.00 40 MEDIUM-VOLTAGE CABLES, 8/10 6p 26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS, 11/8 14p 26 20 00 INTERIOR DISTRIBUTION SYSTEM, 8/8 32p 26 23 00 SWITCHBOARDS, 7/6 14p 26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION, 10/7 12p 26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS,4/6 10p 26 51 00 INTERIOR LIGHTING, 7/7 16p 26 56 00 EXTERIOR LIGHTING, 7/6 10p

DIVISION 27 - COMMUNICATIONS

27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS, 8/11 3p 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM, 1/8 15p 27 51 16 PUBLIC ADDRESS SYSTEMS, 4/6 7p

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 05 26.00 40 GROUNDING & BONDING FOR ELECTRONIC SAFETY AND SECURITY 8/10 7p 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,8/11 44p

DIVISION 31 - EARTHWORK

31 23 00.00 20 EXCAVATION AND FILL, 2/11 10p

DIVISION 33 - UTILITIES

33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING, 11/9 11p 33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION, 11/8 20p 33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND, 11/8 29p 33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP), 4/6 18p

DRAWINGS

Hill AFB B850 Bay G Cleanroom Note: All attachments 1- 73 are one page, dated 03/02/15 Title Sheet# Sheet Title G-001 Title Sheet G-002 Renovate Southern Bay G Sheet Index CU-100 Utility Overall Plan CU-101 Utility Plan CU-501 Civil Detals C-101 Overall Site Plan C-102 Site Plan C-103 Site Details D-101 Demolition Plan A-101 Floor Plan A-102 Floor Plan A-201 Exterior Evaluation A-301 Building/Wall Sections A-401 Enlarged Plans A-402 Interior Evaluations A-601 Finish Floor Plan A-602 Schedules A-650 Equipment Plan A-701 Reflected Ceiling Plan M-000 Mechanical Symbols M-001 Mechanical General Notes M-002 Mechanical Comcheck M-101 Mechanical Plan M-102 Mechanical Roof Plan M-301 Mechanical Sections M-401 Enlarged Mechanical Plans M-501 Mechanical Details M-601 Mechanical Schedules M-602 Mechanical Schedules M-603 Mechanical Schedules M-701 Mechanical Schematics M-702 Mechanical Schematics M-703 Mechanical Schematics M-704 Mechanical Schematics M-705 Mechanical Schematics MPD-101 Mechanical Piping MP-101 Mechanical Piping Plan P-101 Plumbing Plan P-102 Natural Gas Plan P-501 Plumbing Details P-601 Plumbing Schedules LG-101 Lab Gas Plan LG-102 Lab Gas Schematics HP-101 Hydraulic Power Pack Pipe/Isometric Supply Lines HP-102 Hydraulic Power Pack Pipe Isometric-Return Lines HP-103 Hydraulic Power Pack System P&D Legend and Symbols HP-104 Hydraulic Power Pack System P&D HP-105 Hydraulic Power Pack System Standard Pipe Hanger Support EE-001 Symbol Schedule Index Sheet EE-601 Panel Schedules EE-602 Panel Schedules EE-603 Panel Schedules ES-101 Electrical Site Plan ED-101 Demolition Plan EP-101 Power Plan EP-102 Roof Power Plan EP-401 Enlarged Power Plan EP-402 Enlarged Power Plan EP-601 Details EP-502 Details EP-503 Details EP-601 Demolition one line diagram EP-602 New one line diagram EP-603 Equipment Schedule EL-101 Lighting Plan EL-601 Lighting Fixture Schedule EY-101 Auxiliary Plan EY-501 Auxiliary Plan EY-601 Auxiliary Diagrams FA-101 Pipe Alarm Plan FA-601 Pipe Alarm Details FP-101 Fire Protection Plan FP-601 Fire Protection Details

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .