Asbestos_Report_Bldg-850_Bay_G_WO57154.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
Bldg. 850 G Renovate For New Workload Federal contract opportunity
Solicitation number
FA8201-16-B-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Asbestos Report Bldg. 850 bay G

View the file

Other files for this federal contract opportunity

Other files attached to Bldg. 850 G Renovate For New Workload, newest first.
File Type Posted
060316_Specification.pdf PDF
060316_Cleanroom_HVAC_Loads.pdf PDF
Bldg_850_Amend_04_Solicit.docx DOCX document
062116_Drawings.pdf PDF
Projector_PT-RZ570.pdf PDF
Alltec_Screens_Manual_Screen_Info_and_Specifications.pdf PDF
B850_addendum1_QA-22_June_2016.pdf PDF
Bldg_850_Amend_03.docx DOCX document
060316_Cleanroom_HVAC_Loads.pdf PDF
General_Decision_Number_UT160104_22_April_2016_UT_104.pdf PDF
060316_Specification.pdf PDF
Answers_to_Contractor_Questions_-_B850_-_3_June_2016.pdf PDF
Amendment_02_-_FA8201-16-B-0002_-_Bldg_850_-_9_June_2016.pdf PDF
060316_Drawings.pdf PDF
BLD_850_Site_Visit_List.pdf PDF
BLDG_850_AMEND_01.docx DOCX document
General_Decision_Number.docx DOCX document
614162_-_HAFB_B850_Cleanroom.pdf PDF
Lead_Paint_Bldg-850_Bay_G_WO57154.xlsx XLSX spreadsheet
TAB_K__1_Aug_11.pdf PDF
APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_March_2015.docx DOCX document
_3-3-15_SPECS_Final_Combined.pdf PDF
BLDG_850_bay_G_Solicitation_R3.doc DOC document
BASE_FACILITY_DESIGN_STANDARD.docx DOCX document
_Submittal_Register.pdf PDF
Final_B850_Design_Analysisr1.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DEPARTMENT OF THE AIR FORCE
75 CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
LIMITED ASBESTOS INSPECTION REPORT,HILL AFB BUILDING, 850 BAY G
REMODEL BAY FOR NEW WORKLOAD
Date Requested:January 2016Inspection Date:24 February 2016
Requester:Cary HawsInspector:Chase Johnson (Utah Certified Asbestos Inspector ASB#-5645)
Organization:309 MMXG
Location & Building:HILL AFB BUILDING, 850 BAY G
Work Order:57154
Affected Area:South Section Bay G
Statement of Work:Remodel South section of bay G to include 3,000 square feet of 100k cleanroom and 4,000 square feet of 300k cleanroom.
Design any necessary mechanical rooms, production space.

This inspection was performed in accordance with the Utah Division of Air Quality (DAQ) requirements as found in the Utah Air Quality Rule R307-801-10. This inspection report is required to be on site during all abatement, renovation, and demolition activities. Samples referenced in this report were analyzed by polarized light microscopy (PLM) utilizing method 600R-93-116 by The Science and Engineering laboratory at Hill Air Force Base, Utah.

Civil Engineering personnel also reviewed previous asbestos inspection reports of suspect asbestos containing building materials (ACM) that could potentially be encountered in this area. The information gathered from all current and previous inspections is shown below by homogenous area.

SUMMARY OF ASBESTOS CONTAINING MATERIALS FOUND

MATERIAL TYPEASBESTOSFRIABILITY (During Removal)**RACM *Category I *Category IIQUANTITY*LOCATIONS FOUND
Thermal System Hard Pipe InsulationAssumeFriableRACM200 Linear FeetSouth Section Bay G
Thermal System Hard Pipe Fitting InsulationAssumeFriableRACM20 Linear FeetSouth Section Bay G
*Per UDAQ definition.
RACM: Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation project operations.
Category I Non-Friable ACM: Asbestos-containing packings, gaskets, resilient floor coverings, or asphalt roofing products containing more than 1% asbestos as determined by using the method specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM).
Category II Non-Friable ACM: Any material, excluding Category I non- friable ACM, containing more than 1% asbestos as determined by using the methods specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Locations found: Locations of building materials as described in this report indicate where they were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project.
Summary of materials containing ≤1% was identified via "Point Counting". ≤1% is not considered to be an asbestos containing material, but special handling/packaging requirements are necessary per OSHA 29CFR 1926.1101 and 29CFR 1910.1001
MATERIAL TYPEASBESTOSQUANTITY*LOCATIONS FOUND
N/AN/AN/AN/A

The following is a list of the "Suspect Materials" that were sampled as part of this inspection:

Drywall/Joint Compound Wall System

A total of3samples reference the1suspect materials assesses as part of the inspection.
The following table summarizes the sampling data.
Homogenous Building Material, Description, Location, Quantity.Sample #Sample LocationResults
Drywall/Joint Compound Wall System, Bay G, 200 Square FeetGM160807East, Bay GNone Detected
GM160808Southeast, Bay GNone Detected
GM160809Southwest, Outside RestroomsNone Detected

Per EPA requirements, all materials analyzed as containing ≤10% asbestos are point counted utilizing EPA method 600/R-93/116.

POTENTIAL FOR ADDITIONAL MATERIALS:
This inspection report only encompasses the areas/materials designated within this report. Should the scope of the project be altered in any way or any materials found that are not identified in this report shall require additional assessment. This report cannot be used for any other projects within the building.
This report was inspected by:
Chase Johnson (Utah Certified Asbestos Inspector ASB#-5645)
of the 75 CES/CEOHA Asbestos/LBP Shop.
Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance.

CONTACT INFORMATION

Asbetsos/LBP Shop 75 CES(CEOHA)

Supervisor: Nickolas King:DSN: (801)586-7094Asbestos/LBP Shop (801)777-8006
Cell: (801)430-4785

Building: 850 Bay G

Remodel South Section Bay GWO#: 57154
&P24 March 2016

1335 Hours

Sheet2

Traver Andreasen (Utah Certified Asbestos Inspector ASB#-4397)
Chase Johnson (Utah Certified Asbestos Inspector ASB#-5645)
Nickolas King (Utah Certified Asbestos Inspector ASB#-2257)
Raudel Arteaga (Utah Certified Asbestos Inspector ASB#-5863)

image1.emf image2.png